Oracle Open World Presentation 2012

12
Spartan Engineering - From Excel to Excellence Divyesh Muni Nishnaat Management Consultants Pvt. Ltd.

description

Oracle OpenWorld Presentation 2012

Transcript of Oracle Open World Presentation 2012

Page 1: Oracle Open World Presentation 2012

Spartan Engineering - From Excel to Excellence

Divyesh Muni Nishnaat Management Consultants

Pvt. Ltd.

Page 2: Oracle Open World Presentation 2012

Overview

• Background• Challenges Faced• Steps taken to overcome the challenges• The evaluation process• Oracle Product Deployment• Impact of adopting OBA• Achieving Excellence• Lessons learnt• Consulting Partner

Page 3: Oracle Open World Presentation 2012

Organization Background

Spartan Engineering Industries Pvt. Ltd (Spartan), established in 1971 is one of India’s fastest growing construction equipment manufacturing companies. It’s range of products and services include:– Bar cutting & bending machines– Multi Function Hoists– Rope Suspended Platforms– Tower Cranes– Technical consultancy– Leasing of machinery– Continuous after sales service

The organization has grown from a USD 1 million company to a USD 17.5 Million enterprise in the last eight years is keen to adopt industry best practices and yearns to be a USD 200 Million diversified group by 2025.

Currently two manufacturing centres and seven sales and service centres expected to increase exponentially.

Page 4: Oracle Open World Presentation 2012

• Disparate application systems and data repositories• Data Duplication and Data inaccuracy• Poor internal controls• Lack of interdepartmental integration• Excel based reporting systems• End user resistance• Change Management• Family Run business growing at exponential pace. Absence of in-house

capabilities to comprehend, manage and adapt to the project dynamics.• Multiple Locations

Challenges Faced

Page 5: Oracle Open World Presentation 2012

• Appoint Process Consultant – Nishnaat Management Consultants Pvt. Ltd.– Process Reengineering – Channelise the implementation, – Advice Spartan leadership on the do’s and don'ts, – Project Management– Manage the softer aspects of the ERP Implementation etc

• Develop a Long Term Roadmap for Successful Oracle EBS Adaptation, listing business impact, projected benefits and responsibilities

• Listing of Business Requirements to be addressed by the Application System• Identifying critical areas to be addressed and long pending issues.

– Sub-contract Manufacturing – De-kitting Process– Return to Vendor

• Development of an RFP to be circulated among shortlisted products and their implementation partners

Steps taken to overcome the challenges

Page 6: Oracle Open World Presentation 2012

• Evaluation of responses received to the RFP• Product and Implementation Partner Evaluation• Product Finalization - Oracle EBS 12.1.3• Implementation Partner Finalization• Contracting

Evaluation Process

Page 7: Oracle Open World Presentation 2012

• Establishing Project Goals• Project Management• Oracle EBS ver 12.1.3 modules

– Order management– Discrete Manufacturing– Purchasing– Financials– Tele Sales– Field Service– Service Contracts

• Adopting Oracle’s EBS deployment methodology• Identifying, configuring and implementing Oracle Solution for addressing

critical areas and long pending issues• Project Duration – 5 months

Oracle Product Deployment

Page 8: Oracle Open World Presentation 2012

Adopted Oracle Business Accelerators (OBA) for the implementation

• Easy-to-use implementation solution• Incorporated industry best practices business flows• Enabled the OBA Certified implementation consultants to easily map the

business to Oracle EBS• Oracle EBS could easily be deployed• Reduction in the implementation time and cost

Impact of adapting OBA

Page 9: Oracle Open World Presentation 2012

Impact of adapting OBA

As-Is Business Process Study

To Be ProcessDefinition

Solution Build CRP UAT Data MigrationCutoverandGo-Live

Timeline

Traditional Oracle EBS Implementation Cycle

OBA DataCollectionAnd ToolRun

CRP UAT Data Migration

CutoverandGo-Live

Timeline

Implementation with OBA + appLOAD

9

Page 10: Oracle Open World Presentation 2012

• Single information repository organization wide• Inter departmental integration• Increased speed of response• Streamlining of business processes• Enhanced internal controls• Continuous support from Chain-Sys• Adhering to the ERP Roadmap

Achieving Excellence

Page 11: Oracle Open World Presentation 2012

• Top Management Commitment key to project success• Reduction in implementation schedules by deploying OBA• Devise and adhere to the ERP roadmap• Effective project communication• Link EBS Adoption to employee performance management system• The EBS Implementation is a good opportunity for the organization to

revisit existing business processes• A Process Consultant plays an effective role in Business Process Re-

Engineering, assisting the organization in preparing for the EBS Implementation and for managing the softer aspects of the implementation

• Seek services of a knowledgeable and committed Implementation Partner

Lessons Learnt

Page 12: Oracle Open World Presentation 2012

• Reputed implementation partner• Simplicity• Industry knowledge• Top Management Support and commitment to success of the project• OBA Experience• Demonstrated ability to address issues faced by Spartan• Great people to work with

Consulting Partner – Chain-Sys India Pvt. Ltd.