ORLANDO NEW PORT RICHEY CR 121 - CULVERT ......5 4 3 2 1 N 0 1 2 Miles BEE LINE EXPRESSWAY F L O R I...
Transcript of ORLANDO NEW PORT RICHEY CR 121 - CULVERT ......5 4 3 2 1 N 0 1 2 Miles BEE LINE EXPRESSWAY F L O R I...
CONTRACT PLANSPROJECT LOCATION
DATE BY DESCRIPTION
KEY SHEET REVISIONS
NASSAU COUNTY ENGINEERING
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
ROADWAY PLANS
ENGINEER OF RECORD:
P.E. NO.:
ROADWAY SHOP DRAWINGS
TO BE SUBMITTED TO:
PLANS PREPARED BY:
NOTE: THE SCALE OF THESE PLANS MAY
HAVE CHANGED DUE TO REPRODUCTION.
$$date$$
FERNANDINA BEACH, FL. 32034
95094 ARBOR LANE
MCCRANIE & ASSOCIATES, INC.
DANIEL I. MCCRANIE, P.E.
CERTIFICATE OF AUTHORIZATION NO. 8269
TEL. NO. (904) 335-8586
FERNANDINA BEACH, FL. 32034
95094 ARBOR LANE
DANIEL I. MCCRANIE, P.E.
50627
$$time$$ $$FileName$$
DESIGN STANDARDS DATED 2010, AND
0.049261
NASSAU COUNTY PROJECT MANAGER: SCOTT HERRING, P.E.
261
261
0.049
0.049
SHEET DESCRIPTIONSHEET NO.
INDEX OF ROADWAY PLANS
GOVERNING STANDARDS AND SPECIFICATIONS:
STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION DATED 2010, AND
NASSAU COUNTY ORDINACE 99-17 AS
AMENDED BY CONTRACT DOCUMENTS.
FLORIDA DEPARTMENT OF TRANSPORTATION,
APPLICABLE DESIGN STANDARDS MODIFICATIONS: 01/01/2010
For Design Standards Modifications click on
"Design Standards" at the following web site:
http://www.dot.state.fl.us/rddesign/
GROSS LENGTH OF PROJECT
EXCEPTIONS
NET LENGTH OF PROJECT
BRIDGES
ROADWAY
LINEAR FEET MILES
LENGTH OF PROJECT
BOARD OF COUNTY COMMISSIONERS
£ CONST. CR 121
STA 35+09
BEGIN PROJECT
£ CONST. CR 121
STA 37+70
END PROJECT
FEB 2013
FINAL SUBMITTAL
WALTER J. BOATRIGHT - DISTRICT 5
BARRY V. HOLLOWAY - DISTRICT 4 - VICE CHAIRMAN
PAT EDWARDS - DISTRICT 3
STEPHEN W. KELLEY - DISTRICT 2
DANIEL B. LEEPER - DISTRICT 1 - CHAIRMAN
NASSAU/DUVAL COUNTY LINE
CR 121 - CULVERT EXTENSION
SWPPP
TRAFFIC CONTROL PLAN & DRIVEWAY DETAIL
SPECIAL DETAILS
SIGNING & PAVEMENT MARKING
PLAN SHEET
GENERAL NOTES
SUMMARY OF PAY ITEMS
KEY SHEET
8-9
7
6
5
4
3
2
1
N
0 1 2
Miles
BEE LINEEXPRESSWAY
FLO
RID
A STU
RNPIK
E
10
PENSACOLA
FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
75
10
LAKE CITY 295
95
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
4
NEW PORT RICHEY
TAMPA
754
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
275
SARASOTA -
BRADENTON75
95
FT PIERCE
FT MYERS
WEST
PALM
BEACH
FT LAUDERDALE
MIAMI
75
75
NAPLES
KEY WEST
Mattox
TO
JACKSONVILLE
MACCLENNY
BALDWIN
TOB
AK
ER
CO
UN
TY
DUVAL
COUNTY11
10
15
7 89
161718
1920
21
2930
31
38
6
MACCLENNY
TO
TO
2,180,000
2,160,000
340,000
121
90
8
10
10
Baldwin
Bay
DeepCr.
Horseshoe
CSX T.
CSX
T.
Horseshoe Circle
SUMMARY OF PAY ITEMS 2
SUMMARY OF PAY ITEMSITEM DESCRIPTIONITEM NUMBER UNIT PLAN FINAL
NO
TI
CE:
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.003,
F.
A.
C.
101-1 MOBILIZATION LS 1
102-1 MAINTENANCE OF TRAFFIC LS 1
104-10-2 HAY BALES EA 10
110-1-1 CLEARING & GRUBBING
110-4 REMOVAL OF EXISTING PAVEMENT SY 45
120-1 REGULAR EXCAVATION CY 50
120-6 EMBANKMENT CY 50
160-4 TYPE B STABILIZATION SY 200
285-704 OPTIONAL BASE GROUP 4 (6" LIMEROCK) SY 200
339-1 MISCELLANEOUS ASPHALT PAVEMENT TN 20
400-1-1 CONCRETE CLASS I, CULVERTS CY 50
430-174-124 PIPE CULVERT, RCP, ROUND, 24" SD LF 40
430-175-148 PIPE CULVERT, RCP, ROUND, 48" S/CD LF 15
430-982-141 MITERED END SECTION, OPTIONAL, ROUND, 48" SD EA 6
430-984-129 MITERED END SECTION, OPTIONAL, ROUND, 24" SD EA 4
530-3-4 RIPRAP ,RUBBLE, F&I, DITCH LINING TN 12
570-1-2 PERFORMANCE TURF (SOD) SY 650
700-20-60 SINGLE POST SIGN, REMOVE EA 2
705-10-2 OBJECT MARKER, TYPE 2 EA 2
706-3 RETRO-REFLECTIVE PAVEMENT MARKER
EA(BI-DIRECTIONAL) (YELLOW) 57
711-11-111 THERMOPLASTIC, STANDARD, WHITE, SOLID, 6" NM
711-11-124 THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" LF 70
711-11-211 NM 0.10
LS 1
6. 570- 1- 2 Includes approximately 200 SY Sod for temporary erosion control.
5. 400-1-1 Quantity is for the two concrete collars
4. 339-1 Includes driveway and guardrail patch
3. 120-1 Includes muck removal
2. 110-1-1 Includes removal of pipe, guardrail and headwall
1. 104- 10- 2 Based on replacement every 3 months.
==================
PAY ITEM NOTES
THERMOPLASTIC, STANDARD, YELLOW, SOLID, 6"
0.10
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
NO.
SHEET
CONSTRUCTION PLANS FOR:
NASSAU COUNTY ENGINEERINGNASSAU COUNTY FLORIDA
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
Certificate of Authorization No. 8269
(904) 335-8685
Fernandina Beach, FL 32034
95094 Arbor Lane
P.E. # 50627
Daniel I. McCranie, P.E.Engineer of Record:
CR 121
2/25/2013 1:44:12 PM N:\Projects\CR121\cessrd01.dgnDan McCranie
25. ALL PIPE LENGTHS ARE SCALED DIMENSIONS. ALL DRAINAGE STRUCTURES SHALL BE CONSTRUCTED TO CONFORM WITH NASSAU COUNTY AND FDOT REQUIREMENTS AND
NASSAU COUNTY AND FDOT REQUIREMENTS AND JOINTS WRAPPED WITH FILTER FABRIC PER FDOT REQUIREMENTS.
SHALL BE CONSTRUCTED TO CONFORM WITH CURBING, PROPERTY LINES AND LOW POINTS AS SHOWN ON THE PLANS.
26. CONTRACTOR SHALL INSURE THAT ALL DRAINAGE STRUCTURES, PIPES, ETC. ARE CLEAN AND FUNCTIONING PROPERLY AT TIME OF ACCEPTANCE.
27. A PRE-CONSTRUCTION MEETING IS REQUIRED TO BE ATTENDED BY NASSAU COUNTY REPRESENTATIVES, THE CONTRACTOR, QC (CONTRACTOR’S TESTING FIRM), SUB-CONTRACTORS, UTILITY COMPANIES, AND THE ENGINEER OF RECORD.
28. CONTRACTOR WILL BE RESPONSIBLE FOR THE RELOCATION OF ALL STANDARD MAILBOXES IN ACCORDANCE WITH POSTAL REQUIREMENTS.
29. ALL LANES MUST BE REOPENED TO NORMAL TRAFFIC WITHIN 8 HOURS AFTER RECEIVING NOTIFICATION OF A HURRICANE EVACUATION OR ANY OTHER CATASTROPHIC
EVENT AND SHALL REMAIN OPEN FOR THE DURATION OF THE EVACUATION OR EVENT AS DIRECTED BY NASSAU COUNTY. A DISASTER PREPAREDNESS PLAN SHALL BE SUBMITTED AT THE PRE-CONSTRUCTION CONFERENCE.
31. THE REMOVAL OF MUCK AND PLASTIC MATERIAL WITHIN THE PROJECT LIMITS SHALL BE IN ACCORDANCE WITH THE FDOT STANDARD INDEX NO. 505.
32. ALL WORK PERFORMED WITHIN COUNTY’S RIGHT-OF-WAY SHALL CONFORM TO NASSAU COUNTY’S ORDINANCE 99-17 AND TO THE MOST CURRENT EDITION OF THE
FOLLOWING PUBLICATIONS:
STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (ENGLISH)
FDOT DESIGN STANDARDS (ENGLISH)
FDOT PLANS PREP MANUAL
FDOT FLEXIBLE PAVEMENT DESIGN MANUAL FOR NEW CONSTRUCTION AND PAVEMENT REHABILITATION
1. EXISTING DRAINAGE STRUCTURES WITHIN CONSTRUCTION LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED.
2. THE CONTRACTOR SHALL NOTIFY UTILITY OWNERS LISTED BELOW THROUGH SUNSHINE ONE CALL OF FLORIDA, INC.
3. ANY PUBLIC LAND CORNER WITHIN THE LIMITS OF CONSTRUCTIONS TO BE PROTECTED. IF A CORNER MONUMENT OR BENCHMARK
IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN PROPERLY REFERENCED, THE CONTRACTOR SHOULD NOTIFY THE COUNTY
4. THE CONTRACTOR SHALL NOT ALLOW ANY ASPHALT SPOILS, TO BE SWEPT OR BLOWN, ONTO UNPAVED SHOULDER AREAS, INTO
DRAINAGE STRUCTURES, OR DITCHES. CONTRACTOR SHOULD CLEAN UP DAILY AND HAVE A MECHANICAL BROOM AVAILABLE.
5. FILTER FABRIC USED TO WRAP PIPE JOINTS IN ACCORDANCE WITH SPECIFICATION 430 SHALL MEET THE REQUIREMENTS OF
6. ALL WORK PERFORMED WITHIN THE COUNTY RIGHT-OF-WAY, MATERIALS AND TESTING SHALL BE IN COMPLETE ACCORDANCE WITH
ALL RELATIVE SECTIONS OF NASSAU COUNTY STANDARDS, (LATEST REVISION) AND ALL CURRENT NASSAU COUNTY STANDARD DETAILS.
FDOT DESIGN STANDARDS AND FDOT STANDARD SPECIFICATIONS FOR ROAD & BRIDGE 2010, WILL BE USED IF NOT ADDRESSED BY NASSAU COUNTY DOCUMENTS. CONTRACTOR SHALL COMPLY WITH CURRENT FLORIDA ACCESSIBILITY CODE FOR ALL WORK ON THIS PROJECT.
7. ALL WORK SHALL BE PERFORMED IN A SAFE MANNER. ALL SAFETY RULES AND GUIDELINES OF O.S.H.A. SHALL BE FOLLOWED. THE
CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ANY INJURIES TO HIS EMPLOYEES AND ANY DAMAGE TO PRIVATE PROPERTY OR
PERSONS DURING THE COURSE OF THIS PROJECT. ALL COSTS ASSOCIATED WITH COMPLYING WITH O.S.H.A. REGULATIONS AND THE FLORIDA TRENCH SAFETY ACT MUST BE INCLUDED IN THE CONTRACTORS BID.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE JOB SITE PRIOR TO PREPARING THE BID FOR THE PURPOSE OF
FAMILIARIZING HIMSELF WITH THE NATURE AND THE EXTENT OF THE WORK AND LOCAL CONDITIONS, EITHER SURFACE OR
SUB-SURFACE, WHICH MAY AFFECT THE WORK TO BE PERFORMED, AND THE EQUIPMENT, LABOR AND MATERIALS REQUIRED. FAILURE
TO DO SO WILL NOT RELIEVE THE CONTRACTOR OF COMPLETE PERFORMANCE UNDER THE CONTRACT. THE CONTRACTOR IS ALSO URGED
TO TAKE COLOR PHOTOGRAPHS THROUGHOUT THE PROJECT AREA TO RECORD EXISTING CONDITIONS PRIOR TO CONSTRUCTION, AND TO AID IN THE POSSIBLE FUTURE COMPLAINTS THAT MAY OCCUR DUE TO CONSTRUCTION OF THE PROJECT.
9. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO EITHER CONDUCT ANY FIELD EXPLORATION OR ACQUIRE ANY
GEOTECHNICAL ASSISTANCE REQUIRED TO ESTIMATE THE AMOUNT OF UNSUITABLE MATERIAL REQUIRED TO BE REMOVED
10. BENCHMARK DATUM: HORIZONTAL IS NORTH AMERICAN 1983/1990 AND VERTICAL IS NAVD 1988, AS DETERMINED BY
11. THE CONTRACTOR WILL CONTRACT WITH AN INDEPENDENT TESTING LABORATORY TO PERFORM MATERIAL TESTING AND SOIL
TESTING IN ACCORDANCE WITH NASSAU COUNTY AND/OR FDOT REQUIREMENTS WITH PRIOR ADVANCE NOTICE TO NASSAU COUNTY
AND/OR OWNER C.E.I.’S THIS SHALL INCLUDE DENSITY TEST IN ALL PAVEMENT AREAS AND IN ALL UTILITY TRENCHES LOCATED IN PAVEMENT AREAS, CONCRETE TESTING AND ALL OTHER MATERIAL TESTING.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND INSURANCE FOR THE PROJECT INCLUDING NPDES PERMITS, AND ETC.
FOR MAINTENANCE OF TRAFFIC AND METHOD OF CONSTRUCTION AND REPAIR.
14. AS-BUILT DRAWINGS (2 PAPERS & 1 CADD) AS-BUILTS TO NASSAU COUNTY ARE REQUIRED TO BE SIGNED AND SEALED BY A
FLORIDA REGISTERED LAND SURVEYOR THEREFORE, IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO CONTRACT WITH A LAND
SURVEYOR REGISTERED IN THE STATE OF FLORIDA FOR THE PREPARATION, FIELD LOCATIONS, CERTIFICATION AND SUBMITTAL OF
"AS-BUILT" DRAWINGS IN ACCORDANCE WITH CURRENT NASSAU COUNTY STANDARDS AND SPECIFICATIONS. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO PROCESS THE AS-BUILT DRAWINGS FOR APPROVAL BY NASSAU COUNTY. CONTRACTOR SHALL REFER TO NASSAU COUNTY AS-BUILT CHECKLIST.
15. THE CONTRACTOR SHALL COORDINATE HIS CONSTRUCTION WITH ALL OTHER CONTRACTORS IN THE AREA. IN THE EVENT OF ANY CONFLICT WHATSOEVER, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER PRIOR TO PROCEEDING WITH CONSTRUCTION.
16. CLEARING AND GRUBBING REQUIRED FOR ALL ROADWAY, UTILITIES, DITCHES AND BERMS INCLUDED IN THIS PROJECT, AND THE
17. ALL AREAS SHOWN TO BE FILLED SHALL BE CLEARED AND GRUBBED IN ACCORDANCE WITH FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION 2010, SECTION 110.
19. ALL DEBRIS RESULTING FROM ALL ACTIVITIES SHALL BE DISPOSED OF BY THE CONTRACTOR.
20. ALL EXCESS SUITABLE AND UNSUITABLE MATERIAL SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR UNLESS DIRECTED
OTHERWISE BY ENGINEER OR OWNER.
22. ALL EXISTING TREES TO REMAIN SHALL BE PRESERVED AND PROTECTED.
NOXIOUS WEEDS & GRASSES, INCLUDING TROPICAL SODA APPLE. CERTIFICATION SHALL BE PROVIDED PRIOR TO INSTALLATION.
24. ALL STORM SEWER PIPE MATERIALS SHALL BE RCP. ALL PIPE INSTALLATIONS WILL FOLLOW MANUFACTURER’S RECOMMENDATIONS,
30. THE CONTRACTOR WILL NOT BE ALLOWED TO PERFORM NIGHT TIME WORK, OR WEEKEND WORK. ANY CHANGES TO THESE LANE CLOSURE RESTRICTIONS MUST BE APPROVED
PROVIDE ANY NECESSARY SUPPORT TO AERIAL FACILITIES AS DEEMED NECESSARY TO PERFORM CONSTRUCTION. CONTRACTOR MUST
AT NO ADDITIONAL COST TO THE COUNTY, THE CONTRACTOR MAY BE REQUIRED TO PHYSICALLY EXPOSE AND SUPPORT UNDERGROUND
FACILITIES AND PROVIDE REASONABLE TIME TO ALLOW FOR MINOR UNFORSEEN UTILITY RELOCATIONS BY UTILITY COMPANY AND/OR
NOTIFY UTILITY COMPANY 24 HOURS PRIOR TO ANY SUCH WORK.
FDOT DESIGN STANDARDS INDEX 199, TYPE D-3 WITH AN A.O.S. (SIEVE NUMBER) OF 70 TO 100.
AND/OR TO ESTIMATE THE AMOUNT OF OFF SITE BORROW THAT WILL BE REQUIRED. CONTRACTOR TO USE AN APPROVED FDOT PIT.
CLEARING AND GRUBBING OF ALL RIGHT-OF-WAY OR EASEMENTS SHALL BE CONSIDERED AS PART OF THIS PROJECT.
BY NASSAU COUNTY ENGINEERING SERVICES DEPARTMENT. REFER TO NASSAU COUNTY ROAD CLOSURE POLICY. LANE CLOSURES ARE ONLY ALLOWED FROM 9 AM TO 3:30 PM
3
(1-800-432-4770) IN ADVANCE OF BEGINNING CONSTRUCTION ON THE PROJECT SITE.
21. (deleted)
(904) 665-7613 JEA (904) 696-7424 FLORIDA POWER & LIGHT (904) 680-6434 COMCAST CABLE COMMUNICATIONS (904) 256-3225 AT&T DISTRIBUTION
COMPANIES TELEPHONE NUMBERS
WITHOUT DELAY, BY TELEPHONE. THE CONTRACTOR IS RESPONSIBLE FOR ANY EXPENSES ENCUMBERED FOR PROTECTING, REFERENCING AND/OR REPLACING ANY CORNER MONUMENTS OR BENCHMARKS.
THE REMOVAL OF UNSUITABLE MATERIAL WITHIN THE PROJECT LIMITS SHALL BE IN ACCORDANCE WITH FDOT STANDARD INDEX NO. 505.
MANZIE & DRAKE LAND SURVEYORS, INC. (904) 491-5700
13. THE CONTRACTOR SHALL COORDINATE THE WORK WITHIN NASSAU OR DUVAL COUNTY OR STATE RIGHT-OF-WAY WITH THE PROPER AGENCIES
CONTRACTOR WILL SOD ALL DISTURBED AREAS.
18. (deleted)
34. BURNING OF ANY MATERIAL OR DEBRIS IS PROHIBITED.
35. ACCESS TO DRIVEWAYS AND SIDE STREETS SHALL BE MAINTAINED AT ALL TIMES.
GENERAL NOTES
NO
TI
CE:
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.003,
F.
A.
C.
23. CONTRACTOR SHALL CERTIFY THAT ALL SOD WITHIN THE COUNTY RIGHT-OF-WAY SHALL BE BAHIA AND SHALL BE FREE OF
33. ALL BROKEN/CRACKED DRIVEWAYS MUST BE REPAIRED OR REPLACED AT CONTRACTORS EXPENSE.
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
NO.
SHEET
CONSTRUCTION PLANS FOR:
NASSAU COUNTY ENGINEERINGNASSAU COUNTY FLORIDA
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
Certificate of Authorization No. 8269
(904) 335-8685
Fernandina Beach, FL 32034
95094 Arbor Lane
P.E. # 50627
Daniel I. McCranie, P.E.Engineer of Record:
CR 121
2/25/2013 1:44:13 PM N:\Projects\CR121\gnntrd01.dgnDan McCranie
PLAN SHEET
N
4
0 5 20
Feet
CR 121
INV. EL. 69.90
OFFSET 34.89’
STA 36+56.68
18’ CLEAR ZONE
73
73
72
72
71
71
PATCH PAVEMENT
REMOVE EXISTING GUARDRAIL
18’ CLEAR ZONE
REMOVE EXISTING PAVEMENT
36" CMP TO REMAIN
¡ CR 121
TO 1:4 SLOPE WITHIN CLEAR ZONE
RE-GRADE DITCH IN THIS AREA
INV. EL. 70.30
OFFSET 28.36’
STA 36+24.51
REMOVE 20" DEEP UNSUITABLE SOIL
MATCH EXISTING PIPE SLOPES
INSTALL (3) 48" MES (FDOT INDEX 272)
(INCLUDING 19’ IN MES).
EXTEND (3) 48" RCP 21 LF
PATCH PAVEMENT
REMOVE EXISTING GUARDRAIL
AT OUTFALL 18’ x 8’ X 1.5’
PLACE RIPRAP (RUBBLE)
REMOVE 20" DEEP UNSUITABLE SOIL
MATCH EXISTING PIPE SLOPES
INSTALL (3) 48" MES (FDOT INDEX 272)
(INCLUDING 19’ IN MES).
EXTEND (3) 48" RCP 22 LF
TO 1:4 SLOPE WITHIN CLEAR ZONE
RE-GRADE DITCH IN THIS AREA
SAND-CEMENT ENDWALL
REMOVE EXISTING
TO 1:4 SLOPE WITHIN CLEAR ZONE
RE-GRADE DITCH IN THIS AREA
(SEE SHEET 6)
PLACE SYNTHETIC BALES
COORDINATE WITH PROPERTY OWNER
FOR TYPICAL DETAILS
IN PLACE. SEE SHEET 6 AND 7
(FDOT INDEX 273)
(2) DOUBLE 24" MES POURED
REPLACE WITH (2) 24" RCP &
REMOVE EXISTING (2) 24" RCP
RIGHT-OF-WAY.
FROM 7:30 AM TO 8:30 AM, WHEN WORKING IN THE CITY OF JACKSONVILLE’S
3. THE CONTRACTOR IS RESPONSIBLE FOR CALLING 904-255-8366 DAILY
WILL REQUIRE A RIGHT-OF-WAY PERMIT.
2. ANY CONSTRUCTION IN THE CITY OF JACKSONVILLE’S RIGHT-OF-WAY
1. PLACE PERFORMANCE TURF (SOD) IN ALL DISTURBED AREAS.
NOTE:
73
72
71
70
69
68
69
70
71
72
COUNTY ROAD NO. 121
CONCRETE
HEADWALL
CONCRETE
HEADWALL
ELEVATION=73.64’
EASTING=337981.49
NORTHING=2173767.30
OFFSET=15.72R
STATION=33+29.56
"MANZIE LB 7039"
IRON ROD & CAP
SET 5/8"
50.0
’50.0
’
35+00 36+00 37+00
74
73
72
71
70
69
68
67
68
69
70
71
72
73
72
73
72
71
71
72
73
72
71
70
70
69
68
67
67
67
68
69
70
71
72
73
73
72
71
70
74
74
74
73
72
71
71
72
73
7070
73
72
71
70
69
6868
70
71
72
73
73
72
71
70
69
69
70
71
7272
73
68
68
69
70
71
72
73
73
74
74 7
3
73
72
71
74
74
74
74
74
OFF: 30.20’R
STA: 37+20.97
INVERT=70.42’
36" CMP
OFF: 30.16’R
STA: 36+88.31
INVERT=70.36’
36" CMP
GUARD RAIL
(3) 48"RCP
PIPE 1 (SOUTH) INVERT=67.78’STA:36+62.44 OFF:18.11’R PIPE 2 (MIDDLE) INVERT=67.63’STA:36+68.95 OFF:18.73’R PIPE 3 (NORTH) INVERT=67.66’
STA:36+74.96 OFF:18.66’R
(3) 48"RCP
PIPE 1 (SOUTH) INVERT=68.18’
PIPE 2 (MIDDLE) INVERT=67.57’STA:36+62.46 OFF:19.28’L
STA:36+75.48 OFF:18.88’L
STA:36+69.28 OFF:18.90’L PIPE 3 (NORTH) INVERT=67.72’
OFF: 30.12’L
STA: 36+52.58
INVERT=69.65’
24" RCP
OFF: 27.40’L
STA: 36+52.40
INVERT=69.98’
24" RCP
OFF: 26.82’L
STA: 36+27.55
INVERT=70.27’
24" RCP
OFF: 30.02’L
STA: 36+27.48
INVERT=70.47’
24" RCP
20.4
’
GUARD RAIL
GUARD RAIL
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
NO.
SHEET
CONSTRUCTION PLANS FOR:
NASSAU COUNTY ENGINEERINGNASSAU COUNTY FLORIDA
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
Certificate of Authorization No. 8269
(904) 335-8685
Fernandina Beach, FL 32034
95094 Arbor Lane
P.E. # 50627
Daniel I. McCranie, P.E.Engineer of Record:
CR 121
2/25/2013 1:44:19 PM N:\Projects\CR121\planrd01.dgnDan McCranie
N
5
0 5 20
Feet
SIGNING & PAVEMENT MARKING SHEET
OM2-2V
18" SOLID WHITE @ 40’ O.C.
OM2-2V
18" SOLID WHITE @ 40’ O.C.
10’
10’
+70
6" SOLID WHITE
6" SOLID WHITE
+09
£ SURVEY
NO
TI
CE:
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.003,
F.
A.
C.
705-10-2
705-10-2 1 EA
1 EA
7. ALL STRIPING SHALL BE THERMOPLASTIC.
6. REMOVE ALL EXISTING OBJECT MARKERS WITHIN PROJECT LIMITS.
5. REMOVE "NARROW BRIDGE - 45 MPH" SIGNS AT BOTH APPROACHES TO THE PROJECT.
4. REMOVE ALL EXISTING PAVEMENT MARKINGS WITHIN PROJECT LIMITS.
NOT THE DISTANCE BETWEEN THE STRIPES. SEE STANDARD INDEX 17346 FOR PLACEMENT OF LANE LINES.
3. THE LANE WIDTH DIMENSIONS SHOWN IN THE SIGNING AND PAVEMENT MARKING PLANS REFLECT THE NOMINAL WIDTHS,
2. ALL EXISTING SIGNS ARE TO REMAIN UNLESS OTHERWISE NOTED ON THE PLANS.
1. ALIGNMENT OF PROPOSED PAVEMENT MARKINGS SHALL MATCH EXISTING PAVEMENT MARKINGS AT THE LIMITS OF CONSTRUCTION.
Notes:
WITH RPM’s 40’ OC
6" DOUBLE YELLOW SOLID
73
72
71
70
69
68
69
70
71
72
COUNTY ROAD NO. 121
ELEVATION=73.64’
EASTING=337981.49
NORTHING=2173767.30
OFFSET=15.72R
STATION=33+29.56
"MANZIE LB 7039"
IRON ROD & CAP
SET 5/8"
35+00 36+00 37+00
70
70
70
70
70
70
7070
70
70
70
70
70
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
NO.
SHEET
CONSTRUCTION PLANS FOR:
NASSAU COUNTY ENGINEERINGNASSAU COUNTY FLORIDA
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
Certificate of Authorization No. 8269
(904) 335-8685
Fernandina Beach, FL 32034
95094 Arbor Lane
P.E. # 50627
Daniel I. McCranie, P.E.Engineer of Record:
CR 121
2/25/2013 1:44:20 PM N:\Projects\CR121\plansp01.dgnDan McCranie
6
18’ Clear Zone 18’ Clear Zone
1:4
shldr4’ pvd
100’ R/W
70
60
Existing Pavement
Existing (3) 48" RCP
1:4
5.7’ 5’both sidesRemove guardrail
Cross Section
concrete collar (typ)Connect new RCP with Remove Existing Headwall
Travel Lane10’
Travel Lane10’
BARRIERS FOR UNPAVED DITCHES
RECOMMENDED
1’ MIN.
FL
OW
PLAN
ELEVATION
FOR RECOMMENDED SPACING.
DESIGN STANDARDS, INDEX 102. SEE CHART 1 OF INDEX 102
FDOT SPECIFICATION 104 FDOT ROADWAY AND TRAFFIC
COULD POTENTIALLY FLOW TO THEM IN ACCORDANCE WITH
DURING CONSTRUCTION PHASES IN WHICH SILT AND DEBRIS
BELOW SHOULD BE INSTALLED ALONG ALL DITCHES
SYNTHETIC BALES AS SHOWN IN THE DETAIL
REMOVE 20" DEEP UNSUITABLE SOILWITH 1:4 MESEXTEND (3) 48" CROSS DRAINS
REMOVE 20" DEEP UNSUITABLE SOILWITH 1:4 MESEXTEND (3) 48" CROSS DRAINS
OUTFALL 18’ X 8’ X 1.5’PLACE RIPRAP (RUBBLE) AT
SPECIAL DETAILS
NO
TI
CE:
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.003,
F.
A.
C.
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
NO.
SHEET
CONSTRUCTION PLANS FOR:
NASSAU COUNTY ENGINEERINGNASSAU COUNTY FLORIDA
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
Certificate of Authorization No. 8269
(904) 335-8685
Fernandina Beach, FL 32034
95094 Arbor Lane
P.E. # 50627
Daniel I. McCranie, P.E.Engineer of Record:
CR 121
2/25/2013 1:44:21 PM N:\Projects\CR121\spdtrd01.dgnDan McCranie
*
BY THE ENGINEER
* 100’ OR DISTANCE DETERMINED
*
SIDE STREETS
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
ROAD WORK
END
TO STOP
PREPARED
BE
ROAD WORK
END
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
TO STOP
PREPARED
BE
AHEAD
ROAD
ONE LANE
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
ROAD
ONE LANE
250’
500’
PATHS SHALL BE REMOVED OR FULLY COVERED.
LONGER APPLICABLE OR ARE INCONSISTENT WITH INTENDED TRAVEL
EXISTING OR TEMPORARY TRAFFIC CONTROL SIGNS THAT ARE NO
NOTE:
7
LANE CLOSURES ON CR 121
GENERAL SIGNING FOR TRAFFIC CONTROL
CR 121
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
CR 121
WORK ZONE SEE INDEX 600 SERIESFOR TRAFFIC CONTROL THROUGH
1320’
2640’
500’
1640’ 1000’
1000’ 1640’
500’
2640’
1320’
TRAFFIC CONTROL PLAN & DRIVEWAY DETAIL
NO
TI
CE:
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.003,
F.
A.
C.
REMOVE EXISTING PAVEMENT
15’ R
15’ R
12’
TIE TO EXISTING
DRIVEWAY DETAIL
£ CR 121
EDGE OF TRAVEL LANE
PROPOSED SIDE DRAIN
N00°10’27"W (GRID)
N00°08’10"W (FL. D.O.T.)
EDGE OF ASPHALTEDGE OF ASPHALT
EDGE OF ASPHALT
EDGE OF ASPHALT
CONCRETE
HEADWALL
36+00 37+00
GUARD RAIL
GUARD RAIL
GUARD RAIL
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
NO.
SHEET
CONSTRUCTION PLANS FOR:
NASSAU COUNTY ENGINEERINGNASSAU COUNTY FLORIDA
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
Certificate of Authorization No. 8269
(904) 335-8685
Fernandina Beach, FL 32034
95094 Arbor Lane
P.E. # 50627
Daniel I. McCranie, P.E.Engineer of Record:
CR 121
2/25/2013 1:44:23 PM N:\Projects\CR121\spdtrd01.dgnDan McCranie
2. CONTROLS
a. CONSTRUCTION ACTIVITY:
PROJECT DESCRIPTION:
b. MAJOR SOIL DISTURBING ACTIVITIES:
d. (1) RUNOFF COEFFICIENTS BEFORE, DURING, AND AFTER CONSTRUCTION
(2) DESCRIPTION OF SOIL OR QUALITY OF DISCHARGE:
(3) ESTIMATES OF SIZE OF DRAINAGE AREA FOR EACH OUTFALL:
a. EROSION AND SEDIMENT CONTROLS:
(1) STABILIZATION PRACTICES:
TEMPORARY SODDING
TEMPORARY GRASSING
PERMANENT PLANTING, SODDING, OR SEEDING
TEMPORARY MULCHING
ARTIFICIAL COVERING
BUFFER ZONES
PRESERVATION OF NATURAL RESOURCES
(2) STRUCTURAL PRACTICES
ROCK BAGGING
SILT FENCES
HAY BALES
BERMS
DIVERSION, INTERCEPTOR, OR PERIMETER DITCHES
PIPE SLOPE DRAINS
FLUMES
ROCK BEDDING AT CONST. AREA
TIMBER BEDDING AT CONST. EXIT
DITCH LINER
SEDIMENT TRAPS
SEDIMENT BASINS
STORM INLET SEDIMENT TRAP
STONE OUTLET STRUCTURES
CURBS AND GUTTERS
STORM SEWERS
VELOCITY CONTROL DEVICES
TURBIDITY BARRIER
RIP RAP
c. OTHER CONTROLS
(1) WASTE DISPOSAL:
(2) OFFSITE VEHICLE TRACKING:
(3) SANITARY WASTE:
ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS AS
NECESSARY OR AS REQUIRED BY LOCAL REGULATION BY A LICENSED SANITARY
WASTE MANAGEMENT CONTRACTOR.
HAUL ROADS DAMPENED FOR DUST CONTROL
LOADED HAUL TRUCKS TO BE COVERED WITH TARPAULIN
EXCESS DIRT ON ROAD REMOVED DAILY
1. SITE DESCRIPTION
X
X
X
PROJECT LIMITS:
e. LOCATIONS OF DRAINAGE AREAS AND OUTFALLS:
b. DESCRIPTION OF STORMWATER MANAGEMENT:
CLEARING AND GRUBBING & GRADING
CLEARING, GRUBBING, AND GRADING:
CLEARING AND GRUBBING OPERATIONS SHALL BE CONTROLLED SO AS TO MINIMIZE UNPROTECTED
ERODIBLE AREAS EXPOSED TO WEATHER. AREAS OUTSIDE THE LIMITS OF CONSTRUCTION
SHALL NOT BE DISTURBED.
EXCAVATION:
EXCAVATED MATERIAL SHALL NOT BE DEPOSITED IN LOCATIONS WHERE IT COULD BE WASHED AWAY
BY HIGH WATER OR STORM WATER RUNOFF. ANY STOCKPILES SHALL BE COVERED OR ENCIRCLED
WITH SEDIMENT CONTAINMENT DEVICES ADEQUATE FOR ANY SEVERE STORM CONDITION.
CONSTRUCTION:
PERMANENT BANK STABILIZATION SHALL BE PLACED IMMEDIATELY (WITHIN THE SAME DAY)
AFTER FINAL GRADING. ANY DAMAGES TO PERMANENT PLANTINGS DURING THE COURSE OF
CONSTRUCTION SHALL BE REPAIRED BEFORE THE END OF EACH DAY. ALL FILL SHALL BE
THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING THIS PORTION OF THE SWPPP IN THE SECTION
104 EROSION CONTROL PLAN.
IN CONSTRUCTION. SEDIMENT CONTROL DEVICES WILL BE EMPLOYED AS A PERIMETER DEFENSE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING MEASURES:
EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO, OR AS THE FIRST STEP
AGAINST ANY TRANSPORTATION OF SILT BEYOND THE CONSTRUCTION LIMITS.
STABILIZATION MEASURES, ON AREAS OTHER THAN SLOPES, CHANNELS, OR DITCHES, SHALL BE
INITIATED FOR EROSION AND SEDIMENT CONTROL OF DISTURBED AREAS AS SOON AS PRACTICABLE
IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY
CEASED. IN NO CASE SHALL STABILIZATION FAIL TO BE PROVIDED IN AREAS WHERE CONSTRUCTION
ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.
AND ANY OTHER MISCELLANEOUS ITEMS AS INDICATED WITHIN THE CONTRACT DOCUMENTS, THE
FOR ALL SLOPES, CHANNELS, OR DITCHES, PERMANENT SOIL EROSION CONTROL MEASURES SHALL BE
COMPLETED IMMEDIATELY (WITHIN THE SAME DAY) AFTER FINAL GRADING. WHEN IT IS NOT POSSIBLE
TO PERMANENTLY PROTECT A DISTURBED AREA IMMEDIATELY AFTER GRADING OPERATIONS, TEMPORARY
EROSION CONTROL MEASURES SHALL BE INSTALLED IMMEDIATELY (WITHIN THE SAME DAY). ALL
THE CONTRACTOR SHALL FURNISH, INSTALL, MAINTAIN AND SUBSEQUENTLY REMOVE, ALL NECESSARY
EROSION CONTROL, INCLUDING BUT NOT LIMITED TO SILT FENCES, HAY BALES, TURBIDITY BARRIERS
THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING THIS PORTION OF THE SWPPP IN THE SECTION
104 EROSION CONTROL PLAN.
THE CONTRACTOR IS ADVISED THAT THE CONTRACT DRAWINGS ONLY INDICATE EROSION, SEDIMENT,
(1) STABILIZATION PRACTICES:
THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING THIS PORTION OF THE SWPPP IN THE SECTION
104 EROSION CONTROL PLAN.
NO CONSTRUCTION WASTE MATERIAL WILL BE BURIED ON SITE. ALL CONSTRUCTION WASTE MATERIAL
THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING THIS PORTION OF THE SWPPP IN THE SECTION
104 EROSION CONTROL PLAN.
STABILIZED CONSTRUCTION ENTRANCE
UNSTABILIZED AREAS TO PUBLIC ROADS AS WELL AS FROM POND SITES OR STOCKPILE AREAS
OTHER: SOIL TRACKING PREVENTION DEVICES SHALL BE CONSTRUCTED AT POINTS OF EGRESS FROM
ANY SPILLAGE SHALL BE PROMPTLY REMOVED BY THE CONTRACTOR
THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING THIS PORTION OF THE SWPPP IN THE SECTION
104 EROSION CONTROL PLAN.
THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING THIS PORTION OF THE SWPPP IN THE SECTION
104 EROSION CONTROL PLAN.
AND TURBIDITY CONTROLS AT LOCATIONS DETERMINED IN THE DESIGN PROCESS. HOWEVER, THE
FILL SHALL BE PROTECTED PRIOR TO PLACEMENT OF FILL AND THESE PROTECTIVE MEASURES
SHALL REMAIN IN PLACE UNTIL ALL PERMANENT PLANTING HAS ADEQUATELY ROOTED AND GROWN TO
PROVIDE PERMANENT EROSION CONTROL.
CONTRACTOR IS REQUIRED TO UPDATE THE SWPPP TO REFLECT ANY ADDITIONAL CONTROLS
NECESSARY TO PREVENT THE POSSIBILITY OF SILTING ANY ADJACENT LOWLAND PARCEL, RECEIVING
WATER, OR OTHERWISE VIOLATING STATE AND FEDERAL PERMIT REQUIREMENTS. THE CONTRACTOR
WILL ALSO BE REQUIRED TO MODIFY THE PLAN OR MATERIALS TO ADAPT TO SEASONAL VARIATIONS
AND SUPPLY CONTRACT TIME SCHEDULES FOR THE IMPLEMENTATION OF EACH SUBMITTAL.
NARRATIVE - SEQUENCE OF SOIL DISTURBING ACTIVITIES AND IMPLEMENTATION OF CONTROLS.
(4) FERTILIZERS AND PESTICIDES:
(5) NON-STORM WATER DISCHARGE (INCLUDING SPILL REPORTINGS):
NO NON-STORM WATER DISCHARGES ARE ANTICIPATED
FERTILIZERS AND/OR PESTICIDES SHALL BE APPLIED BY A LICENSED OR CERTIFIED APPLICATOR AS
FERTILIZER WILL BE APPLIED ACCORDING TO THE APPLICABLE SUBSECTIONS OF EITHER SECTION 570
OR 577 OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING THIS PORTION OF THE SWPPP IN THE SECTION
104 EROSION CONTROL PLAN.
WHEN THE CONTRACTOR ENCOUNTERS A SPILL, CONSTRUCTION WILL STOP AND WORK WILL NOT
RESUME UNTIL DIRECTED BY THE PROJECT ENGINEER. DISPOSITION OF HAZARDOUS WASTE
WILL BE MADE IN ACCORDANCE WITH ANY REQUIREMENTS AND REGULATIONS OF ANY LOCAL,
STATE, OR FEDERAL AGENCY HAVING JURISDICTION, IF CONTAMINATED SOIL OR GROUND WATER
CONTROL.
IS ENCOUNTERED, CONTACT THE DISTRICT HAZARDOUS MATERIALS COORDINATOR AT 386-943-5000.
PROJECT ENGINEER.
ACTIVITIES HAVE CEASED FOR MORE THAN SEVEN (7) CALENDAR DAYS AFTER THE CONSTRUCTION
PREVENTION PLAN STORM WATER POLLUTION
X
SYNTHETIC BALES AND SILT FENCES HAVE BEEN INCLUDED AS STRUCTURAL PRACTICES PAY ITEMS IN
THE SUMMARY OF QUANTITIES WITHIN THE CONSTRUCTION PLANS.
SHALL BE COLLECTED AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND ORDINANCES.
INSTALLATION OF PERIMETER CONTROLS.
PROTECTED PRIOR TO PLACEMENT OF FILL AND THESE PROTECTIVE MESURES SHALL REMAIN
IN PLACE UNTIL ALL PERMANENT PLANTING HAS ADEQUATELY ROOTED AND GROWN TO PROVIDE
PERMANENT EROSION CONTROL.
CONTRACTOR’S EROSION CONTROL PLAN, OR AS REQUIRED PER APPLICABLE STANDARDS OR THE
STORMWATER FROM THE PROPOSED CONSTRUCTION WILL CONTINUE TO DISCHARGE IN THE SAME MANNER
AS THE EXISTING CONDITION.
DIRECTED BY THE ENGINEER
IF CONTAMINATED SOIL OR GROUNWATER IS ENCOUNTERED, CONTACT THE DISTRICT HAZARDOUS
MATERIALS COORDINATOR
BEFORE: 0.37, DURING: 0.42, AFTER: 0.42
8
TOTAL AREA TO BE DISTURBED: .03 AC
EXISTING STRUCTURES SHALL BE PROTECTED FROM SILTATION DURING CONSTRUCTION.
REMOVAL OF HEADWALL, EXTENSION OF CROSS DRAIN, ADDITION OF MITERED END SECTIONS
NASSAU/DUVAL COUNTY LINE
REMOVAL OF HEADWALL, EXTENSION OF CROSS DRAIN, ADDITION OF MITERED END SECTIONS
INSTALLATION OF PIPE
INSTALLATION OF MES
PLACEMENT OF RIP-RAP AND FINAL SOD
c. TOTAL PROJECT AREA: LESS THAN 0.2 AC
THE EXISTING SOIL IS MUCK AND SOFT SOILS
302.87 AC.
OR QUANTITY OF THE EXISTING PIPES
THIS CROSS DRAIN ALLOWS FOR FLOWS UNDER CR 121. THIS PROJECT DOES NOT CHANGE THE SIZE
f. (1) NAME OF RECEIVING WATERS: UNKNOWN
X
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
NO.
SHEET
CONSTRUCTION PLANS FOR:
NASSAU COUNTY ENGINEERINGNASSAU COUNTY FLORIDA
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
Certificate of Authorization No. 8269
(904) 335-8685
Fernandina Beach, FL 32034
95094 Arbor Lane
P.E. # 50627
Daniel I. McCranie, P.E.Engineer of Record:
CR 121
2/25/2013 1:44:24 PM N:\Projects\CR121\swpprd01.dgnDan McCranie
PREVENTION PLAN STORM WATER POLLUTION
d. APPROVED STATE, LOCAL PLANS, OR STORM WATER PERMITS:
4. INSPECTION:
3. MAINTENANCE:
THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING THIS PORTION OF THE SWPPP IN THE SECTION
104 EROSION CONTROL PLAN.
WHERE SITES HAVE BEEN FINALLY STABILIZED, INSPECTIONS SHALL BE CONDUCTED AT LEAST
ONCE EVERY MONTH AT THE FOLLOWING LOCATIONS AS A MINIMUM:
POINTS OF DISCHARGE TO WATERS OF THE UNITED STATES
POINTS OF DISCHARGE TO MUNICIPAL SEPARATE STORM SEWER SYSTEMS
DISTURBED AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED
AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION
STRUCTURAL CONTROLS
STORMWATER MANAGEMENT SYSTEMS
LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL POLLUTION PREVENTION CONTROLS.
DAILY INSPECTIONS SHALL BE MADE BY THE CONTRACTOR TO DETERMINE THE EFFECTIVENESS OF
EROSION. SEDIMENTATION, TURBIDITY AND POLLUTION CONTROL MEASURES. REMEDIAL ACTION SHALL
BE PERFORMED IMMEDIATELY.
THE CONTRACTOR IS REQUIRED TO INSPECT ALL EROSION CONTROL FEATURES AT LEAST ONCE EVERY
FEATURES AS REQUIRED HEREIN AND AS SPECIFIED IN STATE AND/OR FEDERAL ENVIRONMENTAL
REGULATORY PERMITS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE DAILY REVIEW OF THE
LOCATION OF SILT FENCES IN AREAS WHERE CONSTRUCTION ACTIVITIES HAVE CHANGED THE NATURAL
CONTOUR AND DRAINAGE RUNOFF TO ENSURE THAT SILT FENCES ARE PROPERLY LOCATED
FOR EFFECTIVENESS. THE CONTRACTOR WILL USE FDOT FORM 650-040-03 TO REPORT ALL
INSPECTION FINDINGS AND CORRECTIVE ACTIONS TAKEN AS A RESULT OF THE INSPECTION.
THE CONTRACTOR WILL SIGN EACH INSPECTION REPORT AND SUBMIT IT WEEKLY TO THE ENGINEER.
SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A RAIN EVENT OF 0.5 INCHES
(12.7 mm) OR GREATER. IN ADDITION, THE CONTRACTOR WILL MAINTAIN ALL EROSION CONTROL
THIS PROJECT SHALL COMPLY WITH STATE WATER QUALITY STANDARDS. THE CONTRACTOR IS REQUIRED
TO FILE FOR THE FL NPDES "NOTICE OF INTENT" AS OPERATOR.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF RAIN GAUGES.
DAILY RAINFALL DATA WILL BE RECORDED AND SUBMITTED TO THE ENGINEER ALONG WITH THE
WEEKLY INSPECTIONS REPORTS.
9
BY DESCRIPTIONDATE BY DESCRIPTIONDATE
REVISIONS
NO.
SHEET
CONSTRUCTION PLANS FOR:
NASSAU COUNTY ENGINEERINGNASSAU COUNTY FLORIDA
NASSA
U
C
OUNTY FLORID
A
IN GOD WE TRUS
T
Certificate of Authorization No. 8269
(904) 335-8685
Fernandina Beach, FL 32034
95094 Arbor Lane
P.E. # 50627
Daniel I. McCranie, P.E.Engineer of Record:
CR 121