LIBRA Extended Well Test:
Getting Ready for First Oil
Francisco CostaJoint Venture Operator
EXTENDED WELL TEST IN LIBRA
� First FPSO dedicated for EWT with gas injection
� First use of 8” production flexible line� First Production line pre-laying with buoys� Largest External Turret in Ultra Deep Waters� Swivel operation with the highest gas
injection pressure
Slide 2
Several Industry Firsts:
EXTENDED WELL TEST IN LIBRA
EWTs: Reduction of uncertainty by understanding dynamic behavior is crucial to optimizefinal production systems.
WellsProduction Well
Production UnitOil Capacity: 50 mil bbl/dGas Compression: 4.0 MM m3/d
WellsGas Injection Well
NW-2
NW-3
NW REGION DEVELOPMENT PLAN CONSIDERS FOUR PRODUCTION UNITS (PILOT + 3 MODULES)
2017 2018 2019 2020 2021 2022 2023
EW
T /
EP
S
PR
OG
RA
MLI
BR
A 1
LIB
RA
2LI
BR
A 3
LIB
RA
4
FPSOLOI
OPERATION
DP WELLS CAMPAIGN
FPSOGTD
FPSOLOI
DP WELLS CAMPAIGN
FPSOGTD
FPSOLOI
FPSOGTD
FPSOLOI
OPERATION OPERATION
1ST OIL
Ref: Forecast Apr/17, Petrobras Business Plan 17-21 and Libra Business Plan 2017
1ST OIL
DP WELLS CAMPAIGN
1ST OIL
DP WELLS CAMPAIGN
1ST OIL
Injection Line
Drilled Wells
Completed Wells
Libra 2
Libra 3
Libra 1
Libra 4
NW1
NW5
NW2
NW3
NW4
Production Line
EWT
SPA 1
SPA 2
1ST OILJUL/17
EWT MAIN IMPACTS
MAIN UNCERTAINTIES X INFORMATION ACQUIRED
� Long term dynamic performance of wells and reservoir.
� Minimum “connected” oil in place, reservoir boundaries and detection of sealing faults
� Detection of conductive fractures and/or super-K layers.
� Flow assurance issues and efficiency of mitigating actions
� Drainage plan - optimal number and location of wells & subsea design.
� Production and injection strategy.
� More reliability in the production forecasts..
WE
LLSS
lide
6
Duration (days)
source: Halliburton
INTELLIGENT COMPLETION
Source: Halliburton
Flexibility for different tests
during EWT
Pressure & Temperature for
each interval
Flow / Static control
Intervals can be closed and monitored downhole
Remote control from FPU
Source: Petrobras
3-RJS-742A COMPLETION WITH WEST CARINASlide 8
Opened ICV Packer Feed Through...
......
......
......
......
......
.
SUBSEA
Slide 9
Acquisition of Key Components
Slide 10
Torpedo
Flexible Lines
Mooring Chains
Triplate
Xmas Tree
......
......
......
......
......
....
......
......
......
......
......
....
EWT Mooring Instalation
Torpedo #3 installed
Slide 13
......
......
......
......
......
....
Libras ´́́́s First ANM stackup installed
EWT: 8” PRODUCTION
FLEXIBLE LINES
EWT: 8” PRODUCTION FLEXIBLE LINES
Slide 15
......
......
......
......
......
....
TYPICAL RISER INTERMEDIATE BUOYS INSTALLATION
Slide 16
......
......
......
......
......
....
FIRST PRODUCTION LINE PRE-LAYING & ABANDONMENT WITH BUOYS
PO
SV
SV
PO
SV
UEH
UEH
PO
UEH
Scenario 1without
pre-laying
Scenario 2Pre-laying
withoutbuoyancymodules
Scenario 3Pre-laying
withbuoyancymodules
22
39
51
1217
Base Case
Optimization
17 days in advance
675 M
..............................
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
CONFIDENTIAL
Subsea Activities
LIBRA | Comitê de Gestão | EWT Update| April 27th 2017
FPSO PIONEIRO DE LIBRA
Slide 36
TURRET
Production slot 1
Production slot (spare) 1
Gas injection slot 1
PROCESSING CAPACITY
Oil 50 kbpd
Liquid 50 kbpd
Produced water(up to 50% BSW)
25 kbpd
Gas 4 MMsm 3/d
Storage 756.000 bbl
CONTAMINANTSH2S – gas phase 170 ppmv
CO2 – gas phase ≤ 60 %
.......................................................
.......................................................
TURRET
Slide 37
� One of the heaviest external cantilever Turret
� The largest (approximately 47m x 16m) external cantilever Turret in ultra deepwater(up to 2.400m)
� Pull in capacity: 700 ton
......
......
......
......
......
....
........................................
SWIVEL
Slide 38
Swivel Test:Operating pressure= 550 barg;Design pressure = 605 barg.
Swivel Stack-Terminated Cables (Feb 2017)
Swivel Integration Spool
......
......
......
......
......
....
......
......
......
......
......
....
FPSO PIONEIRO DE LIBRA
FPSO PIONEIRO DE LIBRA
Slide 41
Thank You
FPSO Sail Away (03.28.2017)