Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well...
Transcript of Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well...
![Page 1: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/1.jpg)
The Swedish National Road & Transport Research Institute
Senior Researcher
Leif Sjögren
Overall quality management of road condition monitoring: a case study
![Page 2: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/2.jpg)
11
The Swedish National Road and Transport Research Institute, VTI
www.vti.se
![Page 3: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/3.jpg)
22
Road pavements comprise a major component of public
infrastructure, and are designed to have long service lives
delivering safe, smooth, all-weather access for people and
goods.
Background
![Page 4: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/4.jpg)
33
• A digital framework- road asset database
• Prediction models of pavement performance
• Cost and benefit models
• Maintenance standards
• Environmental effects
Basic components of a
pavement management system
Management
system
![Page 5: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/5.jpg)
44
Acceptable standard
Time (years)
Condition
Treatment
Treatmentor error in monitoring?
New built standard
0 10
Can we trust data?
![Page 6: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/6.jpg)
55
Some quality aspect factors:
• Suitable (adequate) for the mission
• Operational security, safe and sound
• Reliable technical performance
• Maintenance needs
• Impact on environment
• Pros and cons considering competitive equipment’s
• Cost (investment, operation and closure or destruction)
Quality aspectsKnowledge and management of the overall quality is a basic need
for a well functioning pavement management system
![Page 7: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/7.jpg)
66
Tools to improve the pavement management, planning and
maintenance is continuously developed.
Profilometers is examples of valuable tools to reliable monitor
the status or condition of the road pavement assets.
Road condition monitoring
![Page 8: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/8.jpg)
77
Challenges: new technology and methods such as
smart cars (probe vehicles), smartphones,
crowd sourcing and Big Data
![Page 9: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/9.jpg)
8
Strategic long term planning;
Knowledge of the condition of an entire road network
including trend analysis
Objects and projects monitoring;
Support in the daily construction and maintenance
Roadwork planning
Research and policy studies
Contracts;
Performance control of contractors
The use of road condition data
![Page 10: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/10.jpg)
9
Different levels of use for parameters and indicators
![Page 11: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/11.jpg)
10
Technical parameters and indicators should be:
• Objective avoid subjective ratings
• Reliable repeatable and reproducible -many operators and equipment's should give the same result
• Safe no road closures, traffic speed measurements
• Sustainable standardized, long term contracts can be 8-10 years
• Valid measure desired function
![Page 12: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/12.jpg)
11
Example from the Swedish Transport
Administration’s road and pavement database
PMSv3: [email protected]
![Page 13: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/13.jpg)
12
Major error sources in the monitoring process
![Page 14: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/14.jpg)
13
Quality approval control parameters
![Page 15: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/15.jpg)
14
Control level: Main responsibility:
Sensor Equipmentmanufacturer/operator
Application Operator/measurementcompany
Complete function Customer/road owner
Main responsibility of control and approval
![Page 16: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/16.jpg)
15
Height reference
Total station/ Rod and Level
Longitudinal profile,
PrimalTransversal profile,
VTI XPS
Position,
high accuracy GPS
Cracks
Image collectionMacrotexture,
High accuracy profiling
Reference equipment
![Page 17: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/17.jpg)
16
Swedish case study of a successful concept
using quality controlResults from 5 % repeated control measurements
![Page 18: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/18.jpg)
17
• Established standards and descriptions of methods
• A maintenance standard with defined levels for the
monitored parameters e.g. for rut depth, IRI and MPD.
• A common coordinate system that support connection
and synchronizing of databases e.g. road condition data
with accidents data.
• A move to combine road assets into the same database
• Methods for control of received data
• A public available database, PMSv3 giving feedback
from local “experts”
Some actions done in Sweden to increase
and maintain the quality
![Page 19: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/19.jpg)
18
• Public available test sections frequently reference
measured
• “raw” data (profiles) for each indicator with the
“true value” available for implementation tests
Some actions done in Sweden to increase
and maintain the quality
![Page 20: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/20.jpg)
19
• Procurement of monitoring services with emphasis on
quality, not just lowest price. (Extra points for better
quality in the selection process)
• 5 % of the production has to be re-measured and the
deviation from production approved
• Random checks by third party
• Requirements on repeated measurements of
object/project level works
• Specified method how to do when an approved system is
changed during the period it was approved.
• Yearly field tests including comparison with a reference
Some actions done in Sweden to increase
and maintain the quality
![Page 21: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/21.jpg)
20
• The purpose of monitoring sets the requirements!
• Long-term monitoring needs high quality, reliable data
• Object level monitoring, less important unless performance
stated in contracts are involved
• Standards and specifications are important (necessary)
• References equipment needed to support long term
stability
• Certification procedures should be encouraged
• Control schemes, daily checks and calibration
• Operator, positioning and data management the major
source of errors, implying that resources must be put on
data management!
Conclusions
![Page 22: Overall quality management of road condition monitoring: a …874364/FULLTEXT01.pdf · for a well functioning pavement management system . 6 Tools to improve the pavement management,](https://reader035.fdocuments.us/reader035/viewer/2022071213/602fd0f3e10572650b336589/html5/thumbnails/22.jpg)
Thank you for your attention!