Oregon's Statewide Work Zone Traffic Analysis Program

66
Work Zone Traffic Analysis in Oregon Taking the next step Taking the next step Place Photo Here Place Photo Here Place Photo Here

Transcript of Oregon's Statewide Work Zone Traffic Analysis Program

Page 1: Oregon's Statewide Work Zone Traffic Analysis Program

Work Zone Traffic Analysis in Oregon

Taking the next stepTaking the next step

Place Photo Here

Place Photo Here

Place Photo Here

Page 2: Oregon's Statewide Work Zone Traffic Analysis Program

Outline

Why do we do it?What do we do?How do we do it?

Page 3: Oregon's Statewide Work Zone Traffic Analysis Program

Why do we do it?

Determining Major Causes of Highway Work Zone Accidents in Kansas: Final Report (June 2006)Kansas DOT & University of Kansas Center for Research

68 % of crashes were multi-vehicle crashes including head-on, sideswipe, and rear-end

40% caused by heavy trucks

Page 4: Oregon's Statewide Work Zone Traffic Analysis Program

Why do we do it?

Determine safe times for lane closuresTimes when volumes are low enough that travel speeds are not significantly decreased

Page 5: Oregon's Statewide Work Zone Traffic Analysis Program

Why do we do it?

Page 6: Oregon's Statewide Work Zone Traffic Analysis Program

Why do we do it?

Page 7: Oregon's Statewide Work Zone Traffic Analysis Program

What do we do?

Estimate traffic volumesSelect a free flow thresholdCompare

Page 8: Oregon's Statewide Work Zone Traffic Analysis Program

What’s a Free Flow Threshold

The maximum sustainable volume that yields average travel speeds at or near free flow conditionsFFT depends on a number of factors

Page 9: Oregon's Statewide Work Zone Traffic Analysis Program

Free flow thresholds

Thresholds differ depending on the work…

Page 10: Oregon's Statewide Work Zone Traffic Analysis Program

Free flow thresholds

Not recognizing that may have unwanted results…

Page 11: Oregon's Statewide Work Zone Traffic Analysis Program

What traffic numbers are needed?

Design Hour Volume?

Peak vs. off-peak?

24/7

• Does not account for month-to-month variations.

• Peak and off-peak hours start and end at different times in different places.

Page 12: Oregon's Statewide Work Zone Traffic Analysis Program

How do we do it?

WZTA ToolTimelineMay 2004 – Oregon Bridge Delivery Program StartsSummer 2005 – WZTA is created in spreadsheet formSummer 2006 – WZTA is expanded for statewide useFall 2006 – ODOT WZTA Manual is revisedOctober 2008 – WZTA online tool goes live

Page 13: Oregon's Statewide Work Zone Traffic Analysis Program

WZTA Background

OTIA III Bridge Locations

Page 14: Oregon's Statewide Work Zone Traffic Analysis Program

Mobility Corridors

Statewide Mobility Corridors Defined

Page 15: Oregon's Statewide Work Zone Traffic Analysis Program

Mobility Management and Delay Thresholds

I-5 South Corridor (Eugene to CA State Line)

Page 16: Oregon's Statewide Work Zone Traffic Analysis Program

Mobility Management and Delay Thresholds

Segment 4-C (US 199 to CA State Line)

Page 17: Oregon's Statewide Work Zone Traffic Analysis Program

Mobility Management and Delay Thresholds

Length: 55 milesDelay Threshold: 7 minutes

Page 18: Oregon's Statewide Work Zone Traffic Analysis Program

Mobility Management and Delay Thresholds

Length: 55 milesDelay Threshold: 7 minutes

Page 19: Oregon's Statewide Work Zone Traffic Analysis Program

Mobility Management and Delay Thresholds

Corridors broken into segmentsDelay thresholds assigned to segmentsDelay thresholds to be enforced 24/7/365Detailed delay estimates are needed to help manage mobilityIndividual delays must be aggregated

Page 20: Oregon's Statewide Work Zone Traffic Analysis Program

Analysis Needs

Delay estimates required for all projectsEstimated delays on each segment must be compared to thresholds

Page 21: Oregon's Statewide Work Zone Traffic Analysis Program

WZTA Tool

Requires only an internet connection and browserUp-to-date dataAnalysis results stored on server5-15 minutes per analysisOutput

Lane closure chartsDelay estimatesOther…

Page 22: Oregon's Statewide Work Zone Traffic Analysis Program

How Does It Work?

Gather dataAdjust data

Heavy vehiclesSeasonal variationsWeekday/weekendGrowth rates

Identify free flow thresholdCompare

Free Flow Threshold Free Flow Threshold ––

The maximum sustainable volume that yields The maximum sustainable volume that yields average travel speeds at or near free flow average travel speeds at or near free flow

conditions.conditions.

Page 23: Oregon's Statewide Work Zone Traffic Analysis Program

Where Does the Data Come From?

ODOT Manual Count DatabaseITIS

ODOT Highway InventoryAverage Daily TrafficGrowth ratesTruck percentages

ODOT Traffic DatabaseDaily Trends/ATR Data

GISUGB/MPORegion Boundaries

Page 24: Oregon's Statewide Work Zone Traffic Analysis Program

Choose Your Location

Method 1Select Highway # and MP

Page 25: Oregon's Statewide Work Zone Traffic Analysis Program

Choose Your Location

Select highway via drop down

Page 26: Oregon's Statewide Work Zone Traffic Analysis Program

Choose Your Location – Method 1

Manual entry of milepost

Page 27: Oregon's Statewide Work Zone Traffic Analysis Program

Choose Your Location – Method 2

Use map to select location

Page 28: Oregon's Statewide Work Zone Traffic Analysis Program

Choose Your Location

Location data should now be displayed

Page 29: Oregon's Statewide Work Zone Traffic Analysis Program

Year of Analysis

Inputting the year of analysis yields projected traffic data

Page 30: Oregon's Statewide Work Zone Traffic Analysis Program

Manual count data

Page 31: Oregon's Statewide Work Zone Traffic Analysis Program

Viewing manual count data

Page 32: Oregon's Statewide Work Zone Traffic Analysis Program

Example closure charts

Eastbound Westbound

Page 33: Oregon's Statewide Work Zone Traffic Analysis Program

Output – Closure Chart

Lane closure chart

Page 34: Oregon's Statewide Work Zone Traffic Analysis Program

Closure Chart Uses

Used primarily in the planning and design phasesPlanning: May influence final designDesign: Project specificationsConstruction: Short notice issues

Page 35: Oregon's Statewide Work Zone Traffic Analysis Program

Output – Delay

Page 36: Oregon's Statewide Work Zone Traffic Analysis Program

Output – Graphical Delay

Example graphical output

Page 37: Oregon's Statewide Work Zone Traffic Analysis Program

Output – Graphical Delay

Example graphical output

Page 38: Oregon's Statewide Work Zone Traffic Analysis Program

Output - Aggregate Delay

Aggregate delay over user-defined segments

Page 39: Oregon's Statewide Work Zone Traffic Analysis Program

An example of context…

Page 40: Oregon's Statewide Work Zone Traffic Analysis Program

Check Horizontal Geometry

Work zone is on a 4.0 degree curve

Page 41: Oregon's Statewide Work Zone Traffic Analysis Program

Check Vertical Geometry

Work zone is on a 4-6% grade

Page 42: Oregon's Statewide Work Zone Traffic Analysis Program

Roadway Geometry Example

Horizontal geometry = 4 degree curveVertical geometry = 4-6% gradeWhat does this do to the free flow threshold?

Page 43: Oregon's Statewide Work Zone Traffic Analysis Program

Traffic Planning Sheet (TPS)

Can be accessed without loginInput ODOT Hwy# and MP

Page 44: Oregon's Statewide Work Zone Traffic Analysis Program

Traffic Planning Sheet (TPS)

Outputs include:Roadway profileStraightline diagramsHorizontal curve tableVertical grade tableVertical type table

Page 45: Oregon's Statewide Work Zone Traffic Analysis Program

Traffic Planning Sheet (TPS)

Roadway Profile

Page 46: Oregon's Statewide Work Zone Traffic Analysis Program

Traffic Planning Sheet (TPS)

Straightline Diagram

Page 47: Oregon's Statewide Work Zone Traffic Analysis Program

Traffic Planning Sheet (TPS)

Horizontal Curve Table

Page 48: Oregon's Statewide Work Zone Traffic Analysis Program

Traffic Planning Sheet (TPS)

Vertical Grade Table

Page 49: Oregon's Statewide Work Zone Traffic Analysis Program

Traffic Planning Sheet (TPS)

Vertical Type Table

Page 50: Oregon's Statewide Work Zone Traffic Analysis Program

Map Legend

The map legend can be activated to turn on and off data layers including the following:ADTTruck percentageHorizontal Curve data (degree of curvature)Vertical gradeATR locationsManual Count locations

Page 51: Oregon's Statewide Work Zone Traffic Analysis Program

Map Legend

The map legend can be activated to turn on and off data layers including the following:Traffic and Count LocationsATRsSignalsMCTD MapsBoundariesGeometry

Page 52: Oregon's Statewide Work Zone Traffic Analysis Program

Other Important Information

ODOT Motor Carrier Transportation Division Route MapsGroup Map 1Route Map 2Route Map 5Route Map 6Route Map 9

Page 53: Oregon's Statewide Work Zone Traffic Analysis Program

MCTD Group Map 1

This map shows routes allowing loads up to 12’ wide on Continuous Trip Permits (CTP)

Page 54: Oregon's Statewide Work Zone Traffic Analysis Program

MCTD Route Map 2

This map shows routes allowing overwidth loads to travel at night (12’ on freeways, 10’ on others)

Page 55: Oregon's Statewide Work Zone Traffic Analysis Program

MCTD Route Map 5

This map shows routes approved for triple tractor trailers

Page 56: Oregon's Statewide Work Zone Traffic Analysis Program

MCTD Route Map 6

This map shows routes that allow loads up to 14’ wide on CTPs

Page 57: Oregon's Statewide Work Zone Traffic Analysis Program

MCTD Route Map 9

This map shows routes that allow loads up to 14’ wide on CTPs

Page 58: Oregon's Statewide Work Zone Traffic Analysis Program

ATR graphing tool

Allows for the graphing of actual volumes over a user defined period

Page 59: Oregon's Statewide Work Zone Traffic Analysis Program

ATR graphing tool

3 week graph covering Thanksgiving

Page 60: Oregon's Statewide Work Zone Traffic Analysis Program

ATR Graphing Tool

Sunday after Thanksgiving – Baker Valley

Page 61: Oregon's Statewide Work Zone Traffic Analysis Program

ATR Graphing Tool

The same day at Yoncalla

Page 62: Oregon's Statewide Work Zone Traffic Analysis Program

ATR Graphing Tool

Memorial Day weekend at Oakridge ATR

Page 63: Oregon's Statewide Work Zone Traffic Analysis Program

ATR Graphing Tool

Albany ATROctober 6, 2007 to October 9, 2007

Page 64: Oregon's Statewide Work Zone Traffic Analysis Program

Summary

Delay estimates and work windows can be generated quicklyAbility to predict delays/travel times for work zones, segments, and corridorsDuring planning: Closure chart and delay estimates influence staging strategiesDuring design: Closure information used in project specifications

Page 65: Oregon's Statewide Work Zone Traffic Analysis Program

Summary

Scheduling and staging for major construction projects

Page 66: Oregon's Statewide Work Zone Traffic Analysis Program

Contact Information

Smith Siromaskul, P.E.HDRProfessional AssociateTraffic [email protected]

660 Hawthorne Ave SE, Suite 220Salem, OR 97301(224) 766-0526

Jeremy Jackson, E.I.HDRTraffic Engineering [email protected]

660 Hawthorne Ave SE, Suite 220Salem, OR 97301(503) 510-3098