OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files ›...

33
1 of 33 © 2019 View, Inc. Rev 5 | July 2019 OVERVIEW GUIDE QDM-05-000022 Installation Overview

Transcript of OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files ›...

Page 1: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

1 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE QDM-05-000022

Installation Overview

Page 2: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

2 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

View responsibilities:

1. Shipment of IGUs, System Controls, programming and commissioning.

2. The View Project Manager will guide the project team successfully through the implementation process.

3. Provide all product documentation including IGU, roof sensor, control panel, Wall Controls, BMS integration, window controller, and wiring datasheets.

4. Provide Preliminary Interconnect and Final Interconnect Drawings.

5. Provide training on proper installation of all View equipment and best practices.

6. Provide IGU and System Controls shipments on committed ship dates.

7. Mobilize Field Service Engineers to perform functional hardware testing and commissioning.

8. Mobilize Customer Success Manager to work directly with end user during the construction phase and end phase to customize system and provide occupant training.

9. Provide a turnover package and operations training.

10. Provide warranty, support and service.

Responsibilities: Installation Scope of Each Trade

Page 3: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

3 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Glazier responsibilities:1. Provide the shop drawings of Dynamic Glass usage as specified by the architect.

2. Provide the final IGU sizes and makeup, IGU cable lengths and routing in the glazing system, phased shipment schedule, and packaging needs.

3. Provide safe and secure storage of View materials until building is ready for installation.IGU installation in facade with IGU cable stubbed out to agreed upon accessible location for easy hand-off to Low-Voltage Contractor or Electrician.

4. IGU installation in facade with IGU cable stubbed out to agreed upon accessible location for easy hand-off to Low-Voltage Contractor or Electricial.

5. Label all IGU cables per View interconnect drawing. Glazier responsible for testing each IGU post installation using the 4-state controller (provided by View), after testing is completed, label each cable with green “TESTED” label (green “TESTED” labels provided by View).

6. Provide glazier support during View functional hardware testing and commissioning phase, glazing contractor shall be responsible for repairing items identified by the View FSE during functional hardware testing and commissioning phase.

Page 4: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

4 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

1. Define location of System Controls including control panel location, roof sensor, window controller location, trunk cable routing, and drop cable routing (based on View’s design guidelines and datasheets). Provide final lengths of all cabling based on View’s Preliminary Interconnect Drawing that will result in the System Controls Bill of Materials (BOM).

2. Define any phased delivery needs based on the construction plans.

3. Installation of Control Panels, trunk, power insert and drop cables, window controllers, roof sensor, Wall Interface Devices and WAPs (wireless access points).

4. Shall be responsible for all building penetrations, coring, raceways and sleeves necessary to accommodate View control cables. This work should be coordinated with glazing contractor and GC in accordance with local building codes.

5. If IGU cable needs to be extended, LVE shall test using 4-state controller and provide green tested labels.

6. Responsible for labeling all trunk lines, power insert lines and IGU cables per View interconnect drawing.

7. Responsible for testing each IGU post installation using the 4-state controller (provided by View), after testing is completed, label each cable with green “TESTED” label (green “TESTED” labels provided by View).

8. Provide field support as needed during functional hardware testing and commissioning phase, Low-Voltage contractor shall be responsible for repairing items identified by the View FSE during functional hardware testing and commissioning phase. Any billable hours for troubleshooting should be coordinated with the GC.

Low Voltage Contractor or Electrician responsibilities:

Page 5: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

5 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

9. Keep track of all cable and equipment changes including lengths, locations and cable pathways. Provide accurate redline drawings to View Project Manager at completion of project.

10. Electrician to provide stable power prior to functional hardware testing and commissioning.

11. Responsible for all network connections between View equipment (control panels, sky sensor, wall controls and WAPs).

12. LVE may be responsible for installing IGU cables into the glazing system based on Union guidelines.

13. Assist VIEW FSE during functional hardware testing.

14. Take delivery and provide safe and secure storage of View materials until building is ready for installation.

Page 6: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

6 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Glazier scope (in green) and LVE scope (in red)

Low Voltage Electrician

Glazier

Page 7: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

7 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Viewing from inside out

IGU TesterUsed to test

the IGUs

IGU

IGU Cable

Illustration Purposes OnlyNot to scale

Ring Photo Sensor

10

IGU Smart Window Connector

Basic components for Glaziers (IGU testing equipment is provided by VIEW)

Page 8: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

8 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

https://view.com/training

Training Videos Available

Glazier Installation Video

Page 9: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

9 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Below is a table showing an example IGU quantity for a 10,000 sq. ft. (glass area) building. Also shown are the expected additional installation labor minutes per IGU and extended total labor hours accounting for the total number of IGUs. This additional installation time is related to the glazier preparing the IGU frames by drilling holes, deburring hole edges or inserting silicone grommets, and sealing penetrations with silicone as needed to route View cable per View interconnect drawings. Glazier is also responsible for labeling IGU cables per View interconnect drawing. Glazier responsible for testing each IGU post installation using the 4-state controller (provided by View), after testing is completed, label each cable with a green “TESTED” label (green “TESTED” labels provided by View). In this example, we are using $100.00/hr. for the labor rate. We suggest using local market labor rates for this project.

For this example, the IGU and Smart Window Connector are shown in the chart below. The IGU Smart Window Connector will be connected to the IGU cable by the glazing contractor and needs to be made accessible for the LV Electrician.

DEVICE/ITEM QTYLABOR

MINUTES PER DEVICE

ESTIMATED TOTAL LABOR

HOURSLABOR RATE TOTAL

IGU 500 10 83.33 $100.00 $8,333.00

Glazing Installation Labor Estimate Example

Page 10: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

10 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

TYPICAL ELEVATIONSCALE: NONE

1 --3 --

2 --

5--

4--

DETAIL 1HEAD

DETAIL 3SILL

DETAIL 2HORIZONTAL MULLION, SILICONE GLAZED

DETAIL 5LEFT JAMB

DETAIL 4VERTICAL MULLION, SILICONE GLAZED

7/16" DIA. HOLE FOR IGU CABLE TOSMART WINDOW CONNECTOR (SWC) .FILE ALL EDGES SMOOTH.FILL WITH SILICONE SEALANT.

7/16" DIA. HOLES FOR IGU CABLESAT ALL VERTICALS. REQ. (1) PER IGUCABLE. FILE ALL EDGES SMOOTH.

IGU CABLE CONNECTION TO IGUSMART WINDOW CONNECTOR(SWC) IN GLASS POCKET

7/16" DIA. HOLE FOR IGU CABLE TO SMARTWINDOW CONNECTOR (SWC) . FILE ALL EDGESSMOOTH. FILL WITH SILICONE SEALANT.

7/16" DIA. HOLE FOR IGUCABLE TO SMART WINDOWCONNECTOR (SWC) . FILEALL EDGES SMOOTH. FILLWITH SILICONE SEALANT.

7/16" DIA. HOLE FOR IGUCABLE TO SMART WINDOWCONNECTOR (SWC) . FILEALL EDGES SMOOTH. FILLWITH SILICONE SEALANT.

IGU CABLE CONNECTION TO SMARTWINDOW CONNECTOR (SWC) IN 7/16"HOLE. LAY REMAINDER OF SMARTWINDOW CONNECTOR (SWC) IN GLASSPOCKET.

WRAP ZIP TIE AROUND END OF SMARTWINDOW CONNECTOR (SWC) CONNECTORTO RETAIN SMART WINDOW CONNECTOR(SWC) ACCESSIBLE IN GLASS POCKET FORSERVICE.

7/16" DIA. HOLES FOR IGU CABLESAT ALL VERTICALS. REQ. (1) PER IGUCABLE. FILE ALL EDGES SMOOTH.

IGU CABLE CONNECTION TOSMART WINDOW CONNECTOR(SWC) IN 7/16" HOLE. LAYREMAINDER OF SMART WINDOWCONNECTOR (SWC) IN GLASSPOCKET.

WRAP ZIP TIE AROUND END OF SMART WINDOW CONNECTOR(SWC) CONNECTOR TO RETAIN SMART WINDOW CONNECTOR(SWC) ACCESSIBLE IN GLASS POCKET FOR SERVICE.

IGU CABLE CONNECTION TO IGUSMART WINDOW CONNECTOR(SWC) IN GLASS POCKET

VIEW, INC.®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035v. 408/263.9200www.viewglass.com

Mar

ch 2

6, 2

019

PLO

T D

ATE

:

: THIS DOCUMENT ANDTHE INFORMATION CONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSED IN WHOLE OR INPART WITHOUT THE EXPRESS WRITTEN CONSENT OF

.

VIEW INC. CONFIDENTIAL

VIEW, INC ®

®

SCALE:1 INSTALLATION DETAILS: CURTAINWALL - FOR ARCADIA Ti BEAM 3 SERIES, SSGNONE

Glazier Shop Drawings

Page 11: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

11 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Input Power100-240 VAC

View TouchDisplay

Sky Sensor

Fiber OpticConnection

Input Power110-120 VAC

Cell ModemAssembly

12

Sky Sensor

11

IGU

01

IGU Smart Window Connector

08 08

IGU Cable

07IGU Cable

07

Power Insert Cable

09

Trunk Cable

02

Trunk Connector (WYE)

03

Trunk Connector (TEE)

03

Trunk Terminator10

Drop Cable

05

Window Controller06

Window Controller

06

View ControlPanel

Power Insert Connector

Viewing from inside out

NetworkConnection

Network or Cell Modem Connection

02 03 04 05 06 07 08 09 10 11 13

IGU Smart Window Connector

Components of View Control System without Dropbox

Page 12: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

12 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Basic Control System Components Descriptions

Cabling SystemThe View cabling system uses a trunk line/drop line net-work topology. In this topology, the trunk cable carries both power and data through the entire length of the installation. Drop cables are then tapped off of the trunk cable using trunk connectors at locations where window controllers are installed. The window controllers are then connected to individual IGU units via an IGU cable. Note: Component data sheets will supersede the information found here.

01 02 03 04 05 06 07 08 09 10 11 12Control PanelWall-mounted enclosure (21” x 29” x 9”) that contains the power supplies, master controller, as well as auxiliary con-nections such as Ethernet and external sensors. At least one control panel is required for each installation. Each control panel can support up to 256 window controllers. For larger or multi-floor installations, multiple control panels may be required. Each Control Panel requires a dedicated 20-amp circuit (20-amp@120 VAC or 10-amp @240VAC).

Specifications for Control Panel:Input AC 100-240V + 15%Frequency 50-60 Hz + 6%Output Class 2 24 VDC

01 02 03 04 05 06 07 08 09 10 11 12Trunk CablePre-terminated cables fitted with 7/8”, 5-pin connectors. Sim-ple, hand-screw connection with no special tools required.

Specifications for Trunk Cabling:• Max combined length approx. 1,500’• Available in lengths from 1’ to 160’ (meter or fractional

meter increments)• Available in standard and plenum rated cables

01 02 03 04 05 06 07 08 09 10 11 12Trunk ConnectorsUsed to connect drop cables to the trunk cable. Connectors available in both “Tee” and “Wye” configurations for installa-tion flexibility.

01 02 03 04 05 06 07 08 09 10 11 12Drop CableProvides power and data to the window controller. Ties into the trunk cable via the trunk connector.

Specifications for Drop Cabling:• Available in lengths from 1’ to 32.9’ (meter or fractional

meter increments)• Available in standard and plenum rated cables

01 02 03 04 05 06 07 08 09 10 11 12Window ControllerFacilitates power transmission to each IGU. Connected to a drop cable on one end and an IGU cable on the other end. Must be installed at an accessible, environmentally-controlled location. Typically one window controller is installed per IGU.

Specifications for Window Controllers:Input 24 VDCOutput Range between + 5 VDCDimensions 4-5/8” x 3/4” x 3/4”

01 02 03 04 05 06 07 08 09 10 11 12IGU CableConnects a window controller to the IGU Smart Window Connector cable.

Specifications for IGU Cabling:• Available in lengths from 1’ to 100’ (meter or fractional

meter increments)• Available in standard and plenum rated cables• Max combined length from the WC to the IGU is 100’

01 02 03 04 05 06 07 08 09 10 11 12IGU Smart Window ConnectorEach IGU receives power from the control system through an IGU Smart Window Connector. The Smart Window Connec-tor connector is embedded with a digital ID that is unique to that IGU’s dimensions and specifications.

Specifications for IGU Smart Window Connector:• ~12” length located 3” from corner. Location changes

based on shape and dimensions. See IGU data sheet for exact location.

• Requires 7/16” hole size

01 02 03 04 05 06 07 08 09 10 11 12Power Insert CableTransmits power from a power source to the trunk line via a power insert connector. The power insert cable is 14/4 wire (14-AWG/4-conductor) spool options.

For long trunk lines, power inserts may be required to provide appropriate power. The power inserts can originate from:

1. Power output ports from the control panel2. Standalone power injection panel (not shown in diagram)

Specifications for Power Insert Cabling:• Field wireable power insert cables available in up to

1,000’ spools• One power insert is typically required after every (24)

window controller connections• All power insert cables are plenum rated

01 02 03 04 05 06 07 08 09 10 11 12Trunk TerminatorInstalled at the end of each trunk line and also all unused trunk ports at the View control panel.

01 02 03 04 05 06 07 08 09 10 11 12Sky SensorUsed to detect external light and infrared levels. Data from the sensor is transmitted to the control panel for Intelligence. It is typically mounted on the roof top.

Specifications for Sky Sensor:• Connects to View control panel via CAT5 cable• Mounts to rooftop, must be clear of obstructions, 360-de-

gree view of the horizon

01 02 03 04 05 06 07 08 09 10 11 12Cell ModemUsed as a temporary network connection to the View Site Ops monitoring system. Requires 110/120VAC 60Hz.

01 02 03 04 05 06 07 08 09 10 11 12 Fiber Kit For connection of multiple control panels on a site:2 Optional Fiber-optic kits are available for network connec-tivity greater than 328’.

• Multi Mode fiber for distances greater than 328’ but less than 1500 feet.

• Single Mode fiber for distances greater than 1500 feet.• Maximum 2 Fiber Kits per Control Panel.

Page 13: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

13 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

01

IGU

08

Power Insert Cable

04

09

Trunk Terminator10

Drop Cable

05

Window Controller

06

View ControlPanel

Power Insert Connector

8 PortDrop Box

Viewing from inside out Viewing from inside out

Illustration Purposes OnlyNot to scale

IGU Cable

07

Trunk Cable02

Sky Sensor11

Input Power100-240 VAC

View TouchDisplay

Sky Sensor

NetworkConnection

Fiber OpticConnection

Input Power110-120 VAC

Cell ModemAssembly

12

Network or Cell Modem Connection

02 03 04 05 06 07 08 09 10 11 13

IGU Smart Window Connector

Components of View Control System with Dropbox

Page 14: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

14 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Basic Control System Components DescriptionsCabling SystemThe View cabling system uses a trunk line/drop line net-work topology. In this topology, the trunk cable carries both power and data through the entire length of the installation. Drop cables are then tapped off of the trunk cable using trunk connectors at locations where window controllers are installed. The window controllers are then connected to individual IGU units via an IGU cable. Note: Component data sheets will supersede the information found here.

01 02 03 04 05 06 07 08 09 10 11 12Control PanelWall-mounted enclosure (21” x 29” x 9”) that contains the power supplies, master controller, as well as auxiliary con-nections such as Ethernet and external sensors. At least one control panel is required for each installation. Each control panel can support up to 256 window controllers. For larger or multi-floor installations, multiple control panels may be required. Each Control Panel requires a dedicated 20-amp circuit (20-amp@120 VAC or 10-amp @240VAC).

Specifications for Control Panel:Input AC 100-240V + 15%Frequency 50-60 Hz + 6%Output Class 2 24 VDC

01 02 03 04 05 06 07 08 09 10 11 12Trunk CablePre-terminated cables fitted with 7/8”, 5-pin connectors. Sim-ple, hand-screw connection with no special tools required.

Specifications for Trunk Cabling:• Max combined length approx. 1,500’• Available in lengths from 1’ to 160’ (meter or fractional

meter increments)• Available in standard and plenum rated cables

01 02 03 04 05 06 07 08 09 10 11 128-Port Drop BoxA network distribution component used to connect multiple Drop Cables to a Trunk Line. The distribution component will have 8 Drop Cable connection ports.

01 02 03 04 05 06 07 08 09 10 11 12Drop CableProvides power and data to the window controller. Ties into the trunk cable via the trunk connector.Specifications for Drop Cabling:• Available in lengths from 1’ to 32.9’ (meter or fractional

meter increments)• Available in standard and plenum rated cables

01 02 03 04 05 06 07 08 09 10 11 12Window ControllerFacilitates power transmission to each IGU. Connected to a drop cable on one end and an IGU cable on the other end. Must be installed at an accessible, environmentally-con-trolled location. Typically one window controller is installed per IGU.

Specifications for Window Controllers:Input 24 VDCOutput Range between + 5 VDCDimensions 4-5/8” x 3/4” x 3/4”

01 02 03 04 05 06 07 08 09 10 11 12IGU CableConnects a window controller to the IGU Smart Window Connector cable.

Specifications for IGU Cabling:• Available in lengths from 1’ to 100’ (meter or fractional

meter increments)• Available in standard and plenum rated cables• Max combined length from the WC to the IGU is 100’

01 02 03 04 05 06 07 08 09 10 11 12IGU Smart Window ConnectorEach IGU receives power from the control system through an IGU Smart Window Connector. The Smart Window Connec-tor connector is embedded with a digital ID that is unique to that IGU’s dimensions and specifications.

Specifications for IGU Smart Window Connector:• ~12” length located 3” from corner. Location changes

based on shape and dimensions. See IGU data sheet for exact location.

• Requires 7/16” hole size

01 02 03 04 05 06 07 08 09 10 11 12Power Insert CableTransmits power from a power source to the trunk line via a

power insert connector. The power insert cable is 14/4 wire (14-AWG/4-conductor) spool options.

For long trunk lines, power inserts may be required to provide appropriate power. The power inserts can originate from:

1. Power output ports from the control panel2. Standalone power injection panel (not shown in diagram)

Specifications for Power Insert Cabling:• Field wireable power insert cables available in up to

1,000’ spools• One power insert is typically required after every (24)

window controller connections• All power insert cables are plenum rated

01 02 03 04 05 06 07 08 09 10 11 12Trunk TerminatorInstalled at the end of each trunk line and also all unused trunk ports at the View control panel.

01 02 03 04 05 06 07 08 09 10 11 12Sky SensorUsed to detect external light and temperature levels. Data from the sensor is transmitted to the control panel for Intelli-gence. It is typically mounted on the roof top.

Specifications for Sky Sensor:• Connects to View control panel via CAT5 cable• Mounts to rooftop, must be clear of obstructions, 360-de-

gree view of the horizon

01 02 03 04 05 06 07 08 09 10 11 12Cell ModemUsed as a temporary network connection to the View Site Ops monitoring system. Requires 110/120VAC 60Hz.

01 02 03 04 05 06 07 08 09 10 11 12 Fiber Kit For connection of multiple control panels on a site:Two optional fiber-optic kits are available for network con-nectivity greater than 328’.

• Multi Mode fiber for distances greater than 328’ but less than 1500 feet.

• Single Mode fiber for distances greater than 1500 feet.• Maximum 2 Fiber Kits per Control Panel.

Page 15: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

15 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

https://view.com/training

Training Videos Available

Low Voltage Systems Controls Installation Video

Page 16: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

16 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-0.1

4.29

.201

9 12

:39

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

THTI

TLE

SH

EE

T A

ND

SH

EE

TIN

DE

X

®

CONTRACTORSTREET ADDRESSCITY, STATE, ZIPCOUNTRY

PREPARED FOR: PROJECT:

195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035

TEL 408.263.9200 FAX 408.263.9228WWW.VIEW.COM

DYNAMIC GLASS CABLE AND COMPONENTINTERCONNECT DRAWINGS

GENERAL NOTES:

01 00.00.19 PRELIMINARY

PROJECT SCOPE:

REVISION SUMMARY:

INSTALLATION: CONTROLS AND DYNAMIC GLASS INTEGRATED INTOVIEW TRAINING PROJECT .

SHEET INDEX:

XG-0.1 TITLE SHEET X . . . . . . . . . . .XG-1.1.1 SYMBOLS, LEGEND & ABBREVIATIONS XXG-1.2.1 NETWORK DIAGRAM XXG-1.3.1 ONE LINE DIAGRAM - FLOOR 1, 2 XXG-2.1.1 TRUNK LAYOUT - FLOOR 1 XXG-2.2.1 TRUNK LAYOUT - FLOOR 2 XXG-2.R SKY SENSOR LAYOUT - ROOF XXG-3.0.1 BUILDING ELEVATIONS & ZONES - NORTH, EAST XXG-3.0.2 BUILDING ELEVATIONS & ZONES - SOUTH, WEST XXG-3.1.1 ENLARGED ELEVATIONS - NORTH, EAST XXG-3.2.1 ENLARGED ELEVATIONS - SOUTH, WEST XXG-4.01 INTERCONNECT- PATTERN 1, 2, 3, 4 XXG-4.02 INTERCONNECT- PATTERN 5, 6, 7 XXG-4.03 INTERCONNECT- PATTERN 8, 9, 10, P.I. XXG-5.0.1 INSTALLATION DETAILS - SYSTEM ACCESSORIES XXG-5.0.2 INSTALLATION DETAILS - SKY SENSOR XXG-5.1.1 WINDOW CONTROL PANEL DETAILS, TYPICAL XXG-6.01 BILL OF MATERIALS XXG-7.1.1 LOADING SCHEDULE - CP 1.1 XXG-7.1.2 LOADING SCHEDULE - CP 2.1 XXG-8.1.1 TYPICAL SYSTEM LAYOUT XXG-8.2.1 GLAZIER IGU CONNECTION DIAGRAMS XXG-9.1.1 DEVICE DETAILS AND SYMBOLOGY X

XG-9.2.1 FIELD WIREABLE CONNECTIONS AND PRETERMINATEDCORDSETS X

SH

EE

T S

TATU

S:

R

= R

EV

ISE

DX

=

INC

LUD

ED

- =

NO

T IS

SU

ED

ISS

UE

DA

TE:

ISS

UE

DE

SC

RIP

TIO

N:

00.0

0.19

PR

ELI

MIN

AR

Y

IGU SCOPE QTY: 248

· CREATED INTERCONNECT· TRAINED OTHERS

1. VIEW, INC. IS NOT RESPONSIBLE FOR CONNECTION / HANDLING ERRORS BY OTHERS.2. WINDOW CONTROL PANEL(S) SHALL BE INSTALLED AT LOCATION AS SHOWN ON THE DRAWINGS.3. ALL WORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND NATIONAL CODES.4. GENERAL LAYOUT SHOWN SHALL BE FOLLOWED, EXCEPT WHERE OTHER WORK MAY CONFLICT WITH

DRAWINGS.5. ALL EXPOSED EQUIPMENT AND PANELS MOUNTED IN OR ON EXTERIOR WALL SHALL BE WEATHER

RESISTANT AND RAIN TIGHT.6. WHERE ELECTRICAL RECEPTACLES, ELECTRICAL DISTRIBUTION PANELS OR ELECTRICAL SWITCHES

ARE INDICATED, IT IS FOR THE PURPOSE OF LOCATION AND COORDINATION.7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS.8. IF CONDUIT IS REQUIRED, INSTALL BY APPLICABLE CODE AND AUTHORITY HAVING JURISDICTION (AHJ)

REQUIREMENTS. (3/4” DIA. MIN.)9. ALL SYSTEM COMPONENT LOCATIONS AND CORD SET LENGTHS SHALL BE DETERMINED AND VERIFIED

BY CONTRACTOR PRIOR TO ORDERING FROM VIEW, INC.10. INTERCONNECT DIAGRAMS ARE NOT TO SCALE.11. CORD SETS ARE PRE-TERMINATED WITH CONNECTORS. FEMALE CONNECTORS LEAD FROM WINDOW

CONTROL PANEL. MALE CONNECTORS FACE TOWARD WINDOW CONTROL PANEL. OBSERVE GENDERWHEN INSTALLING.

12. TRUNK AND POWER CABLE CONNECTORS ARE 1.06”Ø X 1 7/8” LONG. ALLOW FOR ADEQUATEPENETRATION OR CONDUIT SIZE. CABLE SIZE 7/8”Ø NOMINAL.

13. INSTALLER SHALL PROVIDE CABLE HANGERS, J-HOOK OR OPEN BRIDLE RINGS EVERY 4 FEET (MAXSPACING) TO SUPPORT TRUNK, POWER OR IGU CABLES. (1M MAXIMUM IN CANADA)

14. INSTALLER SHALL PROVIDE J-HOOK (MIN 2” LOOP) AT WALL MOUNTED WINDOW CONTROLLERLOCATIONS TO COIL SLACK IGU CABLES. DO NOT HANG SLACK FROM WINDOW CONTROLLER. NEATLYCOIL AND HANG SLACK. VELCRO WRAP PREFERRED. DO NOT PINCH CABLES.

15. ALL CONNECTIONS TO BE MADE HAND TIGHT ONLY. DO NOT USE TOOLS TO TIGHTEN CONNECTORS.16. PROVIDE GROMMETS AT FRAME PENETRATIONS TO AVOID CABLE DAMAGE. FILE ALL ROUGH

OPENINGS SMOOTH - NO SHARP EDGES. PROVIDE RELIEF CUT IN FRAMING TO AVOID DAMAGE TOCORD SET AND/OR SMART WINDOW CONNECTOR (SWC).

17. SKY SENSOR SHALL BE MAST MOUNTED ON ROOF. ELEVATE SENSOR HEIGHT AS REQUIRED TO OBTAINCLEAR LINE OF SIGHT TO HORIZON FOR OPTIMUM SYSTEM PERFORMANCE.

18. THE FOLLOWING ITEMS ARE REFERENCED IN THIS DRAWING, BUT ARE NOT INCLUDED BY VIEW INCONTRACT AND SHALL BE PROVIDED BY OTHERS:

a. E.C. SHALL PROVIDE 120VAC, 60HZ, 20 AMP DEDICATED UNSWITCHED CIRCUIT WITH GREEN WIREEARTH GROUND TO VIEW WINDOW CONTROL PANEL. CONNECTION TO CRITICAL POWER SOURCEPREFERRED TO MAINTAIN WINDOW STATE IN THE EVENT OF A POWER FAILURE. UPSTREAMFACILITY CIRCUIT BREAKER SHALL BE UL489 LISTED. DO NOT SHARE GROUND OR NEUTRALS.

b. ETHERNET, NETWORK DROPS AT ALL CONTROL PANELS - SEE NETWORK DIAGRAM FOR QTY. c. ETHERNET, (1) PoE NETWORK CABLE AT PHOTO SENSOR ON ROOF.

19. WINDOW CONTROLLERS (WC) ARE PRELABELED WITH SPECIFIC DESIGNATIONS. INSTALLER MUSTENSURE THEY ARE PLACED PER INTERCONNECT DRAWINGS.

20. IGU CABLES SHALL BE LABELED BY THE INSTALLER WITH THE "IGU" NAME TO WHICH IT IS CONNECTED.SEE DETAIL 3, SHEET XG-9.2.1 FOR FURTHER INFORMATION.

VIEW TRAINING PROJECT18330 NOTHING ROADSOMEWHERE, CA 95000

Front Page of the Interconnect Drawing

Page 17: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

17 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

General Notes1. VIEW, INC. IS NOT RESPONSIBLE FOR CONNECTION /

HANDLING ERRORS BY OTHERS.2. WINDOW CONTROL PANEL(S) SHALL BE INSTALLED

AT LOCATION AS SHOWN ON THE DRAWINGS.3. ALL WORK SHALL BE IN ACCORDANCE WITH ALL

LOCAL, STATE AND NATIONAL CODES.4. GENERAL LAYOUT SHOWN SHALL BE FOLLOWED,

EXCEPT WHERE OTHER WORK MAY CONFLICT WITH DRAWINGS.

5. ALL EXPOSED EQUIPMENT AND PANELS MOUNTED IN OR ON EXTERIOR WALL SHALL BE WEATHER RESISTANT AND RAIN TIGHT.

6. WHERE ELECTRICAL RECEPTACLES, ELECTRICAL DISTRIBUTION PANELS OR ELECTRICAL SWITCHES ARE INDICATED, IT IS FOR THE PURPOSE OF LOCATION AND COORDINATION.

7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS.

8. IF CONDUIT IS REQUIRED, INSTALL BY APPLICABLE CODE AND AUTHORITY HAVING JURISDICTION (AHJ)REQUIREMENTS. (3/4” DIA. MIN.)

9. ALL SYSTEM COMPONENT LOCATIONS AND CORD SET LENGTHS SHALL BE DETERMINED AND VERIFIED BY CONTRACTOR PRIOR TO ORDERING FROM VIEW, INC.

10. INTERCONNECT DIAGRAMS ARE NOT TO SCALE.11. CORD SETS ARE PRE-TERMINATED WITH

CONNECTORS. FEMALE CONNECTORS LEAD FROM WINDOW CONTROL PANEL. MALE CONNECTORS FACE TOWARD WINDOW CONTROL PANEL. OBSERVE GENDER WHEN INSTALLING.

12. TRUNK AND POWER CABLE CONNECTORS ARE 1.06”Ø X 1 7/8” LONG. ALLOW FOR ADEQUATE PENETRATION OR CONDUIT SIZE. CABLE SIZE 7/8”Ø NOMINAL.

13. INSTALLER SHALL PROVIDE CABLE HANGERS, J-HOOK OR OPEN BRIDLE RINGS EVERY 4 FEET (MAX SPACING) TO SUPPORT TRUNK, POWER OR IGU CABLES. (1M MAXIMUM IN CANADA)

14. INSTALLER SHALL PROVIDE J-HOOK (MIN 2” LOOP) AT WALL MOUNTED WINDOW CONTROLLER LOCATIONS

TO COIL SLACK IGU CABLES. DO NOT HANG SLACK FROM WINDOW CONTROLLER. NEATLY COIL AND HANG SLACK. VELCRO WRAP PREFERRED. DO NOT PINCH CABLES.

15. ALL CONNECTIONS TO BE MADE HAND TIGHT ONLY. DO NOT USE TOOLS TO TIGHTEN CONNECTORS.

16. PROVIDE GROMMETS AT FRAME PENETRATIONS TO AVOID CABLE DAMAGE. FILE ALL ROUGH OPENINGS SMOOTH - NO SHARP EDGES. PROVIDE RELIEF CUT IN FRAMING TO AVOID DAMAGE TO CORD SET AND/OR SMART WINDOW CONNECTOR (SWC).

17. SKY SENSOR SHALL BE MAST MOUNTED ON ROOF. ELEVATE SENSOR HEIGHT AS REQUIRED TO OBTAIN CLEAR LINE OF SIGHT TO HORIZON FOR OPTIMUM SYSTEM PERFORMANCE.

18. THE FOLLOWING ITEMS ARE REFERENCED IN THIS DRAWING, BUT ARE NOT INCLUDED BY VIEW IN CONTRACT AND SHALL BE PROVIDED BY OTHERS:

a. E.C. SHALL PROVIDE 120VAC, 60HZ, 20 AMP DEDICATED UNSWITCHED CIRCUIT WITH GREEN WIRE EARTH GROUND TO VIEW WINDOW CONTROL PANEL. CONNECTION TO CRITICAL POWER SOURCE PREFERRED TO MAINTAIN WINDOW STATE IN THE EVENT OF A POWER FAILURE. UPSTREAM FACILITY CIRCUIT BREAKER SHALL BE UL489 LISTED. DO NOT SHARE GROUND OR NEUTRALS. b. ETHERNET, NETWORK DROPS AT ALL CONTROL PANELS - SEE NETWORK DIAGRAM FOR QTY. c. ETHERNET, (1) PoE NETWORK CABLE AT PHOTO SENSOR ON ROOF.

19. WINDOW CONTROLLERS (WC) ARE PRELABELED WITH SPECIFIC DESIGNATIONS. INSTALLER MUST ENSURE THEY ARE PLACED PER INTERCONNECT DRAWINGS.

20. IGU CABLES SHALL BE LABELED BY THE INSTALLER WITH THE “IGU” NAME TO WHICH IT IS CONNECTED. SEE DETAIL 3, SHEET XG-9.2.1 FOR FURTHER INFORMATION

Page 18: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

18 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Symbols, Legends and Abbreviations Used

#X##

WC-#X##

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-1.1.1

4.29

.201

9 12

:39

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

THS

YM

BO

LS, L

EG

EN

D A

ND

AB

BR

EV

IATI

ON

S

REFERENCE SYMBOLS LEGEND:

KEY CODE:

INTERCONNECT ABBREVIATIONS:

INSTALLATION GENERAL NOTES:

A.F.F. ABOVE FINISHED FLOORAWG AMERICAN WIRE GAUGEBLDG BUILDINGBOM BILL OF MATERIALSCB CIRCUIT BREAKERCBL CABLECKT CIRCUITCP CONTROL PANEL(E), EX. EXISTINGEC, E.C. ELECTRICAL CONTRACTORFF FINISHED FLOORFLR FLOOR (LEVEL)Hz HERTZIDF INTERMEDIATE DISTRIBUTION FRAMEI.T. INFORMATION TECHNOLOGYIGU INSULATED GLASS UNITGS GROUND STUDLAN LOCAL AREA NETWORKLV, L.V. LOW VOLTAGE (CONTRACTOR)M8K KEYED M8 CONNECTOR(N) NEWNC NETWORK CONTROLLERNTS NOT TO SCALE

N.I.S. NOT IN SCOPEPI, P.I. POWER INSERTP.O.C. POINT OF CONNECTIONPoE POWER OVER ETHERNETPM PROJECT MANAGERPT POWER TRANSFERSHLD SHIELDSWC SMART WINDOW CONNECTORTB TERMINAL BLOCKTBD TO BE DETERMINEDVAC VOLTS ALTERNATING CURRENTvLAN VIRTUAL LOCAL AREA NETWORKWC WINDOW CONTROLLERW.I. WALL INTERFACEw IGU IDENTIFIER4P 4 PIN5P 5 PIN

1. CORDSETS ARE PRETERMINATED WITH CONNECTORS. FEMALE CONNECTORS LEAD FROMWINDOW CONTROL PANEL. MALE CONNECTORS FACE TOWARD WINDOW CONTROL PANEL.OBSERVE GENDER WHEN INSTALLING.

2. CONNECTORS ARE KEYED TO RETAIN PROPER PINOUT. OBSERVE CONNECTOR KEY ATASSEMBLY. DO NOT FORCE CONNECTION OR USE TOOLS TO TIGHTEN.

3. TRUNK AND POWER CABLE CONNECTORS ARE 1.06" Ø x 1 7/8" LONG. IGU CABLE CONNECTORSARE 0.38" Ø x 1 1/4" LONG. ALLOW FOR ADEQUATE PENETRATION / CONDUIT SIZE.

4. TRUNK CABLE SIZE 7/8" Ø NOMINAL. IGU CABLE SIZE IS 3/8" Ø NOMINAL.

5. OBSERVE MINIMUM BEND RADII TO PREVENT CONDUCTOR AND INSULATION DAMAGE.STANDARD CABLE IS 8x DIAMETER. PLENUM CABLE IS 15x DIAMETER.

CABLE TYPE: DIAMETER: MINIMUM BEND RADIUS:TRUNK, STANDARD 0.45" 3.60"TRUNK, PLENUM 0.41" 6.15"IGU/DROP, STANDARD 0.31" 2.50"IGU/DROP, PLENUM 0.25" 3.75"

6. TRUNK CABLE AND POWER INSERT CABLE NAMES ARE SHOWN FOR REFERENCE TO TRACECABLE PATHS FROM END TO CONTROL PANEL. REFER TO ONE LINE DIAGRAMS FOR SPECIFICPORTS ON THE CONTROL PANEL TO CONNECT TO.

7. CONNECTION ORDER OF WINDOW CONTROLLER WITHIN GROUPS OF TEES OR ON DB-8BLOCKS DOES NOT MATTER. CONNECTION LOCATION RELATIVE TO POWER INSERT POINTSDOES MATTER. REFER TO ONE LINE DIAGRAMS FOR QUANTITY OF WINDOW CONTROLLERSWITHIN A POWER SESSION.

8. WINDOW CONTROLLER NAMES MUST BE MATCHED TO THE IGU THEY ARE CONNECTED TO.LABELING OF IGU CABLES IS RECOMMENDED TO AID IN PROPER INSTALLATION.

1XG-X.X.X

ELEVATION OR SECTIONORIENTATION

REFERENCE NUMBER

SHEET NUMBER

1XG-X.X.X

1XG-X.X.X

DETAIL LOCATION

DETAIL NUMBER

SHEET NUMBER

KEYED NOTE NUMBER

WINDOW FRAME ID NUMBER

11.01

A1

1

#-# BOM REFERENCE NUMBERREFER TO "FIND" COLUMN

INTERCONNECT PATTERN NUMBER

PATTERN - FLOOR . INSTANCE

1 REFERENCE TAG NUMBERREFER TO TABLE ON SAME SHEET

# X ##

TRUNK CABLE, 7/8" 5-PIN CONNECTORS

TRUNK CABLE- PLENUM, 7/8" 5-PIN CONNECTORS

POWER INSERT CABLE, 4-PIN CONNECTORS(FIELD TERMINATED)

WINDOW CONTROL PANEL, MAXIMUM 128 WINDOW CONTROLLERS (2 TRUNKS, 6 POWER INSERTS)

WINDOW CONTROL PANEL, MAXIMUM 256 WINDOW CONTROLLERS

ENTERPRISE MASTER SERVER(RACK MOUNT, OPTION FOR LARGER PROJECTS >2,000 ZONES)

DROP CABLE, M8 MALE, M12 FEMALE CONNECTORS

DROP CABLE- PLENUM, M8 MALE, M12 FEMALE CONNECTORS

IGU CABLE, M8 CONNECTORS

IGU CABLE- PLENUM, M8 CONNECTORS

LARGE CONNECTOR - TRUNK TEE

LARGE CONNECTOR - TRUNK WYE - MALE

LARGE CONNECTOR - TRUNK WYE - FEMALE

LARGE CONNECTOR - TRUNK 90 DEGREE ELBOW

LARGE CONNECTOR - TRUNK TERMINATOR

LARGE CONNECTOR - POWER INSERT TEE

LARGE CONNECTOR - POWER INSERT WYE

WINDOW CONTROLLER, BASE, v2.0

CAT6 NETWORK CABLE (NOT BY VIEW)

FIBER OPTIC CABLE, MULTI-MODE (NOT BY VIEW)

FIBER OPTIC CABLE, SINGLE MODE (NOT BY VIEW)

DATA CONNECTION (NOT BY VIEW)

DEVICENET DROP BOX, 8 - PORT - INSTALL PROTECTIVECAPS (P/N: 050-101183) ON ALL UNUSED PORTS

WALL INTERFACE, ASSEMBLY

SKY PHOTO SENSOR (PoE DEVICE) - E.C. TO PROVIDE CAT5E (ORGREATER) CABLE FROM NEAREST CONTROL PANEL LOCATION TOROOF OR DEVICE MOUNTING LOCATION (100 M MAXIMUM)

CABLE TRANSFER, SLIDING(INSTALLATION KIT ALSO PROVIDED)

CABLE TRANSFER, SPRING CONDUIT(VERIFY FINISH AND SIZE)

CABLE TRANSFER, CONCEALED(VERIFY FINISH)

CABLE TRANSFER, ARMORED DOOR LOOP(VERIFY FINISH AND SIZE)

WIRELESS ACCESS POINT (WAP)

REMOTE POWER INSERT BOX

CELL MODEM

#X##

IGU LABELINGWINDOW CONTROLLER NAME

FLOOR NUMBER (LEVEL) FACADE ORIENTATION (N, E, S, W)WINDOW COUNT

IGU LABEL / WINDOWCONTROLLER NAME

IGU SMART WINDOWCONNECTOR (SWC) LOCATION(3" FROM CORNER)

IGU CONNECTOR (M8 FEMALE)

WINDOW CONTROLLER NAME

IGU CONNECTOR (M8 MALE)

INTERCONNECT SYMBOLS LEGEND:

FIND LABEL (BOM) SYMBOL DESCRIPTIONDIAGRAM SYMBOLSHOWN ON PLANS

WT

PI

WT

MALE

CAT6 CAT6

F/O mm F/O mm

CP #.#

CP #.#

CONNECTION POINTFIXED LENGTH

F/O sm F/O sm

WTPI PI

MALE FEMALE

FEMALEMALE

MALE FEMALE

FEMALE

FEMALE

FEMALE

FEMALE

MALE

MALE

MALE

MALE

MALE FEMALE

MALE

MALE

FEMALE

FEMALE

EIC-1

REFERENCE BORDER:

· AREA OF PATTERN· AREA OF CONTROL ZONE· LOCATION OF AUXILIARY

ELEVATION

10XG-9.1.1

DETAIL REFERENCE

11XG-9.1.1

1 - 4XG-5.0.4

1XG-5.1.1

4XG-9.1.1

6XG-9.1.1

5XG-9.1.1

2XG-9.1.1

8XG-9.1.1

7XG-9.1.1

3XG-9.1.1

12XG-9.1.1

1XG-9.1.1

2XG-5.0.1

1XG-5.0.3

1 - 3XG-5.0.2

9XG-9.1.1

CONNECTION POINT

2XG-9.2.1

MALE

1XG-5.0.1PWR

24V

CELL (US)

WAP

W.I.

3XG-5.0.1

1'0"

1'0" P

CBL-14/4P

CP2-128N

CP2-256N

EIC-1

1'0"

1'0" P

1'0"

1'0" P

LC-1

LC-2

LC-3

LC-4

LT-M

PT-1

PY-1

WC-B

DB-8

WI-K

SSA

PB-2

CP-ME

SC6-A

DPT-A

SICM-1

DL-A18

WAP-W

# X ##

FLOOR NUMBER (LEVEL) FACADE ORIENTATION (N, E, S, W)WINDOW COUNT

MALEFEMALE

Page 19: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

19 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Detail Example2

XG

-3.1

.1

2X

G-3

.2.1

1X

G-3

.2.1

1X

G-3

.1.1

3--

4--

2E37

2E36

2E35

2E34

2E33

2E32

2E31

2E30

2E29

2E28

2E27

2E26

2E25 2E24 2E22

2E23 2E21

2E20

2E19

2E18

2E17

2E16

2E15

2E14

2E13

2E12

2E11

2E10

2E09

2E08

2E07

2E06

2E05

2E04

2E03

2E02

2E01

1E22 1E20 1E18 1E16 1E14 1E12 1E10 1E08 1E06 1E04 1E02

1E21 1E19 1E17 1E15 1E13 1E11 1E09 1E07 1E05 1E03 1E01

1E26

1E25

1E241E

23

XW15

XW14

XW13

XW12

XW11

XW10

XW09

XW08

XW07

XW06

XW05

XW04

XW03

XW02

XW01

XE

06

XE

04

XE

02

XE

05

XE

03

XE

01

2N13

1N13

2N12

1N12

2N11

1N11

2N10

1N10

2N09

1N09

2N48

2N47

1N55

1N54

2N46

2N45

1N53

1N52

2N42

2N41

1N48

1N47

2N40

2N39

1N46

1N45

2N38

2N37

1N44

1N43

2N36

2N35

1N42

1N41

2N34

2N33

1N40

1N39

2N32

2N31

1N38

1N37

2N30

2N29

1N36

2N28

2N27

1N33

1N32

2N26

2N25

1N31

1N30

2N24

2N23

1N28

1N27

1N29

2N22

2N21

1N25

1N24

1N26

2N20 2N19 2N17

2N16

1N18

1N17

1N19

2N15

2N14

1N15

1N14

1N16

1N51

2N44

2N43 2N18

1N23

1N22

1N21 1N201N35

1N34

1N50

1N49

2N08

2N07

2N06

2N05

2N04

2N03

2N02

2N01

1N08

1N07

1N06

1N05

1N04

1N03

1N02

1N01

WT WT WT WT WT WT WT WT WT WT WT WT

WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT WT

WT WT WT

WTWTWTWTWTWTWTWTWTWTWT

WT WT WT WT WT WT WT WT WT WT WT WT WTWTWTWTWTWTWTWTWTWTWTWTWTWTWTWT

WTWTWTWTWTWTWTWTWTWTWTWT

LT-M

LT-M

LT-M

LT-M

TRUNK 1.1B

TRUNK 2.1B TRUNK 2.1A

TRUNK 1.1A

TRUNK 2.1A

TRUNK 1.1A

TRUNK 2.1ATRUNK 2.1BTRUNK 2.1C

TRUNK 1.1B

P.I. 1.1A

P.I. 1.1C

P.I. 2.1D P.I. 2.1A P.I. 2.1B P.I. 2.1C

P.I. 2.1F P.I. 2.1E

P.I. 1.1B

102.01

102.03

102.04

82.07

82.08

82.06

82.05

82.04

52.01

62.01

52.02

12.01

12.02

12.03

31.01

11.01

41.01

81.07

81.08

81.06

81.05

81.04

101.01

101.02

101.03

101.04

11.03

11.02

21.01

12.04

12.05

12.06

92.01

92.02

92.03

92.04

82.01

81.01

81.02

81.03

82.01

82.02

82.03

72.01

2XG-4.03

2XG-4.01

1XG-4.01

102.02

3XG-4.02

3XG-4.01

4XG-4.01

2XG-4.02

1XG-4.02

1XG-4.03

3XG-4.03

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-3.1.1

4.29

.201

9 12

:40

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

THE

NLA

RG

ED

ELE

VA

TIO

N -

NO

RTH

, EA

ST

SCALE:1 ELEVATION - NORTH3/16" = 1'-0"

SCALE:2 ELEVATION - EAST3/16" = 1'-0" SCALE:3 AUX. ELEV. - WEST

3/16" = 1'-0" SCALE:4 AUX. ELEV. - EAST3/16" = 1'-0"

Page 20: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

20 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Detail Example 2

INTE

RC

ON

NE

CT

DIA

GR

AM

-P

ATT

ER

N 1

, 2, 3

, 4

PATTERN 1PART # FIND DESCRIPTION QTY ROUTING

370-000024 DB-8 DEVICENET DROP BOX, 8-PORT, LC5P-M/F, M5P-F 1 046010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 8 061

380-101510-02 D-2'0"P DROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M) 8 334380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 4 462380-101509-06 I-8'2"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 8' 2" (2.5M) 4 465380-101509-02 I-2'0"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 2' 0" (0.6M) 4 561380-101509-10 I-14'9"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 14' 9" (4.5M) 4 569

PATTERN 2PART # FIND DESCRIPTION QTY ROUTING

370-000002 LC-1 TEE, LRG CONN 5P-F, LRG CONN 5P-M, MED CONN 5P-F 2 041370-000024 DB-8 DEVICENET DROP BOX, 8-PORT, LC5P-M/F, M5P-F 1 046010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 10 061

380-000038-03 T-3'3"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 3' 3" (1M) 1 140380-101510-02 D-2'0"P DROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M) 10 334380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 4 462380-101509-06 I-8'2"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 8' 2" (2.5M) 2 465380-101509-08 I-11'5"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 11' 5" (3.5M) 4 467380-101509-02 I-2'0"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 2' 0" (0.6M) 5 561380-101509-05 I-6'6"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 6' 6" (2M) 2 564380-101509-08 I-11'5"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 11' 5" (3.5M) 1 567380-101509-10 I-14'9"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 14' 9" (4.5M) 3 569010-101596-01 DPT-A ASM, TRANSITION, POWER TRANSFER, CONCEALED, ALUMINUM, M8K 1 601

PATTERN 3PART # FIND DESCRIPTION QTY ROUTING

370-000002 LC-1 TEE, LRG CONN 5P-F, LRG CONN 5P-M, MED CONN 5P-F 1 041370-000024 DB-8 DEVICENET DROP BOX, 8-PORT, LC5P-M/F, M5P-F 1 046010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 9 061

380-000038-03 T-3'3"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 3' 3" (1M) 1 140380-101510-02 D-2'0"P DROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M) 9 334380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 5 462380-101509-06 I-8'2"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 8' 2" (2.5M) 4 465380-101509-02 I-2'0"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 2' 0" (0.6M) 3 561380-101509-05 I-6'6"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 6' 6" (2M) 4 564380-101509-10 I-14'9"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 14' 9" (4.5M) 3 569010-101596-01 DPT-A ASM, TRANSITION, POWER TRANSFER, CONCEALED, ALUMINUM, M8K 2 601

PATTERN 4PART # FIND DESCRIPTION QTY ROUTING

370-000002 LC-1 TEE, LRG CONN 5P-F, LRG CONN 5P-M, MED CONN 5P-F 1 041370-000024 DB-8 DEVICENET DROP BOX, 8-PORT, LC5P-M/F, M5P-F 1 046010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 9 061

380-000038-03 T-3'3"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 3' 3" (1M) 1 140380-101510-02 D-2'0"P DROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M) 9 334380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 4 462380-101509-06 I-8'2"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 8' 2" (2.5M) 5 465380-101509-02 I-2'0"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 2' 0" (0.6M) 3 561380-101509-05 I-6'6"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 6' 6" (2M) 4 564380-101509-10 I-14'9"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 14' 9" (4.5M) 3 569010-101596-01 DPT-A ASM, TRANSITION, POWER TRANSFER, CONCEALED, ALUMINUM, M8K 2 601

#X##

#X##

#X##

#X##

#X##

#X##

#X##

#X##

#X##

#X##

WTWTWTWTTO NEXTPATTERNSEE PLAN

WTWTWTWTTO CP

FROM PREV.PATTERNSEE PLAN

#X##

#X##

#X##

#X##

#X##

#X##

DB-8

2'0"P(x4)

WC-B(x4)

2'0"P

WC-BNOTES:1. CAP UNUSED PORTS ON WITH .2. CONNECT WINDOW CONTROLLERS TO

DB-8 PORTS IN ORDER THAT WILLPROVIDE THE CLEANEST INSTALL.

DB-8CAP-M-2

14'9" P

2'0"P

14'9" P

2'0"P

14'9" P

2'0"P

14'9" P

2'0"P

8'2"P(x2)

3'3" P(x2)

3'3" P(x2)

8'2"P(x2)

(x4)

(x4)

L.V.GLAZIER

L.V.GLAZIER

1E23

DPT-A

6'6"P

1E22

1E21

1E20

1E19

1E18

1E17

1E26

1E25

1E24

WT WT WT

LC-1

WT WT WTTO CP

FROM PREV.PATTERNSEE PLAN

(x2)

1E26

2'0"P

WC-B

1E25

(x2)

(x2)

1E23

1E24

1E22

1E21

NOTES:1. CAP UNUSED PORTS ON WITH .2. CONNECT WINDOW CONTROLLERS TO

DB-8 PORTS IN ORDER THAT WILLPROVIDE THE CLEANEST INSTALL.

DB-8CAP-M-21E

201E

19

2'0"P(x4)

WC-B(x4)

WT WT WT WTTO NEXTPATTERNSEE PLAN

DB-83'3"P

14'9" P

2'0"P

14'9" P

2'0"P

14'9" P

2'0"P2'0"P

2'0"P

6'6"P

11'5" P

3'3" P(x2)

3'3" P(x2)

1E18

1E17

2'0"P(x4)

WC-B(x4)

8'2"P(x2)

11'5" P(x4)

L.V.GLAZIER

L.V.GLAZIER

1N50 1N49

DPT-A

6'6"P

1N55

1N54

1N53

1N52

1N48

1N47

1N51

1N54

1N53

1N52

1N50

1N51

1N49

2'0"P(x4)

WC-B(x4)

DB-8

WT WT WT WTTO NEXTPATTERNSEE PLAN

LC-1

WT WTTO CP

FROM PREV.PATTERNSEE PLAN

1N55

WT WT WT

3'3"P

2'0"P

WC-BNOTES:1. CAP UNUSED PORTS ON WITH .2. CONNECT WINDOW CONTROLLERS TO

DB-8 PORTS IN ORDER THAT WILLPROVIDE THE CLEANEST INSTALL.

DB-8CAP-M-2

1N48

1N47

2'0"P(x4)

WC-B(x4)

8'2"P(x2)

6'6"P 6'6"P6'6"P2'0"P 2'0"P 2'0"P

14'9" P14'9" P

DPT-A

8'2"P(x2)

3'3"P(x3)

3'3"P(x2)

14'9" P

L.V.GLAZIER

L.V.GLAZIER

1N35 1N34

DPT-A

1N38

1N37

1N33

1N32

1N31

1N30

1N36

1N37

1N35

1N36

1N34

1N33

1N32

2'0"P(x4)

WC-B(x4)

DB-8

WT WT WT WTTO NEXTPATTERNSEE PLAN

LC-1

WT WTTO CP

FROM PREV.PATTERNSEE PLAN

WT WT WT

3'3"P

2'0"P

NOTES:1. CAP UNUSED PORTS ON WITH .2. CONNECT WINDOW CONTROLLERS TO

DB-8 PORTS IN ORDER THAT WILLPROVIDE THE CLEANEST INSTALL.

DB-8CAP-M-2

1N31

1N30

2'0"P(x4)

WC-B(x4)

8'2"P(x2)

2'0"P

14'9" P

1N38WC-B

2'0"P

14'9" P

6'6"P

DPT-A

6'6"P 6'6"P6'6"P2'0"P

14'9" P

8'2"P(x3)

3'3" P(x2)

3'3"P(x2)

L.V.GLAZIER

L.V.GLAZIER

SCALE:1 INTERCONNECT, PATTERN 1 ; THUS 9NONE SCALE:2 INTERCONNECT, PATTERN 2 ; THUS 1

NONE

SCALE:3 INTERCONNECT, PATTERN 3 ; THUS 1NONE SCALE:4 INTERCONNECT, PATTERN 4 ; THUS 1

NONE

L.V

.G

LAZI

ER

L.V

.G

LAZI

ER

L.V

.G

LAZI

ER

L.V

.G

LAZI

ER

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-4.01

4.29

.201

9 12

:40

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

TH

WINDOW CONTROLLERSMUST BE INSTALLED AT ANACCESSIBLE, ENVIRON-MENTALLY -CONTROLLEDLOCATION

Page 21: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

21 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Trunk Line Layout Example

POWER INSERT 2.1-1

POWER INSERT 2.1-2

POWER INSERT 2.1-3

POWER INSERT 2.1-4

POWER INSERT 2.1-5

POWER INSERT 2.1-6

POWER INSERT 2.1-7

TRUNK 2.1A

TRUNK 2.1B

TRUNK 2.1C

TRUNK 2.1D

1XG-3.1.1

2X

G-3

.2.1

2X

G-3

.1.1

1XG-3.2.1

WT

WT

WT

WT

WT WT WT WT WT WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT WT WT WT WT

WT

WT WT WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT

WT WT WT WT WT WT WT WT WT WT WT

WT

WT

WT

WT

WT

WT

WT

WT

92.15

92.14

92.13

92.12

92.11

92.10

92.09

92.08

92.07

92.06

92.05

102.12

102.11

102.10

102.09

102.08

102.07

102.06

102.05

102.01

102.02

102.03

102.04

82.07

82.08

82.06

82.05

82.04

82.01

82.02 8

2.03

72.01

52.01

62.01

52.02

12.01

12.02

12.03

12.04

12.05

12.06

92.01

92.02

92.03

92.04

82.01

4 LT-M

4LT-M

4LT-M

4 LT-M

CP2-256N

1XG-5.1.1

1

WINDOW CONTROLPANEL CP 2.1 2 3

PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI

PI

PI

PI

PI

PI

PI

PIPIPIPIPIPIPI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PIPIPI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PIPIPIPIPI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PIPIPIPIPI

PI

PIPI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI PI PI PI PI PI PI PI PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI

PI PI PI PI PI PI PI PI PI PI PI

PI

PI

PI

PI

4'11"P

4'11"P

4'11"P

4'11"P

4'11

"P

4'11

"P

4'11

"P

4'11

"P

4'11"P

4'11

"P

4'11

"P

4'11

"P

4'11

"P

4'11

"P

32'9

"P8'

2"P

8'2"P

8'2"P

19'8" P

4'11"P

4'11"P

19'8" P

9'10" P

6'6"P

4'11

"P

4'11

"P

4'11

"P

4'11"P

4'11"P

8'2"P

4'11

"P

4'11

"P

4'11

"P

4'11

"P

14'9" P

4'11"P

9'10

"P

9'10

"P

98'5"P

98'5"P

65'7"P

65'7"P

24'7"P 24'7"P21'3"P

24'7"P

26'2"P

CP 2.1

TRUNK 2.1A

TRUNK 2.1B

TRUNK 2.1C

TRUNK 2.1D

FIELD TERMINATED POWER INSERT. SEE DETAIL 2XG-9.2.1

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-2.2.1

4.29

.201

9 12

:39

PM

2019

00.0

0.19

E.C. TO PROVIDE60Hz, DEDICATED 20 AMPCKT. CRITICAL POWERSOURCE PREFERRED.

E.C. TO PROVIDEETHERNET DROP(S) ATWINDOW CONTROLPANEL LOCATION - SEENETWORK DIAGRAM.

(1) ETHERNET DROP ATWINDOW CONTROLPANEL TO CONNECT TORING SENSORLOCATION.

TRUNK TERMINATOR -INSTALL IN ACCESSIBLELOCATION

KEY NOTES

1

2

3

4

0134

0-10

133313

0067

130

THTR

UN

K L

AY

OU

T -

FLO

OR

2

SCALE:1 TRUNK LAYOUT - FLOOR 23/16" = 1'-0"

E.C. TO PROVIDE 120VAC,

CKT. CRITICAL POWERSOURCE PREFERRED.

E.C. TO PROVIDEETHERNET DROP(S) ATWINDOW CONTROLPANEL LOCATION - SEENETWORK DIAGRAM.

(1) ETHERNET DROP ATWINDOW CONTROLPANEL TO CONNECT TORING SENSORLOCATION.

TRUNK TERMINATOR -INSTALL IN ACCESSIBLELOCATION

KEY NOTES

1

2

3

4

Page 22: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

22 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

One-Line Diagram Example

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

XX

XX

XX

XX

SIT

E N

AM

EB

UIL

DIN

GS

TRE

ET

AD

DR

ES

SC

ITY

, STA

TE 0

0000

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-1.3.1

4.29

.201

9 12

:39

PM

2019

00.0

0.19

E.C. TO PROVIDE 120VAC60Hz, DEDICATED 20 AMPCKT. CRITICAL POWERSOURCE PREFERRED.

E.C. TO PROVIDEETHERNET DROP(S) ATWINDOW CONTROLPANEL LOCATION - SEENETWORK DIAGRAM.

(1) ETHERNET DROP ATWINDOW CONTROLPANEL TO CONNECT TORING SENSORLOCATION.

TRUNK TERMINATOR -INSTALL IN ACCESSIBLELOCATION

KEY NOTES

1

2

3

4

0134

0-10

1#####

####

##

XX

XX

XX

XX

ON

E L

INE

DIA

GR

AM

-FL

OO

R 1

, 2

SCALE:1 TRUNK LAYOUT - CP 1.1NONE

SCALE:2 TRUNK LAYOUT - CP 2.1NONE

PI

PI

PI PI PI PI PI

PI

PI PI PI

WT

WT WT WT WT WT WT

10 WC 8 WC

4

1 2

9 WC 9 WCWINDOW CONTROLPANEL

CP 1.1

WT

WTWTWTWTWTWTWTWTWTWTWTWTWTWT

4

PI

PIPIPIPIPIPIPIPI

P.I. 1.1-1

2 WC 1 WC

TRUNK 1.1BTRUNK 1.1AP.I. 1.1-2 P.I. 1.1-3

31.01

11.01

41.01

81.07

81.08

81.06

81.05

81.04

81.01

81.02

81.03

101.01

101.02

101.03

101.04

101.10

101.09

101.08

101.07

101.06

101.05

11.03

11.02

21.01

92.15

92.14

92.13

92.12

92.11

92.10

92.09

92.08

92.07

92.06

92.05

102.12

102.11

102.10

102.09

102.08

102.07

102.06

102.05

102.01

102.02

102.03

102.04

82.07

82.08

82.06

82.05

82.04

82.01

82.02

82.03

72.01

52.01

62.01

52.02

12.01

12.02

12.03

12.04

12.05

12.06

92.01

92.02

92.03

92.04

82.01

PI

PI

PI PI PI PI

PI

PI PI

WT

WT

WT

WT

WT WT WT WT WT WT WT WT WT

WT

WT WT WT WT WT

4

1 2

4

WINDOW CONTROLPANEL

CP 2.1

WT

WT

WT

WT

WTWTWTWTWTWTWTWTWTWTWTWTWTWT

WT

WTWTWTWTWTWTWTWTWTWTWTWTWTWT

4

4P

IP

I

PIPIPIPI

PI

PIPI

P.I. 2.1-1

PI

PI

PIPIPIPIPIPI

P.I. 2.1-2P.I. 2.1-3

1 WCP

I

PI PI PI PI PI PI

P.I. 2.1-7P

I

PIPIPIPIPIPIPIPI

15 WC 10 WC 7 WC

3 WC

TRUNK 2.1BTRUNK 2.1A

TRUNK 2.1DTRUNK 2.1C

P.I. 2.1-4 P.I. 2.1-5

P.I. 2.1-6

8 WC 8 WC2 WC2 WC2 WC2 WC2 WC2 WC2 WC2 WC2 WC 1 WC 1 WC 1 WC 1 WC 1 WC 1 WC 1 WC

TRUNK SCHEDULEFLOOR 1, CP 1.1

DESC: POWER INSERT (FT) TRUNK (FT) WC QTYTRUNK 1.1A 0 193.3 12

PI 1.1-1 178 88.2 16TRUNK 1.1B 0 183.6 18

PI 1.1-2 163 47.5 17PI 1.1-3 197 26.1 17TOTAL 538 538.7 80

CONNECTION J3-J8, J11-J16 J9, J10

TRUNK SCHEDULEFLOOR 2, CP 2.1

DESC: POWER INSERT (FT) TRUNK (FT) WC QTYTRUNK 2.1A 0 111.5 10

PI 2.1-1 109 18 17PI 2.1-2 120 22.9 16PI 2.1-3 138 67 15

TRUNK 2.1B 0 147.6 16PI 2.1-4 156 45.9 16PI 2.1-5 193 26.1 16TOTAL 716 439 106

CONNECTION J3-J8, J11-J16 J9, J10TRUNK 2.1C 0 127.6 16

PI 2.1-6 104 40.8 12TRUNK 2.1D 0 170.1 18

PI 2.1-7 150 101.3 16TOTAL 254 439.8 62

CONNECTION J3-J8, J11-J16 J1, J2CP TOTAL 970 878.8 168

2 WC 2 WC 2 WC 2 WC 1 WC 1 WC 1 WC 1 WC 1 WC 1 WC 1 WC 1 WC 10 WC 8 WC 8 WC 8 WC 8 WC 8 WC 8 WC

2 WC 2 WC 2 WC 2 WC 2 WC 2 WC 2 WC 2 WC 3 WC3 WC3 WC3 WC3 WC 3 WC3 WC3 WC3 WC 3 WC3 WC3 WC3 WC3 WC

3

Page 23: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

23 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Pattern Example

INTE

RC

ON

NE

CT

DIA

GR

AM

-P

ATT

ER

N 8

, 9, 1

0, P

.I.

PATTERN 8PART # FIND DESCRIPTION QTY ROUTING

370-000002 LC-1 TEE, LRG CONN 5P-F, LRG CONN 5P-M, MED CONN 5P-F 1 041010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 1 061

380-101510-02 D-2'0"P DROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M) 1 334380-101509-04 I-4'11"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 4' 11" (1.5M) 1 563

PATTERN 9PART # FIND DESCRIPTION QTY ROUTING

370-000002 LC-1 TEE, LRG CONN 5P-F, LRG CONN 5P-M, MED CONN 5P-F 3 041010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 3 061

380-000038-03 T-3'3"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 3' 3" (1M) 2 140380-101510-02 D-2'0"P DROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M) 3 334380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 3 562

PATTERN 10PART # FIND DESCRIPTION QTY ROUTING

370-000002 LC-1 TEE, LRG CONN 5P-F, LRG CONN 5P-M, MED CONN 5P-F 2 041010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 2 061

380-000038-03 T-3'3"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 3' 3" (1M) 1 140380-101510-02 D-2'0"P DROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M) 2 334380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 2 562

#X##

WTTO NEXTPATTERNSEE PLAN

#X## WC-B

2'0"P

LC-1

WTTO CP

FROM PREV.PATTERNSEE PLAN

4'11"P

#X###X## #X##

3'3" PLC-1

#X##

WTTO CP

FROM PREV.PATTERNSEE PLAN

WTTO NEXTPATTERNSEE PLAN

WC-B

2'0"P#X

## WC-B

2'0"P

#X## WC-B

2'0"P

WTWT

3'3"PLC-1LC-1

3'3"P 3'3"P 3'3"P

#X## #X##

3'3"P

WTTO CP

FROM PREV.PATTERNSEE PLAN

WTTO NEXTPATTERNSEE PLAN

#X## WC-B

2'0"P

#X## WC-B

2'0"P

WT

LC-1LC-1

3'3"P 3'3" P

SCALE:4 INTERCONNECT, POWER INSERT @ 1-2 TEESNONE

NEXT POWER SESSION

## PART # FIND DESCRIPTION QTY1 370-000025 PT-1 TEE, POWER, LRG CONN 5P-F, LRG CONN 5P-M, LRG CONN 4P-M 12 310-000061 FW-LC4-1 CONNECTOR, FIELD WIREABLE, LRG CONN, 4P-M 13 310-000063 FW-LC4-2 CONNECTOR, FIELD WIREABLE, LRG CONN, 4P-F 1

PT-1

WT WTTO CP

FROM PREV.PATTERNSEE PLAN

WT WTTO NEXTPATTERNSEE PLAN

PI

PI

PI

PI

FW-LC4-2

FW-LC4-1

(CONNECT AT CONTROL PANEL)FIELD WIRED 4 PIN MALE POWER CONNECTOR

(CONNECT AT CONTROL PANEL)

FIELD WIRED 4 PIN FEMALEPOWER CONNECTOR

POWER INSERT CABLE.SEE PLAN FOR ROUTING.

USE THIS POWER INSERT PATTERN TO CONNECT BEFORE 1-2 DROP TEES.MAXIMUM (3) CONNECTORS TOGETHER BEFORE NEEDING STRAIN RELIEF,UNLESS CONNECTORS ARE MOUNTED TO A SOLID SURFACE.

USE FIELD WIRED CONNECTORS WITH 14/4P POWER INSERT CABLE: 500' SPOOL, PART NUMBER 300-101032-01 1000' SPOOL, PART NUMBER 300-101032

FOR ASSEMBLY OF FIELD WIRED CONNECTORS, SEE DETAIL 2XG-9.2.1

SCALE:5 INTERCONNECT, POWER INSERT @ DB-8 BOX, TEENONE

NEXT POWER SESSION

PT-1

WT WTTO CP

FROM PREV.PATTERNSEE PLAN

WTTO NEXTPATTERNSEE PLAN

PI

PI

PI

PI

FW-LC4-2

FW-LC4-1

(CONNECT AT CONTROL PANEL)FIELD WIRED 4 PIN MALE POWER CONNECTOR

(CONNECT AT CONTROL PANEL)

FIELD WIRED 4 PIN FEMALEPOWER CONNECTOR

POWER INSERT CABLE.SEE PLAN FOR ROUTING.

WT

1'0" P

## PART # FIND DESCRIPTION QTY1 370-000025 PT-1 TEE, POWER, LRG CONN 5P-F, LRG CONN 5P-M, LRG CONN 4P-M 12 310-000061 FW-LC4-1 CONNECTOR, FIELD WIREABLE, LRG CONN, 4P-M 13 310-000063 FW-LC4-2 CONNECTOR, FIELD WIREABLE, LRG CONN, 4P-F 14 380-000038-01 T-1'0"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 1' 0" (0.3M) 1

USE THIS POWER INSERT PATTERN TO CONNECT BEFORE DB-8 BOX.

USE FIELD WIRED CONNECTORS WITH 14/4P POWER INSERT CABLE: 500' SPOOL, PART NUMBER 300-101032-01 1000' SPOOL, PART NUMBER 300-101032

FOR ASSEMBLY OF FIELD WIRED CONNECTORS, SEE DETAIL 2XG-9.2.1

SCALE:1 INTERCONNECT, PATTERN 8 ; THUS 17NONE SCALE:2 INTERCONNECT, PATTERN 9 ; THUS 15

NONE SCALE:3 INTERCONNECT, PATTERN 10 ; THUS 22NONE

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-4.03

4.29

.201

9 12

:40

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

TH

WINDOW CONTROLLERSMUST BE INSTALLED AT ANACCESSIBLE, ENVIRON-MENTALLY -CONTROLLEDLOCATION

Page 24: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

24 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Control Panel Configuration Example

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-5.1.1

4.29

.201

9 12

:40

PM

2019

00.0

0.19

E.C. TO PROVIDE 120VAC, 60Hz, DEDICATED 20 AMPCKT. CRITICAL POWERSOURCE PREFERRED.

E.C. TO PROVIDEETHERNET DROP(S) ATWINDOW CONTROLPANEL LOCATION - SEENETWORK DIAGRAM.

(1) ETHERNET DROP ATWINDOW CONTROLPANEL TO CONNECT TORING SENSORLOCATION.

TRUNK TERMINATOR -INSTALL IN ACCESSIBLELOCATION

KEY NOTES

1

2

3

4

0134

0-10

133313

0067

130

THW

IND

OW

CO

NTR

OL

PA

NE

LD

ETA

ILS

, TY

PIC

AL

E.C. TO PROVIDE 120VAC, 60Hz,1Ø, 20 AMP UNSWITCHED CKT

WITH GREEN WIRE EARTHGROUND. CRITICAL POWER

SOURCE PREFERRED. DO NOTSHARE GROUND OR NEUTRALS.

RJ-45 BULKHEAD PORTS

POWER INSERT BULKHEADPORTS, TYP. OF 6 EACH.-03 AND -04 CP MODELS.

POWER INSERT BULKHEADPORTS, TYP. OF 6 EACH.

ONLY -04 CP MODEL.

TRUNK BULKHEAD PORTS, TYP. OF 2 EACH.ONLY -04 CP MODEL.

IF TRUNK NOT ATTACHED TO PORT, CONNECTLT-M (TERMINATOR), P/N 370-000008

TRUNK BULKHEAD PORTS, TYP. OF 2 EACH.-03 AND -04 CP MODELS.IF TRUNK NOT ATTACHED TO PORT, CONNECTLT-M (TERMINATOR), P/N 370-000008

(2) OPTIONAL PORTSFROM SFP MODULES

SCALE:1 CONTROL PANEL - BULKHEAD CONNECTIONSNONE SCALE:2 CONTROL PANEL - INSTALLATION REQUIREMENTS AND DIMENSIONS

NONE

SCALE:3 CONTROL PANELS - PARTS AND OPTIONAL ACCESSORY LISTNONE

29"

NOTE: TRUNK AND POWER INSERT NAMES MAY DIFFER FROMTHOSE REPRESENTED HERE. SEE ONE LINE DIAGRAMS FOR EACHCONTROL PANEL FOR TRUNK AND POWER CONNECTIONS USED.

60"

21"

WINDOW CONTROL PANEL

9"

MA

INTA

IN 6

" CLE

AR

SP

AC

EB

OTH

SID

ES

OF

CO

NTR

OL

PA

NE

L

MA

INTA

IN 6

" CLE

AR

SP

AC

EB

OTH

SID

ES

OF

CO

NTR

OL

PA

NE

L

MAINTAIN 36" CLEAR SPACEIN FRONT OF CONTROL PANEL

MA

INTA

IN 6

" CLE

AR

SP

AC

EB

OTH

SID

ES

OF

CO

NTR

OL

PA

NE

L

MA

INTA

IN 6

" CLE

AR

SP

AC

EB

OTH

SID

ES

OF

CO

NTR

OL

PA

NE

L

FINISH FLOOR

FIN

ISH

WA

LL S

UR

FAC

E

ECAFRUS LLAW HSINIF

INSTALLATION NOTES:

1. MAY BE MOUNTED TO FIRE RESISTANT BACKBOARDOR DIRECTLY TO WALL.

2. CONTRACTOR TO DETERMINE SUITABLE MOUNTINGMETHOD & ANCHORS.

3. CONTROL PANEL AND PULL BOX DOORS ARE LEFTSWING ONLY.

4. CONTROL PANEL WEIGHT: APPROX. 70 POUNDSINSTALLED.

5. E.C. TO PROVIDE NETWORK DROP 10" ABOVE TOP OFCONTROL PANEL. SEE NETWORK DIAGRAM FORNUMBER OF DROPS AND ROUTING.

6. IF PULLBOX ENCLOSURE IS PROVIDED, LOCATENETWORK DROP WITHIN ENCLOSURE.

7. E.C. TO PROVIDE CAT5E / CAT6 PATCH CORDS TOCONNECT CONTROL PANEL BULKHEAD FITTINGS TONETWORK DROP.

FRONT ELEVATION SIDE ELEVATION

PLAN AND CLEARANCES

E.C. TO PROVIDE 120VAC, 60Hz,1Ø, 20 AMP UNSWITCHED CKT

WITH GREEN WIRE EARTHGROUND. CRITICAL POWER

SOURCE PREFERRED. DO NOTSHARE GROUND OR NEUTRALS.

LADDER RACK OR OTHER CABLE MANAGEMENT SHOWN AS INSTALLATION SUGGESTION

CP-256N (-04)

CP-128N (-03)

MOUNTING WEIGHT:APPROX. 70 LBS.

9"

E.C. TO PROVIDE NETWORK DROP10" ABOVE TOP OF CONTROL PANEL.SEE NETWORK DIAGRAM FORNUMBER OF DROPS AND ROUTING.

10"

## PART # FIND DESCRIPTION QTY NOTES1 010-101604-03 CP2-128N ASSY, CP2.0, 2 PS, 24V, CLASS 2, 128 WC, NETWORKED -2 010-101604-04 CP2-256N ASSY, CP2.0, 3 PS, 24V, CLASS 2, 256 WC, NETWORKED -3 010-101611 CP-PB PULL BOX ENCLOSURE, CP2.0 -4 015-101821-01 POE-1 KIT, 1 POE - ADD (1) PoE PORT5 015-101821-02 POE-2 KIT, 2 POE - ADD (2) PoE PORTS6 015-101844-01 SFP-OPT1 KIT, OPTICAL, SFP PORTS, 1000BASE-SX SHORT WAVELENGTH; RUGGED - ADD MULTIMODE FIBER PORT 300'-1500' RANGE7 015-101844-02 SFP-OPT2 KIT, OPTICAL, SFP PORTS, 1000BASE-LX/LH LONG WAVELENGTH; RUGGED - ADD SINGLE MODE FIBER PORT >1500' RANGE8 015-101844-03 SFP-RJ45 KIT, OPTICAL, SFP PORTS, 1000BASE-T STANDARD - ADD RJ-45 NETWORK PORT9 050-101565-02 LATCH, COMPRESSION, VISE ACTION, E3 SERIES W/ TUBULAR KEY - OPTIONAL CASE LOCK

BULKHEAD PORT CONNECTION DESCRIPTIONCP MODEL

NOTES-03 -04

J1 TRUNK X.C N/A X TRUNK PAIR #2, 128 WCs MAX.J2 TRUNK X.D N/A XJ3 POWER INSERT X-7 N/A XJ4 POWER INSERT X-8 N/A XJ5 POWER INSERT X-9 N/A XJ6 POWER INSERT X-10 N/A XJ7 POWER INSERT X-11 N/A XJ8 POWER INSERT X-12 N/A XJ9 TRUNK X.A X X TRUNK PAIR #1, 128 WCs MAX.J10 TRUNK X.B X XJ11 POWER INSERT X-1 X XJ12 POWER INSERT X-2 X XJ13 POWER INSERT X-3 X XJ14 POWER INSERT X-4 X XJ15 POWER INSERT X-5 X XJ16 POWER INSERT X-6 X XJ17 RJ-45 X X TO W.W.W./CUSTOMER NETWORKJ18 RJ-45 X X PoE-1J19 SFP MODULE N/A N/A OPTIONAL RJ-45 OR FIBERJ20 RJ-45 X X TO NEXT CP PORT J21J21 RJ-45 X X FROM PREVIOUS CP PORT J20J22 SFP MODULE N/A N/A OPTIONAL RJ-45 OR FIBER

BULKHEAD CONNECTIONS FORTRUNK, POWER AND NETWORK.SEE LEFT.

2 31

44

Page 25: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

25 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

System Network Requirements ExampleRJ-45 - WWW FROM EN01

J21 - RJ-45 - SW PORT 3

J22 - SFP - FIBER OR COPPERJ19 - SFP - FIBER OR COPPER

J18 - RJ-45 - SW PORT 1 / PoE-1

J20 - RJ-45 - SW PORT 2 / PoE-2

SCALE:4 CONTROL PANEL BULKHEAD MAPPINGNONE

SCALE:1 BOM INFORMATIONNONE SCALE:5 BULKHEAD CONNECTIONS - FLOOR 1

NONE SCALE:6 BULKHEAD CONNECTIONS - FLOOR 2NONE

CP 1.1PORT # TYPE CONNECTION NAME CONNECT TO

J17 RJ-45 W.W.W. VIA CUSTOMER NETWORK OR CELL MODEMJ18 RJ-45 SW PORT 1 PoE-1 TO SKY SENSORJ19 BLANK FIBER OR COPPER -1J20 RJ-45 SW PORT 2 NEXT CP - PORT J21J21 RJ-45 SW PORT 3 PREVIOUS CP - PORT J20J22 BLANK FIBER OR COPPER -2

CP 2.1PORT # TYPE CONNECTION NAME CONNECT TO

J17 RJ-45 -- RESERVED FOR W.W.W. CONNECTIONJ18 RJ-45 SW PORT 1 PoE-1 TO SKY SENSORJ19 BLANK FIBER OR COPPER -1J20 RJ-45 SW PORT 2 NEXT CP - PORT J21J21 RJ-45 SW PORT 3 PREVIOUS CP - PORT J20J22 BLANK FIBER OR COPPER -2

CAT5e

CA

T5e

CA

T5e

CAT5eCAT5eCAT5eCAT5eCAT5eCAT5eCAT5eCAT5eCAT5e

CA

T5e

CAT5e TO CUSTOMER NETWORK OR CELL MODEM

CA

T5e-

PoE

USE CASE:

· TIER 2 MC· MULTIPLE CP· NO FIBER· ALL DROPS LESS THAN 300 CABLE FEET

SKY SENSOR - ON ROOF

NETWORK MEDIUM KEY:

· COPPER Cat5e <300'· COPPER Cat6 <300'· COPPER Cat5 / PoE <300'· COPPER Cat6 / PoE <300'· Fiber OM2 Multimode <1500'· Fiber Single Mode >1500'

SCALE:3 USE CASENONE

SCALE:2 NETWORK MEDIUM KEYNONE

BOM INFORMATION:

· KIT, POE-1 015-101821-011 kit required for SKY Sensor

CAT5eCAT6

CAT5e-PoECAT6-PoE

F/O mmF/O sm

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-1.2.1

4.29

.201

9 12

:39

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

THN

ETW

OR

K D

IAG

RA

M

Page 26: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

26 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Roof Layout for Sky Sensor

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-2.R

4.29

.201

9 12

:39

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

THS

KY

SE

NS

OR

LA

YO

UT

-R

OO

F

SCALE:1 SKY SENSOR LAYOUT - ROOFNONE

MOUNT MIN. 2 FEET (0.6M) ABOVE HIGHESTOBSTRUCTION ONROOF. PROVIDE 360°UNOBSTRUCTED VIEWHORIZONTAL, 200°VERTICAL (10° BELOWHORIZONTAL).

ENSURE MOUNTINGHEIGHT WILL NOT BEOBSCURED BASED ONAVERAGE SNOWFALLACCUMULATION.

MOUNT MUST BEBONDED TO BUILDINGGROUND.

VERIFY MOUNTINGLOCATION IN FIELDWITH BUILDING OWNER.

PROVIDE CAT5E (ORGREATER) CABLE FROMNEAREST IDF LOCATIONTO ROOF OR DEVICEMOUNTING LOCATION(100 M MAXIMUM).

SEE DETAILS ONXG-9.4.1 FOR FURTHERMOUNTING AND SETUPINFORMATION.

KEY NOTES

1

2

3

4

5

CAT5e

CAT5e CAT5e

CAT5e

CAT5e

SSA

1 2 3 45

SKY SENSOR TO BE MOUNTEDON ELEVATOR OVERRUN WITHINEQUIPMENT SCREEN

Page 27: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

27 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Bill of Materials Example

\CustSig_1_sig\ \CSDate_1_date\

Controls Order Acknowledgment(Standard lead times apply from the date of signed approval or submittal to View)

I __CustomerName___ of _____Company Name_____ have reviewed the materials list on this drawing and verify that the information is correct.By signing below I accept release of the materials listed to be procured for this job.

Signed: ____________________________________ Date: ______________________

01P

RE

LIM

INA

RY

03.2

0.19

JKA

NG

XX

XX

XX

XX

BLD

G 1

DE

MO

INS

TALL

123

MA

IN S

TRE

ET,

AN

YTO

WN

, ST

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEW.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-6.01

7.23

.201

9 12

:10

PM

2019

03.2

0.19

0134

0-10

1#####

####

##

XX

XX

XX

XX

BIL

L O

F M

ATE

RIA

LS

SCALE:1 CP 2.1, HEAD ENDNONE

015-101###-01INTERCONNECT DIAGRAM 340-101xxx

SECOND FLOOR, CP 2.1, HEAD END## PART # FIND DESCRIPTION QTY

Control Panels, Accessories1 010-101604-03 CP2-128N ASSY, CP2.0, 2 PS, 24V, CLASS 2, 128 WC, NETWORKED 12 010-101611 CP-PB PULL BOX ENCLOSURE, CP2.0 13 015-101821-01 POE-1 KIT, 1 POE 1

Large Connectors4 370-000002 LC-1 TEE, LRG CONN 5P-F, LRG CONN 5P-M, MED CONN 5P-F 265 370-000008 LT-M TERMINATOR, LRG CONN 5P-M 2

CapsWindow Controllers

6 010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 26Trunk Cables

7 380-101549 T-8"P TRUNK CABLE, PLENUM, STUB, LRG CONN, 5P MF 48 380-000038-04 T-4'11"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 4' 11" (1.5M) 19 380-000038-06 T-8'2"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 8' 2" (2.5M) 2

10 380-000038-07 T-9'10"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 9' 10" (3M) 211 380-000038-13 T-19'8"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 19' 8" (6M) 212 380-000038-21 T-32'9"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 32' 9" (10M) 113 380-000038-23 T-98'5"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 98' 5" (30M) 2

Drop Cables

8 380-101510-02 D-2'0"PDROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0"

(0.6M) 26

IGU Cables9 380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 1

10 380-101509-04 I-4'11"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 4' 11" (1.5M) 811 380-101509-05 I-6'6"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 6' 6" (2M) 112 380-101509-06 I-8'2"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 8' 2" (2.5M) 513 380-101509-07 I-9'10"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 9' 10" (3M) 114 380-101509-09 I-13'1"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 13' 1" (4M) 415 380-101509-11 I-16'4"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 16' 4" (5M) 516 380-101509-12 I-18'0"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 18' 0" (5.5M) 1

015-101###-02INTERCONNECT DIAGRAM 340-101xxx

SECOND FLOOR, CP 2.1, GLAZIER## PART # FIND DESCRIPTION QTY

IGU Cables1 380-101509-05 I-6'6"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 6' 6" (2M) 26

015-101###-03INTERCONNECT DIAGRAM 340-101xxx

SECOND FLOOR, CP 2.1, SPARE## PART # FIND DESCRIPTION QTY

Large Connectors1 370-000002 LC-1 TEE, LRG CONN 5P-F, LRG CONN 5P-M, MED CONN 5P-F 1

CapsWindow Controllers

2 010-101584 WC-B ASSEMBLY, 2.0 WINDOW CONTROLLER 1Trunk Cables

3 380-101549 T-8"P TRUNK CABLE, PLENUM, STUB, LRG CONN, 5P MF 14 380-000038-04 T-4'11"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 4' 11" (1.5M) 15 380-000038-06 T-8'2"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 8' 2" (2.5M) 16 380-000038-07 T-9'10"P TRUNK CABLE, PLENUM, LRG CONN, 5P MF, 9' 10" (3M) 1

Drop Cables

7 380-101510-02 D-2'0"PDROP CABLE, PLENUM, MED CONN, 5P M, SML CONN, 5PK F, 2' 0"

(0.6M) 1

IGU Cables

8 380-101509-04 I-4'11"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 4' 11" (1.5M) 19 380-101509-05 I-6'6"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 6' 6" (2M) 1

10 380-101509-06 I-8'2"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 8' 2" (2.5M) 1

SCALE:2 CP 2.1, GLAZIERNONE

SCALE:3 CP 2.1, SPARENONE

SCALE:4 4 STATE TESTERS - LVENONE

SCALE:5 4 STATE TESTERS - GLAZIERNONE

Transfers015-101###-700

INTERCONNECT DIAGRAM 340-101xxx4 STATE TESTERS, L.V.

## PART # FIND DESCRIPTION QTY1 010-101543 4ST-B ASSY, 4 STATE CONTROLLER / TESTER 12 380-101516 ADAPT 1 ADAPT 1, IGU CABLE, PLENUM, SML CONN-F 5PK, SML CONN-M 5P 13 380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 1

015-101###-701INTERCONNECT DIAGRAM 340-101xxx

4 STATE TESTERS, GLAZIER## PART # FIND DESCRIPTION QTY1 010-101543 4ST-B ASSY, 4 STATE CONTROLLER / TESTER 12 380-101516 ADAPT 1 ADAPT 1, IGU CABLE, PLENUM, SML CONN-F 5PK, SML CONN-M 5P 13 380-101509-03 I-3'3"P IGU CABLE, PLENUM, SML CONN, 5PK MF, 3' 3" (1M) 1

015-101###-800INTERCONNECT DIAGRAM 340-101xxx

CELL MODEM## PART # FIND DESCRIPTION QTY1 010-101130 CP-ME ASSY, WIRELESS ROUTER, VERIZON WIRELESS 12 380-000012-04 ETH-4 CABLE, ETHERNET, RJ45, 84 IN BLK (7.0 FT) 1

SCALE:6 CELL MODEMNONE

SCALE:7 SKY SENSORNONE

015-101###-900INTERCONNECT DIAGRAM 340-101xxx

SKY SENSOR## PART # FIND DESCRIPTION QTY1 010-101619-01 SSA ASSEMBLY, SKY SENSOR 1

Page 28: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

28 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

XX

XX

XX

XX

SIT

E N

AM

EB

UIL

DIN

GS

TRE

ET

AD

DR

ES

SC

ITY

, STA

TE 0

0000

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-7.1.1

4.29

.201

9 12

:40

PM

2019

00.0

0.19

0134

0-10

1#####

####

##

XX

XX

XX

XX

IGU

AN

D W

C Z

ON

ING

(LO

AD

ING

SC

HE

DU

LE)

CP

1.1

SCALE:1 LOADING SCHEDULE - CP 1.1 ; TRUNKS ON J9, J10NONE SCALE:2 LOADING SCHEDULE - CP 1.1 ; TRUNKS ON J1, J2

NONE

ZONE # MARK ID IGU # WIDTH HEIGHT SF WC#ID NOTES TRUNK IDCONF 105 N 1N01 1 1.1ACONF 105 N 1N02 2 1.1ACONF 105 N 1N03 3 1.1ACONF 105 N 1N04 4 1.1ACONF 104 N 1N05 5 1.1ACONF 104 N 1N06 6 1.1ACONF 104 N 1N07 7 1.1ACONF 104 N 1N08 8 1.1ACONF 103 N1 1N09 9 1.1ACONF 103 N2 1N10 10 1.1ACONF 103 N3 1N11 11 1.1ACONF 103 N4 1N12 12 1.1ACONF 103 N5 1N13 13 1.1ACONF 106 W1 1W01 14 1.1ACONF 106 W1 1W02 15 1.1ACONF 106 W2 1W03 16 1.1ACONF 106 W2 1W04 17 1.1ACONF 106 W3 1W05 18 1.1ACONF 106 W3 1W06 19 1.1ACONF 105 W1 1W07 20 1.1ACONF 105 W1 1W08 21 1.1ACONF 105 W2 1W09 22 1.1ACONF 105 W2 1W10 23 1.1ACONF 105 W3 1W11 24 1.1ACONF 105 W3 1W12 25 1.1ACONF 104 XE XE01 26 1.1ACONF 104 XE XE03 27 1.1ACONF 104 XE XE05 28 1.1A

PROD 110 E1_B 1E01 29 1.1BPROD 110 E1_T 1E02 30 1.1BPROD 110 E1_B 1E03 31 1.1BPROD 110 E1_T 1E04 32 1.1BPROD 110 E1_B 1E05 33 1.1BPROD 110 E1_T 1E06 34 1.1BPROD 110 E1_B 1E07 35 1.1BPROD 110 E1_T 1E08 36 1.1BPROD 110 E2_B 1E09 37 1.1BPROD 110 E2_T 1E10 38 1.1BPROD 110 E2_B 1E11 39 1.1BPROD 110 E2_T 1E12 40 1.1BPROD 110 E2_B 1E13 41 1.1BPROD 110 E2_T 1E14 42 1.1BPROD 110 E2_B 1E15 43 1.1BPROD 110 E2_T 1E16 44 1.1BPROD 110 E3_B 1E17 45 1.1BPROD 110 E3_T 1E18 46 1.1BPROD 110 E3_B 1E19 47 1.1BPROD 110 E3_T 1E20 48 1.1BPROD 110 E3_B 1E21 49 1.1BPROD 110 E3_T 1E22 50 1.1BPROD 110 DR3 1E23 51 OPERABLE 1.1BPROD 110 E3_T 1E24 52 1.1BPROD 110 E3_B 1E25 53 1.1BPROD 110 E3_T 1E26 54 1.1BPROD 110 N1_B 1N30 55 1.1BPROD 110 N1_T 1N31 56 1.1BPROD 110 N1_B 1N32 57 1.1BPROD 110 N1_T 1N33 58 1.1BPROD 110 DR1 1N34 59 OPERABLE 1.1BPROD 110 DR1 1N35 60 OPERABLE 1.1B

PROD 110 N1_T 1N36 61 1.1BPROD 110 N1_B 1N37 62 1.1BPROD 110 N1_T 1N38 63 1.1BPROD 110 N2_B 1N39 64 1.1BPROD 110 N2_T 1N40 65 1.1BPROD 110 N2_B 1N41 66 1.1BPROD 110 N2_T 1N42 67 1.1BPROD 110 N2_B 1N43 68 1.1BPROD 110 N2_T 1N44 69 1.1BPROD 110 N2_B 1N45 70 1.1BPROD 110 N2_T 1N46 71 1.1BPROD 110 N3_B 1N47 72 1.1BPROD 110 N3_T 1N48 73 1.1BPROD 110 DR2 1N49 74 OPERABLE 1.1BPROD 110 DR2 1N50 75 OPERABLE 1.1BPROD 110 N3_T 1N51 76 1.1BPROD 110 N3_B 1N52 77 1.1BPROD 110 N3_T 1N53 78 1.1BPROD 110 N3_B 1N54 79 1.1BPROD 110 N3_T 1N55 80 1.1B

81828384858687888990919293949596979899

100101102103104105106107108109110111112113114115116117118119120121122123124125126127128

NOT USED

Loading Schedule Example

Page 29: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

29 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Loading Schedule Example

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

XX

XX

XX

XX

SIT

E N

AM

EB

UIL

DIN

GS

TRE

ET

AD

DR

ES

SC

ITY

, STA

TE 0

0000

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-7.2.1

4.29

.201

9 12

:41

PM

2019

00.0

0.19

0134

0-10

1#####

####

##

XX

XX

XX

XX

IGU

AN

D W

C Z

ON

ING

(LO

AD

ING

SC

HE

DU

LE)

CP

2.1

SCALE:1 LOADING SCHEDULE - CP 2.1 ; TRUNKS ON J9, J10NONE SCALE:2 LOADING SCHEDULE - CP 2.1 ; TRUNKS ON J1, J2

NONE

ZONE # MARK ID IGU # WIDTH HEIGHT SF WC#ID NOTES TRUNK ID ZONE # MARK ID IGU # WIDTH HEIGHT SF WC#ID NOTES TRUNK IDLOBBY 101 N_B 1N14 1 2.1ALOBBY 101 N_M 1N15 2 2.1ALOBBY 101 N_T 1N16 3 2.1ALOBBY 101 N_B 1N17 4 2.1ALOBBY 101 N_M 1N18 5 2.1ALOBBY 101 N_T 1N19 6 2.1ALOBBY SLIDER 1N20 7 SLIDER 2.1ALOBBY SLIDER 1N21 8 2.1ALOBBY 101 N_M 1N22 9 2.1ALOBBY 101 N_T 1N23 10 2.1ALOBBY 101 N_B 1N24 11 2.1ALOBBY 101 N_M 1N25 12 2.1ALOBBY 101 N_T 1N26 13 2.1ALOBBY 101 N_B 1N27 14 2.1ALOBBY 101 N_M 1N28 15 2.1ALOBBY 101 N_T 1N29 16 2.1A

OFC 204 N1 2N01 17 2.1AOFC 204 N1 2N02 18 2.1AOFC 204 N2 2N03 19 2.1AOFC 204 N2 2N04 20 2.1AHALL 201 N1 2N05 21 2.1AHALL 201 N1 2N06 22 2.1AHALL 201 N2 2N07 23 2.1AHALL 201 N2 2N08 24 2.1AOFC 203 N1 2N09 25 2.1AOFC 203 N2 2N10 26 2.1AOFC 203 N3 2N11 27 2.1AOFC 203 N4 2N12 28 2.1AOFC 203 N5 2N13 29 2.1A

HALL 200 N_B 2N14 30 2.1AHALL 200 N_T 2N15 31 2.1AHALL 200 N_B 2N16 32 2.1AHALL 200 N_T 2N17 33 2.1AHALL 200 N_B 2N18 34 2.1AHALL 200 N_T 2N19 35 2.1AHALL 200 N_T 2N20 36 2.1AHALL 200 N_B 2N21 37 2.1AHALL 200 N_T 2N22 38 2.1AHALL 200 N_B 2N23 39 2.1AHALL 200 N_T 2N24 40 2.1AHALL 201 XE XE02 41 2.1AHALL 201 XE XE04 42 2.1AHALL 201 XE XE06 43 2.1A

LOBBY 101 XS_B XW01 44 2.1ALOBBY 101 XS_M XW02 45 2.1ALOBBY 101 XS_T XW03 46 2.1AHALL 200 XS_B XW04 47 2.1AHALL 200 XS_T XW05 48 2.1A

LOBBY 101 XS_B XW06 49 2.1ALOBBY 101 XS_M XW07 50 2.1ALOBBY 101 XS_T XW08 51 2.1AHALL 200 XS_B XW09 52 2.1AHALL 200 XS_T XW10 53 2.1A

LOBBY 101 XS_B XW11 54 2.1ALOBBY 101 XS_M XW12 55 2.1ALOBBY 101 XS_T XW13 56 2.1AHALL 200 XS_B XW14 57 2.1AHALL 200 XS_T XW15 58 2.1AOPEN 219 E1_B 2E01 59 2.1BOPEN 219 E1_T 2E02 60 2.1BOPEN 219 E1_B 2E03 61 2.1BOPEN 219 E1_T 2E04 62 2.1BOPEN 219 E1_B 2E05 63 2.1BOPEN 219 E1_T 2E06 64 2.1BOPEN 219 E1_B 2E07 65 2.1BOPEN 219 E1_T 2E08 66 2.1BOPEN 219 E2_B 2E09 67 2.1BOPEN 219 E2_T 2E10 68 2.1BOPEN 219 E2_B 2E11 69 2.1BOPEN 219 E2_T 2E12 70 2.1BOPEN 219 E2_B 2E13 71 2.1BOPEN 219 E2_T 2E14 72 2.1BOPEN 219 E2_B 2E15 73 2.1BOPEN 219 E2_T 2E16 74 2.1BOPEN 219 E3_B 2E17 75 2.1BOPEN 219 E3_T 2E18 76 2.1BOPEN 219 E3_B 2E19 77 2.1BOPEN 219 E3_T 2E20 78 2.1BOPEN 219 E3_B 2E21 79 2.1BOPEN 219 E3_T 2E22 80 2.1BOPEN 219 E3_B 2E23 81 2.1BOPEN 219 E3_T 2E24 82 2.1BOPEN 219 N1_B 2N25 83 2.1BOPEN 219 N1_T 2N26 84 2.1BOPEN 219 N1_B 2N27 85 2.1BOPEN 219 N1_T 2N28 86 2.1BOPEN 219 N1_B 2N29 87 2.1BOPEN 219 N1_T 2N30 88 2.1BOPEN 219 N1_B 2N31 89 2.1BOPEN 219 N1_T 2N32 90 2.1BOPEN 219 N2_B 2N33 91 2.1BOPEN 219 N2_T 2N34 92 2.1BOPEN 219 N2_B 2N35 93 2.1BOPEN 219 N2_T 2N36 94 2.1BOPEN 219 N2_B 2N37 95 2.1BOPEN 219 N2_T 2N38 96 2.1BOPEN 219 N2_B 2N39 97 2.1BOPEN 219 N2_T 2N40 98 2.1BOPEN 219 N3_B 2N41 99 2.1BOPEN 219 N3_T 2N42 100 2.1BOPEN 219 N3_B 2N43 101 2.1BOPEN 219 N3_T 2N44 102 2.1BOPEN 219 N3_B 2N45 103 2.1BOPEN 219 N3_T 2N46 104 2.1BOPEN 219 N3_B 2N47 105 2.1BOPEN 219 N3_T 2N48 106 2.1B

107108109110111112113114115116117118119120121122123124125126127128

OFC 217 E 2E25 129 2.1COFC 217 E 2E26 130 2.1COFC 217 E 2E27 131 2.1COFC 217 E 2E28 132 2.1COFC 216 E 2E29 133 2.1COFC 216 E 2E30 134 2.1COFC 216 E 2E31 135 2.1COFC 216 E 2E32 136 2.1COFC 215 E 2E33 137 2.1COFC 215 E 2E34 138 2.1COFC 215 E 2E35 139 2.1COFC 215 E 2E36 140 2.1COFC 215 E 2E37 141 2.1COFC 215 S1 2S01 142 2.1COFC 215 S1 2S02 143 2.1COFC 215 S2 2S03 144 2.1COFC 215 S2 2S04 145 2.1COFC 215 S3 2S05 146 2.1COFC 215 S3 2S06 147 2.1COFC 215 S4 2S07 148 2.1COFC 215 S4 2S08 149 2.1COFC 214 S 2S09 150 2.1COFC 214 S 2S10 151 2.1COFC 214 S 2S11 152 2.1COFC 214 S 2S12 153 2.1COFC 214 S 2S13 154 2.1C

HALL 221 S1 2S14 155 2.1CHALL 221 S1 2S15 156 2.1CHALL 221 S1 2S16 157 2.1DHALL 221 S1 2S17 158 2.1DHALL 221 S1 2S18 159 2.1DHALL 221 S2 2S19 160 2.1DHALL 221 S2 2S20 161 2.1DHALL 221 S2 2S21 162 2.1DHALL 221 S2 2S22 163 2.1DHALL 221 S2 2S23 164 2.1DHALL 221 S3 2S24 165 2.1DHALL 221 S3 2S25 166 2.1DHALL 221 S3 2S26 167 2.1DHALL 221 S3 2S27 168 2.1DHALL 221 S3 2S28 169 2.1DOFC 213 S 2S29 170 2.1DOFC 213 S 2S30 171 2.1DOFC 213 S 2S31 172 2.1DOFC 213 S 2S32 173 2.1DOFC 213 S 2S33 174 2.1D

BOARD 225 W1 2W01 175 2.1DBOARD 225 W1 2W02 176 2.1DBOARD 225 W2 2W03 177 2.1DBOARD 225 W2 2W04 178 2.1D

OFC 209 W 2W05 179 2.1DOFC 209 W 2W06 180 2.1DOFC 208 W 2W07 181 2.1DOFC 208 W 2W08 182 2.1DOFC 208 W 2W09 183 2.1DOFC 207 W 2W10 184 2.1DOFC 207 W 2W11 185 2.1DOFC 207 W 2W12 186 2.1DOFC 206 W 2W13 187 2.1DOFC 206 W 2W14 188 2.1DOFC 205 W 2W15 189 2.1DOFC 205 W 2W16 190 2.1D

191192193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222223224225226227228229230231232233234235236237238239240241242243244245246247248249250251252253254255256

Page 31: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

31 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Glass Implementation Process

Project Kicko�Meeting(scope,

schedule,planning)

Provide feedback

for ControlsSystem design

Install View controls andassist with functional hardware

testing

Review anditerate on

PreliminaryInterconnect

Drawing

Consolidateinput andproduce

PreliminaryInterconnect

Drawing

Consolidateinput andproduce

FinalInterconnect

Drawing

Manufactureand ship IGU

cables toGlazier

Commissionsystem and

provideturnover

package andoperation

ShipControlsSystem

Provideproduct

informationand designguidelines

Provide facadeshop detail

Finalize IGUorder with

signed OrderAcknowledge-

ment

Install IGUs,functional

check

GCElectrician

LV Contractor

Glazier

View

Page 32: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

32 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

Proper Cable Labeling

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-9.2.1

4.29

.201

9 12

:41

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

THFI

ELD

WIR

EA

BLE

CO

NN

EC

TIO

NS

AN

DP

RE

TER

MIN

ATE

DC

OR

DS

ETS

M12, MALE M8 FEMALE, KEYED M8 FEMALE, KEYEDM8 MALE, KEYED7/8, MALE 7/8, FEMALE

V-V+V+

V-

1234 GRN 14 AWG

BLK 14 AWG

RED 14 AWGWHT 14 AWG

V-V+V+

V-

1234GRN 14 AWG

BLK 14 AWG

RED 14 AWGWHT 14 AWG

12345

12345

CAN_H

V+

CAN_L

V-

SHIELD

CAN_H

V+

CAN_L

V-

SHIELDRED 14 AWGBLK 14 AWGWHT 18 AWGBLU 18 AWG

BARERED 14 AWGBLK 14 AWG

WHT 18 AWGBLU 18 AWG

BARE

FIND NUMBER (LENGTH)ON COLORED WRAP,

BOTH ENDS OF CABLE

PART NO: 380-000038-XX (PLENUM) PART NO: 380-101510-XX (PLENUM) PART NO: 380-101509-XX (PLENUM)

PART NO: 380-000057-XX (STANDARD) PART NO: 380-101512-XX (STANDARD) PART NO: 380-101511-XX (STANDARD)

1. MACHINE PRINTED LABEL SHOULD BE LOCATED WITHIN 4" OF CABLE END.2. EACH LABEL SHOULD BE MACHINE PRINTED - BLACK PRINT ON WHITE MATERIAL.3. USE PROPORTIONAL FONT, MINIMUM 14 PT BOLD.4. CABLE IDENTIFIER SHOULD APPEAR TWO TIMES ON THE LABEL FOR VISIBILITY.5. LABELS SHOULD BE OF PERMANENT TYPE MATERIAL.6. HAND WRITTEN LABELS SHOULD NOT BE USED.7. DO NOT MAKE LABELS FROM MASKING TAPE, ELECTRICAL TAPE, DUCT TAPE,

PAPER COVERED SCOTCH TAPE OR ANY NON LABEL MATERIAL.8. WIRE MARKER TAPE CAN BE USED FOR IGU CABLES. USE NUMBER TO MATCH

IGU MARKING ON INTERCONNECT.9. LABELS AND MARKER TAPE NOT PROVIDED BY VIEW.10. TESTED LABEL, PROVIDED BY VIEW, TO BE PLACED ON EACH END OF CABLE

AFTER INSTALLATION AND TESTING.

SCALE:1 FIELD TERMINATED TRUNK (2x14 AWG / 2x18 AWG) CONNECTIONNONE SCALE:2 FIELD TERMINATED POWER CONNECTION

NONE SCALE:3 REQURED CABLE LABELINGNONE

SCALE:6 IGU CORDSET DETAIL AND DESCRIPTION LISTNONESCALE:5 DROP CORDSET DETAIL AND DESCRIPTION LIST

NONESCALE:4 TRUNK CORDSET DETAIL AND DESCRIPTION LISTNONE

STANDARD PLENUM DESCRIPTIONT-1'0" T-1'0"P TRUNK CABLE, LRG CONN, 5P MF, 1' 0" (0.3M)T-2'0" T-2'0"P TRUNK CABLE, LRG CONN, 5P MF, 2' 0" (0.6M)T-3'3" T-3'3"P TRUNK CABLE, LRG CONN, 5P MF, 3' 3" (1M)

T-4'11" T-4'11"P TRUNK CABLE, LRG CONN, 5P MF, 4' 11" (1.5M)T-6'6" T-6'6"P TRUNK CABLE, LRG CONN, 5P MF, 6' 6" (2M)T-8'2" T-8'2"P TRUNK CABLE, LRG CONN, 5P MF, 8' 2" (2.5M)

T-9'10" T-9'10"P TRUNK CABLE, LRG CONN, 5P MF, 9' 10" (3M)T-11'5" T-11'5"P TRUNK CABLE, LRG CONN, 5P MF, 11' 5" (3.5M)T-13'1" T-13'1"P TRUNK CABLE, LRG CONN, 5P MF, 13' 1" (4M)T-14'9" T-14'9"P TRUNK CABLE, LRG CONN, 5P MF, 14' 9" (4.5M)T-16'4" T-16'4"P TRUNK CABLE, LRG CONN, 5P MF, 16' 4" (5M)T-18'0" T-18'0"P TRUNK CABLE, LRG CONN, 5P MF, 18' 0" (5.5M)T-19'8" T-19'8"P TRUNK CABLE, LRG CONN, 5P MF, 19' 8" (6M)T-21'3" T-21'3"P TRUNK CABLE, LRG CONN, 5P MF, 21' 3" (6.5M)T-22'11" T-22'11"P TRUNK CABLE, LRG CONN, 5P MF, 22' 11" (7M)T-24'7" T-24'7"P TRUNK CABLE, LRG CONN, 5P MF, 24' 7" (7.5M)T-26'2" T-26'2"P TRUNK CABLE, LRG CONN, 5P MF, 26' 2" (8M)T-27'10" T-27'10"P TRUNK CABLE, LRG CONN, 5P MF, 27' 10" (8.5M)T-29'6" T-29'6"P TRUNK CABLE, LRG CONN, 5P MF, 29' 6" (9M)T-31'2" T-31'2"P TRUNK CABLE, LRG CONN, 5P MF, 31' 2" (9.5M)T-32'9" T-32'9"P TRUNK CABLE, LRG CONN, 5P MF, 32' 9" (10M)T-65'7" T-65'7"P TRUNK CABLE, LRG CONN, 5P MF, 65' 7" (20M)T-98'5" T-98'5"P TRUNK CABLE, LRG CONN, 5P MF, 98' 5" (30M)T-131'2" T-131'2"P TRUNK CABLE, LRG CONN, 5P MF, 131' 2" (40M)T-164'0" T-164'0"P TRUNK CABLE, LRG CONN, 5P MF, 164' 0" (50M)

T-8"P TRUNK CABLE, PLENUM, STUB, LRG CONN, 5P MF

STANDARD PLENUM DESCRIPTIOND-1'0" D-1'0"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 1' 0" (0.3M)D-2'0" D-2'0"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M)D-3'3" D-3'3"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 3' 3" (1M)D-4'11" D-4'11"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 4' 11" (1.5M)D-6'6" D-6'6"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 6' 6" (2M)D-8'2" D-8'2"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 8' 2" (2.5M)D-9'10" D-9'10"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 9' 10" (3M)D-11'5" D-11'5"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 11' 5" (3.5M)D-13'1" D-13'1"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 13' 1" (4M)D-14'9" D-14'9"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 14' 9" (4.5M)D-16'4" D-16'4"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 16' 4" (5M)D-18'0" D-18'0"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 18' 0" (5.5M)D-19'8" D-19'8"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 19' 8" (6M)D-21'3" D-21'3"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 21' 3" (6.5M)D-22'11" D-22'11"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 22' 11" (7M)D-24'7" D-24'7"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 24' 7" (7.5M)D-26'2" D-26'2"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 26' 2" (8M)D-27'10" D-27'10"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 27' 10" (8.5M)D-29'6" D-29'6"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 29' 6" (9M)D-31'2" D-31'2"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 31' 2" (9.5M)D-32'9" D-32'9"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 32' 9" (10M)

STANDARD PLENUM DESCRIPTIONI-1'0" I-1'0"P IGU CABLE, SML CONN, 5PK MF, 1' 0" (0.3M)I-2'0" I-2'0"P IGU CABLE, SML CONN, 5PK MF, 2' 0" (0.6M)I-3'3" I-3'3"P IGU CABLE, SML CONN, 5PK MF, 3' 3" (1M)I-4'11" I-4'11"P IGU CABLE, SML CONN, 5PK MF, 4' 11" (1.5M)I-6'6" I-6'6"P IGU CABLE, SML CONN, 5PK MF, 6' 6" (2M)I-8'2" I-8'2"P IGU CABLE, SML CONN, 5PK MF, 8' 2" (2.5M)I-9'10" I-9'10"P IGU CABLE, SML CONN, 5PK MF, 9' 10" (3M)I-11'5" I-11'5"P IGU CABLE, SML CONN, 5PK MF, 11' 5" (3.5M)I-13'1" I-13'1"P IGU CABLE, SML CONN, 5PK MF, 13' 1" (4M)I-14'9" I-14'9"P IGU CABLE, SML CONN, 5PK MF, 14' 9" (4.5M)I-16'4" I-16'4"P IGU CABLE, SML CONN, 5PK MF, 16' 4" (5M)I-18'0" I-18'0"P IGU CABLE, SML CONN, 5PK MF, 18' 0" (5.5M)I-19'8" I-19'8"P IGU CABLE, SML CONN, 5PK MF, 19' 8" (6M)I-21'3" I-21'3"P IGU CABLE, SML CONN, 5PK MF, 21' 3" (6.5M)I-22'11" I-22'11"P IGU CABLE, SML CONN, 5PK MF, 22' 11" (7M)I-24'7" I-24'7"P IGU CABLE, SML CONN, 5PK MF, 24' 7" (7.5M)I-26'2" I-26'2"P IGU CABLE, SML CONN, 5PK MF, 26' 2" (8M)I-27'10" I-27'10"P IGU CABLE, SML CONN, 5PK MF, 27' 10" (8.5M)I-29'6" I-29'6"P IGU CABLE, SML CONN, 5PK MF, 29' 6" (9M)I-31'2" I-31'2"P IGU CABLE, SML CONN, 5PK MF, 31' 2" (9.5M)I-32'9" I-32'9"P IGU CABLE, SML CONN, 5PK MF, 32' 9" (10M)I-35'0" I-35'0"P IGU CABLE, SML CONN, 5PK MF, 35' 0" (10.66M)I-40'0" I-40'0"P IGU CABLE, SML CONN, 5PK MF, 40' 0" (12.19M)I-45'0" I-45'0"P IGU CABLE, SML CONN, 5PK MF, 45' 0" (13.71M)I-50'0" I-50'0"P IGU CABLE, SML CONN, 5PK MF, 50' 0" (15.24M)I-55'0" I-55'0"P IGU CABLE, SML CONN, 5PK MF, 55' 0" (16.76M)I-60'0" I-60'0"P IGU CABLE, SML CONN, 5PK MF, 60' 0" (18.28M)I-65'0" I-65'0"P IGU CABLE, SML CONN, 5PK MF, 65' 0" (19.81M)I-70'0" I-70'0"P IGU CABLE, SML CONN, 5PK MF, 70' 0" (21.33M)I-75'0" I-75'0"P IGU CABLE, SML CONN, 5PK MF, 75' 0" (22.86M)I-80'0" I-80'0"P IGU CABLE, SML CONN, 5PK MF, 80' 0" (24.38M)I-85'0" I-85'0"P IGU CABLE, SML CONN, 5PK MF, 85' 0" (25.90M)I-90'0" I-90'0"P IGU CABLE, SML CONN, 5PK MF, 90' 0" (27.43M)I-95'0" I-95'0"P IGU CABLE, SML CONN, 5PK MF, 95' 0" (28.95M)I-100'0" I-100'0"P IGU CABLE, SML CONN, 5PK MF, 100' 0" (30.48M)

MALE CONNECTOR FACESTOWARD CONTROL PANEL

WT

MALE CONNECTOR FACESTOWARD CONTROL PANEL

MALE CONNECTOR FACESTOWARD CONTROL PANEL

1.06

FIND NUMBER (LENGTH)ON COLORED WRAP,

BOTH ENDS OF CABLE

X'X"

X'X" P

X'X"

X'X" P

X'X"

X'X" P

0.25"Ø PLENUM0.31"Ø STANDARD

BEND RADIUS, STANDARD 2.5"

BEND RADIUS, PLENUM 3.75"

FIND NUMBER (LENGTH)ON COLORED WRAP,

BOTH ENDS OF CABLE

0.41"Ø PLENUM0.45"Ø STANDARD

TO CONTROL PANEL AWAY FROMCONTROL PANEL

CABLE ORIENTATION LABEL,BOTH ENDS OF CABLEMANUFACTURER AND DATE

CODE, BOTH ENDS OF CABLE0.25"Ø PLENUM

0.31"Ø STANDARD

TO CONTROL PANEL

MANUFACTURER AND DATECODE, BOTH ENDS OF CABLE

AWAY FROMCONTROL PANEL

CABLE ORIENTATION LABEL,BOTH ENDS OF CABLE

BEND RADIUS, STANDARD 2.5"

BEND RADIUS, PLENUM 3.75"

BEND RADIUS, PLENUM 6.15"

BEND RADIUS, STANDARD 3.6"

TO CONTROL PANEL

MANUFACTURER AND DATECODE, BOTH ENDS OF CABLE

AWAY FROMCONTROL PANEL

CABLE ORIENTATION LABEL,BOTH ENDS OF CABLE

7/8, MALE 7/8, FEMALE

1. REMOVE THE UPPER SECTION OF CONNECTOR -HOLD THE UPPER SECTION OF THE CONNECTOR INPLACE THEN TWIST THE LOWER SECTION OF THECONNECTOR COUNTERCLOCKWISE.

2. LOOSEN THE NUT FOR THE STRAIN RELIEF ON THELOWER SECTION OF THE CONNECTOR.

3. FEED THE CABLE THRU BOTTOM HOLE.4. CUT THE OUTER JACKET ~ 1.5” TO EXPOSE THE 4

WIRES INSIDE THE CABLE.5. STRIP THE 4 INDIVIDUAL WIRES ~ 1/4” .

6. WITH A SMALL SCREW DRIVER LOOSEN THE SCREWON THE TERMINALS.

7. INSERT AND TIGHTEN THE WIRES IN THE UPPERSECTION OF THE CONNECTOR PER THE SCHEMATIC.

8. DO A PULL TEST MAKING SURE THAT NO STRAYWIRES ARE STICKING OUT.

9. SLIP THE LOWER SECTION OF THE CONNECTORONTO THE UPPER SECTION AND TIGHTEN.

10. TIGHTEN THE STRAIN RELIEF NUT.

PIPIPI

MALE CONNECTOR FACESTOWARD CONTROL PANEL

FW-LC4-1 FW-LC4-2

~3.43" ~3.37"

1.10

CBL-14/4P

ASSEMBLY INSTRUCTIONS

CABLE PINOUT

SHIELD

1. REMOVE THE UPPER SECTION OF CONNECTOR -HOLD THE UPPER SECTION OF THE CONNECTOR INPLACE THEN TWIST THE LOWER SECTION OF THECONNECTOR COUNTERCLOCKWISE.

2. LOOSEN THE NUT FOR THE STRAIN RELIEF ON THELOWER SECTION OF THE CONNECTOR.

3. FEED THE CABLE THRU BOTTOM HOLE.4. CUT THE OUTER JACKET ~ 1.5” TO EXPOSE THE 4

WIRES AND SHIELD INSIDE THE CABLE.5. STRIP THE 4 INDIVIDUAL WIRES ~ 14 " AND TWIST THE

SHIELD TO FIT INTO A TERMINAL.

6. WITH A SMALL SCREW DRIVER LOOSEN THE SCREWON THE TERMINALS.

7. INSERT AND TIGHTEN THE WIRES IN THE UPPERSECTION OF THE CONNECTOR PER THE SCHEMATIC.

8. DO A PULL TEST MAKING SURE THAT NO STRAYWIRES ARE STICKING OUT.

9. SLIP THE LOWER SECTION OF THE CONNECTORONTO THE UPPER SECTION AND TIGHTEN.

10. TIGHTEN THE STRAIN RELIEF NUT.

ASSEMBLY INSTRUCTIONS

CABLE PINOUT

SHIELD

~3.43" ~3.37"

1.10

7/8, MALE 7/8, FEMALECUT TO LENGTH AS NEEDED

~1.5"

WTWTWT

MALE CONNECTOR FACESTOWARD CONTROL PANEL

FW-LC5-1

FW-LC5-3

~1.5"

PLENUM TRUNK ONLY

STANDARD TRUNK ONLY FW-LC5-2

FW-LC5-4

TO CONTROL PANEL

4" MAXIMUM

4" MAXIMUM

4" MAXIMUM

4" MAXIMUM

2N25

2 5

P.I. 1.1A

TRUNK 1.1A

TRUNK CABLES

WRAPPED LABEL, TRUNK NAME, BOTH ENDS OFFIRST TRUNK SEGMENT FROM CONTROL PANEL

POWER INSERT CABLES

IGU CABLES

IGU CABLES, OPTIONAL

WRAPPED LABEL, POWER INSERT NAME,BOTH ENDS OF CABLE

WRAPPED LABEL, IGU WC NAME, BY GLAZIER,MALE END OF CABLE OUTSIDE OF FRAME

WIRE MARKER TAPE, IGU WC NUMBER, BY GLAZIER,MALE END OF CABLE OUTSIDE OF FRAME

~1.5" ~1.5"

0.41"Ø PLENUM0.45"Ø STANDARD

0.25"Ø

TO CONTROL PANEL

TO CONTROL PANEL

2

1 5

3

42

15

3

4

PART # FIND DESCRIPTION310-000061 FW-LC4-1 CONNECTOR, FIELD WIREABLE, LRG CONN, 4P-M310-000063 FW-LC4-2 CONNECTOR, FIELD WIREABLE, LRG CONN, 4P-F

300-101032-01 CBL-14/4P CABLE, 4 COND, 14AWG, PLENUM, L 500ft300-101032 CBL-14/4P CABLE, 4 COND, 14AWG, PLENUM, L 1000ft

PART # FIND DESCRIPTION310-000047 FW-LC5-1 CONNECTOR, FIELD WIREABLE, LRG CONN, 5P-M310-000051 FW-LC5-2 CONNECTOR, FIELD WIREABLE, LRG CONN, 5P-F310-000071 FW-LC5-3 CONNECTOR, FIELD WIREABLE, LRG CONN, 5P-MALE, 14AWG310-000070 FW-LC5-4 CONNECTOR, FIELD WIREABLE, LRG CONN, 5P-FEMALE, 14AWG

300-101041-01 T-500 CABLE, TRUNK , 2x14AWG, 2x18AWG, SHIELD, NON-PLENUM, 500 FT SPOOL300-101041-02 T-1000 CABLE, TRUNK , 2x14AWG, 2x18AWG, SHIELD, NON-PLENUM, 1000 FT SPOOL300-101042-01 T-P-500 CABLE, TRUNK , 2x14AWG, 2x18AWG, SHIELD, PLENUM, 500 FT SPOOL

2

1

3

4

2

1

3

4

TESTED LABEL

01P

RE

LIM

INA

RY

00.0

0.19

THA

RR

ELL

TH

VIE

W T

RA

ININ

G P

RO

JEC

T18

330

NO

THIN

G R

OA

DS

OM

EW

HE

RE

, CA

950

00

DR

AW

ING

RE

LEA

SE

SD

ES

CR

IPTI

ON

NO

.D

ATE

RE

LEA

SE

#

DR

AW

N:

DE

SIG

N:

RE

VIE

W:

ISS

UE

DA

TE:

INFO

RM

ATI

ON

®

VIEW, INC. ®195 SOUTH MILPITAS BLVD.MILPITAS, CA 95035PH: 408-263-9200WWW.VIEWGLASS.COM

PLO

T D

ATE

:

SFI

D:

VIE

W D

OC

UM

EN

T N

UM

BE

R

SH

EE

T TI

TLE

:

SHEET NUMBER:

VIEW, INC. CONFIDENTIAL:THIS DOCUMENT AND THE INFORMATIONCONTAINED IN IT ARE CONFIDENTIAL,AND CANNOT BE COPIED OR DISCLOSEDIN WHOLE OR IN PART WITHOUT THEEXPRESS WRITTEN CONSENT OFVIEW, INC. ® © - VIEW, INC.

XG-9.2.1

4.29

.201

9 12

:41

PM

2019

00.0

0.19

0134

0-10

133313

0067

130

THFI

ELD

WIR

EA

BLE

CO

NN

EC

TIO

NS

AN

DP

RE

TER

MIN

ATE

DC

OR

DS

ETS

M12, MALE M8 FEMALE, KEYED M8 FEMALE, KEYEDM8 MALE, KEYED7/8, MALE 7/8, FEMALE

V-V+V+

V-

1234 GRN 14 AWG

BLK 14 AWG

RED 14 AWGWHT 14 AWG

V-V+V+

V-

1234GRN 14 AWG

BLK 14 AWG

RED 14 AWGWHT 14 AWG

12345

12345

CAN_H

V+

CAN_L

V-

SHIELD

CAN_H

V+

CAN_L

V-

SHIELDRED 14 AWGBLK 14 AWGWHT 18 AWGBLU 18 AWG

BARERED 14 AWGBLK 14 AWG

WHT 18 AWGBLU 18 AWG

BARE

FIND NUMBER (LENGTH)ON COLORED WRAP,

BOTH ENDS OF CABLE

PART NO: 380-000038-XX (PLENUM) PART NO: 380-101510-XX (PLENUM) PART NO: 380-101509-XX (PLENUM)

PART NO: 380-000057-XX (STANDARD) PART NO: 380-101512-XX (STANDARD) PART NO: 380-101511-XX (STANDARD)

1. MACHINE PRINTED LABEL SHOULD BE LOCATED WITHIN 4" OF CABLE END.2. EACH LABEL SHOULD BE MACHINE PRINTED - BLACK PRINT ON WHITE MATERIAL.3. USE PROPORTIONAL FONT, MINIMUM 14 PT BOLD.4. CABLE IDENTIFIER SHOULD APPEAR TWO TIMES ON THE LABEL FOR VISIBILITY.5. LABELS SHOULD BE OF PERMANENT TYPE MATERIAL.6. HAND WRITTEN LABELS SHOULD NOT BE USED.7. DO NOT MAKE LABELS FROM MASKING TAPE, ELECTRICAL TAPE, DUCT TAPE,

PAPER COVERED SCOTCH TAPE OR ANY NON LABEL MATERIAL.8. WIRE MARKER TAPE CAN BE USED FOR IGU CABLES. USE NUMBER TO MATCH

IGU MARKING ON INTERCONNECT.9. LABELS AND MARKER TAPE NOT PROVIDED BY VIEW.10. TESTED LABEL, PROVIDED BY VIEW, TO BE PLACED ON EACH END OF CABLE

AFTER INSTALLATION AND TESTING.

SCALE:1 FIELD TERMINATED TRUNK (2x14 AWG / 2x18 AWG) CONNECTIONNONE SCALE:2 FIELD TERMINATED POWER CONNECTION

NONE SCALE:3 REQURED CABLE LABELINGNONE

SCALE:6 IGU CORDSET DETAIL AND DESCRIPTION LISTNONESCALE:5 DROP CORDSET DETAIL AND DESCRIPTION LIST

NONESCALE:4 TRUNK CORDSET DETAIL AND DESCRIPTION LISTNONE

STANDARD PLENUM DESCRIPTIONT-1'0" T-1'0"P TRUNK CABLE, LRG CONN, 5P MF, 1' 0" (0.3M)T-2'0" T-2'0"P TRUNK CABLE, LRG CONN, 5P MF, 2' 0" (0.6M)T-3'3" T-3'3"P TRUNK CABLE, LRG CONN, 5P MF, 3' 3" (1M)

T-4'11" T-4'11"P TRUNK CABLE, LRG CONN, 5P MF, 4' 11" (1.5M)T-6'6" T-6'6"P TRUNK CABLE, LRG CONN, 5P MF, 6' 6" (2M)T-8'2" T-8'2"P TRUNK CABLE, LRG CONN, 5P MF, 8' 2" (2.5M)

T-9'10" T-9'10"P TRUNK CABLE, LRG CONN, 5P MF, 9' 10" (3M)T-11'5" T-11'5"P TRUNK CABLE, LRG CONN, 5P MF, 11' 5" (3.5M)T-13'1" T-13'1"P TRUNK CABLE, LRG CONN, 5P MF, 13' 1" (4M)T-14'9" T-14'9"P TRUNK CABLE, LRG CONN, 5P MF, 14' 9" (4.5M)T-16'4" T-16'4"P TRUNK CABLE, LRG CONN, 5P MF, 16' 4" (5M)T-18'0" T-18'0"P TRUNK CABLE, LRG CONN, 5P MF, 18' 0" (5.5M)T-19'8" T-19'8"P TRUNK CABLE, LRG CONN, 5P MF, 19' 8" (6M)T-21'3" T-21'3"P TRUNK CABLE, LRG CONN, 5P MF, 21' 3" (6.5M)T-22'11" T-22'11"P TRUNK CABLE, LRG CONN, 5P MF, 22' 11" (7M)T-24'7" T-24'7"P TRUNK CABLE, LRG CONN, 5P MF, 24' 7" (7.5M)T-26'2" T-26'2"P TRUNK CABLE, LRG CONN, 5P MF, 26' 2" (8M)T-27'10" T-27'10"P TRUNK CABLE, LRG CONN, 5P MF, 27' 10" (8.5M)T-29'6" T-29'6"P TRUNK CABLE, LRG CONN, 5P MF, 29' 6" (9M)T-31'2" T-31'2"P TRUNK CABLE, LRG CONN, 5P MF, 31' 2" (9.5M)T-32'9" T-32'9"P TRUNK CABLE, LRG CONN, 5P MF, 32' 9" (10M)T-65'7" T-65'7"P TRUNK CABLE, LRG CONN, 5P MF, 65' 7" (20M)T-98'5" T-98'5"P TRUNK CABLE, LRG CONN, 5P MF, 98' 5" (30M)T-131'2" T-131'2"P TRUNK CABLE, LRG CONN, 5P MF, 131' 2" (40M)T-164'0" T-164'0"P TRUNK CABLE, LRG CONN, 5P MF, 164' 0" (50M)

T-8"P TRUNK CABLE, PLENUM, STUB, LRG CONN, 5P MF

STANDARD PLENUM DESCRIPTIOND-1'0" D-1'0"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 1' 0" (0.3M)D-2'0" D-2'0"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 2' 0" (0.6M)D-3'3" D-3'3"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 3' 3" (1M)D-4'11" D-4'11"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 4' 11" (1.5M)D-6'6" D-6'6"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 6' 6" (2M)D-8'2" D-8'2"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 8' 2" (2.5M)D-9'10" D-9'10"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 9' 10" (3M)D-11'5" D-11'5"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 11' 5" (3.5M)D-13'1" D-13'1"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 13' 1" (4M)D-14'9" D-14'9"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 14' 9" (4.5M)D-16'4" D-16'4"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 16' 4" (5M)D-18'0" D-18'0"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 18' 0" (5.5M)D-19'8" D-19'8"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 19' 8" (6M)D-21'3" D-21'3"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 21' 3" (6.5M)D-22'11" D-22'11"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 22' 11" (7M)D-24'7" D-24'7"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 24' 7" (7.5M)D-26'2" D-26'2"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 26' 2" (8M)D-27'10" D-27'10"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 27' 10" (8.5M)D-29'6" D-29'6"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 29' 6" (9M)D-31'2" D-31'2"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 31' 2" (9.5M)D-32'9" D-32'9"P DROP CABLE, MED CONN, 5P M, SML CONN, 5PK F, 32' 9" (10M)

STANDARD PLENUM DESCRIPTIONI-1'0" I-1'0"P IGU CABLE, SML CONN, 5PK MF, 1' 0" (0.3M)I-2'0" I-2'0"P IGU CABLE, SML CONN, 5PK MF, 2' 0" (0.6M)I-3'3" I-3'3"P IGU CABLE, SML CONN, 5PK MF, 3' 3" (1M)I-4'11" I-4'11"P IGU CABLE, SML CONN, 5PK MF, 4' 11" (1.5M)I-6'6" I-6'6"P IGU CABLE, SML CONN, 5PK MF, 6' 6" (2M)I-8'2" I-8'2"P IGU CABLE, SML CONN, 5PK MF, 8' 2" (2.5M)I-9'10" I-9'10"P IGU CABLE, SML CONN, 5PK MF, 9' 10" (3M)I-11'5" I-11'5"P IGU CABLE, SML CONN, 5PK MF, 11' 5" (3.5M)I-13'1" I-13'1"P IGU CABLE, SML CONN, 5PK MF, 13' 1" (4M)I-14'9" I-14'9"P IGU CABLE, SML CONN, 5PK MF, 14' 9" (4.5M)I-16'4" I-16'4"P IGU CABLE, SML CONN, 5PK MF, 16' 4" (5M)I-18'0" I-18'0"P IGU CABLE, SML CONN, 5PK MF, 18' 0" (5.5M)I-19'8" I-19'8"P IGU CABLE, SML CONN, 5PK MF, 19' 8" (6M)I-21'3" I-21'3"P IGU CABLE, SML CONN, 5PK MF, 21' 3" (6.5M)I-22'11" I-22'11"P IGU CABLE, SML CONN, 5PK MF, 22' 11" (7M)I-24'7" I-24'7"P IGU CABLE, SML CONN, 5PK MF, 24' 7" (7.5M)I-26'2" I-26'2"P IGU CABLE, SML CONN, 5PK MF, 26' 2" (8M)I-27'10" I-27'10"P IGU CABLE, SML CONN, 5PK MF, 27' 10" (8.5M)I-29'6" I-29'6"P IGU CABLE, SML CONN, 5PK MF, 29' 6" (9M)I-31'2" I-31'2"P IGU CABLE, SML CONN, 5PK MF, 31' 2" (9.5M)I-32'9" I-32'9"P IGU CABLE, SML CONN, 5PK MF, 32' 9" (10M)I-35'0" I-35'0"P IGU CABLE, SML CONN, 5PK MF, 35' 0" (10.66M)I-40'0" I-40'0"P IGU CABLE, SML CONN, 5PK MF, 40' 0" (12.19M)I-45'0" I-45'0"P IGU CABLE, SML CONN, 5PK MF, 45' 0" (13.71M)I-50'0" I-50'0"P IGU CABLE, SML CONN, 5PK MF, 50' 0" (15.24M)I-55'0" I-55'0"P IGU CABLE, SML CONN, 5PK MF, 55' 0" (16.76M)I-60'0" I-60'0"P IGU CABLE, SML CONN, 5PK MF, 60' 0" (18.28M)I-65'0" I-65'0"P IGU CABLE, SML CONN, 5PK MF, 65' 0" (19.81M)I-70'0" I-70'0"P IGU CABLE, SML CONN, 5PK MF, 70' 0" (21.33M)I-75'0" I-75'0"P IGU CABLE, SML CONN, 5PK MF, 75' 0" (22.86M)I-80'0" I-80'0"P IGU CABLE, SML CONN, 5PK MF, 80' 0" (24.38M)I-85'0" I-85'0"P IGU CABLE, SML CONN, 5PK MF, 85' 0" (25.90M)I-90'0" I-90'0"P IGU CABLE, SML CONN, 5PK MF, 90' 0" (27.43M)I-95'0" I-95'0"P IGU CABLE, SML CONN, 5PK MF, 95' 0" (28.95M)I-100'0" I-100'0"P IGU CABLE, SML CONN, 5PK MF, 100' 0" (30.48M)

MALE CONNECTOR FACESTOWARD CONTROL PANEL

WT

MALE CONNECTOR FACESTOWARD CONTROL PANEL

MALE CONNECTOR FACESTOWARD CONTROL PANEL

1.06

FIND NUMBER (LENGTH)ON COLORED WRAP,

BOTH ENDS OF CABLE

X'X"

X'X" P

X'X"

X'X" P

X'X"

X'X" P

0.25"Ø PLENUM0.31"Ø STANDARD

BEND RADIUS, STANDARD 2.5"

BEND RADIUS, PLENUM 3.75"

FIND NUMBER (LENGTH)ON COLORED WRAP,

BOTH ENDS OF CABLE

0.41"Ø PLENUM0.45"Ø STANDARD

TO CONTROL PANEL AWAY FROMCONTROL PANEL

CABLE ORIENTATION LABEL,BOTH ENDS OF CABLEMANUFACTURER AND DATE

CODE, BOTH ENDS OF CABLE0.25"Ø PLENUM

0.31"Ø STANDARD

TO CONTROL PANEL

MANUFACTURER AND DATECODE, BOTH ENDS OF CABLE

AWAY FROMCONTROL PANEL

CABLE ORIENTATION LABEL,BOTH ENDS OF CABLE

BEND RADIUS, STANDARD 2.5"

BEND RADIUS, PLENUM 3.75"

BEND RADIUS, PLENUM 6.15"

BEND RADIUS, STANDARD 3.6"

TO CONTROL PANEL

MANUFACTURER AND DATECODE, BOTH ENDS OF CABLE

AWAY FROMCONTROL PANEL

CABLE ORIENTATION LABEL,BOTH ENDS OF CABLE

7/8, MALE 7/8, FEMALE

1. REMOVE THE UPPER SECTION OF CONNECTOR -HOLD THE UPPER SECTION OF THE CONNECTOR INPLACE THEN TWIST THE LOWER SECTION OF THECONNECTOR COUNTERCLOCKWISE.

2. LOOSEN THE NUT FOR THE STRAIN RELIEF ON THELOWER SECTION OF THE CONNECTOR.

3. FEED THE CABLE THRU BOTTOM HOLE.4. CUT THE OUTER JACKET ~ 1.5” TO EXPOSE THE 4

WIRES INSIDE THE CABLE.5. STRIP THE 4 INDIVIDUAL WIRES ~ 1/4” .

6. WITH A SMALL SCREW DRIVER LOOSEN THE SCREWON THE TERMINALS.

7. INSERT AND TIGHTEN THE WIRES IN THE UPPERSECTION OF THE CONNECTOR PER THE SCHEMATIC.

8. DO A PULL TEST MAKING SURE THAT NO STRAYWIRES ARE STICKING OUT.

9. SLIP THE LOWER SECTION OF THE CONNECTORONTO THE UPPER SECTION AND TIGHTEN.

10. TIGHTEN THE STRAIN RELIEF NUT.

PIPIPI

MALE CONNECTOR FACESTOWARD CONTROL PANEL

FW-LC4-1 FW-LC4-2

~3.43" ~3.37"

1.10

CBL-14/4P

ASSEMBLY INSTRUCTIONS

CABLE PINOUT

SHIELD

1. REMOVE THE UPPER SECTION OF CONNECTOR -HOLD THE UPPER SECTION OF THE CONNECTOR INPLACE THEN TWIST THE LOWER SECTION OF THECONNECTOR COUNTERCLOCKWISE.

2. LOOSEN THE NUT FOR THE STRAIN RELIEF ON THELOWER SECTION OF THE CONNECTOR.

3. FEED THE CABLE THRU BOTTOM HOLE.4. CUT THE OUTER JACKET ~ 1.5” TO EXPOSE THE 4

WIRES AND SHIELD INSIDE THE CABLE.5. STRIP THE 4 INDIVIDUAL WIRES ~ 14 " AND TWIST THE

SHIELD TO FIT INTO A TERMINAL.

6. WITH A SMALL SCREW DRIVER LOOSEN THE SCREWON THE TERMINALS.

7. INSERT AND TIGHTEN THE WIRES IN THE UPPERSECTION OF THE CONNECTOR PER THE SCHEMATIC.

8. DO A PULL TEST MAKING SURE THAT NO STRAYWIRES ARE STICKING OUT.

9. SLIP THE LOWER SECTION OF THE CONNECTORONTO THE UPPER SECTION AND TIGHTEN.

10. TIGHTEN THE STRAIN RELIEF NUT.

ASSEMBLY INSTRUCTIONS

CABLE PINOUT

SHIELD

~3.43" ~3.37"

1.10

7/8, MALE 7/8, FEMALECUT TO LENGTH AS NEEDED

~1.5"

WTWTWT

MALE CONNECTOR FACESTOWARD CONTROL PANEL

FW-LC5-1

FW-LC5-3

~1.5"

PLENUM TRUNK ONLY

STANDARD TRUNK ONLY FW-LC5-2

FW-LC5-4

TO CONTROL PANEL

4" MAXIMUM

4" MAXIMUM

4" MAXIMUM

4" MAXIMUM

2N25

2 5

P.I. 1.1A

TRUNK 1.1A

TRUNK CABLES

WRAPPED LABEL, TRUNK NAME, BOTH ENDS OFFIRST TRUNK SEGMENT FROM CONTROL PANEL

POWER INSERT CABLES

IGU CABLES

IGU CABLES, OPTIONAL

WRAPPED LABEL, POWER INSERT NAME,BOTH ENDS OF CABLE

WRAPPED LABEL, IGU WC NAME, BY GLAZIER,MALE END OF CABLE OUTSIDE OF FRAME

WIRE MARKER TAPE, IGU WC NUMBER, BY GLAZIER,MALE END OF CABLE OUTSIDE OF FRAME

~1.5" ~1.5"

0.41"Ø PLENUM0.45"Ø STANDARD

0.25"Ø

TO CONTROL PANEL

TO CONTROL PANEL

2

1 5

3

42

15

3

4

PART # FIND DESCRIPTION310-000061 FW-LC4-1 CONNECTOR, FIELD WIREABLE, LRG CONN, 4P-M310-000063 FW-LC4-2 CONNECTOR, FIELD WIREABLE, LRG CONN, 4P-F

300-101032-01 CBL-14/4P CABLE, 4 COND, 14AWG, PLENUM, L 500ft300-101032 CBL-14/4P CABLE, 4 COND, 14AWG, PLENUM, L 1000ft

PART # FIND DESCRIPTION310-000047 FW-LC5-1 CONNECTOR, FIELD WIREABLE, LRG CONN, 5P-M310-000051 FW-LC5-2 CONNECTOR, FIELD WIREABLE, LRG CONN, 5P-F310-000071 FW-LC5-3 CONNECTOR, FIELD WIREABLE, LRG CONN, 5P-MALE, 14AWG310-000070 FW-LC5-4 CONNECTOR, FIELD WIREABLE, LRG CONN, 5P-FEMALE, 14AWG

300-101041-01 T-500 CABLE, TRUNK , 2x14AWG, 2x18AWG, SHIELD, NON-PLENUM, 500 FT SPOOL300-101041-02 T-1000 CABLE, TRUNK , 2x14AWG, 2x18AWG, SHIELD, NON-PLENUM, 1000 FT SPOOL300-101042-01 T-P-500 CABLE, TRUNK , 2x14AWG, 2x18AWG, SHIELD, PLENUM, 500 FT SPOOL

2

1

3

4

2

1

3

4

TESTED LABEL

Page 33: OVERVIEW GUIDE QDM-05-000022 - View, Inc | Smart Windows › sites › default › files › documents › installation-over… · OVERVIEW GUIDE View responsibilities: 1. Shipment

33 of 33 ©2019 View, Inc.Rev 5 | July 2019

OVERVIEW GUIDE

IGU Cable

4” Adapter

IGU Smart Window Connector

IGU Cable

IGU Cable

IGU Pigtail

Required IGU testing by glazier and LVE, the installer needs to observe each glass IGU tinting from the busbars (allow 1 minute per IGU)

4-State Controller/Tester