Particula r commissio n on public debate Préfet (specific lines; dependent on voltage/l ength) Local stakehold er committee s Regional committee s/ supra- regional committee Public National Commissio n for Public Debate (CNDP) RTE Need determination Spatial planning Permitting Develop 10-year French National Investment Plan TSO PA PA PA NGOs PA TSO TSO PA Pu Internal studies Routing option Comm. strategy Provision of info material during public debate Show how people will be informe d in process Decisio n on public debate Organisation of public debate Compilat ion of report Meetings during public debate Joint definitio n of study areas to find corridors Joint definitio n of study areas to find corridors Joint definitio n of study areas to find corridors Decision on participan ts/ number/ format of meetings of committees Runs studie s Joint identi ficati on of min. 2 corrid ors Joint identi ficati on of min. 2 corrid ors Joint identi ficati on of min. 2 corrid ors Hands in appli ca- tion Runs EIA and consu l- tatio n Determi nes line details Negoti -ation of compen - sation measur es Coordinat ion of process with other stake- holders Negoti - ation of compen - sation measur es Negoti -ation of compen - sation measur es Established at Cotentin-Maine project: Informed twice per year by RTE Publi c consu l- tatio n EIA New tool: citizen conferences Ministry of Energy Publicati on of recommen- dation Projec t approv al GOV ER ER 2 4 6 6 6 10 10 10 9 7

description

Overview of the legal procedure in France

Transcript of Overview France

Page 1: Overview France

Particular commission

on public debate

Préfet (specific lines; dependent on voltage/lengt

h)

Local stakeholder committees

Regional committees/

supra-regional committee

Public

National Commission

for Public Debate (CNDP)

RTE

Need determination Spatial planning Permitting

Develop 10-year French National Investment Plan

TSO

PA

PA

PA

NGOs

PA

TSO

TSO

PA

Pu

Internal studies Routing optionComm. strategy

Provision of info material during public debate

Show how people will be informed in process

Decision on public debate

Organisation of public debate

Compilation of report

Meetings during public debate

Joint definition of study areas to find corridors

Joint definition of study areas to find corridors

Joint definition of study areas to find corridors

Decision on participants/ number/ format of meetings of committees

Runs studies

Joint identification of min. 2 corridors

Joint identification of min. 2 corridorsJoint identification of min. 2 corridors

Hands in applica-tion

Runs EIA and consul-tation

Determines line details

Negoti-ation of compen-sation measures

Coordination of process with other stake-holders

Negoti-ation of compen-sation measures

Negoti-ation of compen-sation measures

Established at Cotentin-Maine project: Informed twice per year by RTE

Public consul-tation EIA

New tool: citizen conferences

Ministry of Energy

Publication of recommen-dation

Project approval

GOV

ER

ER

2 4 6

6

6

10

10

10

9

7

Page 2: Overview France

Refers to the box numbers in the report chapter, highlighting good practice