Oracle Primavera Smart City Projects Solution · Title: OOW-India-2017-16x9 Author: cmcnulty...
Transcript of Oracle Primavera Smart City Projects Solution · Title: OOW-India-2017-16x9 Author: cmcnulty...
Copyright © 2014 Oracle and/or its affiliates. All rights reserved. |
Oracle Primavera Smart City Projects Solution
1
Werner Maritz Director: Industry Strategy Construction and Engineering Global Business Unit
YOUR SMART CITY VISION, REALISED The world is watching
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Safe Harbor Statement
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
The transformation challenge
3
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 4
The Smart City transformation process
Collect Communicate Analyse
Why do something What to do How to do it
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Smart Utilities
Citizen Services
Public Safety
Smart payments
and finance
Water Usage Monitoring
Cloud & Data Centre
Signaling and parking
Health and
human services
Smart City Transformation – Creating the vision
Street Lighting
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
7% Capital wasted due
to poor project
selection
14% Capital wasted due
to poor project
execution
6
7% Capital wasted due
to poor maintenance
Challenges in delivering the vision
Source: McKinsey Infrastructure Practice, Infrastructure productivity: How to save $1 trillion a year, January 2013
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 7
The traditional silo approach to infrastructure planning
Water
Power
Health Roads
Rail
Airport
Schools
Housing
Waste
Telco
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Water Schools Housing Waste Telco
8
New Integrated approach to infrastructure planning
Power Health Roads Rail Airport
Infrastructure Development Solution
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 9
Plan for the future – boost infrastructure productivity
Align project portfolio with transformation agenda
Ensure operational excellence in project delivery
Ensure sustainability of infrastructure assets
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Best of breed point applications
Best of SaaS solution
10
✘ ✓
Plan for the future – boost infrastructure productivity
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 11
By improving project delivery systems with Oracle technology Step by step improvements
How......
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Opportunity identification
Strategic alignment of project portfolio
Capital planning
Risk analysis
12
A platform for investment decision support
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Critical path scheduling
Co-ordination of projects and
activities
Extension of Time (EOT) claims
13
An integrated scheduling system
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Funding traceability
Budget management
Cost control
Cost reporting
Cash flow
Forecasting
Invoices
Confidential – Oracle Internal/Restricted/Highly Restricted
14
Proven financial governance and control platform
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Combine 3D, IFC models
Clash Detection
Walkthrough
Redline
Constructability
Design change management
15
Engineering design team collaboration improvements
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 16
Traceable contractual transactions and team collaboration
• Web based collaboration
• Role based workflow
• Schedule coordination
• Document and records management
• Contract change management
• Project communication management
• Risk management
Owner
Contractor
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 17
• Provide an electronic record of
project and contract events,
data items and claims.
• It can track time allocations for
specific tasks or actions to
reduce time barring on claims
Provide a common data environment for all stakeholders
Drawings & Models
Transmittals
Payment applications Claims
Submittals
Correspondence
Documents
Specifications
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Facilities management
Preventive maintenance
Corrective maintenance
Real-estate management
Extend infrastructure life through rigorous maintenance
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. |
Real-time project performance reporting
Management decision support
Accurate & dependable information
19
Provide real-time reporting and data analytics
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 20
Bring mobility to the infrastructure delivery workforce
• Enable site based workers
• Leverage mobile platforms
• Real-time information on demand
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 21
• Oracle Primavera applications
available as SaaS or on premise
• Pre-configured solution
accelerators bring rapid
deployment and short time to
value
Easy deployment in the Oracle Cloud
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 22
Sample Customers
Copyright © 2017, Oracle and/or its affiliates. All rights reserved. | 23