Installation of this type of equipment requires at least three people, and the use of a lifting tower or platform.

1. Read all instructions carefully before starting assembly.2. Check using the parts list and fixing kit list that none of the components are missing. If any parts are missing contact our office.3. Plan the final position of the play equipment ensuring there is sufficient space. See ground plan for recommended safety surface area and critical fall height to EN-1176.4. Excavate the foundation holes in accordance with the ground plan. Orchard is designed to be installed onto a level site.5. Fit the ground shoes OPA001/006 (for wet pour surfacing) / OPA002/007 (for loose fill) to the bottom of all posts but OTP214 / 220 / 221, using 3 x coach screws (M10 x 80). Each post is numbered, and are marked with an 'X' on the bottom end.6. Fit the rubber post caps to the top of each post using 3 x 50mm wood screws per cap.7. Erect the main posts into the foundation holes using the ground plan for dimensions. Assembling decks and activities between the posts will help to brace it before it is concreted.8. Ensure ropes and nets are taught before concreting the posts.9. Assemble all activities and nets onto the posts in accordance with the assembly instructions in this document. Do not concrete the main legs until all the nets, panels, and other activities are fitted, as adjustments may be required. 10. Fit the two spragging irons provided through the holes in the end of the painted slide bar.11. When all the activities are fitted and decks are levelled, fill the foundation holes to the required depth with concrete.12. Do not allow the equipment to be used until the concrete has set (2-3 days) and the required safety surface has been installed.13. Check that all fixing bolts are fully tightened.14. When all fixings are secure, fill the 40mm diameter counterbores in the posts with the rubber bungs supplied.15. Follow the maintenance instructions supplied.

NB: During installation, care must be taken to prevent hazards to children. If you are at all unsure or have any questions, please contact the contracts department immediately for their assistance and advice. Extra care should be taken if conditions are abnormal.

Tools Required

M10 Security screw torx fixing toolSockets for M16 boltsSockets for M10 boltsDigging Implements

OTU/OTW210Orchard UnitInstallation Instructions

Page 2Rev 04

Page 3: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitParts List & Fixing Kit

Page 3Rev 04

Ref Description Qty

OTU210F Fixing Kit 1

OTP205 Post 205 1OTP211 Post 211 1OTP214-227 Posts 214-227 1 / EachCZS220 Foot Holds 3ORR200 Net Bridge 1 ORR210 Climbing Net 1ORR215 Traverse Rope 4ORM003 Net Rail 1ORM005 Climbing Wall Bracket 7ORP005 HPL Climbing Panel 1ORP006 Hex Climbing Panel 1ORP009 Ramp Panel 1DZA106 Climbing Grips 15ORM001 Deck 'T' Rail 4ORA202 Deck Support Rail 7ORP001 Hex Round Deck 1ORP002 Hex Oval Deck 2ORA206 Peg Climber 1ORM007 Seat Support Rail 1ORP007 Oval Leaf Seat Panel 3PNS001 Stainless Slide Bar 1ORM009 Painted Slide Bar 1ORM008 Slide Bar Support Rail 1ORM010 Deck Barrier Rail 1ORM011 435mm Bracing Rail 1ORM014 Fireman's Pole 1ORM015 Deck Entrance Frame 1DZA652 Leaf Step Bracket 3ORP004 Leaf Step Panel 3ORS003 Rubber Post Caps 15 PED005 Post Pedestal 2OPA001/002 Aluminium Shoes 1OPA006/007 Aluminium Shoes 12

NB: surplus '+' fixings are included in the kit to account for breakages and losses. OTU210F Fixing Kit List:

CHN005 Chain Adapter 14CZS009BK Nylon Bracket Cover 14+2DZS005 Nylon Nut Cover 86+9DZS007 Nylon Fixing Covers 42+3DZS009 Step Washer 86FIX125 M6x25 Security Bolt 14FIX230 M12x30 Security Bolt 1HHB518 M10x50 Hex Bolt 1HHB534 M10x90 Hex Bolt 5 HHB555 M10x150 Hex Bolt 2 HHB770 M16x260 Hex Bolt 5 HSS522 M10x60 Hex Bolt 7HSS530 M10x80 Coach Screw 101 HSS550 M10x100 Coach Screw 56LKN320 M10 Nyloc Nut 88LKN340 M16 Nyloc Nut 29MCS107 M6x20 Button Head 14MCS321 M10x35 Countersink 18MCS326 M10x40 Countersink 13MCS340 M10x55 Countersink 5MCS358 M10x70 Countersink 10MCS361 M10x75 Countersink 2MCS375 M10x140 Countersink 12MCS400 M6x25 Countersink 14MSL003 300mm Spragging Irons 3ORS001 Post Rubber Spacer 10ORS002 Post Rubber Bung 48+6ORS005 Metal Spacer Insert 5ORS017ZP M16 Rope Fixing 14PZS001 Plastic Base 42STS060 1.1/4" Self Tap Screw 84+11WDS450 2" Wood Screw 45+7WSR034 M16 Washer 34+6WSR040 M10 Washer 134+16WSR050 M12 Washer 1WSR420 M10 Grip Washer 192+18WSR440 Black Saddle Washer 7

Page 4: Orchard - Oak OTU/OTW210 Installation Instructions

MSL003

Page 4Rev 04 0 10 20 30 40 50 60 70 80 90 100 110mm

CHN005

OTU/OTW210Orchard UnitFixing Kit

Illustrations Not To Scale CZS009BK DZS005

DZS007 DZS009 ORS001

ORS002 ORS005 PZS001CZS220

ORS017ZP

Page 5: Orchard - Oak OTU/OTW210 Installation Instructions

Page 5Rev 04

OTU/OTW210Orchard UnitParts List

ORS003

DZA106

OPA001/006 or OPA002/007Wet Pour or Loose FillPED005

ORR215

ORR200

ORR210

Page 6: Orchard - Oak OTU/OTW210 Installation Instructions

Page 6Rev 04

ORA202

ORM010

ORM008 ORM003ORM007

OTU/OTW210Orchard UnitParts List

ORM005

ORM011 DZA652ORM001

Page 7: Orchard - Oak OTU/OTW210 Installation Instructions

Page 7Rev 04

OTU/OTW210Orchard UnitParts List

ORA206ORM014

ORM015

PNS001

ORM009

Page 8: Orchard - Oak OTU/OTW210 Installation Instructions

Page 8Rev 04

OTU/OTW210Orchard UnitParts List

ORP004ORP007

ORP006ORP005

ORP001 ORP002

ORP009

Page 9: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard Unit

Page 9Rev 04

Page 10: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard Unit

Page 10Rev 04

Page 11: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing Details - Post Caps and Shoes

Page 11Rev 04

OTP223 TO BE INSERTED INTO THE GROUND FIXING BY 750mm. See next page for details.

Page 12: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing Details - Shoes

Page 12Rev 04

Page 13: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing Details - Post Joints and Ropes

Page 13Rev 04

Page 14: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing Details - Decks

Page 14Rev 04

Page 15: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing Details - Climbing Ramp

Page 15Rev 04

WSR040

HSS550

ORS002

LKN320WSR040

LKN320DZS009

DZS005

MCS340M10 x 55

Countersink Bolt

MCS375M10 x 140Countersink Bolt

This spragging iron (MSL003) should feed through pre-drilled holes in both

pedestals, bracing them together

Page 16: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing details for the following activities (please check coach screw length):

Page 16Rev 04

Page 17: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing details for the following activities (please check coach screw length):

Page 17Rev 04

Page 18: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing details for the following activities (please check coach screw length):

Page 18Rev 04

Page 19: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing Details - Panel Fixing

Page 19Rev 04

This assembly of fixings also features on the larger leaf panels and framework:

Page 20: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing Details - Slide Bars & Climbing Wall

Page 20Rev 04

Page 21: Orchard - Oak OTU/OTW210 Installation Instructions

OTU/OTW210Orchard UnitFixing Details - Climbing Wall Grips

Page 21Rev 04

Grips on the climbing wall should be positioned in the pre-drilled holes as illustrated:

Page 22: Orchard - Oak OTU/OTW210 Installation Instructions

NOTEThe warranty is invalidated if these instructions are not followed.All wood needs annual inspection and retreatment where required.

Recommended Regular Inspection and Maintenance Interval Days 7 14 28 56 365

Check stability of structure, tighten connections if required.

Check all uprights at ground level for corrosion and/or rot.Replace any defective parts.

Check all painted elements for damage, rub down and repaint or replace as required.

Check chain/ropework assemblies for wear and damage, replace if required.

Check rotating and pivot points for wear and smooth runninglubricate or replace if required.

Check rubber parts for wear and/or damage, replace if required.

Check tension cables, adjust if required.

Check wear of cables, replace if required.

Check slide chutes for smoothness and any foreign elements, remove any found.

Check rubber safety surfaces for damage and poor performance, repair or replace if required.

Check loose fill safety surfaces, remove any foreign elements, rake level and top up if required.

Disposal Instructions

All components should be broken down into categories of:-1 Mild Steel - all Swing Frames, Playzone, Toddlerzone, Teenzone activities, Deck Frames and Springie Frames.2 Stainless Steel - all Slides, Mirror Panels.3 Aluminium - all Playzone and Toddlerzone Posts.4 Galvanised Steel - all Chains and Teenzone Posts.5 Moulded Rubber Products without steel inserts - all Toddlerzone Caps and edge details.6 Timber - all natural timber, plywood, and MDF panels.Wherever possible these materials should be taken to specialist recycling organisations and recycled.In some cases where composite materials are used, then disposal at land fill sites is the only alternative such as:7 Moulded Rubber Products encasing steel inserts - all Swing Seats, Deck Tops, Duo/Dizzy Disc Tops.8 High Pressure Laminate - all Toddlerzone, Playzone and Teenzone Panels.9 Steel Core Polypropylene Rope - all Scramble Nets, Space Nets, Playzone/Toddlerzone Ropes.

OTU/OTW210Orchard UnitMaintenance Instructions