Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances...

22
Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    0

Transcript of Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances...

Page 1: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Organizational Management

Architect & Design

8th Semester

Intrepreneurship

Lise Kofoed & Frances Jørgensen

Page 2: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Agenda

• Defining Intrapreneurship

• What is Project Leadership

• Types of projects

• (Project) Team Roles

• Project Leadership: Characteristics & Functions

Page 3: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

What is an intrapreneur?

…a person within a corporation who takes direct responsibility for turning an idea into a

profitable finished product through assertive risk-taking and innovation.

The intrapreneur is often the organizational maverick; the one who challenges the status

quo and is only satisfied initiating changes from within.

Page 4: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Why do we need intrapeneurs?

• "As competition intensifies, the need for creative thinking increases.   It is no longer enough to do the same thing

better... no longer enough to be efficient and solve problems.   Far more is needed.   Now business has to keep

up with changes... And that requires creativity.   That means creativity both at a strategic level and also on the

front line, to accompany the shift that competitive business demands... from administration to true entrepreneurship.”

Edward de Bono

Page 5: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

The real measure of success is the number of experimentsthat can be crowded into 24 hours. Thomas Edison

Page 6: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Project Leadership vs. Project Management

• (Project)leadership: “the art of mobilizing others to want to struggle for shared aspirations” (Kouzes & Posner, 1995, p.30).

• (Project) management is a function that must be exercised in any business; (project) leadership is a relationship between leader and led that can energize an organization.

Page 7: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Project Leadership

• Managing the visible and invisible team to achieve the objectives of the stakeholders.– Those directly involved (the visible team)– Those indirectly involved (the invisible team)– All with an interest in the outcome (multiple

stakeholders)

• Also involves managing organizational networking, and taking the organizational context and the people factor into consideration.

Page 8: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Types of Projects

• Concrete projects: we know from the start the expected outcome or deliverable, as well as the projected available resources and time constraints.

• Examples: a construction project, installation of a new system or process; new product lauch.

• Characteristics include: full time leader as conductor of the orchestra; full-time visible team, well-established systems for planning and managing the various elements.

Page 9: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Types of Projects (cont’d)• Occasional projects: we have a general theme, but the

boundaries and deliverables are not clearly defined; not certain from start who/what will be involved; temporary; often internally-focused, less formal

• Examples: introducing TQM, defining and implementing a new product development process; establishing a strategy for entering a new market.

• Characteristics: part time leadership as sculptor; part-time team membership; unfamiliar planning and control methods; guesstimated resources.

Page 10: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Types of Projects (cont’d)

• Open projects: we have an idea but no defined objectives, or outcomes; objectives and outcomes change frequently.

• Examples: research laboratories experimenting with new drugs; applying more empowering work practices; trying out applications for untried technology.

• Characteristics: no formal leader (the mole); team members are self-selected by interests; low priority; no realistic guesstimates of necessary resources; low visibility; often produce significant innovations!

Page 11: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Belbins Team Roles

Fill out the questionnaire by diving 10 points (from 2-4) within each of the 7 sections.

STOP – DON’T TURN THE PAGE !

Page 12: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

What it takes to be a project leader

• Common characteristics in every project leader’s role (and not necessarily in managerial role):– Often goes beyond a matrix of responsibility

and authority; lacking codes of practice; – Defines own success criteria– Establishes own lines of contact– Responsible for identifying and obtaining own

resources

Page 13: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Project Leader Functions

• The project leader is an integrator, one who can pull together all of the activities of the project while watching out for any broken or missing links; one whose expertise lies in being able to integrate own and others’ strengths and capabilities to the fullest.

Page 14: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

– Secure stakeholder’s agreement

– Build creativity

– Networking

– Marketing

– Anticipating

– Continuous Planning and Reviewing

– Informing

– Seeking feedback

– Providing purpose and direction– Clarifying individual success criteria– Being tough on quality– Creating a supportive culture– Reflecting– Celebrating success

Project Leader Functions (cont’d)

Page 15: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Understanding the Big Picture– In Japan: 80% of project time goes to active

planning & experimentation; 20% to implementation.

– In the West: 20% of project time goes to planning; 80% to implementation.

– ”Up front time” ensures that Big Picture is clear and simple for all; provides a sense of purpose & direction.

– Seeing the Big Picture may require stepping back from formal objectives to understand why the project is important.

Page 16: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Understanding the Big Picture (cont’d)

• What are the strategic pressures?• What are the consumer pressures?• What are the environmental pressures

(political, social, economic)?

• It is the project leader’s job to define the context of the project so that the team can develop a shared project vision.

Page 17: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Assessing Project Risks• Identifying actual and possible risks at the start of

the project allows for contingency planning and ensures that all are clear on what is involved; one method is referred to as project risk mapping:– Brainstorm– Review past experiences– Cluster & weight topics– Develop plans for most serious & probable risks– Develop overall project plan taking these into

consideration (e.g. in time plans)– Consider efforts to reduce risks

Page 18: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Managing the Sponsor

– What do you need from the sponsor? – What can you expect from the sponsor?– How does the project appear from the sponsor’s

perspective (between customer and project team)?– What political forces should be considered?

• The sponsor should be involved in the early planning stages to establish guidelines (e.g. budget) and the framework (e.g. project type); there should be regular contact throughout the project.

• Project leadership requires the ability to read and manage political dynamics.

Page 19: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Scoping

• The process by why clarity, agreement, and commitment are obtained (overt); helps key players to imagine the project’s implications (and how to plan for them).

• Explicitly imagining the entire project cyle

Page 20: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.
Page 21: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.
Page 22: Organizational Management Architect & Design 8 th Semester Intrepreneurship Lise Kofoed & Frances Jørgensen.

Project Start Up