Oracle BPM 11g Lesson 1

92
Oracle BPM 11g Developer Lesson -1 Name – Rakesh Gujjarlapudi Email Address – [email protected]

Transcript of Oracle BPM 11g Lesson 1

Page 1: Oracle BPM 11g Lesson 1

Oracle BPM 11g Developer Lesson -1 Name – Rakesh Gujjarlapudi

Email Address – [email protected]

Page 2: Oracle BPM 11g Lesson 1

LESSON 1 - OVERVIEW

SAMPLE APPLICATION THE PERMIT PROCESSING SCENARIO In this workshop, we will utilize the full BPM Lifecycle around a specific use-case of permit processing to achieve continuous process improvement.

Oracle BPM Full Life Cycle

The City needs to manage the processing of construction and building permits submitted by local citizens. This is currently a very manual and time consuming process. The applicant submits permit applications either online or in person in the city hall. This has to be reviewed by zoning and planning officers to make sure that the permit can be granted. This also has to be reviewed by the appropriate construction officials responsible for electrical, plumbing, fire and building codes. Once approved, the payment for the permit will be processed and the applicant will be notified of the approval.

Process Modelling

Process Improvement

Process Implementation

Process Iteraction

Process Monitoring

Permit Applicant

Applies for Permit

Zoning Officer

Reviews Site Information

Planning Officer

Reviews Plans

Construction Officials

Reviews Construction

Code

Page 3: Oracle BPM 11g Lesson 1

The City also utilizes a couple of web services for this process from other agencies and vendors – a Zoning Information Service and a 3rd party Payment Processing Service.

The existing process can be described by the following characteristics:

Zoning Information Service

A service that determines how a property is zoned based on the

address - Commercial, Industrial, Residential, Open Acess or Historical

Payment Processing Service

A service that processes credit card or electronic bank payments for the

permit

The City is receiving an average of 10 requests for permit applications every

hour.

An applicant takes an average of 5 minutes to

complete a permit application.

The City employs 8 Zoning Officers taking an average of

2 hours to complete a site review per application.

The City employs 5 Planning Officers taking an average of

1 hour to review construction plans per

application.

The City utilizes 10 Construction Officials taking an average of 30 minutes to

review the permit construction codes of an

application.

The Zoning Information Service and the Payment

Processing Service are both averaging 30 seconds to process a transaction for

each application.

There is a 5% rejection rate for permit applications.

Page 4: Oracle BPM 11g Lesson 1

Oracle BPM Suite 11G will be used to accomplish the following:

•Model the City ’s current permitting process. Process Modeling

•Leverage simulation tools and optimization techniques to optimize the process. Process Improvement

•Deploy the implemented process including service integration and human workflow to the run-time environment.

Process Implementation & Deployment

•Execute the process, engaging the various process participants using a work list application. Process Interaction

•Monitor the overall performance of the permitting process using real-time dashboards. Process Monitoring

Page 5: Oracle BPM 11g Lesson 1

INTRODUCTION TO ORACLE BUSINESS PROCESS MANAGEMENT

The Oracle BPM Suite provides an integrated environment for developing, administering, and using business applications centered on business processes. It enables us to create process models based on standards with user-friendly applications. It enables collaboration between process developers and process analysts. Oracle BPM supports BPMN 2.0 and BPEL across the process lifecycle starting from modeling and implementation to run time and monitoring. The Oracle BPM Suite provides a seamless integration of all stages of the application development life cycle from design-time and implementation to run-time and application management. The Oracle BPM Suite is layered on the Oracle SOA Suite and shares many of the same product components, including:

Business Rules

Human Workflow

Oracle Adapter Framework for Integration

Spring Components

Oracle Web Service Manager

BUSINESS PROCESS MANAGEMENT ROLES & RESPONSIBILITIES

Different stages of the application development life cycle require interaction from different types of users.

Page 6: Oracle BPM 11g Lesson 1

PROCESS ANALYST Process analysts are responsible for creating the initial flow of a business process and documenting its steps. This includes identifying and defining the KPIs and high level rules that define the routing artifacts of the business process. This person may also perform simulations to calculate and estimate ROI. Process analysts typically use Business Process Composer to create process models. They may also use process analyst role within Oracle BPM Studio for modelling and simulation. You will play the role of the Process Analysts during Lab 1 - Process Modelling and Lab 2 - Process Improvement. PROCESS DEVELOPER Process developers are responsible for implementing the process models created by process analysts. Each step in the process requires an implementation. The process developer is responsible for integrating the business process with back-end applications like databases and services. Process developers typically use Oracle BPM Studio to model and implement the components of a business application. We will be deploying a fully implemented process during Lab 3 - Process Deployment. The Day 2 format of this workshop will focus on the role of the Process Developer. PROCESS PARTICIPANTS Process participants are the people who use the business applications created with the Oracle BPM Suite. Process participants typically use Oracle BPM Workspace or Process Spaces in the Oracle WebCenter Suite. In this workshop, we have process participants such as the permit applicant, the zoning and planning officers and certain constriction officials who will be interacting with the permitting process. You will play the roles of these participants during Lab 4 - Process Interaction. PROCESS OWNER Process owners are responsible for controlling and managing deployed business processes. They are responsible for the overall supervision of the running business process. They often use metric analysis tools like dashboards to understand the current state of the managed business processes. Process owners typically use Oracle BPM Workspace. They also use Business Process Composer to change the behavior of a process by editing Oracle Business Rules. They may also use the Oracle BAM console to view metrics dashboards. You will play the role of the Process Owner during Lab 4 - Process Interaction and Lab 5- Process Monitoring. PROCESS ADMINISTRATOR Process administrators are responsible for administering the BPM infrastructure. Typical activities include the installation and setup of BPM environments and the overall management of the BPM Engines that are hosting business processes. The main tool used by business administrators is the Oracle Enterprise Manager and automated tools like Ant. Business administrators also use Workspace to manage organizational units, role assignments and perform other activities like creating workflow advanced routing declarations. This workshop does not cover the Process Administrator role but has several of the administrative tasks in setting up the BPM environment documented in the Appendices. In summary, the Oracle BPM Solution spans all these business process roles and responsibilities and ties these in with Enterprise Architecture and Governance initiatives of an organization in a Complete Business Process Management Lifecycle, as indicated below

Page 7: Oracle BPM 11g Lesson 1
Page 8: Oracle BPM 11g Lesson 1

LESSON 1 – PROCESS MODELLING

The first stage of the Business Process Management life cycle is Process Modelling. During this stage a process analyst creates process models based on real-world business processes and problems.

Business Process Modelling Notation (BPMN) is an industry standard notation for defining business processes. The Oracle BPM Suite supports BPMN 2.0. The BPM Suite 11G provides BPMN design time modelling capabilities using the Oracle BPM Studio and the Oracle Business Process Composer, which will run natively on its BPMN 2.0 run-time engine. For this lab, we will utilize Oracle Business Process Composer for our initial process modelling activities.

Oracle Business Process Composer The Oracle Business Process Composer is a web-based application that enables business users to collaborate with process developers and designers.

Provides a user friendly environment for composing processes and process templates.

Enables process analysts to create process blueprints, which are initial drafts of a process that can be used by process developers as a starting point for implementation in Oracle BPM Studio.

Enables certain users to edit business rules at run time. This is important because policies tend to evolve faster that business processes.

CREATING A BPM PROJECT WITH A BUSINESS PROCESS To get started, let’s use the Business Process Composer to create a new BPM project for the Permit Process.

1. Start Oracle Business Process Composer by clicking on the BPM Composer icon from the desktop.

2. This will bring up the Business Process Composer login screen in a web browser. Optionally, you can also

enter the URL directly from your browser: http://localhost/bpm/composer.

Login as the Process Analyst using the following: User Name: Rakesh.Gujjarlapudi Password: welcome1

Process Modelling

Process Improvement

Process Implementation

Process Iteraction

Process Monitoring

Page 9: Oracle BPM 11g Lesson 1

3. Create a new project by clicking on from the top-right and enter the following information Name: PermitProject Description: Process management of construction permits

Click Finish to create the project.

Page 10: Oracle BPM 11g Lesson 1

4. Click the New Process option as shown below.

5. Name the process PermitProcess, and click Create button.

6. You should now see your new Permit Process. Click the Save button from the top, to save your project

and process. Double click PermitProcess to open the process.

Page 11: Oracle BPM 11g Lesson 1

By default, it creates a process with a simple Message Start and Message End. 7. Now, we will add roles and activities to build the most expected path of the Permit Process project.

Let’s add the first role. Hover your mouse to the side bar of the horizontal lane and you will find a pencil icon on it. Click the icon to edit.

Select the Create option and name the new role Applicant.

8. To initiate the process, we’ll use an Initiator task from the BPMN components on the right.

Click the button under the BPMN component list on the right and find the Initiator from the list of Interactive components.

Page 12: Oracle BPM 11g Lesson 1

9. Drag the Initiator task to the arrow between the Start and End activities.

Click the text of the User Task activity and rename it to Apply for Permit.

Click button under the BPMN component list to collapse the list of components. Drag a new Interactive Task from the BPM Components to the white space below the Applicant lane.

Click the text of the new User Task activity to rename it to Review Site Information.

Page 13: Oracle BPM 11g Lesson 1

Right Click on the Unassigned Role and select Properties. Select the Create radio button create a new role called Zoning Officer.

Drag the end of the arrow coming from Apply for Permit down to Review Site Information as shown:

Drag another User Task from the BPM Components to the white space below the Zoning Officer lane and rename it to Review Plans

10. Right Click on the Unassigned Role and select Properties. Click the create radio button to create a new

role. Call the role Planning Officer.

Page 14: Oracle BPM 11g Lesson 1

11. Drag a Default connector from the Review Site Information task and connect it to the new Review Plans task as shown. To do this, just hover your mouse on the Review Site Information task and you will see

button. Just click that button and drag it to the Review Plans.

12. Drag another User Task from the BPM Components to the white space below the Planning Officer lane and rename it to Review Construction Codes.

Click on the Unassigned Role and then click the icon and create a new role called Construction Officials by choosing the create option.

Page 15: Oracle BPM 11g Lesson 1

Connect the Review Plans and new Review Construction Codes task in the same way as you did earlier.

Because we are using an Initiator to initiate the process, let’s change the Start and End type to None. To

do this, hover you mouse on the Start and click the pencil icon. Change the Trigger to None. Do the same for the End.

Move the End event object from the top Applicant lane down to the bottom Construction Officials lane.

Page 16: Oracle BPM 11g Lesson 1

Lastly, drag a Default connector from Review Construction Codes task and connect it to the End object.

13. The PermitProcess should now look like this

Save the work

Page 17: Oracle BPM 11g Lesson 1

ADDING AUTOMATED ACTIVITIES Add a couple automated activities to the process. These activities will be in the form of Service Tasks. We will define Service Tasks for the following services:

1. We’ll use the Service Task from the BPMN components on the right. Click the button under the BPMN component list on the right and find the Service Task from the list of Activity components.

Drag two Service Task components to the PermitProcess diagram as shown. One will be in between the Apply for Permit and Review Site Information tasks and the other one will be between the Review Construction Codes and the End object. Tip: When you drag the service tasks to the diagram, drag it to the connectors you want to insert it into. While dragging, mouse over the connectors and wait for them to pulse or get highlighted, and then release it. This way, the service tasks will be inserted in between.

Zoning Information Service

A service that determines how a property is zoned based on the

address - Commercial, Industrial, Residential, Open Acess or Historical

Payment Processing Service

A service that processes credit card or electronic bank payments for the

permit

Page 18: Oracle BPM 11g Lesson 1

Rename the first Service Task to Get Zoning Information.

Rename the second Service Task to Process Payment. PermitProcess will now look like this:

Page 19: Oracle BPM 11g Lesson 1

Save your work

Page 20: Oracle BPM 11g Lesson 1

ADDING AN ALTERNATE PATH Add an alternative path to what’s expected. For the permit process, there is the possibility that the permit application will not meet the correct zoning, planning and construction requirements. In this case, the application has to be rejected and sent back to the applicant.

1. To determine the outcome of the reviews, add a conditional gateway right after the last review activity before payment is processed. Drag a Gateway object from the BPMN Components to the arrow between the Review Construction Codes and the Process Payment tasks.

Rename the Exclusive Gateway to Review Outcome.

We are sending back rejected applications to the applicant. To do this, do the following:

a. Hover your mouse on Review Outcome and then use the icon to connect it to Apply for Permit. b. Drag the middle of the sequence flow arrow outbound to make the arrow cornered as shown

below.

Page 21: Oracle BPM 11g Lesson 1

Save your work. The Permit Process should look like

Page 22: Oracle BPM 11g Lesson 1

2. Close the project by selecting Close Project from the drop-down on the upper right section of the page.

Log out of Oracle Business Process Composer by clicking Sign Out from the top right corner and close your web browser.

As simple as it is, this process is our starting point for modelling the Permit Process. This is the “As- Is” model for the Permit Process. It represents the current way permits are processed which may not be as optimized as we want it to there are still several areas for improvement.

Exercise: List down areas for improvement that you see in this permit process.

Page 23: Oracle BPM 11g Lesson 1

LESSON 2 – PROCESS IMPROVEMENT

The whole point of BPM is for continuous process improvement. The next stage focuses on the Process Improvement aspect of Business Process Management. In this stage, we will identify potential bottlenecks in the Permit Process using process simulations and then optimize the process by adjusting the model in Oracle BPM Studio.

ORACLE BPM STUDIO Oracle BPM Studio is a component of the Oracle BPM Suite that enables process developers to create process-based applications. It also enables process analysts and developers to model and simulate business processes. Oracle BPM Studio is part of the Oracle JDeveloper IDE and shares the JDeveloper user interface elements used by the Oracle SOA Suite. The JDeveloper environment can be tailored based on the role selected by the user. Oracle BPM Studio includes the Analyst Role which only includes process design elements that are useful to business analysts. Process developers who need access to the complete functionality of the Oracle BPM and SOA Suites should use the default role.

IMPRORING PROCESS MODEL INTO ORACLE BPM STUDIO

1. Start Oracle BPM Studio by clicking on the BPM Studio icon from the desktop.

When prompted to select a role, select Default Role and click OK. This will allow us to download the

Permit Process from the Oracle BPM Metadata Service (MDS) repository.

Process Modelling

Process Improvement

Process Implementation

Process Iteraction

Process Monitoring

Page 24: Oracle BPM 11g Lesson 1

Create a new BPM Application by clicking New Application and name it PermitApplication. Make sure that the Directory is pointed to /home/oracle/jdeveloper/mywork/. Also make sure that the BPM Application is selected in the Application Template. Click Finish.

Note that there is a default project called Project1, which we are not going to use. We will download the project from the MDS Repository. Right-click on Project1 and select Delete Project and choose the option to Remove the project and delete all of its contents (including source directories) and confirm the deletion.

Save all

Page 25: Oracle BPM 11g Lesson 1

2. Click on the third tab from the left. This is the BPM MDS Navigator. From there, select the option to Configure Connection as shown. (Note: If you do not see the BPM MDS Navigator, you can select this from the top menu – View > BPM MDS Navigator.)

Select BPM_MDS when prompted for an MDS Connection, and click OK. Note: This connection has already been pre-configured to point to your BPM MDS Repository. Please refer to Appendix A on how to configure the BPM MDS Repository connection.

3. In the BPM MDS Navigator, you will see your PermitProject as shown. Right-click

on it and select Check Out.

4. Note: If you notice that the PermitProject icon has a pad-lock on it like this:

. It means that it was not closed properly in Oracle BPM Composer. You can force this to close by right-clicking PermitProject and selecting Unlock, and then Check out

Page 26: Oracle BPM 11g Lesson 1

5. When asked if you want to migrate the project, select Yes. Then click OK to finish.

6. Click on the second tab from the left – BPM Project Navigator, and from there, expand the PermitProject > Process folder. Double click PermitProcess. You should now see the Permit Process diagram in Oracle BPM Studio.

Tip: Change the View to 75% to see the full process (or your preference). Note that you will see yellow warning icons on each activity. This is because these activities have not been implemented yet and you are logged in with the Default

Page 27: Oracle BPM 11g Lesson 1

Role. If you want to view this without warnings, you can click on the Highlight Level below the diagram, and slide the level to the middle to hide warnings and only show errors.

Page 28: Oracle BPM 11g Lesson 1

CREATING STIMULATION MODEL By running simulations, business analysts and developers can predict the behaviour of business processes under specified conditions. They can run simulations to verify that the output meets the metric objectives and identify any bottlenecks. They can also run simulations to test the effects of changes on an existing process design. First, we need to define a Simulation Model. A Simulation Model enables you to define the behaviour for an individual process model. Note that, for any given process model, you can have multiple simulation models, so that you can mimic a variety of scenarios.

1. From the BPM Project Navigator, navigate from PermitProcess > Simulations and right- click on Simulation model. Select New Simulation Model to define a simulation model.

Click OK to Create the Simulation Model with the default name.

You should see the Simulation Model that will allow you to configure the behavioural characteristics of the process including the duration of each activity, the resources and costs involved, queuing information and the probabilities of each outgoing flow from occurring.

Page 29: Oracle BPM 11g Lesson 1

2. Use the following characteristics for the Permit Process and capture the characteristics in the simulation model

3. Click the Start node from the list of Flow Nodes on the left. Define the average of 10 requests per hour

for permit applications by setting the Start node’s distribution type to Exponential with an Average Frequency of 10 Instances every 1 hour as follows:

The City is receiving an average of 10 requests for permit applications every

hour.

An applicant takes an average of 5 minutes to

complete a permit application.

The City employs 8 Zoning Officers taking an average of

2 hours to complete a site review per application.

The City employs 5 Planning Officers taking an average of

1 hour to review construction plans per

application.

The City utilizes 10 Construction Officials taking an average of 30 minutes to

review the permit construction codes of an

application.

The Zoning Information Service and the Payment

Processing Service are both averaging 30 seconds to process a transaction for

each application.

There is a 5% rejection rate for permit applications.

Page 30: Oracle BPM 11g Lesson 1

Click the Apply for Permit node from the list of Flow Nodes on the left. The 5 minute average for an application to complete a permit application can be specified by setting the Apply for Permit node’s Mean duration to 5 minutes as follows:

Click the Review Site Information node from the list of Flow Nodes on the left. The 2 hour average to complete a site review can be specified by setting the Review Site Information node’s Mean duration to 2 hours as follows:

From the Review Site Information node, click the Resources tab. The City’s 8 zoning Officers doing site reviews can be can be specified by setting the Available Resources to 8.

Page 31: Oracle BPM 11g Lesson 1

Click the Review Plans node from the list of Flow Nodes on the left. The 1 hour average to complete a plan review can be specified by setting the Review Plans node’s Mean duration to 1 hour as follows:

From the Review Plans node, click the Resources tab. The City’s 5 Planning Officers doing site reviews can be can be specified by setting the Available Resources to 5

Click the Review Construction Codes node from the list of Flow Nodes on the left. The 30 minute average to complete a construction code review can be specified by setting the Review Construction Codes node’s Mean duration to 30 minutes as follows:

From the Review Construction Codes node, click the Resources tab. The City’s 10 Construction Officials doing construction code reviews can be can be specified by setting the Available Resources to 10

Page 32: Oracle BPM 11g Lesson 1

Click the Get Zoning Information node from the list of Flow Nodes on the left. Verify the 30 second durations for the Zoning Information Service. This is the default value so no change is needed.

Click the Process Payment node from the list of Flow Nodes on the left. Verify the 30 second durations for the Payment Processing Service. This is the default value so no change is needed.

Lastly, Click the Review Outcome node from the list of Flow Nodes on the left. Define the 5% Rejection Rate in the probabilities of the Review Outcome such that: a) There is a 5% probability that it will go to Apply for Permit b) There is 95% a probability that it goes to Process Payment. You can define this by dragging the probability sliders in the Outgoing Flows as follows. Note: Make sure you specify the percentage correctly for the Apply for Permit and Process Payment flows, as sometimes the order these flows are shown below is different.

Save the Simulation Model.

Page 33: Oracle BPM 11g Lesson 1

CREATING STIMULATION DEFINITION Next, we need to create a Simulation Definition. A Simulation Definition enables you to define the processes and resources that define a simulation scenario. In a simulation definition, you specify the processes that participate in the simulation by selecting the simulation models associated to those processes. A process may have multiple simulation models defined for it. If a process has multiple simulations models defined, then you must select one of those models to use in the simulation definition.

1. From the BPM Project Navigator, navigate from PermitProcess > Simulations and right- click on Simulation Definition. Select New Simulation.

Click OK to Create the Simulation Definition with the default name.

You should see the Simulation Definition that will allow you to set the start time, duration, models and resources used in the simulation. Set the Duration for 1 Day and check the box to Include in simulation for the PermitProcess SimulationModel as shown.

Save the Simulation Definition.

Page 34: Oracle BPM 11g Lesson 1

RUNNING THE SIMULATION Now, with the simulation definition and model, let’s run a simulation on the Permit Process.

1. Click on the Permit Process to view the process diagram and click the Simulation tab below.

Click the icon to start the simulation. Observe the process diagram for bottlenecks.

Page 35: Oracle BPM 11g Lesson 1

Note that there is an obvious bottleneck in the Zoning Officer’s queue as indicated by the waiting queue being marked as Red. This means that the 8 Zoning Officers are not able to handle the incoming workload. Because the process is single threaded (all activities are sequential), all succeeding tasks are affected by this bottleneck.

Stop the Simulation.

Page 36: Oracle BPM 11g Lesson 1

IMPROVING THE PROCESS WITH PARALELL ACTIVITY One quick approach to improve the process is to parallelize certain activities. Let’s assume that there are no dependencies between the work of the Zoning and Planning officers. In this case, we can make these activities go in parallel.

2. From the Component Palette on the right, drag the Parallel Gateway to the process diagram.

Name the Parallel Gateway Parallel Reviews.

You should see the Parallel Gateway added to your process. (Note: The red error icons simply indicate that the gateways are not connected to your process yet). To visually show that Review Site Information and Review Plans will go in parallel, position the Review Site Information and Review Plans to be vertically aligned and stretch the parallel gateway and in the middle of the 2 activities as follows:

Page 37: Oracle BPM 11g Lesson 1

3. Adjust the existing arrows in your process to connect to the parallel gateway to the Review Site Information and Review Plans by doing the following

a. Drag the end of the connector going from Get Zoning Information to Review Site Information to make it connect to the start of the Parallel Reviews gateway:

b. Drag the end of the Parallel Reviews connector to make it connect to Review Site Information:

c. Drag the end of the connector going from Review Site Information to Review Plans to make it

connect to the end of the Parallel Gateway:

Page 38: Oracle BPM 11g Lesson 1

d. Drag the end of the connector going from Review Plans to Review ConstructionCodes to make it

connect to the end of the ParallelGateway:

e.

4. You should now have something like this:

Page 39: Oracle BPM 11g Lesson 1

5. Right click on the Parallel Reviews gateway and select Add default sequence flow to connect it to the Review Plans task.

6. Add an Exclusive Gateway after the Parallel Gateway and call this Preliminary Review Outcome. This will

loop back to the applicant in case there are rejections from the Zoning or Planning officers.

7. Create the loopback by right-clicking on the new gateway, selecting Add conditional sequence flow and connecting it to the Apply for Permit task.

Page 40: Oracle BPM 11g Lesson 1

8. Add default sequence flows to connect the ParallelGateway to the Preliminary Review Outcome gateway and to the Review Construction Codes task as shown. (Note: Adjust the other objects as needed)

9. Save the model

10. Run the simulation again. Notice that the bottleneck has now been divided between the 2 parallel activities. There is still queuing going on in each activity.

Page 41: Oracle BPM 11g Lesson 1

11. Stop the Simulation

Page 42: Oracle BPM 11g Lesson 1

IMPROVING THE PROCESS WITH PARALELL ACTIVITY Another approach to improve the process is to bypass the execution of long running tasks using decisions made by a rules engine. For the Permit Process, we can add a Business Rule to evaluate permits based on zoning and project size and allow certain types of permits based on this information to skip the preliminary reviews. The business rule will basically determine that certain projects may not require reviews from the Plan Officer and the Zoning Officer.

1. From the Component Palette on the right, drag a Business Rule to the process diagram, right after the

Get Zoning Information task. (Hint: Drag it to the arrow and release when the arrow shows with a color blue. This will make automatically insert in between without having to define new sequence flows.)

Name the Business Rule Evaluate Permit.

Add an Exclusive Gateway after the business rule and call this Evaluation Outcome. This will determine whether preliminary review can be bypassed.

Page 43: Oracle BPM 11g Lesson 1

Add a conditional sequence flow from the new gateway to connect straight to the Review Construction Codes task. Drag the arrow from the middle going outward to make it cornered. Adjust the other objects to make room. The process should look like the following:

Page 44: Oracle BPM 11g Lesson 1

Let’s assume that with this new rule, 75% of the applications will not require preliminary review. Go to the Simulation Model and adjust the Evaluation Outcome with a 75% probability of going to the outgoing flow to Review Construction Codes.

Also adjust the Preliminary Review Outcome to have a 5% Rejection Rate.

Page 45: Oracle BPM 11g Lesson 1

Run the simulation again. Notice that the process is now executing very efficiently.

Page 46: Oracle BPM 11g Lesson 1

VIEWING SIMULATION METRICS

1. While the simulation is still running, double click the simulation tab to maximize it.

2. Look at some simulation metrics. Click the Configure icon . Uncheck all the checkboxes under Units and check the Average process time and Average Waiting Time under Time. This will show us the time the process spends executing and waiting. Ideally, there should be minimal waiting time.

Page 47: Oracle BPM 11g Lesson 1

Click on the Drill Down icon to get a breakdown by activity.

Change the Column chart to a Bar chart and click on to increase the font size until the fonts on the right are readable.

Notice the breakdown of activities. Most of the time is spent processing, not waiting. The only activity that’s spent waiting is when an applicant applies for a permit. This shows that the Permit Process is now operating efficiently.

Page 48: Oracle BPM 11g Lesson 1

Stop the Simulation by clicking the icon. Click the Save All icon Go to the Application Navigator tab and with the PermitProject selected, select Close from the Application menu.

Through process simulation, we have identified potential bottlenecks in our “As-Is” process and have continuously improved it in our new “To-Be” Process. Next, we will move on to the next phase of the BPM Lifecycle – Process Implementation.

Page 49: Oracle BPM 11g Lesson 1

LESSON 3 – PROCESS IMPLEMENTATION

This lesson will examine the fully implemented Permit Process developed by the Process Developer and deploy it to the unified run-time environment. For all of these implementation activities, the Process Developer leveraged declarative tools from the Oracle Fusion Middleware SOA Suite to design and construct the required logic without having to do any custom coding. We will explore the following implementation activities:

Human Task Implementation – Defining the human workflow task configuration for each interactivity activity in the process. Oracle SOA Suite Human Workflow component is used to define tasks.

Service Task Implementation – Utilizing web services to integrate with back end services such as a zoning information system and a payment database system. Oracle SOA Suite Database Adapter to generate database operation services. Oracle SOA Suite Transformation Tools to declaratively transform the permit data object to the database structure.

Business Logic Implementation – Defining a business rule to determine how to process permit applications. Oracle SOA Suite Business Rules component to create a decision table exposed as a decision service. You will also define the conditional expressions to control the process flow logic and a script task to initialize the process data objects.

Business Activity Monitoring Implementation – Defining business indicators in the process and enabling the use of Oracle Business Activity Monitoring (BAM).

User Interface Forms Generation and Customization – Generating user task forms for each human task and customizing the generated form to improve the end user interaction. The generated task forms are based on the Oracle Application Development Framework (ADF). Oracle ADF components for customizing the task forms.

Process Deployment - Mapping the process roles to the actual roles that these users are assigned to in a Corporate Directory/LDAP Server and then deploying the process to the BPM/SOA runtime environment running on Oracle WebLogic Suite. Oracle WebLogic Embedded LDAP server for the users and groups. All the users and their corresponding groups have already been defined in the Oracle WebLogic Embedded LDAP Server.

Process Modelling

Process Improvement

Process Implementation

Process Iteraction

Process Monitoring

Page 50: Oracle BPM 11g Lesson 1

OPENING THE COMPLETED APPLICATION Open and deploy a BPM application that has already been completely implemented by the Process Developer.

1. Start Oracle BPM Studio. When prompted to select a role, select Default Role and click OK.

From the Application menu, select Open and navigate to /home/oracle/MyFiles/PermitApplication. Complete and open the file PermitApplication.jws

. You should see the completed PermitProject folder on the Application Navigator along with 3 generated forms projects – PermitApplicationForm, PermitContsructionOfficialForm, and PermitReviewForm.

Click on the BPM Project Navigator and expand the PermitProject > Process folder. Double click PermitProcess. You should now see the fully implemented Permit Process diagram in Oracle BPM Studio.

Page 51: Oracle BPM 11g Lesson 1

EXAMINING HUMAN TASKS Examine the Human Tasks for each interactive activity. Interactive activities are the ones with the green boxes.

2. The Apply for Permit task is the task that initiates the PermitProcess. Double-click the Apply for Permit

task and click on the Implementation tab. This task is a User Task implemented using a Human Task definition called PermitApplicationTask.

Click OK. To see the Human Task definition file, right-click the Apply for Permit task and select Open Human Task.

Page 52: Oracle BPM 11g Lesson 1

Since this is the first user task, this utilizes the Initiator Pattern to allow the Applicant to submit a Permit Application. Notice the outcome of SUBMIT.

Click on Data and see how the task is using the PermitApplication as its input with the Editable setting checked. This will allow the Permit Applicant to edit the Permit Application during submission or re-submission.

Back in the BPM process diagram; examine the Review Site Information and Review Plans tasks by double-clicking them. Both of these tasks use the Human Task definition called PermitReviewTask.

Page 53: Oracle BPM 11g Lesson 1

View the Human Task definition by right-clicking on the task and select Open Human Task.

As shown in the Task Definition, the Permit Review task is defined using the default Simple pattern and can return different outcomes – in this case the defaults - APPROVE or REJECT. Users will be able to choose one of these outcomes to complete the task. (Note that you can configure additional outcomes if needed).

Click on Data and notice that this task is read-only, the Editable is unchecked. This makes the permit application data read-only for the reviewers.

Close the PermitReviewTask.task file to go back to the BPM Process diagram. Examine the last task, Review Construction Codes, by double-clicking it. The task is using the Human Task definition called ConstructionCodeReviewTask.

Page 54: Oracle BPM 11g Lesson 1

View the Human Task definition by right-clicking on the task and select Open Human Task.

As shown in the Task Definition, this task implements a complex pattern because the permit will have to dynamically assigned to the appropriate official depending on the type of permit. Route to 2 officials – the Plumbing Official for plumbing related permits and the Electrical Official for electrical related permits. Click the Assignments tab from the right to see the complex workflow pattern.

Page 55: Oracle BPM 11g Lesson 1

EXAMINING SERVICE TASKS Examine the Service Tasks of the automated activities. Automated activities are the ones with the blue boxes.

1. Let’s take a look at the first automated activity, Get Zoning Information. Web Service. From the BPM Process, double-click the first automated activity, Get Zoning Information and click the

Implementation tab. Click the icon and how this is implemented by a Service Call using a SOAP Web Service called ZoningInformationService.

2. Click the Data Associations link to review the data associations. In the Data Association, view the Input and Output tabs to see the input and output mappings. The block, lot and siteAddress come from the Permit Application and the ZoningInformaationService returns the Zone.

Page 56: Oracle BPM 11g Lesson 1

3. Examine the last automated activity, Process Payment. Typically, the process payment activity will be handled by another process that will orchestrate the calls to an external credit card validation service and potentially internal billing and order management systems.

4. For simplicity invoke a database operation to store the payment information in a database table. This service task utilizes the Database Adapter to insert the Payment Information to the Payment database table. From the BPM Process, double-click the last automated activity, Process Payment and click the Implementation tab. Notice how it uses the insert operation of the PaymentProcessingService.

It also transforms the data from the permit application to the payment database table. Click the Data Associations link to open the transformation.

Page 57: Oracle BPM 11g Lesson 1

Click the Counter tab. A counter mark is used in this activity to count the number of permit approvals that has reached payment processing.

Page 58: Oracle BPM 11g Lesson 1

EXAMINING THE BUISNESS RULES Examine the Business Rule for determining whether permit applications require preliminary reviews or not. The business rule is the one with the yellow box.

1. From the BPM Process, double-click Evaluate Permit business rule and click the Implementation tab. See that this task is using the PermitApplicationRules business rule.

Click the Data Associations link. Notice how PermitApplication is assigned as the input and output. The rule takes in the PermitApplicationInput, evaluates it and returns the same object with the applicationEvaluationResults field populated with either: REVIEWS_REQUIRED or NO_REVIEW_REQUIRED.

Page 59: Oracle BPM 11g Lesson 1

In the Output tab, notice how we are setting the applicationStatus as Submitted and the referenceNumber using a system function called getCompositeInstanceID.

In the Output tab, we are also initializing the values of 3 Business Indicators: Cost, TypeOfWork and Zone with data coming from the Permit Application and Zoning Service. These business indicators will be used for monitoring the process in business dashboards.

Page 60: Oracle BPM 11g Lesson 1

Click OK and go to the Counter tab. A counter mark is used in this activity to count the number of permit applications that has been evaluated.

Click OK to go back to the BPM Process.

2. From the BPM Process, right click the Evaluate Permit business rule activity and select Open Business Rule.

Page 61: Oracle BPM 11g Lesson 1

This will bring you to the Rules Editor with a Decision Table with the following rule logic: Small projects will return NO_REVIEWS_REQUIRED, Medium and Large projects will return REVIEWS_REQUIRED.

To see how Small, Medium and Large are defined, let’s review the Local List of Ranges, also called a Bucket Set. This bucket set will be used to classify the permit applications based on the estimated cost of the permit application. Click on PermitApplication.summary.estimatedCost under Conditions. Make sure Local List of Ranges is

selected and click the icon next to it.

The ProjectSize bucket set defines what is considered large, medium and small based on the permit application’s estimated costs using the following ranges:

Projects greater than or equal $100,000 are large projects.

Projects greater than or equal $10,000 and less than $100,000 are medium projects.

Projects less than $10,000 are small projects.

Page 62: Oracle BPM 11g Lesson 1

Click Ok. Close the Rules Editor by clicking the x button on the tab.

EXAMINING THE CONDITIONAL LOGIC Examine the conditional logic of the process. We will take a look at the expressions for each conditional transition.

1. Double-click the transition that returns from the Preliminary Review Outcome gateway going back to Apply for Permit. This condition occurs when either the Zoning Office rejects the site information or the planning office rejects the plans.

Page 63: Oracle BPM 11g Lesson 1

Click on the Properties tab and review the condition:

Click Ok.

Next, double-click the transition that bypasses the preliminary reviews to go straight to the Review Construction Codes. This condition occurs when EvaluatePermit business rule returns a value of NoReviewRequired.

Page 64: Oracle BPM 11g Lesson 1

Click on the Properties tab and review the condition:

Click Ok. Lastly, double-click the transition that returns from the Review Outcome gateway going back to Apply for Permit. This condition occurs when the Construction Officials reject the construction codes.

Page 65: Oracle BPM 11g Lesson 1

Click on the Properties tab and review the condition:

Click OK

EXAMINING THE SCRIPT TASK Examine how the Process Developer made use of a Script task to initialize our permit application with an XML data structure. The Script task is useful for initiating or setting any constant values in the data objects. For the purposes of this workshop, initialize the permit application with default data to save us from having to type all the information manually when we run this.

2. Double-click the Initialize Permit Application script task and click the Implementation tab.

3. Check the Data Associations link.

From the Data Associations, notice how the Permit Application is being initialized with data in XML format.

Page 66: Oracle BPM 11g Lesson 1

Double click the icon on the left of PermitApplication to review the XML that contains default values we are assigning to the permit process.

Click OK on all dialog boxes until you’re back in the BPM Process. To validate that there are no problems, click the Make icon in JDeveloper.

Page 67: Oracle BPM 11g Lesson 1

Note: The Compiler Output will show warnings about the Error assignee not specified. You can ignore these warnings.

EXAMINING THE USER INTERFACE For users to interact with the human task in the Permit Process, we will need some UI forms. The integrated development environment of Oracle BPM Suite includes Oracle Application Development Framework (Oracle ADF) for this purpose. With Oracle ADF, you can design a task form that depicts the human task in the BPM Process. You can also automatically generate the forms based on the input and output parameters defined for the task form. In this lab, we will examine the task forms generated and customized by the Process Developer for each of the human tasks in the process:

Apply for Permit

Review Site Information

Review Plans

Review Construction Codes

1. Click on the Application Navigator, see 3 additional projects: Permit ApplicationForm, PermitReviewForm and PermitConstructionOfficialForm, together with your PermitProject. Under each project, you will see a file called taskDetails1.jspx. This is the generated task form that the Process Developer customized.

Page 68: Oracle BPM 11g Lesson 1

2. Open the taskDetails1.jspx file of the PermitApplicationForm project and review the various ADF components used:

3. Open the taskDetails1.jspx file of the PermitReviewForm project and review the various ADF components used:

4. Open the taskDetails1.jspx file of the PermitConstructionReviewForm project and review the various ADF components used:

Page 69: Oracle BPM 11g Lesson 1

5. Close all .jspx forms

ASSIGN PROCESS PARTICIPANTS BPM is about tying in People, Process and Technology. We’ve create the Process, configured the Technology, now let’s review how the People participate in the process The following users will be participating in the Permitting Process with the respective roles and responsibilities:

The Process Roles you see in the diagram are mapped to the actual roles that these users are assigned to in the Corporate Directory/LDAP Server. For this workshop, we will use the embedded LDAP server in the WebLogic Application Server. All these users and their corresponding groups have already been defined in the LDAP Server.

Page 70: Oracle BPM 11g Lesson 1

1. From the BPM Project Navigator, expand the PermitProject folder and double click Organization. You should see the Organization Editor in Oracle BPM Studio showing the process roles.

Review how each process role is mapped to the LDAP Group. You should see the mappings defined in this table:

Process Role LDAP Group Applicant Citizens

Construction Officials PlumbingOfficials ElectricalOfficials

Planning Officer PlanningOfficers

Process Owner PermitProcessOwners

Zoning Officer ZoningOfficers

Page 71: Oracle BPM 11g Lesson 1

DEPLOYING THE PROCESS

2. Go to the Application Navigator and right-click the PermitProject. Select Deploy > PermitProject.

Choose Deploy to Application Server and click Next.

Page 72: Oracle BPM 11g Lesson 1

Click Next to accept the default Revision ID.

Make sure you check the boxes to select the 3 task form projects. This will include these projects in the deployment. Click Next.

Select the Application server SCAServer and click Next.

Page 73: Oracle BPM 11g Lesson 1

Click Next to accept the default partition.

Click Finish to proceed with the deployment

Page 74: Oracle BPM 11g Lesson 1

This may take a few minutes since each task form all has to be uploaded and deployed. Monitor the Deployment log and wait for the following message:

Troubleshooting Tip: If you get deployment issues about “No credential mapper entry found for password indirection”, go to 'Application Properties' -> Deployment -> Uncheck the 'Auto Generate and Synchronize weblogic-jdbc.xml Descriptors During Deployment' option and try deploying again.

After successful deployment, close JDeveloper

Page 75: Oracle BPM 11g Lesson 1

LESSON 4 – PROCESS INTERACTION

Focus on the Process Interaction stage of the Business Process Management life cycle. In this stage, we will engage the various Process Participants in interacting with the business process using the BPM Workspace

We will use the following Process Participants with their corresponding roles and responsibilities.

Process Modelling

Process Improvement

Process Implementation

Process Iteraction

Process Monitoring

Bob Builder

Citizen and Owner of Bob and Sons Construction

Needs to Apply for a Construction Permit

John Zone

Zoning Officer, City

Needs to Review Site Information for Proper Zoning

Mary Plana

Planning Officer, City

Needs to Review the Construction Plans

Chris Plummer

Plumbing Official, City

Needs to Review Plumbing Codes

Karen Elektra

Electrical Official, City

Needs to Review Electrical Codes

Mike Scott

Department Head in Charge of Permitting, City

Needs to Oversee the Permitting Process

Page 76: Oracle BPM 11g Lesson 1

ORACLE BPM WORKSPACE The Oracle BPM Workspace is a web-based application that allows process participants to interact with process applications deployed in Oracle BPM. The Oracle BPM Workspace user interface provides tabs for each of the following:

Process Instances: This tab enables process participants to view running process instances.

Task List: This tab enables process participants to view and work with their assigned tasks.

Process Dashboards: This tab provides out-of-the-box dashboards for monitoring process performance, task performance and workload.

Custom Dashboards: This tab enables process participants to define and use custom dashboard based on the measurement data generated by process instances.

The Oracle BPM Workspace also enables business administrators to configure and maintain organizations and roles.

BOB APPLIES FOR A CONSTRUCTION PERMIT Let’s start interacting with the Process as Bob Builder, the owner of a construction company who wants to apply for a permit for a new construction project in the City

1. Start Oracle BPM Workspace by clicking on the BPM Workspace icon from the desktop

This will bring up the BPM Workspace login screen in a web browser. (Optionally, you can also enter the URL directly from your browser: http://soa.odemo.com/bpm/workspace. Login as the permit applicant, Bob Builder using the following: User Name: Bob.Builder Password: welcome1

Page 77: Oracle BPM 11g Lesson 1

The BPM Workspace displays tasks that have been assigned to the user in the My Tasks section. In this case, Bob does not have any tasks assigned to him. As a permit applicant, he has the ability to initiate the Permit Process. You will see the Permit Process in the list of Applications on the left.

To initiate the process, click on PermitProcess from the list of Applications. This will bring up a window for the Permit Application Data Entry form.

Page 78: Oracle BPM 11g Lesson 1

Notice all the fields have already been prefilled because of the Script Task that we added to the process. Review the information. Because the Estimated Cost is $1M, we should expect this to go through all the reviews. If you recall, our business rule specified that all large and medium projects $10,000 and above require reviews. Click Submit on the upper right corner of the form to submit the permit application Logout of the Oracle Business Process Workspace. Based on the process we modelled, this should have gone through the execution of the Zoning Service and the Business Rule, and because the Estimated Cost is $1 Million (more than the business rule’s “Small Project” maximum limit of $10,000), it will be routed to the Zoning Officer and the Planning Officer for preliminary reviews.

JOHN REVIEWS THE ZONING INFORMATION Let’s login as the Zoning Officer John Zone to review the site information. 1. Login as the Zoning Officer, John Zone using the following:

User Name: John.Zone Password: welcome1 The BPM Workspace displays tasks that have been assigned to the user in the My Tasks section. In this case, John has a new task assigned, a permit application waiting for his review of the site information.

Double-click on the task Permit Review – Site Information. You should see a new window pop up with the Permit Information submitted.

Page 79: Oracle BPM 11g Lesson 1

Also notice the values under Permit Application – System. These were generated by the BPM Process, such as the unique Reference Number and the Application Status. The Evaluate Permit Business Rule determined the Application Evaluation Results of Reviews Required. The Zoning Information Service determined that this site is Commercial Zone. Click Approve. Notice the task disappears from John’s task list.

1. Rakesh

MARY REVIEWS THE CONSTRUCTION PLANS The permit is still awaiting the approval of the planning officer. Let’s login as the Planning Officer Mary Plana.

1. Login as the Planning Officer, Mary Plana using the following: User Name: Mary.Plana Password: welcome1 Like John, Mary has a new task assigned, a permit application waiting for her review of the construction plans. Single-click on the task Permit Review – Plans. You should see the Permit Application load in the bottom window.

Page 80: Oracle BPM 11g Lesson 1

From the Actions menu under My Tasks, select Approve.

Notice the task disappears from Mary’s task list. Logout the BPM Workspace.

CHRIS VALIDATES THE PLUMBING CODES After the permit gets reviewed by the zoning and planning officers, the codes should be approved by the construction officials. In this case, it will have to go through 2 officials, the Plumbing Official and the Electrical Official. Let’s login as Chris Plummer, a Plumbing Official.

1. Login as the Plumbing Official, Chris Plummer using the following: User Name: Chris.Plummer Password: welcome1 Chris should see a new task assigned, a permit application waiting for his review of the plumbing codes.

Page 81: Oracle BPM 11g Lesson 1

Double-click on the task. You should see the Permit Application popup in another window. Scroll down to the end and in the Comments section, enter a comment about the Plumbing Codes.

From the Attachments section, click , choose a Desktop File Attachment Type and upload the homepipes.pdf file found in /home/oracle/MyFiles/execution.

Page 82: Oracle BPM 11g Lesson 1

Scroll back up and click Approve.

KAREN VALIDATES THE ELECTRICAL CODES

1. Let’s play the role of the Electrical Official. Login as the Electrical Official, Karen Elektra using the following: User Name: Karen.Elektra Password: welcome1 Karen should see a new task assigned, a permit application waiting for her review of the electrical codes.

Double-click on the task. You should see the Permit Application popup in another window. Scroll down to the end. Karen should see the Comment and Attachment entered by Chris.

Enter another comment.

Try opening the attachment by clicking the file link.

Page 83: Oracle BPM 11g Lesson 1

Scroll back up and click Approve.

MIKE TRACKS THE PROCESS

1. Login as the Department Head, Mike Scott using the following: User Name: Mike.Scott Password: welcome1 Mike should see the permit application on his task list because if you recall, there was an FYI task assigned to the Process Owner at the end of the complex task. It’s not waiting for his approval though because it is just an FYI.

Page 84: Oracle BPM 11g Lesson 1

Scroll down and look at the comments and attachments section from the previous approvers.

As the Process Owner, click on Process Tracking. Because it already completed, the task does not show up by default. Click on the Advanced link above button to change the filter with the Status set to Completed.

Click on the completed instance that shows up. From the instance details section below, scroll down and expand the Audit Trail to see each activity in a tabular format.

Page 85: Oracle BPM 11g Lesson 1

Change it to Graphical Format to see the process flow that you modelled and track the path that the execution took. Click the small arrows on the top right and bottom left corners of the Instance Details to maximize the process map.

2. Press the F11 key to view in full screen. Once it’s maximized, you should see the process execution flow with the shaded green arrows indicating the execution path.

Page 86: Oracle BPM 11g Lesson 1

The last activity of Process Payment should have resulted in a new record inserted in the database. To verify this, start JDeveloper and go to the Database Navigator. Note: If you do not see the Database Navigator, you can enable this by selecting View > Database > Database Navigator.

From the Database Navigator, expand PermitApplication > PermitAppDB > Tables and double-click the PERMIT_APPLICATION table. Click on the Data tab below and you should see the Permit Application record with the same reference number.

Page 87: Oracle BPM 11g Lesson 1

RUNNING THE PROCESS FOR DIFFERENT SCENARIOS Execute the process again using different scenarios. For example, try the following: Try rejecting certain tasks and analyze the loopback behaviour. Try submitting a permit application with Estimated Cost less than $10,000 to bypass the preliminary reviews. Try submitting a permit application with the Require Plumbing Permit or Require Electrical Permit check boxes unchecked to skip the approvals needed from the Plumbing or Electrical officials. Submit 10 or more permit applications and leave some of the permit applications sitting on the various users’ task inbox without any action. We will use this for monitoring dashboards in the next lab.

Page 88: Oracle BPM 11g Lesson 1

LESSON 5 – PROCESS MONITORING

The next stage focuses on the Process Monitoring aspect of Business Process Management. In this stage, we will monitor the activity of the process using Process Analytics. Process Analytics enable you to obtain performance and workload metrics which are useful for making more intelligent decisions about your process.

BUSINESS PROCESS ANALYTICS Business Process Analytics enables you to monitor the performance of your deployed processes. It measures the key performance indicators in your project and stores them in pre-defined cubes in the database that enable you to analyze the data in multiple perspectives. You can also store the metrics in the Oracle Business Activity Monitoring (BAM) database for real-time monitoring. Process analysts can view the metrics using dashboards from the Oracle BPM Workspace or Oracle Business Activity Monitoring (BAM). In summary, Process Analytics track:

Workload Metrics

Process and Activity Performance Metrics

Human Resource Metrics By default, the BPM Engine stores the values of pre-defined measures and dimensions that are common to all BPM processes. The supported pre-defined measures are:

Number of active instances by activity, process, and participant

Average time to complete an activity

Average time to complete a process The supported pre-defined dimensions are:

Process

Activity

Participant You can also define custom measures according to your needs. To define custom measures, you use business indicators. The different types of business indicators enable you to measure specific values, keep track of categories or count the times an instance completes one or more activities

Process Modelling

Process Improvement

Process Implementation

Process Iteraction

Process Monitoring

Page 89: Oracle BPM 11g Lesson 1

MONITORING PROCESS USING STANDARD DASH BOARDS

1. Login as the Department Head, Mike Scott using the following: User Name: Mike.Scott Password: welcome1Rakesh Click the Standard Dashboards tab to view the predefined metrics. Workload per process dashboard should be selected by default. This dashboard shows the number of instances sitting in the process. This should show you how many times your Permit Process was initiated. Click on the bar in the left graph and a new graph on the right will be displayed to show you the number of instances sitting in each activity. Click on any of the bars in the right graph and this will load the actual process instances below.

2. Change the view to show Performance per process. This dashboard shows the average time your process takes to complete.

3. Click on the bar in the left graph and a new graph on the right will be displayed to show you the average time it takes each activity in that process to complete.

4. Click on any of the bars in the right graph and this will load the actual process instances below

Page 90: Oracle BPM 11g Lesson 1

5. Change the view to show Workload per participant. This dashboard shows the number of instances sitting for each participant. It will give the process owner an indication of human resource workload and bottlenecks

6. Click on the bar in the left graph and a new graph on the right will be displayed to show you the processes the selected participant are involved with and the number of instances for each. In our example, we only have 1 process, so only the Permit Process will show up there.

7. Click on any of the bars in the right graph and this will load the actual process instances below.

8. Change the view to show Performance per participant. This dashboard shows the average time each user takes to process their tasks. It will give the process owner an indication of human resource performance and bottlenecks.

Page 91: Oracle BPM 11g Lesson 1

9. Click on the bar in the left graph and a new graph on the right will be displayed to show you the processes the selected participant are involved with and the average time the user spends for each. In our example, we only have 1 process, so only the Permit Process will show up there.

10. Click on any of the bars in the right graph and this will load the actual process instances below.

Completed The Lessons

Page 92: Oracle BPM 11g Lesson 1