Transcript of OS-NMA User Terminal
![Page 1: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/1.jpg)
OS-NMA User TerminalFlavio SBARDELLATI, Market Development DepartmentKate BOUSFIELD-PARIS, Legal and Procurement DepartmentGiovanni LUCCHI, Project Control OfficeFundamental elements Webinar, 29th March 2017This presentation can be interpreted only together with the oral comments accompanying it
![Page 2: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/2.jpg)
2
• Participants’ microphones are muted. To avoid any echo, please switch off your microphone.
• Make sure your speakers or headphones are switched on, and turn up the volume.
• To interact you can use the common chat room. Questions to individual participants will not be answered.
• Your questions will appear anonymously to the other participants
Before we start – way of working (1/2)
![Page 3: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/3.jpg)
3
• Questions are collected and addressed at the end of the session, if time allows it.
• All questions and answers will be published on the GSA website in order to guarantee the equal treatment of tenderers/applicants.
• Slides and clarifications will be available in due course online after this webinar.
• After the information session, you will receive a short satisfaction questionnaire, please fill it in.
Before we start – way of working (2/2)
![Page 4: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/4.jpg)
4
TECHNICAL SCOPE PARTICIPATION AND EVALUATION CONTRACT GUIDELINES TO FILL IN THE FINANCIAL TABLES HOW TO PREPARE YOUR TENDER Q&A TIME
Agenda
![Page 5: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/5.jpg)
5
TECHNICAL SCOPE
![Page 6: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/6.jpg)
6
• Open Service Navigation Message Authentication Signal in Space transmission is foreseen in 2018 while full service provision is planned in 2020.
• OS-NMA Specification for Signal-in-Space testing v.1.0 was disclosed in February 2017 allowing for OS-NMA implementation at chipset/receiver level.
• A new generation of user terminals enabled to exploit this feature needs to be industrialised.
Background
![Page 7: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/7.jpg)
7
• Development of a “close to market” OS-NMA User Terminal:• Target application: The UT shall meet Smart Tachograph application’s
requirements
• Level of maturity to carry out a demonstration in a representative environment (TRL 7+)
• Supply of qty. 3 units
• Development of a suitable end-to-end Validation Platform
Tender objectives (1/2)
![Page 8: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/8.jpg)
8
• Extensive testing of the UT: anti-spoofing performance assessment using:• Real GNSS signals, and
• End-to-end Validation platform
Tender objectives (2/2)
![Page 9: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/9.jpg)
9
• Implementing OS-NMA in accordance with [AD.1] (OS-NMA specification for SiS testing v1.0)• At data level, implementing cryptographic and rough
synchronisation functions required for OS-NMA (e.g. key management, algorithm implementation, receiver logic)
• At signal level, including anti-replay protection by making an optimal use of the unpredictable bit broadcast in the NMA data
Highest level of robustness (1/2)
![Page 10: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/10.jpg)
10
• Additional anti-spoofing capability:• A list of mandatory measures defined in the tender spec
(sect. 2.2.7.2)• Protection against the full list of spoofing threats
identified by the tenderer• A list of optional measures proposed by the contractor to
achieve the best possible PVT solution in terms of robustness and reliability
Highest level of robustness (2/2)
![Page 11: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/11.jpg)
11
Stepwise approach
![Page 12: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/12.jpg)
First UT (v.1 featuring OS-NMA) developed
Validation platform developed
UT v.1 extensively tested ‒Real SiS‒Validation platform
Two-stage project
12
Final UT (v.2 with full anti-spoofing capability) developed
Validation platform upgraded
UT v.2 extensively tested ‒Real SiS‒Validation platform
Qty. 1 proto unit delivered Qty. 2 proto units delivered
STAGE 1 STAGE 2
![Page 13: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/13.jpg)
13
End-to-end Validation platform
![Page 14: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/14.jpg)
14
• The contractor, upon the GSA’s approval and tools’ availability, shall be granted access on request to the following items:• GNSS Simulator • Spoofing Generator • Experimentation NMA Module
• Description of the tools available in the next slides.
Customer Furnished Items (CFI)
![Page 15: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/15.jpg)
• Generating E1BC in accordance with Galileo OS-NMA Scheme
Spirent GSS9000 with 6x Signal Banks: GAL E1/E5/E6 + GPS L1/L2/L5 Up to 16 channels in all signal banks- Generation of GAL E1BC with pre-computed INAV navigation data symbols in accordance with current
GAL OS-NMA scheme- OS-NMA Module: SW tool calculating INAV data symbols for a given set of satellite ephemeris and
time window will be made available.
GNSS Simulation Capabilities
![Page 16: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/16.jpg)
• Two possible solutions:
1. Using record and playback platform and a GNSS simulator: - Spoofing attacks on the GPS/Galileo OS in L1 implemented pre-recording sequentially two
scenarios (baseline and spoofing) and combining them off-line into one IF dataset to be played back.
- Sharing 10 MHz reference and a TRIG signal allows a very precise time alignment (<1 ns) of the two scenarios.
2. Using two GNSS simulators currently available at the JRC: a Spirent GSS9000 and a Spectracom GSG-64 (with GPS L1/L2/L5, GAL E1/E5).
- Time alignment of the two GNSS signals is much coarser in this case
Spoofing & Meaconing generation
![Page 17: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/17.jpg)
• 2x NI USRP 2943R: Record and playback of IF data with 4,8, or 16 bit depth• Up to two bands simultaneously recorded/played back at a sustained sampling
rate up to 100 Msmp/sec
• IF data streamed to/from an SATA SSD disk drive on the host PC running the control software
Record and playback capability
![Page 18: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/18.jpg)
18
Signal-in-Space testing
OS-NMA public key distribution:• E-mail and publication
on GSC web portal for registered users
• Public key renewal process through SIS during testing phase is TBC
![Page 19: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/19.jpg)
19
• Coordination task:‒ coordination with EC/GSA projects dealing with the OS-NMA, authentication
and terminal robustness concepts with the aim to collect and inject into the project any relevant input.
• Standardisation task:‒ Definition of a standard architecture for the OS-NMA UT‒ Recommendation for additional anti-spoofing techniques complementing OS-
NMA against a certain set of spoofing threats‒ Definition of a standard approach to assess the protection level of the UT‒ Identification of interfaces and APIs to enable a wide market uptake of OS-NMA
Transversal activities (1/2)
![Page 20: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/20.jpg)
20
• Dissemination task:‒ Of the achievements of the project among relevant stakeholders with the
aim of fostering the innovation created in the frame of the action and creating market awareness of the project’s results.
• Engineering support to GSA/EC‒ Fixed unit level of effort to provide support to the GSA and EC concerning
the OS-NMA implementation aspects.
Transversal activities (2/2)
![Page 21: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/21.jpg)
21
Stage 1 - Milestones Schedule (indicative)
P1KOM Stage 1 Kick-Off meeting T0
SRR System Requirements Review T0+2m
DR Design Review T0+4m
TRR1 Test Readiness Review 1 T0+6m
TTVR Testing Tools Validation Review T0+6m
FR1 Final Review 1 T0+9m
Milestones plan
Stage 2 - Milestones Schedule (indicative)
P2KOM Stage 2 Kick-Off meeting T1
dDR delta Design Review T1+2m
TRR2 Test Readiness Review 2 T1+5m
FR2 Final Review 2 T1+11m
![Page 22: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/22.jpg)
22
Maximum price: 2,500,000.00€ Funding rate: 100% Total price of Stage 1 shall not exceed 45% of the Total
Contract Value
Procurement budget
![Page 23: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/23.jpg)
23
TIMETABLE DATE Note
Launch of procurement process 15 February
Deadline for submission of clarifications 5 May 2017Last date on which clarifications are published by the GSA 12 May 2017
Deadline for submission of tenders 19 May 2017Opening of tenders 26 May 2017
Evaluation of tenders May – August 2017 Estimated
Award decision September 2017 Estimated
Contract signature October 2017 Estimated
Project timeline
![Page 24: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/24.jpg)
24
PARTICIPATION AND EVALUATION
![Page 25: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/25.jpg)
25
• All EU natural and legal persons and those from:‒Iceland‒Norway‒Liechtenstein‒Former Yugoslav Republic of Macedonia‒Albania‒Montenegro‒Serbia and‒Bosnia and Herzegovina
Participation
![Page 26: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/26.jpg)
26
• Assessment of the tender is done in sequential and eliminatory stages:
Evaluation
![Page 27: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/27.jpg)
27
• ALL entities (prime, consortium members, and subcontractors) must fulfil the exclusion criteria
complete Annex I.D.
Evaluation: exclusion criteria
![Page 28: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/28.jpg)
28
• ALL entities (prime, consortium members, and subcontractors) must fulfil the selection criteria unless indicated otherwise.‒Legal capacity all entities‒Economic and financial capacity see p.46 (note: “core”
subcontractor)‒Technical and professional capacity see p.47 (note: “core”
subcontractor)
NOTE: Submit the evidence required for each capacity criterion (nb. the maximum age of supporting documents)
Evaluation: selection criteria
![Page 29: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/29.jpg)
29
• Tenderers must fulfil the minimum requirements in section 3.3 of Annex I (prime, consortium members).
Evaluation: minimum requirements
![Page 30: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/30.jpg)
30
• Qualitative and financial
Evaluation: award criteria
![Page 31: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/31.jpg)
31
CONTRACT
![Page 32: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/32.jpg)
32
• Conditional Stage Payment Contract‒Contract is divided into stages ‒Contracting authority defines the conditions for starting the
next stage or terminating the contract at the end of the stage‒Payments are always limited per stage
Overview of the CSPC – intro
![Page 33: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/33.jpg)
33
1st Stage – development and supply of OS-NMA UT prototype – details in section 1.3.1 of Annex I
2nd Stage – prototype performance assessment and supply– details in section1.3.2 of Annex I
Overview of the CSPC – stages
![Page 34: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/34.jpg)
34
• Conditions precedent for 2nd stage:‒GSA’s authorisation, given provided that:
(1) 1st contract stage successfully completed
AND
(2) the Galileo ground system and the satellite constellation are able to broadcast OS-NMA Signal-in-Space (SiS) through E1-B I/NAV, such that it is objectively suitable to support the tasks as foreseen and scheduled for 2nd contract stage
Overview of the CSPC – conditions precedent for 2nd stage
![Page 35: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/35.jpg)
35
• Read the draft contract carefully:
this is only an overview of important points on ownership of results and use of background IPR
IPR licensing conditions (1/5)
![Page 36: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/36.jpg)
36
• Results (tangible and intangible) created under the contract shall be vested in the EU, represented by the EC
• EU acquires a number of exclusive rights and modes of exploitation
IPR licensing conditions (2/5)
![Page 37: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/37.jpg)
37
• Background IPR shall be declared as soon as the contractor is aware of its need
• Contractor provides/ensures all necessary licenses over background IPR to enable the the EU, GSA and institutional assignees/licensees to use the Results for institutional purposes
IPR licensing conditions (3/5)
![Page 38: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/38.jpg)
38
• Subject to compliance with contractual obligations, the contractor and the contractor parties (incl. affiliates) obtain a non-transferable, non-sub licensable, perpetual, unrestricted, free of charge, non-exclusive right to use the results, including for commercialisation purposes of products having embedded the results
IPR licensing conditions (4/5)
![Page 39: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/39.jpg)
39
• Contractor shall provide license over background IPR licence upon request where this is needed for commercial exploitation of the results under fair, equal and reasonable market terms and conditions
IPR licensing conditions (5/5)
![Page 40: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/40.jpg)
40
GUIDELINES TO FILL THE FINANCIAL TABLES
![Page 41: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/41.jpg)
41
• Annex I.K – Effort distribution • Annex I.L – Financial Offer
‒Including Annex I.La substantiating the Financial Offer by providing detailed cost element data
How to build the Financial Table
![Page 42: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/42.jpg)
42
• WBS-E based (bottom-up approach)• Define the labour cost, allocate it to tasks• Differentiated sheets to be filled in by the prime and
subcos/members (bottom-up approach)• Integrated approach – integration and consistency check in
charge to the prime (tenderer’s leader)
Approach
![Page 43: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/43.jpg)
43
• WBS-E based
• The sum of the prices of the WBSE’s has to be the total tender price.
• This price must match the price reported in the Annex I.L – Financial Offer sheet.
• It shall be assessed against the award criteria (Q1)
Effort distribution – Annex I.K
Tenderer (full company name):
WP titleWBE id
(relating to WP)
WBE Price (*) (in % of the Total Overall Tender
price)
Share (%) of competitive subcontracting (**)
(*) Totel Overall Price = PCS-A6 price + Task 7.1 PCS-A1 price + Task 7.2 PCS-A1 price (**) Percentage of the WBE price which is subcontracted through a competitive tendering
Signature by tenderer's authorised representative:
_____________________________
Procurement/Contract Number: GSA/OP/23/16 - Development, Supply and Testing of a Galileo Open Service Authentication User Terminal (OS-NMA) for the GSA
Annex I.K - Effort Distribution
![Page 44: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/44.jpg)
44
Annex I.L: Financial Offer sheet, to be filled in by the Prime only
• PCS-A1 sheet
• Task 7.1 PCS-A1 sheet
• Task 7.2 PCS-A1 sheet
• Leader PCS-A2 sheet, to be filled in by the Prime only
• Member_ PCS-A2 sheet
• PCS-A2 Exibit A sheet
• PCS-A2 Exibit B sheet
• PCS-A2 Exibit C sheet
• PCS-A4 sheet
• PCS-A6 sheet
• PCS-A8 sheet
Financial Tables – Annex I.L
Annex I.La Price Cost sheets
![Page 45: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/45.jpg)
45
Financial Tables – Annex I.La - Logic
![Page 46: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/46.jpg)
46
• Step 1 – PCS-A1• Step 2 – in parallel (PCS-A8; PCS-A2 Exhibits A,B and C)• Step 3 – PCS-A2• Step 4 – Task 7.x PCS-A1• Grouping by the prime to get Leader PCS-A2 Exhibit C• PCS-A2 Exhibit C + Task 7.x PCS-A1 Financial Offer
Financial Offer generation
![Page 47: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/47.jpg)
47
HOW TO PREPARE YOUR TENDER
![Page 48: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/48.jpg)
48
• Documents must be submitted in accordance with double envelope system
Tender package composition
Outer Envelope
Inner Envelope
#1#2
#3
![Page 49: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/49.jpg)
49
In accordance with tender specifications, sect. 4.5:
A. The Administrative filesB. The Technical Offer C. The Financial Offer
Summary of the tenders
![Page 50: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/50.jpg)
50
• Signed cover letter• ID sheet• Power of Attorney• Submit subcontractor’s Letter of Intent• Financial identification form• Financial statements• DOH• Non-disclosure undertaking• Statement re: minimum requirements
Administrative files (1/2)
![Page 51: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/51.jpg)
51
Attention:• Legal identity form – Annex I.B (download the
applicable template and do not forget to submit supporting documents* indicated on the top of the downloaded template)
• Submit the required statements of authorisation*
Administrative files (2/2)
![Page 52: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/52.jpg)
52
• Executive Summary (max 2 pages)• Technical proposal addressing all matters laid down in the
tender specifications‒Pay attention to the elements listed in the TS, section 4.5.4
• Annex I.G – Technical and Professional Selection Criteria Cover Sheet
• Annex I.K – Effort distribution• Annex II.III – Declaration of Background IPR
Technical Offer
![Page 53: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/53.jpg)
53
• Annex I.L and I.La – Financial Table of Answers and Cost Statement Forms
NOTE:‒ Price elements of Annex I.L shall be fully aligned and supported by
the percentage figures presented in Annex I.K (included in the Technical Offer) with no discrepancies.
‒ The level of detail and the justification of costs submitted in the Cost Statement Forms (CSF) in Annex I.La shall be evaluated as part of the qualitative award criteria (Q1).
Financial Offer
![Page 54: OS-NMA User Terminal](https://reader036.fdocuments.us/reader036/viewer/2022062900/58ed58221a28ab90168b4699/html5/thumbnails/54.jpg)
54
E-mail address: [email protected]
Tenders sent by express mail, commercial courier or post mail to
GSA Legal and Procurement Department Janovského 438/2, 170 00, Prague 7, Czech Republic Tender ref. GSA/OP/23/16Tenders sent by hand-delivered should be addressed to the same postal
address not later than 19 May 2017 at 17.00 (CET)
Submit requests for clarifications by: 5 May 2017
Submit tenders by: 19 May 2017
Contact coordinates for the tender