ORK AND UTIONS - Access Design · modular primary and secondary steelwork W.Design,supply ... STAAD...

9
STEELWORK AND GRP SOLUTIONS

Transcript of ORK AND UTIONS - Access Design · modular primary and secondary steelwork W.Design,supply ... STAAD...

STEELWORK AND GRP SOLUTIONS

02 > INTRODUCTION

CONTENTS

> 03

access-design.co.uk

Middlesbrough manufacturing facility

ADE are specialists in the design, manufacture and installation of secondary steelwork and

GRP/FRP engineering solutions.

In 2014 ADE became a part of the Lionweld Group, sister company Lionweld Kennedy Flooring Limited

is the only UK manufacturer of open mesh steel grating. With over 100 years of manufacturing and

knowledge, both businesses compliment each other in their chosen market sectors.

Structural Steelwork

GRP structures

Staircases

Walkways & Platforms

Access Ladders

Access Covers

Flooring & Handrailing

Miscellaneous Metalwork

Off-site modular concepts

STRUCTURAL STEELWORK > GRP STRUCTURES > STAIRCASES >WALKWAYS & PLATFORMS > ACCESS LADDERS > ACCESS COVERS > FLOORING & HANDRAILING > MISCELLANEOUS METALWORK > OFF-SITE MODULAR CONCEPTS

Access Design & Engineering (ADE) has over 35 years of operating experience across many market sectors.

A complete project management solution for:

02 INTRODUCTION

04 IN-HOUSE DESIGN

06 KEY INDUSTRIES

08 MANUFACTURING CAPABILITIES

10 PROJECT MANAGEMENT

12 H&S, QUALITY & THE ENVIRONMENT

14 PROJECT PORTFOLIO

15 SECURITY COVERS

Subsidiary of Hill & Smith Holdings PLC.

Far left Lee Tunnel WWTW. Design, supply and installation of steel modular access solutions

Left and below Hampton Pump Out Shaft WTW.Design, supply and installation of modular primary and secondary steelwork

W. Design, supplyf steel modular

ut Shaft WTW.d installation ofand secondary

access-design.co.uk

04 > IN-HOUSE DESIGN DESIGN& EXPERTISE >MODERNNEWTECHNOLOOGY > TECHNICAL SUPPORT > VVAVAV LUE ENGINEERING

Design & Expertise

ADE offers a team of highly experienced and qualified designers, engineers

and draughtsmen, utilising the latest software to value engineer project solutions.

> 05

Design, manufacture and installation.

Modern New Technology

Tekla – 3D Modelling

STAAD Pro design software

BIM Compliant (Building Information Modelling)

Technical Support

Design support

Project Management

On-site surveys

Value Engineering

Collaborative working

Cost effective solutions

One stop shop

access-design.co.uk

Delivering with confidence – serving key industries.

CONSTRUCTION

PETRO-CHEMICAL RAIL

ENERGY FROM WASTEWATER

SECURITY

BIOMASS/BIOFUEL POWER

06 > KEY INDUSTRIES INDUSTRY EXPERIENCE > 07

ADE are one of the market

leaders in the design,

manufacture and installation of

miscellaneous steelwork and

GRP structures.

The company specialise in

tailored solutions in either

steel or GRP, such as modular

“flat-pack” systems for self

installation, or the complete

project management -

installation from start to finish.

To ensure that ADE can

operate in its chosen market

sectors, it must hold the

relevant accreditations.

access-design.co.uk

08 > MANUFACTURING CAPABILITIES > 09 MANUFACTURING > FABRICATION

ADE’s state of the art manufacturing facilities are located in the

north east of England, with further capability outlets throughout

the UK.

Continual investment is foremost in ADE’s strategy to maintain its

premier position within the UK market.

Manufacturing facilities:

New CNC Grating machine

State of the art GRP fabrication workshop, including CNC routers,

saws and milling machine

12,000 sq metre manufacturing facility of Steel & GRP products

Cranage - 20 ton

Easy access to motorways

In-house galvanising - sister company

Customers are encouraged to visit ADE’s premises and satisfy

themselves of the capabilities, capacity and commitment to quality

which the company prides itself on.

State of the art manufacturing facilities.

Far leftCoppermills WTW. Design, supplyand installation of steel and GRPaccess solutions

LeftBuffalo Court WWTW. Design, supply and installation ofsteel & GRP access platforms

BelowBudds Farm WWTW. Design, supply and installation ofmodular secondary steelwork

Far leftCoppermills WTW. Design, supplyand installation of steel and GRPaccess solutions

LeftBuffalo Court WWTW.Design, supply and installation ofsteel & GRP access platforms

BelowBudds Farm WWTW.Design, supply and installation ofmodular secondary steelwork

Examples of training held by Access Design & Engineeringemployees includes:

SMSTS

Site Supervisors

Confined Space Training

PASMA Alloy Tower

NEBOSH

IOSH Managing Safely

Safety Passports

CSCS cards

CPCS

PTS

LUCAS

Appointed Person

BESC

SHEA

Project Management

Dedicated, experienced and qualified Project Managers who

can deliver on time and to budget.

access-design.co.uk

10 > PROJECT MANAGEMENT > 11 INSTALLATION > TRAINING

Installation

ADE utilise highly skilled and experienced installation crews who

comply with all standards and requirements for working on major

construction sites. Contracts undertaken are project managed to

ensure on-time delivery, high level of quality and ‘Best in Class’

performance.

Training

The training and culture climate of the company is to fully develop

and train a competent, professional workforce to maintain high

level of quality goods and services. The development of the

workforces’ skill base makes a successful business and benefits

the company as well as the individuals’ career aspirations.

All employees are encourages to continually develop their working

careers through ongoing identified training.

Delivering with confidence - installation & training.

Health & Safety

ADE is dedicated to providing a safe working environment for all

employees, persons and stakeholders who may be affected by

their acts or emissions from their working activities.

The management team endeavour to keep up to date with current

professional expertise on health and safety matters and to

observe all relevant statutory, regulations and codes of practice.

Quality

ADE are proud to be approved by Lloyds Register Quality

Assurance to ISO9001:2008. The Quality Management System is

applicable to: Design, Fabrication and Installation of industrial and

semi-architectural metalwork to BS 1090 CE Marking.

PROJECTS > APPLICATIONS

access-design.co.uk

PRO E TS > APPL CAT NS > 13 12 > H&S, QUALITY, THE ENVIRONMENT

Environment

As a responsible company, Access Design & Engineering

recognises that the protection of the environment forms an

integral part of its business objectives and aims to:

Initiate measures to improve resource conservation

Have effective waste management programmes

Control and minimize energy usage

Achieve registration to BS EN ISO14001:2015

RPRPEPEPRERGRGROGOUOUOJUJLELEACACTTTTATATATTTATISISOSOS N>N> SASA >P>PP>PAPAPLALSLSLISICSCSCSCASAUAUATUTATAUATARTRTIRIAOAONNNNCSCSE > RESOURCECONSERVAVAV TATA ION

Professional expertise on health and safety matters.

access-design.co.uk

14 > PROJECT PORTFOLIO A FEW EXAMPLES OF OUR COMPLETED PROJECTS

Projects delivered with confidence.

Used to protect and prevent entry to secure points, reservoir

access points, value chambers, roof access points. Ventilated

and none vented, outer cover leaf and frame only and inner

and outer cover options.

Hot Dip Galvanised to

BS EN 1461 2008.

Torsion Sprung inner and

outer covers to meet manual

handling regulations.

Shroud base protection plate

for units set on chambers

over 150mm from ground

level.

Protective innovative hinge

design.

Internal and External lids

with Auto safety stays.

Internal cover sealed and

vented with 425 Micro Mesh

non vented options.

Ladder Safety Grids options

GRP, Galvanised Steel and

Stainless Steel Options.

Alarm Brackets.

Cable entry points..

HIGH SECURITY UPSTAND COVERS > 15

Far left Fleetwood WWTW. Design, supply andinstallation of all metalwork and platforms

LeftDenton WWTW. Design, supply and installationof Steel and GRP

Bottom CentreBlackburn Meadows EFW. Design, supply andinstallation of modular pipe support bridge

BelowWest Brompton Train Platform. Design, andsupply of a full GRP 130 metre rail platform

Far LeftKings Lynn WWTW. Design, supply and installation ofa steel complex access modular platform

Top centre Isle of Grain LPG Tanks. Design, supply andinstallation of GRP access platform

Top right Three Bridges Rail Maintenance Depot. Design,supply and installation of all GRP and secondarysteelwork access solutions

LeftEast Midlands Parkway Rail Station. Design, supplyand installation of a 250m modular GRP rail platform

Access Design & Engineering is a division of the Lionweld Group, and a member ooff Hill & Smith Holdings PLC.

hsholddiinnggs.co.ukProduced by BROCKWORX

ACCESS DESIGN & ENGINEERING MARSH ROAD | MIDDLESBROUGH | TS1 5JS

MIDDLESBROUGH TEL 01642 245151 | FAX 01642 224710

TELFORD TEL 01952 588788 | FAX 01952 685139

[email protected] | WWW.ACCESS-DESIGN.CO.UK