ORGANISATION AND MAJOR ACTIVITIES: POST INCUMBENT …vi) CO-CO bogie bogie with brake rigging...

4
ORGANISATION AND MAJOR ACTIVITIES: POST INCUMBENT PHOTO ACTIVITIES Dy. Chief Electrical Engineer Planning And Development. SUMANTA DATTA. MEE. CUG NO.9002027302 Over all in-charge of the Electrical Planning And Development Organization. Assistant Works Manager Planning And Development SAHADEV MONDAL LME. CUG NO.9002027409 Assisting to Dy. Chief Electrical Engineer (P&D) in his activities. Senior Section Engineer Planning. TUSHAR DUTTA. H.S, DME,BE (Mech.) CUG NO.9002027395 Planning of material procurement for workshop and Eastern Railway LOCO & EMU Sheds. Budget Indents. Liaison with suppliers Senior Section Engineer Technical. PRANAB CHAKRABORTY B.sc. DME CUG NO.9002027329 All Technical Support and correspondence with Head Quarters, Railway Board, Stock records, Condemnation, unit Exchange Spares. Senior Section Engineer Stores BISWAJIT BHATTACHARJEE B.sc., DEE, AMIE. CUG NO.9002027326 Receiving and distribution of Materials of Direct purchase and RSP Rolling Stock Program Transport Management. Senior Section Engineer M&P SUPRIYAO HALDAR DME,AMIE CUG NO.9002027397 Planning & procurement of Machineries and Plant, indenting, approval, commissioning for all Electrical Shops of Kanchrapara Workshops. Junior Engineer RSP PRASENJIT DEY DEE CUG NO.9002027394 Planning & procurement of all Rolling stock Program items. Budget indents for Electric Locomotives and Electric Multiple Units of Eastern Railway. Senior Section Engineer Drawings Electric. RAM CHANDRA BISWAS LEE,AMIE CUG NO.9002027352 Preparation, Maintenance, Records of all Drawings of Electric Locomotives, Electric Multiple Unit Specifications, standards, special maintenance instructions , Technical Circulars, Modification Sheet liaison with Research Design and Standard Organization. Chief Office Superintendent/ In-charge GOPI NATH SOREN B.A. CUG NO.9002077359 Maintenance of office and all Ministerial works, Dead stocks, Right to information, Audit, Abolition of contractual labour Act, Parliament Questions. Chief Office Superintendent Works ANUP SENGUPTA H.S. CUG NO.9002027396 Works tenders, Contracts, Bills. Minimum Wages Act. Revenue Estimate.

Transcript of ORGANISATION AND MAJOR ACTIVITIES: POST INCUMBENT …vi) CO-CO bogie bogie with brake rigging...

Page 1: ORGANISATION AND MAJOR ACTIVITIES: POST INCUMBENT …vi) CO-CO bogie bogie with brake rigging vii)HHP traction motor viii) Traction motor /BHEL Make. ix) Brake control system incd.

ORGANISATION AND MAJOR ACTIVITIES:

POST INCUMBENT PHOTO ACTIVITIES

Dy. Chief Electrical Engineer Planning And Development.

SUMANTA DATTA. MEE. CUG NO.9002027302

Over all in-charge of the Electrical Planning And Development Organization.

Assistant Works Manager Planning And Development

SAHADEV MONDAL LME. CUG NO.9002027409

Assisting to Dy. Chief Electrical Engineer (P&D) in his activities.

Senior Section Engineer Planning.

TUSHAR DUTTA. H.S, DME,BE (Mech.) CUG NO.9002027395

Planning of material procurement for workshop and Eastern Railway LOCO & EMU Sheds. Budget Indents. Liaison with suppliers

Senior Section Engineer Technical.

PRANAB CHAKRABORTY B.sc. DME CUG NO.9002027329

All Technical Support and correspondence with Head Quarters, Railway Board, Stock records, Condemnation, unit Exchange Spares.

Senior Section Engineer Stores

BISWAJIT BHATTACHARJEE B.sc., DEE, AMIE. CUG NO.9002027326

Receiving and distribution of Materials of Direct purchase and RSP Rolling Stock Program Transport Management.

Senior Section Engineer M&P

SUPRIYAO HALDAR DME,AMIE CUG NO.9002027397

Planning & procurement of Machineries and Plant, indenting, approval, commissioning for all Electrical Shops of Kanchrapara Workshops.

Junior Engineer RSP

PRASENJIT DEY DEE CUG NO.9002027394

Planning & procurement of all Rolling stock Program items. Budget indents for Electric Locomotives and Electric Multiple Units of Eastern Railway.

Senior Section Engineer Drawings Electric.

RAM CHANDRA BISWAS LEE,AMIE CUG NO.9002027352

Preparation, Maintenance, Records of all Drawings of Electric Locomotives, Electric Multiple Unit Specifications, standards, special maintenance instructions , Technical Circulars, Modification Sheet liaison with Research Design and Standard Organization.

Chief Office Superintendent/ In-charge

GOPI NATH SOREN B.A. CUG NO.9002077359

Maintenance of office and all Ministerial works, Dead stocks, Right to information, Audit, Abolition of contractual labour Act, Parliament Questions.

Chief Office Superintendent Works

ANUP SENGUPTA H.S. CUG NO.9002027396

Works tenders, Contracts, Bills. Minimum Wages Act. Revenue Estimate.

Page 2: ORGANISATION AND MAJOR ACTIVITIES: POST INCUMBENT …vi) CO-CO bogie bogie with brake rigging vii)HHP traction motor viii) Traction motor /BHEL Make. ix) Brake control system incd.

Total Staff Strength

Officers Supervisors Ministerial Tech. Helper

2 31 10 02 20

RECENT HIGHLIGHTS:-

SL.No.

Description

Status Photo

1 Condemnation of Electric Locomotives & Electric Multiple Unit Motor Coaches

25 Numbers of Electric Multiple Unit Motor Coaches and 3 numbers of Locomotives have been Condemned In the FY-2018-19

Condemned MC

2 Distribution of Major item

The following Materials received and distributed to Shop and division through Planning And Develop Store. i)Compact Design silicon Rectifier & main silicon rectifier for EMU. ii)MPCS iii)Tri-plate panel. iv) Static Inverter. V) 25 KV transformer for EMU. vi) CO-CO bogie bogie with brake rigging vii)HHP traction motor viii) Traction motor /BHEL Make. ix) Brake control system incd. driver vigilance control device. x) Oil cooling radiator for 3 ph. loco.

RSI

CO-CO BOGIE

HHP TM

MAIN COMPRESSOR/LOCO

3 Drawings. Survey of Electric Locomotive Cab Air Condition has been completed. Preparation of works instruction under process.

Provision of AC CAB

Page 3: ORGANISATION AND MAJOR ACTIVITIES: POST INCUMBENT …vi) CO-CO bogie bogie with brake rigging vii)HHP traction motor viii) Traction motor /BHEL Make. ix) Brake control system incd.

4 Machine and Plants. The following Machineries and Plants have been received on Machine and Plants program in FY 2017-18 and 18-19 i) Transformer oil Filtration Plant Cap. 3000 LPH - 2 numbers. ii) Fully Automatic Mica under Cutting machine.1 numbers iii) Dynamic Balancing Machine-1 number iV) Vacuum Drying Plant - 1 number.

TFP OIL FILTER

5 Rolling Stock Program. The following Major items have been purchased & material received Through RSP: i) Static Inverter-21 numbers ii) Silicon Rectifire-10 numbers iii) Vacuum Circuit Breaker - 28 Sets. iv) 25 KV EMU Transformer-3 numbers. v) Traction Motor.-1 numbers. vi) Energy cum Speed monitoring system-23 sets vii) Master controller for 3 phase locos.-8 viii) Main Compressor for Elc. Locos- 7 sets. ix) Tri-plate pneumatic panel -1 x) Gear 91 teeth for EMU- 29 nos xi) Air Dryer-20 nos xii) Micro processor control sysyem-40 sets. xiii) HHP traction motor-4 nos.

SIV

RSI

VCB

SMGR

TAP-CHANGER

Page 4: ORGANISATION AND MAJOR ACTIVITIES: POST INCUMBENT …vi) CO-CO bogie bogie with brake rigging vii)HHP traction motor viii) Traction motor /BHEL Make. ix) Brake control system incd.

6 Works The following Major Works have been out sourced at KPA Workshop: i) Rehabilitation of Tap Changer ii) Repair/ Rehabilitation of 5400KVA Transformer. iii) Repair/ Rehabilitation of 3900KVA Transformer. iv) PU - Painting and Retro-reflective Tap of Electric Locomotives. v) Modification of Smoothing Reactor for fire prevention of Electric Locomotives. vi) PU- Painting of Electric Multiple Unit Motor/Trailer Coaches. Vii) Transportation of Railway materials by Trailer/Lorry. Viii) Stripping and Cleaning of Core & Commutator Traction Armature. iX) Re-Piping of Electric Locomotives. X) Mechanical Repair/Rehabilitation of Tri-mount CO-CO Bogie of WAG5 Electric Locomotives. Xii) Repair/Over hauling of E-70 Brake Panel of 3 phase Locomotives. xiii) Re-generative braking feature of WAG7 locos

PU-Paint of Locomotives

5400 Kva Transformer

Armature TAO

7 Principal Employer Registration

Principal Employer Registration in the name of DY. Chief Electrical Engineer Planning & Development have been done at DY. Chief Labor Commissioner (Central). Nizam palace Kol-700020. On 12/3/2018.

8 Transportation of Rail

Way Materials through LORRY/TRAILER by out- sourced.

Various materials are being transported from KPA Workshop to Division or Zonal Railway and vice versa. MTKM consumed in this year as under. i) Above 500KM-27,61,00 by Trailer. ii) Below 500 KM-9,28,500 by Trailer. iii) Above 500 KM-10,53,500 by Lorry. iv) Below 500 KM -6,08,300 by Lorry.

: