our people and our passion in every project
Historic Rehabilitation of the Erie Canal “Flight of Five Locks”
Project Update
William R. Miles, PE Director of Civil Works
Presented by:
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Question:What era are the locks being restored to?
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
The vessel size on the canal continued to increase from the original in the 1820’s to the early 20th Century so minimum draft and lock size needed to increase.
Ditch Locks Evershed Locks(Locks 67-71)
Barge Canal(Locks 34 & 35)
Canal Depth (Min.)Lock WidthLock LengthLock StepVessel Capacity
4’15’90’12’
30 T
7’18’110’12’
240 T
12’45’360’24.5’
> 1000 T
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project T O D AY
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Design Challenges [As presented at 2008 WCC in Kingston, Ontario, CA]
1. Water Diversion2. Debris Management3. Sediment Removal4. Maintaining Access to Locks 34 & 355. Handrail Restoration & Safety6. Gate Balance Beam Interferences7. Reinstall Mitre Gates8. Lock Walls (Configuration)9. Culverts (Configurations)10. Lock Floor Restoration11. Lamp Post Replacement12. Arch Bridge Rehabilitation
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Project Requirements
Meet City of Lockport requirements Meet New York State Canal Corporation requirements Meet design criteria Meet codes, standards, and guidelines
Question:Who are the Stakeholders?
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
City of Lockport Requirements
Vision Mission Scope
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Vision“A world renowned tourist
destination; The Lockport Locks Heritage District.”
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Mission“The stabilization and restoration of the
Flight of Five Locks to a fully functioning flight of locks,
representative of their 1862 condition.”
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every projectPresent ConditionLooking Downstream
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every projectPresent ConditionLooking Upstream
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Scope of the Rehabilitation Removal of sediments. Preservation/restoration of the wooden foundation. Restoration of the existing railings. Restoration of the existing arched bridges. Restoration of the masonry walls. Installation of wooden lock gates.
Question:What work needs to be done first?
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
NYSCC Requirements
Maintain power plant operating license. Maintain a treaty for water usage with Canada. Maintain ability to perform maintenance. Maintain ability to operate Locks 34 & 35. Provide appropriate level of safety. Develop an Operation & Maintenance Plan in
partnership with the City of Lockport.
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Codes, Standards, and Guidelines Standards for the Treatment of
Historic Properties, Secretary of the Interior
NEPA SEQRA A Policy on Geometric Design of
Highways and Streets 2004 (AASHTO) Guide for the Development of Bicycle
Facilities (AASHTO) Designing Sidewalks and Trails for
Access, Best Practices Design Guide (FHWA)
Pedestrian Facilities Users Guide –Providing Safety and Mobility, (FHWA)
NYSDOT Highway Design Manual
National Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) and the New York State Supplement.
Standard Specifications for Highway Bridges, American Association of State Highway and Transportation Officials (AASHTO)
NYSDOT Bridge Manual (BM) ADA Accessibility Guidelines for
Buildings and Facilities AASHTO Guide Specification for
Design of Pedestrian Bridges, American Association of State Highway and Transportation Officials (AASHTO)
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Design Criteria
Vertical & Horizontal Clearance in Locks to Accommodate Demonstration Vessel
Structural Capacity of Bridges to Accommodate Pedestrians or Maintenance Vehicles
Horizontal Clearance on Bridges to Accommodate Pedestrians or Maintenance Vehicles
Railing Height ADA
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Lock 67 / 68 Balance Beam Interferences Project Requirements
The primary project goal is to rehabilitate the Flight of Five to the Evershed Era drawings. In order to best achieve that goal, the following major actions were considered:• Reinstall wooden gates at the upper end of Lock 67. • Remove Bridge 2; as it did not exist during the Evershed Era.• Reinstall an arch pedestrian bridge downstream of the gates at
the upper end of Lock 67.
Maintain access to the center island for maintenance vehicles/equipment.
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Lock 67 / 68 Balance Beam InterferencesProblem & Alternative Solutions
The vehicular bridge that spans the lock is located on top of the miter gate recess which will cause both installation and operational interference with these gates.
Alternatives Considered:• Option 1 – Move the Bridge Upstream• Option 2 – Move the Bridge Downstream• Option 3 – Reduce the Bridge Width• Option 4 – Remove the Bridge• Option 5 – Modify Gate Design with Existing Bridge• Option 6 – Modify Gate Design with Temporary Bridge
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Lock 67 / 68 Gates Confl ict with BridgeRecommendation
Options 1 and 2 would be the most costly options; and would have a significant negative impact on the historic authenticity.
Options 5 and 6 would provide access to the center island with the existing or temporary structure; and would alter the historic authenticity by hiding the gates and changing how they would be operated.
Option 4 would return the Flight of Five to its most historically authentic state. However, it would significantly impact the NYSCC’sability to perform maintenance.
Option 3 would be the least costly and most feasible.
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Photosimulat ionGate Between Locks 69 & 70
Existing Conditions Proposed Conditions
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Photosimulat ionLocks 67 & 68 (Beams Extended)
Existing Conditions Proposed Conditions
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Photosimulat ionLocks 67 & 68 (Hinged Beams Folded)
Existing Conditions Proposed Conditions
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Photosimulat ionGate Between Locks 68 & 69
Existing Conditions Proposed Conditions
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Photosimulat ionGate Between Locks 67 & 68 (Looking Downstream)
Existing Conditions Proposed Conditions
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Photosimulat ion
Proposed Light
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Photosimulat ionGate Between Locks 67 & 68 (Looking Upstream)
Existing Conditions Proposed Conditions
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Photosimulat ionGate Between Locks 67 & 68 (Looking Upstream)
Existing Conditions Proposed Conditions
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
2009 Demonstrat ion Project
East End of Center Wall ($90k US Cost) Railing Replacements and Reports Stone Stair Repairs: Dutchman Jahn Mortar Pressure Grouting Cracks
Lessons Learned
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Demo Project Photos (2009)
After ConstructionBefore Repair
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Demo Project Photos (2009)
Rai l ings
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Demo Project Photos (2009)
Rai l ings
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Demo Project Photos (2009)
Stone Sta i rs
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Prel iminary Design Phase
Design Report Produced (30% Design Plans) – April 2010 Dam Break Analysis (NYSDEC Required) Additional Survey & Mapping Review and Comments by:
City of Lockport NYS Canal Corp. NYSDEC NYSHPO NYSDOT
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
S ta tus of Pro ject Funding Through July 2010
Grigg Lewis Historic Structures Report $50,000
Grigg Lewis (1)Grigg Lewis (2)
Program Management $120,000$300,000
NYS Legislature Appropriations (Sen. Maziarz)
Project Publicity $24,000
ESDC (Sen. Maziarz) Design $300,000
NYSDOT (Cong. Reynolds) Design & Construction $2,236,000
NYS Canal Corporation Design & Construction $112,000
Total $3,142,500
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
Recent Area Improvements
Main Street Restoration Richmond Street/Canal Street Improvements Canal Street Block Erie Canal Discovery Center Harbor Feasibility Study Area Economic Impact Study
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
For More Information Contact:Bill Miles: [email protected] Nims: [email protected]
An Update on the Effort to Restore the Erie Canal Flight of Five Locks, Lockport, NY, US William Miles, P.E., Bergmann Associates, Rochester, NY, USA [email protected] As previously presented at the 2008 World Canals Conference in Kingston, Ontario, the City of Lockport, New York has been continuing its efforts to fully restore the 1840’s vintage stone masonry northern flight of locks to operating condition. In the last two years significant progress has been made on the planning, dam safety analysis, engineering design, public relations efforts and fundraising. An initial demonstration project for the rehabilitation construction of stone stairways and metal railings has been completed on the east end of the locks and a little less than one-half of the funds to restore the locks has been raised by the City and its sponsors. Two videos have also been prepared to aid in raising additional funds; to showcase the great value of the facility to the region, state and nation and to provide a vision of the restored locks. The presentation will provide a complete update to the project along with the showing of the videos and the anticipated future schedule. William Miles is the Director of Civil Works for Bergmann Associates, a 350 person consulting engineering and architecture firm headquartered in Rochester, NY and with 10 offices in the eastern half of the US. He is the technical manager of the firm’s nationally recognized Waterway Structures Business and has over 30 years of experience with the new and rehabilitation design and construction of navigation structures for state agencies and the US Army Corps of Engineers. His role on the Flight of Five Project is as Principal-in-Charge and Navigation Specialist. He is a graduate of Syracuse University with a BS in Civil Engineering and is licensed PE in seven states.