Transcript of Oracle Primavera Contract Management
http://tensix.com | T: (703) 910-‐2600 | Ten Six Consulting LLC | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451
Duration: 3-days
Prerequisites: No previous experience working with Oracle Primavera Contract Management is necessary.
Course Description
Oracle Primavera Contract Management (PCM) is a web based, multi-user, multi-project database system for managing all aspects of a project relating to the contractual relationship. This contractual relationship is the "center of the universe" from the perspective of how PCM manages information. A project may have multiple relationships with contractors within a project. Oracle Primavera Contract Management is designed to allow the users and management to be pro-active in understanding the progress of the project relating to money and communication. • Know when RFI's need to be answered • Know when insurance is about to expire for a contractor • Know when there is a potential for cost over-runs long before the end of the project • Know when submittals must be approved to not affect schedule • Know what changes are affecting the bottom line
This highly interactive and hands-on class will take attendees through real world scenarios and how Oracle Primavera Contract Management supports these.
Oracle Primavera Contract Management
http://tensix.com | T: (703) 910-‐2600 | Ten Six Consulting LLC | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451
Course Contents DAY 1
Lesson 1 – Introduction to Contract Management Ø What is Oracle Primavera Contract Management
Ø Login to Contract Management
Ø Customize the Project View in the Main window
Ø Customize the Control Center in the Main window
Ø Navigation in Contract Management
Lesson 2 – Creating a Project Ø Create a project using the project wizard
Lesson 3 – Companies and Contacts Ø Add a company
Ø Create Contacts
Ø Group vs project companies
Ø Copy Companies / Contacts
Ø Using distribution lists
Ø Inactivate companies / contacts
Lesson 4 – Tracking Drawings Ø Record and review the drawing log
Ø Distribution of Drawings
Ø Using drawing sets
Ø Use the transmittal queue
Lesson 5 – Communication Ø Enter an RFI
Ø Record an answer to RFI
http://tensix.com | T: (703) 910-‐2600 | Ten Six Consulting LLC | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451
Ø Document a telephone record
DAY 2
Lesson 6 – Logging and Tracking Submittals Ø Understanding submittals and submittal packages
Ø Identify the submittal workflow
Ø Using multiple reviewers
Ø Tracking Submittals
Ø Use the transmittal queue
Lesson 7 – Project Issues Ø Define a new issue
Ø Link documents and attachments to an issue
Ø Create issue by searching
Lesson 8 – More Communication Ø Create a daily report
Ø Generate daily Report
Ø Create meeting minutes
Ø Generate meeting minutes
Lesson 9 – Managing Project Costs Ø Cost code structure
Ø Cost worksheet
Ø Understanding the cost worksheet
Ø Cost code detail
Lesson 10 – Budget, Contracts, Purchase Orders, and Trends Ø Adding a budget
Ø Adding a contract and purchase order
http://tensix.com | T: (703) 910-‐2600 | Ten Six Consulting LLC | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451
Ø Distribute documents to the cost worksheet
DAY 3
Lesson 11 – Change Management Ø Change management workflow
Ø Initiate change management
Ø Following the CM process
Lesson 12 – Payment Requisitions Ø Determine payment requisition options
Ø Generate from a contract
Ø Create a schedule of values
Ø Retrieve change orders
Ø Progress and certify requisitions
Case Study