· installation or facilitiesunder the operational or administrative control of the Port...

48
1 www.salalahport.com

Transcript of  · installation or facilitiesunder the operational or administrative control of the Port...

Page 1:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

1

www.salalahport.com

Page 2:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

2

Tariff Book: 1st April 2017

Page 3:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

3

www.salalahport.com

Port of Salalah Tariff

(Updated up to 1st Apri l 2017)

Schedule I - InterpretationandGeneralInformation

Schedule II - Marine Charges

Schedule III - GeneralCargoTerminal

Schedule IV - ContainerTerminalTariff

Schedule V - HireofEquipment

Schedule VI - MaintenanceandRepair

Page 4:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

Contents

Schedule I – Interpretation and General Information ......................................................................7

Section A - Tariff Book ..................................................................................................................................7

Section B - Charges .......................................................................................................................................7

Section C - Port Authority ............................................................................................................................7

Section D - The Port ......................................................................................................................................7

Section E - Port Limits ...................................................................................................................................7

Section F - Port Premises ..............................................................................................................................7

Section G - Vessel ...........................................................................................................................................7

Section H - Cargo Handling .........................................................................................................................7

Section I - Documentation ..........................................................................................................................7

Section J - Tugs ...............................................................................................................................................7

Section K - Pilotage .......................................................................................................................................7

Section L - Hygiene ........................................................................................................................................7

Section M - Labor ...........................................................................................................................................7

Section N - Port Rules and Regulations ....................................................................................................8

Section O - Dangerous Cargo......................................................................................................................8

Section P - Customs .......................................................................................................................................8

Section Q - Safety ..........................................................................................................................................8

Section R - Exchange Rate ............................................................................................................................8

Section S - Disposal of Cargo ......................................................................................................................8

Section T - Agreement to Terms of the Tariff ...........................................................................................8

Section U - Alterations to the Terms of the Tariff ...................................................................................8

Section V - Port Authority Held Harmless .................................................................................................8

Schedule II – Marine Charges ...................................................................................................................9

Section A - Port Dues ....................................................................................................................................9

Section B - Tug and Barge Operation ......................................................................................................11

Section C - Part A Tugs for vessels with GRT less than 31,000 (excluding tankers) ......................11

Section C - Part B Tugs for all tankers and all vessels with GRT 31,000 or more ...........................11

Section D - Pilot Launches .........................................................................................................................11

Section E - Mooring Launches ...................................................................................................................12

Section F - Ropes ..........................................................................................................................................12

Section G - 1 Pilotage .................................................................................................................................12

Section G - 2 Part A Pilotage charges for tankers less than 5,000 GRT and other vessels

of less than 31,000 GRT (per hour or part thereof) .........................................................12

Section G - 2 Part B Pilotage charges for tankers more than 5,000 GRT and other vessels more

than 31,000 GRT (per hour or part thereof) ......................................................................12

Section G - 3 Pilots kept waiting through any fault of the vessel or vessels Agent ......................13

Page 5:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

www.salalahport.com

Section H - Berthing or Un-berthing Charges .......................................................................................13

Section I - Fresh Water ................................................................................................................................14

Section J - Electricity ...................................................................................................................................14

Section K - Waste Disposal .........................................................................................................................14

Section L - Rat Guards .................................................................................................................................14

Section M - Other services .........................................................................................................................14

Section N - Environment Fees, etc ...........................................................................................................17

Schedule III – General Cargo Terminal Tariff .....................................................................................18

Section A - Stevedoring Charges ..............................................................................................................18

Section B - Quay Handling and Storage Charges ................................................................................ 22

Section C - RORO Vessels ........................................................................................................................... 26

Section D - Charges at Container Freight Station (CFS) ..................................................................... 27

Section E - Ship to Ship Transfer Operations for Liquids and LPG (STS) .......................................... 28

Schedule IV – Container Terminal Tariff and Naval Vessel ........................................................... 29

Section A - General Conditions, Definitions and Abbreviations ....................................................... 29

Section A - 1 Tariff Authority, Scope and Application ........................................................................ 29

Section A - 2 Consent to Terms of Tariff ................................................................................................ 29

Section A - 3 Currency & Exchange Rate ................................................................................................ 29

Section A - 4 Rates for Services not shown in this Tariff .................................................................... 29

Section A - 5 Definitions ............................................................................................................................ 29

Section A - 6 Abbreviations .......................................................................................................................31

Section B - Marine Charges ...................................................................................................................... 32

Section C - Other Services ......................................................................................................................... 33

Section D - Environment Fees, etc .......................................................................................................... 34

Section E - Charges for Containers ......................................................................................................... 35

Section F - Charges at CFS (Container Freight Station) ...................................................................... 40

Section G - Entry pass - Port reserves the right to admission ............................................................41

Section H - HSSE Charges ...........................................................................................................................41

Schedule V - Hire of Equipment ............................................................................................................ 42

Schedule VI - Maintenance and Repair ............................................................................................... 44

Section A - Container Repairs .................................................................................................................. 44

Section B - Vessel Repairs (Under Normal conditions) ........................................................................ 45

Section B - All Other Repairs (Under Normal conditions) .................................................................. 45

Page 6:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

6

Tariff Book: 1st April 2017

Page 7:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

7

www.salalahport.com

Schedule I – Interpretation and General Information

Section A - Tariff BookMeansthechargesbookforship,cargo,andpassengersaspublishedbyPortofSalalahAuthorityandmustbereadinconnectionwiththePortRulesandRegulationsBook.

Section B - ChargesIncludeallcharges,rates,servicefees,andpassageandentrancefeestotheportandanyotherchargeswhichwouldbeincludedinthismeaning.

Section C - Port AuthorityMeansSalalahPortServicesCo.(S.A.O.G).

Section D - The PortMeansthePortofSalalah,SultanateofOmanandincludesalllandingplacesandwaterswithinthelimitsofthePort.

Section E - Port LimitsThelimitsofthePortofSalalah:From thehighestpointof thehigh tidewhere thepoint intersect the coast at 054°04.00’ E longitudeandthenceinthedirectionoftruesouthtothepointintersectingtheline16°58’NandthenceinthedirectionoftrueEasttothepoint intersecting longitude054°05.40’Eandthenceinthedirectionoftruesouthtothepointintersecting16°54.00’NlatitudeandthenceinthedirectionoftrueWesttothepointintersecting053°58.00’ElongitudeandthenceinthedirectionoftrueNorthtothepointintersectingthecoastlineandthencefollowing the coastback to thestartingpoint. And includes allwharves, quays, piers, landingplaces,docks,storageareas,roadsandbuildingsundertheoperationaloradministrativecontrolofthePortAuthority.

Section F - Port PremisesMeans all w harves, piers, landing places, docks, storage areas, roads, passageways, buildings and anyinstallationorfacilitiesundertheoperationaloradministrativecontrolofthePortOperators.

Section G - VesselIncludeseverydescriptionofwatercraft,includingnon-displacementcraftandseaplanes,usedorcapableofbeingusedasameansoftransportationonwater.

Section H - Cargo HandlingMeansloading/dischargingorshiftingofcargofromlocationtoanotherwithinthePortlimits.

Section I - DocumentationThedocuments in respectof cargomustbe in thepossessionofPortof Salalahat least 24hoursprior toarrivalofvessels.Vesselswillnotnormallybeberthedwithoutreceiptofallsuchdocuments.

Section J - TugsTugsareavailableforberthingvessels.

Section K - PilotagePilotageiscompulsory.Pilotsmayboardfromlaunchortugandareavailable24hours.

Section L - HygieneTheportprovidesgarbagebinsatvariouspointsforusebyvessels.Theuseofthesebinsiscompulsoryandwillbechargedfor.

Section M - LaborLaboronbothvesselandquayisprovidedandcontrolledbyThePortoritsnominatedcontractor.RequestsforlaborshouldbemadeinadvancebyAgentstotheOperationsDepartment.

Page 8:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

8

Tariff Book: 1st April 2017

Section N - Port Rules and RegulationsAs published by the Port Authority all Rules and Regulations of the Port of Salalahmust be adhered to aswell as theGCCPortsRulesandRegulations issued inAugust1998andamendments thereof.Thehandlingofvessels,cargoandpassengersandotherrelatedworkwithintheportshallbesubjecttotheprovisionoftheRulesandRegulationsreferredtoabove.

Section O - Dangerous CargoNo dangerous, offensive or harmful goods likely to cause personal injury or damage to property may bebrought into the port premiseswithout specific written approval to that effect. Some types of dangerouscargo(asinIMDGcode)willonlybeallowedintothePortondirectdeliverybasis.

Section P - CustomsCustoms officers board t he vessels on arrival e ither in Port or at t he anchorage. Vessels Masters arerequiredtoproducethefollowingdocuments:

• Crewlist

• Crew’sPersonaldeclarationlist

• Ship’sBondedstorelist

Section Q - SafetyAllportusersmustadheretoallofthecurrentsafetyrulesandregulations.

Section R - Exchange RateTheRiyalOmaniislinkedtotheUnitedStatesDollaratarateof0.3845

Section S - Disposal of CargoTheportreservestherighttoremoveanddisposeofcargotocoveraccruedcharges inaccordancewiththerulesandregulationsoftheportanditsfrustratedcargopolicy.

Section T - Agreement to Terms of the TariffTheuseofservicesandequipmentwithintheportshallconstituteconsenttotheterms&conditionsofthistariffandevidencesanagreementonthepartofallvessels,theirownersandagentsandanyotheruserstochargesspecifiedinthetariffandtobegovernedbyallRulesandRegulationshereincontained.

Section U - Alterations to the Terms of the TariffTheportreservestherighttoalter,changeoramendanyorallcharges,termsandconditionsorinterpretationscontainedinthetariffwithoutpriornotice.

Section V - Port Authority Held HarmlessEachvesselowner,operator,chartereroragentwhosevesselcallsattheportandeachowneroragentofthecargohandledthereat,asaconditiontoreceivingservicesattheportagreestoindemnifyandholdharmlesstheport,anyofitsagentsoremployeesfromandagainstalllosses,claims,demandsandsuitsfordamages,fordeathorpersonal injuryorpropertydamage thatmaybe imposedupon theportsoranyof itsagents,employeesorrepresentativesbyanyowner,operator,chartererorcargoowner(ortheiragentsoremployees)asaconsequenceofservicesattheport.

Page 9:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

9

www.salalahport.com

Schedule II – Marine Charges

Section A - Port DuesPortdueswillbeassessedagainstallvesselsenteringthePort.Allmarinechargesw illbebasedontheGrossRegisteredTonnage(GRT)ofthevessel.WhereavesselhasdualGRTsthehigherGRTwillapply.

Nature of Service provided Rate in OMRA-1 Portduesforanyperiodnotexceeding3daysper10GRT 0.130

A-2 After3daysforeachdayorpartthereofper10GRT 0.030

A-3 Vesselsberthedalongsideforreasonsotherthancargodischargeorloading:

1 Initial24hrsorpartthereofper10GRT 0.060

2 Subsequent24hourperiodsorpartthereofper10GRTuptoa periodofaweek 0.100

3 Aftertheperiodinitem2),foreachsubsequent24hrs.periodorpartthereofper10GRT 0.190

A-4a NonContainervesselsatanchorage:

Upto12hrsper10GRT 0.020

12to24hrs.orpartthereof 0.010

Eachsubsequent24hourperiodorpartthereof 0.020

b Consolidatedchargesforyachtsupto16metersLOAorNRT20orlessatanchor. 20.000

c Consolidatedchargesforyachtsupto16metersLOAorNRT20orlessalongsideberthforupto3daysincludingEnvironmentchargesandskipcharges.

30.000

Forstaybeyond3daysnormalvesselchargeswillbeapplicableandnotconsolidatedcharges.

A-5 Vesselsindistressorrequiringmedicalassistanceatanchorageonly:1 Initial72hours NoCharge

2 Subsequent24hourperiodsorpartthereofper10GRT 0.030

A-6 Ifforanyreasonavesselremainsatanchoragebeforedischargingorloading,tariffitemA-1andA-2willapply.

A-7 Ifforanyreasonavesselremainsatanchorageafterdischargingorloading,tariffitemA-4willapply.

A-8 VesselsindistressordisabledwillonlybeacceptedwiththeapprovaloftheHarborMaster

Page 10:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

10

Tariff Book: 1st April 2017

A-9 Exempted vessels: Thefollowingvesselsorclassesofvesselsshallbeexemptedfrompaymentofportdues:

1 VesselsintheserviceoftheSultanateofOman

2 Vesselsintheserviceofforeigngovernments,unlessoccupyingaberthinthePort;anchoragesareconsideredtobeberthsintheportandthenavyvesselswouldbechargedasperapplicabletariff

3 Tendersofanyrecognizedbuoyage,lightingornavigationalaidservice

4 Pleasureyachtsofunder20tonsNRT

5 Countrycraftwhichisgenerallydefinedasdhoworsmallshipofwoodenconstructionunder100tonsDWT

6 VesselsexemptedfromthepaymentofPortduesbytheGovernmentoftheSultanateofOman

A-10 Anchorage ChargesThenorthanchorageisnotadesignatedanchoragebutisusedforvesselswithdraftoflessthan9M.Ithoweverprovidesshelterforsuchsmallvessels.Rateswillbeappliedasbelow:

Nature of Service provided Rate in OMRa. UptoLOA75m 50.000

b. Above75mbutbelowLOA100m 150.000

c. Above100butbelowLOA150m 250.000

d. Above150butbelowLOA200m 350.000NOTE: Availabilityofanchorageissubjecttoportconvenience

Incaseof longstaywhichexceeds15days,thePortmaysuitably increasethetariffdependingonprevailing circumstances.

A-11 Charges for Keeping launches / dhows / Yacht on Jetty / Yard.

Nature of Service provided Rate in OMR1. Firstperiod:Fortheinitialperiodof28daysperGRTper7dayorpartthereof 0.500

2. SecondPeriod:Forthesecondperiodof14daysperGRTper7daysorpartthereof

0.750

3. ThirdPeriod:Foreachsubsequentperiodof7daysorpartthereofperGRT 1.000

Note : a. Equipmentusedforliftingouton/tothejetty/seawillbechargesextraasperthetariff

b. PortofSalalahwillnotbeheldresponsibleforanydamage,fireoranyclaimfromthelaunchOwnerforanyreasonwhatsoeverduringtheirstayonJetty.

c. Ownerswillberequiredtoobtainpriorapprovalforanymechanicalwork(welding)fromthefire-fighting/Marinesections(HarbourMaster’soffice)andrelevantchargesasperSectionM-3shallbelevied.

d. OwnerswillbefullyresponsiblefortheirownLaunches/Dhow/Yachtoranythirdpartyandportofpropertiesasandwhenanydamageoccurdueorbecausetheirwork/repairscarriedoutonjettyoryard.

e. Depositsonapproximate calculated storageperiodmustbe keptwith thePortbefore service isrendered

f. ItistheLaunch/Dhow/Yachtowners’responsibilitytomakesurethattheJetty/Yardandsurroundingareaaremaintainedcleanandtidyduringoraftertheir liftingormaintenancework. Ifthereisafailuretocomply,theportreservestheexclusiverighttoundertakethecleaningworksandrecoverthesamefromtheowner.

Page 11:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

11

www.salalahport.com

Section B - Tug and Barge Operation B-1 NormalPortdues(SectionA)andberthing/un-berthing(ItemH-1)willapply,basedonthetotalGRToftug(s)

andbargecombined,ordeadweightifGRTisnotavailable.

B-2 IfintheopinionoftheHarborMasteradditionalmarineservicesarerequired,theywillbebilledseparately.

Section C – Part A Tugs for vessels with GRT less than 31,000 (excluding tankers) Allvessels,otherthancountrycraft,enteringorleavingthePortshallaccepttheservicesofaTugorTugsatthediscretionoftheHarborMaster.

Nature of Service provided Rate in OMRC-1 NormalTugChargesperTugperhourorpartthereof 150.000

C-2 Vesselswithoutpower,defectivesteering,etc. 300.000

C-3 StandbychargesperTugperhourorpartthereof 120.300

C-4 Foruseotherthanberthingorun-berthing,rateswillbeprovidedonrequestbytheHarborMaster.

Section C – Part B Tugs for all tankers and all vessels with GRT 31,000 or more Allvessels,otherthancountrycraft,enteringorleavingthePortshallaccepttheservicesofaTugorTugsatthediscretionoftheHarborMaster.

Nature of Service provided Rate in OMRC-1 NormalTugChargesperTugperhourorpartthereof 180.000

C-2 Vesselswithoutpower,defectivesteering,etc. 320.000

C-3 StandbychargesperTugperhourorpartthereof 120.300

C-4 Foruseotherthanberthingorun-berthingrateswillbeprovidedonrequestbytheHarbor Master.

Section D – Pilot Launches

Nature of Service provided Rate in OMRD-1 Perhourorpartthereof 30.760

D-2 ForuseotherthantransportingPilotstoandfromvessels,rateswillbeprovidedonrequestbytheHarborMaster.

D-3 PerHourorpartthereoffortankers 60.000

Page 12:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

12

Tariff Book: 1st April 2017

Section E – Mooring Launches

Nature of Service provided Rate in OMR

E-1 Usedforrunningextramooringsperhourorpartthereof 12.300

E-2 Foruseotherthanrunningvesselslines,rateswillbeprovidedonapplicationtotheHarborMaster.

Section F – Ropes

Nature of Service provided Rate in OMR

F-1 FurnishingropesforusebyvesselsotherthantankersandvesselswithGRTlessthan31,000 42.300

F-2 FurnishingropesforusebyalltankersandallvesselswithGRT31,000ormore. 84.600

Section G – 1 PilotageG-1 Withtheexceptionofthefollowingvesselspilotageiscompulsory.

a) VesselsintheserviceoftheSultanateofOman

b) Anyvesselunder200tonsGRT

c) Countrycraft

d) Tendersofanyrecognizedbuoyage,lightingornavigationalaidservice

NotwithstandingItemsa)tod),theHarborMastermayinsistontheuseofapilotintheinterestsofPortSafety,inwhichcasetheappropriatetariffchargeswillapply

Section G – 2 Part A Pilotage charges for tankers less than 5,000 GRT and other vessels of less than 31,000 GRT (per hour or part thereof)

Size of vessel Rate in OMR

Vesselsupto2,500tons 50.000

Vesselsfrom2,501to6,000tons 60.000

Vesselsfrom6,001to12,000tons 80.000

Vesselsfrom12,001to25,000tons 110.000

Vesselsfrom25,001to31,000tons 160.000

Section G – 2 Part B Pilotage charges for tankers more than 5,000 GRT and other vessels more than 31,000 GRT (per hour or part thereof)

Size of vessel Rate in OMR

Vesselsfrom5,000to6,000tons 90.000

Vesselsfrom6,001to12,000tons 105.000

Vesselsfrom12,001to25,000tons 150.000

Vesselsfrom25,001to50,000tons 190.000

Vesselsfrom50,001to70,000tons 280.000

Vesselsfrom70,000to120,000tons 325.000

Vesselsover120,000tons 390.000

Page 13:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

13

www.salalahport.com

G-3 Pilots kept waiting through any fault of the vessel or vessels Agent:

Nature of Service provided Rate in OMRPerhourorpartthereof 21.150

PilotLaunchkeptwhenstandingbyordetainedPerhourorpartthereof 31.530

PilotagechargesforshiftingvesselswithinthePort;RatesinG-2willapply.

SpecialPilotagecharges:Vesselswithoutpower,defectivesteeringorotherdamagewillbechargedatdoubletherateinItemG-2

Section H – Berthing or Un-berthing Charges AllvesselsincludingexemptedvesselsshallbechargedforberthingatthePort,andincludestheservicesoftheHarborMasterorhisrepresentative,mooringlaunchandmooringgang.

H-1 Nature of Service provided Rate in OMR

Vesselsupto2,500tons 35.000

Vesselsfrom2,501to6,000tons 50.000

Vesselsfrom6,001to12,000tons 60.000

Vesselsfrom12,001to25,000tons 80.000

Vesselsfrom25,001to50,000tons 110.000

Vesselsfrom50,001to70,000tons 150.000

Vesselsfrom70,001to120,000tons 175.000

Vesselsover120,000 230.000

H-2 VesselsberthingorunberthingonFridays,SaturdayorPublicHolidays.Vesselswithoutpower,withdefectivesteeringorotherdamagewillbechargeddoubletheratesinItemH-1.

H-3 IfavesselismovedtoanadjacentberthatthevesselsorvesselsagentrequestchargesinitemH-1willapply.

H-4 Ifamooringgangiskeptwaitingthroughanyfaultofthevesselorvesselsagent:

Nature of Service provided Rate in OMRStandbychargeperhourorpartthereof 31.530

H-5 Vesseloccupiesberthduetoanyreasonassociatedtoship/shipperfailingtoperformoperations2hoursbeyondberthingorfailingtovacateberth1houraftercompletionofoperationcompletion(otherthanwaitingforPilot)willbesubjecttothefollowingcharges:

Nature of Service provided Rate in OMRFirst2hoursbeyondpermittedperiod(perhour) 96.000

Fornext2hoursorpartthereof 192.000

Subsequentperiodperhourorpartthereof 577.000

H-6 A25%ofberthchargesshallapplyforvesselcallscancelledwithin24hoursofreservedberthingtime

Page 14:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

14

Tariff Book: 1st April 2017

Section I – Fresh Water

Nature of Service provided Rate in OMRI-1 PerTon 2.000

I-2 Administrationchargesforfreshwatersupplyshallbe25%ofOMR2.000perton. 0.500Subjecttominimumof3Tonsperdeliveryfordhowsand10Tonsperdeliveryforothervessels

Section J – Electricity

Nature of Service provided Rate in OMRJ-1 Perstandardunit 0.030

J-2 Administrationchargesof15%ofOMR0.030perunit 0.004

Section K – Waste DisposalTheuseofgarbageskipswhilethevesselisalongsideiscompulsory.

Nature of Service provided Rate in OMRK-1 Useofcommonskipatberth(compulsorypervisit)exceptforyachtsofLOA16

metersandless.30.000

K-2 ExclusiveSkip(inadditiontoK1) 30.000

Section L – Rat GuardsTheuseofratguardsiscompulsory.

Nature of Service provided Rate in OMRL-1 Perratguardperdayorpartthereof 5.770

Section M – Other services

Nature of Service provided Rate in OMRM-1 BoatServiceCharges

1 VesselCallingforCargoOperationsa) PilotBoatperservice 384.620b) TugBoatperService 769.230

2 VesselCallingfornon-cargooperationc) PilotBoatperservice 576.920d) TugBoatperService 961.540

3 TransferofSpareparts,StoresbyTugBoattoAnchorage(per hour or part of an hour)TimetocommencefromthetimethetugcastsofffromberthtothetimetheTugisbacktoberth.

576.920

4 SpecialBoatTransferduringKhareefDuringmonsoon “Khareef” the portwill endeavor to provide special boat transferservicessubjecttoweatherconditions,whetheroutsideorinsideharbor.Duringtheaboveperiod, the followingconsolidatedratesshallapply:

Page 15:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

15

www.salalahport.com

Nature of Service provided Rate in OMR

Transferofupto5persons(perTrip) 961.540TransferofsparesorprovisionsbyTugBoat 1,346.150

Theaboveratesincludeservicesoftugsandpilotiftransfertakesplaceeitherinsideoroutsidetheharborbutexcludesportdues.Inthecaseofvesselswhichcannotbesafelybroughtintotheharborduetotypeofvessel,LOA,draft,etc.theportwillattempttocarryoutthetransferoutsideonlywhichwillbesubjecttoweathercondition

M-2 Fender servicesInordertoimproveservicestoourcustomers,porthasincreasedcapacitytoprovidefloatingfenderservicesforvesselsthatrequiressuchservices.Thefenderservicesareofferedwiththefollowingconditions:

1 PortFenderswillbeusedasfirstoption.

2 Aservice requestneed tobesent toportcontrol ingoodtimeprior tovesselarrivaldate tobook theservices

3 HiringrateisOMR125perfenderperdayorpartofadayexcludinghandlingcharges.

4ThirdPartyfenderscanbeusedincasenonavailabilityofportfenders.InsuchcasesalevyofOMR60perfenderperdayorpartofadaywillbechargedforfollowingsuchuse.Thisappliesforvessel’sownfendersthatiscarriedonboard.

5 Thirdpartyfendershavetobeclearlymarkedforeasyidentification.

Page 16:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

16

Tariff Book: 1st April 2017

M-3 Charges for port clearance/work permission/services Rate in OMRInordertocompensateforresourcesusedupinattendingtoissueofvariousclearancesachargeshallbeleviedforeachofthebelowmentionedservices:

1 Hotworkpermission 10.000

2 Bunkeringpermission 10.000

3 Oiltransferpermission 10.000

4 Divingpermission 10.000

5 Hull/propeller/seachestcleaning 10.000

6 Oilywater/greywaterdischarge 10.000

7 IssueofPortclearance 20.000

8 EngineImmobilization 10.000

9 Ship’sboatloweringinwaterforanypurposeotherthandrill 10.000

10 Changeofregistry 10.000

11 Changeofship’sname 10.000

12 Changeofagent 10.000

13 Chargesforsigningof“NoteofProtest”. 10.000

14 Inspectionofvesselbymarinedept.officer-hourlycharges 150.00

15 Additionalmooringchargespermoveforberthinganduberthingofvesselsusingwireropes

50.000

16 ChargesforcancellationofPreArrivalnotice 20.000

M-4 Cavotec / Shore tension Rate in USD1 ChargesforuseofCavotecmooringsystemperdayorpartthereof 8,000

2 ShoreTensionmooringsystemperdayorpartthereof(for4Units) 6,000

3 ShoreTensionmooringsystemperdayorpartthereof(for2Units) 4,000

NOTE:UseofCavotec/ShoreTensionisnotmandatoryforvesselsandwillbeprovidedsubjecttoavailability.Chargesshallbeleviedonnon-containervesselsifequipmentisrequested.ChargesshallapplytoContainervesselsifthesameisrequestedduringnon–operationalstay.

Page 17:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

17

www.salalahport.com

Section N - Environment Fees, etc.

N-1 Tier 2 Environment fee to be applied to all vessels calling Port of Salalah.PursuanttoaMinisterialdirectivedated1OthDecember2005bytheGovernmentofOmanthroughtheMinistry of RegionalMunicipalities Environment andWater Resources(MRMEWR) all industries - eitherdirectlyorindirectlyassociatedwithHydro-CarbonsubstancesmustensureaTierllEnvironmentalCoverisinplacetohandleOilSpillRecoveryforallincidentswhetheroffshoreoronshore.TheGovernmenthasalsoinstructedthatSalalahPortServiceCoSAOGbeingthedesignatedportAuthorityshouldberesponsibleforthecollectionoftheTierllEnvironmentalFeeforallentitiesusingtheport.Whereverapplicablepartofthedaywillalsobeconsideredafullday

Type of Vessel Rate in OMR1 Non Cargo / Non-Operational Vessels

Atanchorage-forevery7days 100.000Atberth-every7days 200.000Chargewillnottobeleviedincasevesselhascargooperationsinthesamecall.Intheeventthatavesselisatanchorageandatberthwithinthesame7daychargingperiod,onlytheEnvironmentalFeeatberthshallbechargedfortheperiod.”

2 GeneralCargovesselsandContainervessels-percall 45.00

3 LiquidbulkcargoperMetricTonloadedordischarged 0.040

4 Navalvessels-percall(OmaniNavyandROPvesselsareexempt) 100.00

5 Yachtsandotherpleasurecrafts-percall 20.000

6 CruiseVessels-percall 200.000

7 Launches/Dhows–percall 30.000

N-2 Port Entry Pass – Port reserves the right to admission

Type Rate in OMR1 IndividualEntryFee:

Daily 0.300

Weekly 1.000

Monthly 2.500

3Months 6.000

6Months 12.000

Annual 20.000

Page 18:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

18

Tariff Book: 1st April 2017

Schedule III – General Cargo Terminal Tariff Section A – Stevedoring ChargesAllstevedoringwithinthePortofSalalah isundertakenbythePortAuthorityortheirnominatedContractor.Ratesincludethesupplyofsupervisionandlaboronboardthevesseltoload/dischargeontoquay.ThePorthasalimitedsupplyofcargohandlinggear.

Charges areper freight tonunlessotherwise specified. Freight tonwill bedeterminedbyweight ormeasurementwhichever is higher.

A-1 Discharging Rate in OMR Rate in USD 1 GeneralCargoincludingbaggedcargo 1.350 3.51

Incaseshorecraneused 1.700 4.42

2 FoodstuffsandMedicinesincludinganimalfeed 0.865 2.25

3 IronorSteelbars,pipes,tubes,channels,mesh,girders,sheetsandanglesincratesofnotlessthan500kg.

1.950 5.07

4 Plywood, hardboard, chipboard, blackboard, lamina board, Timber (includingpolesandlogs)andothersimilarlaminatedwoodproductsInCrates/packedinBundles 1.500 3.90Loose 3.000 7.80

5 Unpackedvehicles,mobilemechanicalequipment,trailersandCaravansUnder2.5tons,perunit 7.875 20.482.5tonsandunder5tonsperunit 12.000 31.215tonsandoverperton 3.000 7.80Componentsofmechanicalequipmentshippedwiththatequipmentbutinseparatepackageswillbechargedatthegeneralcargorateunlesssecurelyattachedtothebasemachine

6 Refrigerated cargo (day and night working) per gang hour, subject toaminimumof2hoursanditshouldbedelivereddirectlyfromtheshiptothevehiclesGangcostperhour–Normal 20.800 54.08GangcostperHour–Overtime(commencefrom1615Hrs) 26.00 67.60Gang cost per hour – Friday, Saturdays and Public Holidays (minimumcharge for 8 hours)

26.00 67.60

7 Baggedcementandhydratedlime(perFRT) 1.125 2.93

Hatchcleaningcharges(perhatch):Vesselsdischargingupto4000tons,eachvessel 56.250 146.29Vesselsdischargingover4000tones,eachvessel 112.500 292.59

8 WharfageOverstowedcargolandedtothequayandsubsequentlyre-shippedonthesamevesselwillbechargedwharfageinadditiontootherchargesaspertariffattherateofperton(FRT)perday(orpartthereof)

0.190 0.49

Page 19:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

19

www.salalahport.com

A-1 Rate in OMR Rate in USD 9 BadStowage 1.350 3.51

WherethePortconsidersthatcargoisbadlystowedorofsuchanatureandinsuchconditionthatnormaldischargingisnotpossible,thenitreservestherighttochargeinadditiontonormalstevedoringtariff

Atarateperganghoursubjecttominimumof2hours 20.800 52.00

BadStowageOvertimerateperganghour (minimum2hours )Sunday toThursday–(commencefrom1615Hrs)

26.000 67.60

Bad Stowage Overtime rate per gang hour (minimum 8 hour ) Friday,Saturday and Public Holidays

26.000 67.60

10 Cargodischargeddirectoverside

Cargodischargeddirectoversidetobargeorcoasteror fromship toshipwill incur thenormalstevedoringchargesplus50%ifPort labor issupplied inthebargeorcoaster.

A-2 Loading for ExportsThebasicexportserviceisreceivinggoodsforexport.Providingsuchstorageasmayberequiredandtenderinggoodstotheshiponquaysidesubsequentlyloadingonthevessel.

AllexportconsignmentsmustbeaccompaniedbyashippingNote.AllchargesforexportaredebitedtothevesselsAgentandaresubjecttoaminimumchargeofR.O.1.900pereachShippingNote.

A-2 Rate in OMR Rate in USD 1 General Cargo

Directdeliverytoquay

Upto50,000Tons(perFRT) 1.850 4.81

Over50,000upto100,000Tons(perFRT) 1.750 4.55

Over100,000Tons(perFRT) 1.650 4.29

Volumeslabs&ratesareonaperannumbasisandonincrementalbasis

Conditions for direct delivery:

BlockStowedhomogenouscargo

Deliverybyasinglemeansoftransport

Indirect delivery

Upto50,000Tons(perFRT) 3.200 8.32

Over50,000upto100,000Tons(perFRT) 3.100 8.06

Over100,000Tons(perFRT) 3.000 7.80

Volumeslabs&ratesareonaperannumbasisandonincrementalbasis

UseofShoreCraneperTon 0.350 0.91

Page 20:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

20

Tariff Book: 1st April 2017

A-2 Rate in OMR Rate in USD 2 Unpacked vehicles

Unpackedvehicles,mobilemechanicalequipment,trailersandcaravans:Under2.5tonsperunit 12.375 32.182.5tonsandunder5tonsperunit 18.750 48.765Tonsandover,perton 4.125 106.96

A-2 Rate in OMR Rate in USD 3 Live Animals

Sheep/Goatperhead 0.750 1.95Cowperhead 1.500 3.90othersperhead 2.000 5.20

4 Direct ShipmentLifts over 25 tons in (A 2.2) above and live animals in (A 2.3) must beshippeddirect.

5 Cargo Loaded Ex Barge or CoasterGoods loaded direct from barges lying alongside vessels will incur thenormalstevedoringchargesplus50%ifportlaborissuppliedinthebarges.

6 Unloaded Export CargoExtrachargesforunloadedexportcargo:GeneralcargopertonFRT 1.500 3.90Unpackedvehicles,mobilemechanicalequipment, trailersandcaravansperunit

1.500 3.90

Rate in OMR Rate in USD A-3 Shiftingcargo,lashing/unlashing,covering/uncoveringhatches,collecting

/ laying dunnage, rigging gear, repacking on board and any other extraservicesrenderingduringloadingordischargingwillbechargedasfollows:Perganghour(orpartthereof)subjecttoaminimumof2hourspershift 20.800 54.08

Rate in OMR Rate in USD A-4 Gangs kept Waiting

Perganghour(orpartthereof)subjecttoaminimumof2hourspershift 20.800 54.08

Page 21:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

21

www.salalahport.com

Rate in OMR Rate in USD A-5 Overtime Premium and Night Shift work

Overtimepremium:1 After1615hrs.Sunday-Thursdayperganghour(orpartthereof)subject

toamin2hours26.000 67.60

2 During holidays working per gang hour (or part thereof) subject tominimum of eight hours.

26.000 67.60

3 TallyClerk

NormalHoursfromSundaytoThursday Nil Nil

OvertimeHours (from1615Hrstill 0800Hrs) fromSunday to Thursday (minimum2hours)

5.300 13.78

Overtime Hours on Friday, Saturdays and Public Holidays (minimum2hours)

7.95 20.67

Rate in OMR Rate in USD A-6 Hire of personnel on board vessels other than in connection with normal

stevedoringPerpersonperhour(orpartthereof)subjecttoaminimumof2hours 5.400 14.06

WinchMan 5.400 14.06

Rateshallbeincreasedby50%onFriday,SaturdayandPublicHoliday)

Rate in OMR Rate in USD A-7 Dhow and Launch Cargo

Cargodischarge/loadedfrom/todhowsandcountrycraftswillbeassessedasshownsubjecttoaminimumchargeofR.O.1.900perbilloflading.

GeneralcargoperFRT 0.300 0.78MetalScrap,perFRT 1.500 3.90Vehicle,MobileMechanicalequipment 2.440 6.35

LiveAnimals(Includedirectdeliverycharge)Sheep/Goatperhead 0.750 1.95Cowsperhead 1.500 3.90Othersperhead 2.000 5.20

Theabovechargesapplytoconsignmentsdelivereddirectlytovehicles

ConsignmentslandedtoquayandremaininginthePortformorethan24hrsperFRT

3.750 9.75

TheabovetariffmustbereadinconjunctionwiththeRulesandRegulationsgoverningPortofSalalah.

AfineofR.O150.000willbeimposedontheimporterforanywrongdeclarationoftonnageexceeding+or-10%)ofactualtonnage

Demurragechargesforgeneralcargounderthisschedulewillbeapplicableafter14days

Demurrageinvoicesshallberaisedevery14daysorpartthereofevenifcargohasnotbeenevacuatedandhastobepaidwithinstipulatedcreditperiod.

Useofportequipmentisnotincluded

AnadministrativechargeofOMR10willbechargedforchangeincarrier,billofladingorcustomclearance.

Page 22:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

22

Tariff Book: 1st April 2017

A-8 Vessel Worked at AnchorageWhenstevedoringlaborisprovidedbythePort,twicethenormaltariffisappliedpluslaunchcharges

WherebyprioragreementwiththePort,stevedoringisundertakenattheanchoragewithouttheuseofPortlabor,nostevedoringchargeswillberendered

Section B – Quay Handling and Storage Charges

B-1 Imports

Theimportserviceisreceivinggoodsonoroverquayfromship,sortingtobilloflading,storageifnecessaryinaplacedeterminedbythePortAuthorityandtenderingtodeliveryvehicle.Itdoesnotincludesortingtosub-markswithinaBillofLadingforwhichadditionalchargeswillberendered.ThePortoperatesoninstacktallyofcargoonreceiptfromvessel.

AllchargesareperFreighttonunlessotherwisespecifiedandaresubjecttoaminimumchargesofOMR1.900perbilloflading.FreightTonwillbedeterminedbyweightormeasurementwhicheverishigher.

B-1 Rate in OMR Rate in USD 1 Generalcargoincludingbaggedcargootherthanfoodstuff 1.125 2.93

2 Foodstuffandmedicineincludinganimalfeed 0.750 1.95

3 Ironandsteelbars,pipes,tubeschannels,mesh,girders,Sheetsandanglesincratesnotlessthan500kg.

1.500 3.90

4 Plywood, hardboard, chipboard, blackboard, lamina board, Timber(including poles and logs) and other similar laminated wood productsInCrates/packedinBundles 1.500 3.90

Loosepercubicmeter 2.250 5.86

5 Unpackedvehicles,mobilemechanicalequipmenttrailersandcaravans:Under2.5tons,perunit 7.500 19.51

2.5tonsandunder5tonsperunit 15.000 39.01

5Tonsandoverperunit 18.750 48.76Components of mechanical equipment received with that equipmentbutinseparatespackagewillbechargedatthegeneralcargorateunlesssecurely attached to the basemachine.

6 Heavylifts(5tonsandoverexcludingvehiclesandmechanicalequipment) 1.500 3.90

7 FrozenFish 0.300 0.78

Page 23:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

23

www.salalahport.com

B-1 Rate in OMR Rate in USD 8 Baggedcementandhydratedlime 0.900 2.34

Itistheconsignee’sresponsibilitytoensurethatthequayiscleaneddailyandoncompletionofthedischarge.Asasuretyforthequaybeingcleanedtothesatisfactionoftheport,adepositwillberequiredbeforethevesselberths.Rateofdepositareasfollows:Vesselsdischargingupto4000tons,eachvessel 300.000 780.23

Vesselsdischargingover4000tonseachvessel 600.000 1,560.47

9 LiveanimalsperheaddirectdeliverySheep/Goatperhead 0.750 1.95Cowsperhead 1.500 3.90Othersperhead 2.000 5.20Liftsover25tonsandliveanimalsmustbedelivereddirect.

The above rates except (B-1.9) will be reduced by 50% for consignments delivered direct from ship to vehicle.

10 Bulk CargoThe vessels agent and the importers are responsible, at their cost, toensurethatallsafetymeasuresaretakentoprotecttheenvironmentwhiledischarging/loadingbulkcargo.Thevessel’sagentorimporter/exportershallberesponsibletoarrange,attheircost,theequipmentrequiredfortheoperation.Upto25,000MT 1.250

From25,000MTto50,000MT 1.000

From50,000MTto2MillionMT 0.750

From2MillionMTonwards 0.600DryBulkcargoremainsinsidetheportareaforaperiodforbeyond60dayswill be subject to storage chargesofOMR0.100permonthper squaremeter.

Volumeratesareincremental.

LiquidBulkCargo(perMetricTon) 0.600

OtherServicesRemovingofberthcurbstonesorsafetybarrierpercurbstone 230.000 598.00

Passenger levy Per passenger ( Excluding infants below 02 years )embarking or disembarking

3.000

Page 24:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

24

Tariff Book: 1st April 2017

B-2 Demurrage ( Import / Export )ChargeforStorageissubjecttoaminimumchargefor1freighttonperBilloflading.Allchargeareperfreighttonunlessotherwisespecified.

Forthefirst14daysafterfinaldischarge FREE1st / 2nd period

( in OMR )3rd period ( In OMR)

General cargo, Foodstuff and Medicines, Iron and steel, timber andPlywood

0.225 0.90

Unpackedvehicles,mechanicalequipment,trailersandcaravans:5tons,perunit 3.670 11.25

5tonsandover,perunit 7.000 22.50

Baggedcementandhydratedlime 0.150 0.75

Periodiscalculatedasfollows:1stperiod-14days(orpartthereof)afterthefreedays2ndperiod–7days(orpartthereof)afterthefirstperiod3rdperiod–foreachperiodof7days(orpartthereof)afterthesecondperiodDemurrageinvoicesshallberaisedevery14daysorpartthereofevenifcargohasnotbeenevacuatedandhastobepaidwithinstipulatedcreditperiod.

B-3 Overtime

Normalhoursfordeliveryofimportandreceivingofexportcargoasfollows:

Rate in OMR Rate in USD Otherthannormalhoursperperson/hour 0.400 1.04

TallyClerk 5.300 13.78

B-4 Hire of Personnel for use Other Than in Connection with Delivery Receipt of Cargo

Rate in OMR Rate in USD Perpersonperhour(orpartthereof) 5.300 13.78

Theabovewillbeincreasedby50%onFriday,SaturdayandPublicHolidays

B-5 Coopering and Sorting

Onrequestdamagedpackageswillberepacked,rebaggedordockcooperatedandpackagescanbesortedtosubmarksatthepersonnelhourratesasshownin(B-4)above.

Page 25:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

25

www.salalahport.com

B-6 Re-marking / Labelling

On request damaged packages will be re-marked/ labeled at the following rates subject to a minimum charge ofR.O.1.500.

Rate in OMR Rate in USD Remarkingwithbrushandpaint,perpackage 0.150 0.39

Attachingpre-printedlabels,perpackage 0.075 0.19

B-7 Examination of Damaged Goods

Damaged/defectivecargocanbeexaminedandcertificateissuedbythePortonrequestforachargebasedonthehourlyratesofHireofpersonnelshownin(B-4)above.

B-8 AuctionConsignmentsremaininginthePortinexcessofthefollowingperiodswillbesubjecttoauction.Anycargo,forwhichtherespectivePortandCustomschargeshavenotbeenpaidwillbeconsidered frustratedandmaybeauctionedandsoldbyThePortofSalalahafterthefollowingtimeperiods

GeneralCargo:OneMonthforperishablegeneralcargoThreeMonthsfornon-perishableGeneralCargoSixMonthsforDrybulkcargo

ContainerizedCargo:OneMonthforRefrigeratedContainerizedCargoandothercargoconsideredperishableThreeMonthsforallotherContainerizedCargo

B-9 Import Goods Landed for Re-export (other than transshipment goods on through bill of landing).Goodsimported,retainedinthePortandsubsequentlyre-exportedincurthebasicImporthandlingchargesplustheloadingrate.Consignmentswillbeliablefordemurrageatscheduledrateifnotshippedwithin7daysfromfinaldateofdischargeoftheimportingvessel.

B-10 Transshipment Cargo Transshipment cargo is charged as follows, Stevedoring and Handling charges included:

Vehicle T/shipment 0-10 K units 10 – 20K units10 % discount

20 - 30K units20% discount

>30K units30 % discount

Upto1.5MetricTons USD45.00 USD40.50 USD36.00 USD31.50

1.5to5MetricTons USD50.00 USD45.00 USD40.00 USD35.00

5to15MetricTons USD70.00 USD63.00 USD56.00 USD49.00

Over15MetricTons USD90.00 USD81.00 USD72.00 USD63.00

GeneralCargo:LoadperFRT(Equipmentexcluded)

OMR2.250 USD5.85

Page 26:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

26

Tariff Book: 1st April 2017

B-11 Free Storage PeriodUnderthisschedule,freestorageperiodis14daysfromthedateofdischargingcompletionfortransshipmentcargo.Demurrageinvoicesshallberaisedevery14daysorpartthereofevenifcargohasnotbeenevacuatedandhastobepaidwithinstipulatedcreditperiod.

Section C – RORO Vessels

All charges are per unit unless otherwise specified Rate in OMR Rate in USD C-1 Discharging / Loading (Import / Export)

Trailersfrom/tovessels(loadedoremptycargootherthancontainers):IfvesselusesPorttugMaster:Trailerupto30’ 15.000 39.01

Trailerupto30’ 22.500 8.65

Ifvesselusesowntugmasteranddriver:Trailerupto30’ 7.500 19.50

Trailerupto30’ 11.250 29.20Note:Loadedtrailersdischargedfromthevesselandreshippedemptyonthesamevesselwillnotbesubjecttofurthercharges.

VehiclesandmechanicalequipmentDischargeVehiclesunder10tons 7.500 19.50

Vehicles10tons&overandmobilemechanicalequipment 9.375 24.30

LoadingVehiclesunder10tons 12.000 31.21

Vehicles10tons&overandmobilemechanicalequipment 20.625 53.64

C-2 DemurrageVesselsowntrailernotreturnedonthesamevesselswillincurdemurrageforeachday(orpartthereof)Trailerupto30’ 0.200 0.52

Trailers30’andover 0.375 0.98Demurrageinvoicesshallberaisedevery14daysorpartthereofevenifcargohasnotbeenevacuatedandhastobepaidwithinstipulatedcreditperiod.

C-3 Shifting Trailers / Vehicles & Mechanical EquipmentWhereRoRotrailers,vehicles,&mechanicalequipmentnotdestinedforPort of Salalah are shifted off the vessels and subsequently re-loaded,charges as above equivalent one movement will be made. Shifting onboardwillbechargedat50%of theabove rates.

Page 27:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

27

www.salalahport.com

C-4 RO RO Services 0-10 K units

USD

10 – 20K units10 % discount

USD

20 - 30K units20% discount

USD

>30K units30 % discount

USDBatteryCallOut 20.00 20.00 20.00 20.00

Subsequentunitsamecall 10.00 10.00 10.00 10.00

Fuel Cost+15% Cost+15% Cost+15% Cost+15%

Towing/SpecialRigging 50.00 50.00 50.00 50.00

Shifting(shiporquay) 20.00 20.00 20.00 20.00

Tallyclerkperhour 9.00 9.00 9.00 9.00

TireChanging 6.00 6.00 6.00 6.00

50%overtimewillbeleviedonTallyclerkchargesonFridays,SaturdaysandallPublicHolidaysDiscountbasedonvolumenotapplicableforTallyclerkcharges.

C-4 Shore handling Charges for Cargo Ex RORO vessels Rate in OMR Rate in USD Trailersfrom/tovessels(loadedoremptycargootherthancontainers):

Loadedtrailersdeliveredtoconsignee’stractorunitwithinportarea:

Trailerupto30’ 15.000 39.01

Trailers30’andover 22.500 58.52

Consignmentsunloadedfromtrailerswithinportareawill incurchargesanddemurragesaspersectionA.AllotherchargesaspersectionB.

Demurrageinvoicesshallberaisedevery14daysorpartthereofevenifcargohasnotbeenevacuatedandhastobepaidwithinstipulatedcreditperiod.

Section D– Charges at Container Freight Station (CFS)

All charges are in USD Upto 20 foot Over 20 foot

D-1 CompositeRateCYtoCFSorV/V 160.00 220.00

Terms & Conditions & Rates include:

InboundContainershiftingofloadedboxfromCYtoCFS,un-stuffing,andshiftingofemptyboxbacktoCY

OutboundContainer-shiftingofemptyboxfromCYtoCFS,stuffing,andshiftingofloadedboxbacktoCY

DataAmendmentchargeappliesoninboundCFSboxesnotdeclaredpriortooperationalcut-off

Page 28:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

28

Tariff Book: 1st April 2017

All charges are in USD Upto 20 foot Over 20 footD-2 Goods Receiving or Delivering Charge to / from CFS USD8.5per

FreightTonUSD8.5perFreightTon

Terms & Conditions:FreetimeandDemurrageatCFSappliesasperGeneralCargoTerminaltarifffreetimeanddemurrageschedule

Additionalchargeswillbeleviedforreceivingordeliveringcargoesrequiringadditionallabor&equipment

Section E– Ship to Ship Transfer Operations for Liquids and LPG (STS)

STS operations are permitted at designated Salalah Anchorages subject to requisite approvals being received. Pleasecontact the Commercial Team for rates, terms and conditions.

Page 29:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

29

www.salalahport.com

Schedule IV - Container Terminal Tariff and Naval Vessel

Section A – General Conditions, Definitions and AbbreviationsThis Tariff should be read in conjunction w ith t he Port of Salalah Rules and Regulations, as well as t heContainerTerminalOperationalGuidelinesandt hePortofSalalahTe rmsofBusiness,asupdated fromtimetotime.

A-1: Tariff Authority, Scope and ApplicationThis Tariff is issuedby thePort ofSalalahandasof its effectivedate replaces any andall earlier tariffs andrates in effect for vessels and cargo using the Container TerminalandisalsoapplicableforallnavalvesselsirrespectiveofwhetherberthingatContainerTerminalorGeneralCargoTerminalberthsatthePortof Salalah.The rates alongwith their terms and conditions contained in this Tariff apply unless otherwise specified inwriting by anauthorized person in the Commercial Department of the Port of Salalah. The Port of Salalahreservestherighttoalteroramendanyandallratesalongwiththeirtermsandconditionswithoutpriornotice.

A-2: Consent to Terms of TariffThe use of t he Port of Salalah s hall constitute a c onsent to t he rates and t heir terms and conditionscontained in this Tariff, and evidence agreement on the part of all Users to pay all the charges specified,andtobegovernedbythetermsandconditionsspecifiedaswellastheRulesandRegulationsandTermsofBusinessofthePortofSalalah.

A-3: Currency & Exchange RateAll rates are stated inUSDollars (US$)which is linked to the RiyalOmani (R.O.) at a rateof 0.3845 RiyalOmanitooneUSDollar.

A-4: Rates for Services not shown in this TariffIn case rates for any services are not shown in this Tariff, then customers must provide ‘Special ServiceRequest’tothePortwhowillpricetheworkinvolvedandgetthecustomer’sapprovalbeforecarryingouttheservice.

A-5: DefinitionsThe following words and expressions, wherever used in any part of this Tariff, have the meaning assignedhereunder:

The Port:Refers to the Port of Salalah and all its berths and facilities. The Port is under the management of Salalah Port Services Company SAOG trading as Port of Salalah.

Agent or Shipping Agent or Vessel Agent:Refers to any company, firm or organization appointed by the Owner, the shipping company or the ship’s master to act on their behalf in the Sultanate of Oman which accepts such appointment.

Break Bulk:Refers to any cargo that is not loaded in a container.

Cargo:Refers to any goods, merchandise, articles or other property whatsoever whether or not in a Container in respect of which the Port provides services.

Container:Refers to any container including flat-racks, platforms, reefers, bolsters, tanks or any other units designed for the carriage of goods and equipped with corner castings for handling by mechanical equipment consistent with the safety requirements of the Convention for Safe Containers and either complying with all relevant prevailing ISO standards or capable of being handled by the Port’s cranes and spreaders.

Page 30:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

30

Tariff Book: 1st April 2017

Container Terminal:Refers to the area designated by the Port for handling of vessels carrying containers including the berths and the area for landside operations.

Day:Refers to a 24 hrs day. For all charges specified ’per day’, day starts at midnight and charges apply per day or part thereof.

Direct Delivery:Refers to containers that discharge from or load to a vessel in the Port directly to or from the customer’s own transport.

Free time:Refers to the period that containers may stay in the Port without charge after being discharged from a vessel or before being loaded onto a vessel.

Freight Ton:Refers to a cargo weight of 1,000 kg or cargo volume of 1 M3 whichever is greater.

Hazardous Cargo or Dangerous Cargo:Refers to any material of hazardous nature or components as per the IMDG Code issued by theInternational Maritime Organization (IMO).

Length Overall:Is the figure indicating the length of the vessel shown on the official registration papers carried by the vessel.

Loading / Discharging of Containers/Cargo:Refers to the handling of the containers/cargo between the stowage position onboard the vessel and the position in the Container Yard of the Port.

Non-Cellular Vessel:Refers to a vessel without cell-guides below deck and/or specific container stowage positions on deck.

Over dimensional:Refers to containerized cargo that projects beyond the normal length, width or height of a container, or to containers that are different from the normal length, width or height for standard sea containers specified by the International Standards Organization.

Pilotage:Refers to the service offered by the person appointed by the Port to assist the Master with the navigation of the ship while sailing within the Port limits.

Port Area:Referstotheareaowned,leased,managedorotherwisecontrolledbythePort.

Public Holiday:Refers to any day declared as an official holiday by the Government of the Sultanate of Oman.

Storage or Demurrage:Refer to the charges that are payable by the cargo interest for use of port storage facilities after expiry ofthe applicable free time.

Transshipment:Refers to containers landed in the Port from a vessel for the purpose of reshipment from the Port onanother vessel. Such containers must not leave the Container Terminal from time of landing to time of reshipment.

Vessel:Refers to any ship suitable for the carriage of Containers.

Page 31:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

31

www.salalahport.com

A-6: Abbreviations

CFS:ContainerFreightStation

CY:ContainerYard

FCL:FullContainerLoad

IMO:InternationalMaritimeOrganization

ISO:InternationalStandardsOrganization

KW:Kilowatt

LOA:LengthOverall

M: Meter

N/A:Notapplicable

US$:UnitedStatesDollar

V/V:ViceVersa

Page 32:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

32

Tariff Book: 1st April 2017

Section B – Marine Charges

B-1 Consolidated Marine Charge:

TheConsolidatedMarineChargeshownbelowisapplicableforallvesselscallingataberthforContainervesselsandNavyvesselsandincludesPilotage,Tugs,BerthingandUnberthingCharges,PortDuesanddailysanitaryCharge.Rateincludesupto24hoursfreewaitingattheanchoragewhenavailableincasevesselarrivesaheadoftheberthavailability.

Vessel LOA CategoryFirst 12 Hours

Berth Time(or part thereof )

Berth Time thereafter

(or part thereof )Upto150m USD2,250 USD50

Over150mupto175m USD2,750 USD60

Over175mupto200m USD3,500 USD70

Over200mupto250m USD4,250 USD90

Over250mupto300m USD5,250 USD100

Over300mupto350m USD7,750 USD125

Over350mupto400m USD10,250 USD150

Over400m USD12,750 USD175

Terms & Conditions: • AnydelayorPilotkeptwaitingthroughfaultofvesseloragentwillbecountedasberthtimeused• AnydelaytotugsthroughfaultofvesseloragentwillbebilledatUSD400pertugperhourorpartthereof• IncasemoretugsareutilizedforanyreasonthantherequirementasperHarborMaster’scircularno05/2000(asupdatedfromtimetotime),thenthesearechargeableattherateofUSD400perhourorpartthereof

• AndelaytomooringgangthroughfaultofvesseloragentwillbebilledatUSD100perhourorpartthereof

B-2 Other Charges:

Rate in USDUseofCommonSkips(perskip) USD78.00Chargeforadditionalskipsrequestedperday(perskip) USD78.00

FreshWater(perton) USD5.20Administrationchargesforfreshwatersupplyshallbe25%ofUSD5.20perton. USD1.30

Electricity(perKW-Hour) USD0.08AdministrationchargesforElectricitysupplyshallbe15%ofUSD0.08perKWHour USD0.012

RatGuardformooringropesperday(perguard) USD15.00

Terms & Conditions: • Chargeforadditionalskipincludescostofplacingtheskip• Freshwatersupplyissubjecttominimum10tonsperdelivery• VesselswithoutRatGuardswillberequiredtohirefromthePort

Page 33:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

33

www.salalahport.com

B-3 Anchorage Charges:VesselswhichrequestanchorageatPortofSalalahforreasonsotherthancargooperationsshallbebilledinaccordancewithSectionAofScheduleIIofthePortofSalalahTariff.

Section C – Other Services

Nature of Service provided Rate in USDC-1 BoatServiceCharges1 VesselCallingforCargoOperations

e) PilotBoatperservice USD1,000.00f) TugBoatperService USD2,000.00

2 VesselCallingfornon-cargooperationg) PilotBoatperservice USD1,500.00h) TugBoatperService USD2,500.00

3 TransferofSpareparts,StoresbyTugBoattoAnchorage(per hour or part of an hour)TimetocommencefromthetimethetugcastsofffromberthtothetimetheTugisbacktoberth.

USD1,500.00

4 SpecialBoatTransferduringKhareefDuringmonsoon “Khareef” the portwill endeavor to provide special boat transferservicessubjecttoweatherconditions,whetheroutsideorinsideharbor.Duringtheaboveperiod, the followingconsolidatedratesshallapply:

Transferofupto5persons(perTrip) USD2,500.00TransferofsparesorprovisionsbyTugBoat USD3,500.00

Theaboveratesincludeservicesoftugsandpilotiftransfertakesplaceeitherinsideoroutsidetheharborbutexcludesportdues.Inthecaseofvesselswhichcannotbesafelybroughtintotheharborduetotypeofvessel,LOA,draft,etc.theportwillattempttocarryoutthetransferoutsideonlywhichwillbesubjecttoweathercondition

C-2 Fendering Services

Inorderto improveservicestoourcustomers,porthas increasedcapacitytoprovidefloatingfenderingservices for vessels that requires such services. The fendering services are offered with the followingconditions:

1. PortFenderswillbeusedasfirstoption.

2. Aservicerequestneedtobesenttoportcontrolingoodtimepriortovesselarrivaltobooktheservices

3. HiringrateisOMR125perfenderperdayorpartofadayexcludinghandlingcharges.

4. ThirdPartyfenderscanbeusedincasenonavailabilityofportfenders.InsuchcasesalevyofOMR75perfenderperdayorpartofadaywillbechargedforfollowingsuchuse.Thisappliesforvessel’sownfloatingthatiscarriedonboard.

5. Thirdpartyfendershavetobeclearlymarkedforeasyidentification.

Page 34:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

34

Tariff Book: 1st April 2017

C-3 Charges for port clearance/work permission/services Rate in OMR

Inordertocompensateforresourcesusedupinattendingtoissueofvariousclearancesachargeshallbeleviedforeachofthebelowmentionedservices:

1 Hotworkpermission 10.000

2 Bunkeringpermission 10.000

3 Oiltransferpermission 10.000

4 Divingpermission 10.000

5 Hull/propeller/seachestcleaning 10.000

6 Oilywater/greywaterdischarge 10.000

7 IssueofPortclearance 20.000

8 EngineImmobilization 10.000

9 Ship’sboatloweringinwaterforanypurposeotherthandrill 10.000

10 Changeofregistry 10.000

11 Changeofship’sname 10.000

12 Changeofagent 10.000

13 Chargesforsigningof“NoteofProtest”. 10.000

14 Inspectionofvesselbymarinedept.officer-hourlycharges 150.00

15 AdditionalmooringchargespermoveforberthingandUnberthingof 50.000

16 ChargesforcancellationofPreArrivalnotice 20.000

Section D - Environment Fees, etc

D-1 Tier 2 Environment fee to be applied to all vessels calling Port of Salalah.PursuanttoaMinisterialdirectivedated1OthDecember2005bytheGovernmentofOmanthroughtheMinistry of RegionalMunicipalities Environment andWater Resources(MRMEWR) all industries - eitherdirectlyorindirectlyassociatedwithHydro-CarbonsubstancesmustensureaTierllEnvironmentalCoverisinplacetohandleOilSpillRecoveryforallincidentswhetheroffshoreoronshore.TheGovernmenthasalsoinstructedthatSalalahPortServicesCo.SAOGbeingthedesignatedportAuthorityshouldberesponsibleforthecollectionoftheTierllEnvironmentalFeeforallentitiesusingtheport.Whereverapplicablepartofthedaywillalsobeconsideredafullday

Page 35:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

35

www.salalahport.com

Type of Vessel Rate in OMR1 Non Cargo / Non-Operational Vessels

Atanchorage-forevery7days 100.000Atberth-every7days 200.000Chargewillnottobeleviedincasevesselhascargooperationsinthesamecall.Intheeventthatavesselisatanchorageandatberthwithinthesame7daychargingperiod,onlytheEnvironmentalFeeatberthshallbechargedfortheperiod.”

2 LiquidbulkcargoperFreightTonloadedordischarged 0.040

3 Navalvessels-percall(OmaniNavyandROPvesselsareexempt) 100.00

4 Yachtsandotherpleasurecrafts-percall 20.000

5 CruiseVessels-percall 200.000

6 Launches/Dhows–percall 30.000

Section E – Charges for Containers

E-1 Loading / Discharging of Import / Export Containers

Upto 20 foot Over 20 footLoadedContainers USD75.00 USD115.00

EmptyContainers USD30.00 USD40.00

Terms & Conditions:

• Novolumeincentiveapplicableonimport/export

• Additional charge ofUS$ 50 per container for hazardous containers including empty containerwith cargoresidue,andadditionalchargeofUS$100percontainerforIMOclasses1,5.2,6.1,6.2,7andotherhazardouscargoes requiringspecialhandling.

• Shiftingandsweepingchargesshallapplyoncontainerswithcargoresidue

• Directdeliveryisnotnormallyallowedandevenifitis,nodiscountontheseratesisapplicable

• Non-cellularvesselsarenotnormallyhandledattheterminal;incasePortagreestohandle25%additionalcharge isapplicable

• 10%additionalchargeonPublicHoliday

• Ratesincludelashingandunlashingcharges

• Minimum billing of USD 5,000 per vessel call for total loading/unloading of Import, Export, restows andTransshipmentcontainers.Forthepurposeofminimumbillingonly,thetotalhandlingchargeaccruedforthatparticularvessel callwill considered.Common feedersareexcluded fromthis requirement.

Page 36:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

36

Tariff Book: 1st April 2017

E-2 Loading / Discharging of Transshipment Containers

Upto 20 foot Over 20 footLoadedContainers USD100.00 USD130.00

EmptyContainers USD80.00 USD115.00

Volume Discount rates are offered on Transshipment Containerratesbasedontotalnumberofmoveswithinacalendaryearasfollows:More than 50,000 movesLoadedContainers USD90.00 USD120.00

EmptyContainers USD75.00 USD105.00

Terms & Conditions: • Ratesshownareforfullcyclei.e.VesseltoCYtoVessel.• Onefullcyclecountsastwomoves• Halftheapplicablerateisbilledagainsttheinboundvesselandhalftheapplicablerateagainsttheoutboundvessel

• Additional charge ofUS$ 50 per container for hazardous containers including empty containerwith cargoresidue,andadditionalchargeofUS$100percontainerforIMOclasses1,5.2,6.1,6.2,7andotherhazardouscargoesrequiringspecialhandling.Shiftingandsweepingchargesshallapplyoncontainerswithcargoresidue.

• Non-cellularvesselsarenotnormallyhandledattheterminal,incasePortagreestohandle25%additionalcharge is applicable

• Creditnotesforvolumediscountswillbeissuedattheendofeachcalendaryearuponapplicationbytheline.• OnlyTransshipmentContainermovecountwillbeconsideredforthepurposeofcomputingvolumediscount• 10%additionalchargeforworkingonPublicHoliday• Ratesincludelashingandunlashingcharges• Minimum billing of USD 5,000 per vessel call for total loading/unloading of Import, Export, restows andTransshipmentcontainers.Forthepurposeofminimumbillingonly,thetotalhandlingchargeaccruedforthatparticularvessel callwill considered.Common feedersareexcluded fromthis requirement.

E-3 Restows / Hatch Cover / Gear Box

Rate in USD AnyRestow(percontainer) USD60.00

Hatchcover,Pontoons,stackingframes(perunit) USD120.00

GearBox(perunit) USD100.00

E-4 Use of Special Equipment

Rate in USD EachLift(perContainer) USD100.00

Fornon-operationalreasonsperhourorpartthereof USD100.00

Terms & Conditions: • ApplicabletoeachliftunderE-1,E-2,E-3,E-7,andE-8.

Page 37:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

37

www.salalahport.com

E-5 Free time and Container Storage Rates

Freetimeisapplicableasfollows:Import/ExportLoadedContainers(exceptcategoriesbelow) 7days

EmptyContainers 15days

Transshipment(exceptcategoriesbelow) 15days

HazardousCargoContainersClass1and7(whichrequireescortandspecialapprovalsandshouldbeevacuatedimmediately)

0days

Import/Export 5days

Transshipment 7days

OverDimensionalContainers 7days

Thereafter storage charges apply as follows:

Upto 20 foot Up to 40 foot Over 40 footImport/ Export ContainersPerdayforfirst7days USD5.00 USD10.00 USD11.25

Perdayforthenext7days USD7.50 USD15.00 USD17.00

Perdayforthenext7days USD10.00 USD20.00 USD22.50

Perdaythereafter USD20.00 USD40.00 USD45.00

Transshipment and empty ContainersPerdayforfirst7days USD3.75 USD7.5 USD8.50

Perdayforthenext7days USD5.50 USD11.00 USD12.50

Perdayforthenext7days USD7.50 USD15.00 USD17.00

Perdaythereafter USD15.00 USD30.00 USD34.00

Terms & Conditions: • ForImportandTransshipmentContainers,Freetimecommencesonthedayofdischargeofthevessel,anddemurragechargesstoponthedaycontainerleavestheportorisloadedonavessel.

• ForExportContainers,freetimecommencesonthedaythecontainerenteredthePort,anddemurragechargesstoponthedaycontainerisloadedonthevessel

• StoragechargesforOverdimensionalcontainersarethricetheaboverates• StoragechargesforHazardousCargoContainers

• Storageforthefirst7dayssubsequenttofreedays:USD150perdayorpartthereof• ThereafterUSD300perdayorpartthereof.• Thischargeisalsoapplicabletoanyleakingcontainer

• Cleaningofleakageareawillbechargedatactualplus10%

Page 38:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

38

Tariff Book: 1st April 2017

E-6 Charges for Refrigerated Containers

Rate in USD ElectricSupply/Plugging/UnpluggingofRefrigeratedContainersperday USD30.00

MonitoringofRefrigeratedContainersperdaypercontainer USD5.00

HotstuffedRefrigeratedContainers USD50.00

Terms & Conditions: • ChargescommencefromthedaycontainerispluggedintoPortelectricitysupply• HotstuffedRefrigeratedcontainerchargesapplyuponnotificationtotheline.Portdoesnotacceptliabilityonsuchcontainers.

E-7 Shifting Charges

Rate in USD WithinContainerTerminalpercontainer USD60.00

WithinPortArea USD90.00

Terms & Conditions: • 10%additionalchargeonpublicholidays

E-8 Truck Loading / Unloading

Rate in USD Foreachloadingorunloading USD25.00

Terms & Conditions: • Truckloading/unloadingchargeappliestoallimport/exportcontainersthataredeliveredandreceivedattheCYbothloadedandempty

• Rateincludesonemoveandtheassociatedlifton/liftoffifapplicable• 10%surchargeonPublicHolidays

E-9 Weighing of Containers

Rate in USD UseofWeighbridge,perweighing USD10.00

AdminCharges USD15.00

Terms & Conditions: • TheportReserves the right to spot check containerweights toensuredocumented containerweightsarecorrect.

• 10%additionalchargeonpublicholidays• Rateincludesonemoveandtheassociatedlifton/liftoffifapplicable.• ForVGMrelatedprocessandcharges,pleaserefertothecommunicationsentinJune2016bytheport.

Page 39:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

39

www.salalahport.com

E-10 X-Ray Inspection of Containers

Rate in USD UseofX-RayInspectionMachine,perinspection USD30.00

Terms & Conditions: • TheaboverateisexclusiveofanyshiftingthatmayberequiredwhichshallbeleviedasperE-7• 10%additionalchargeonpublicholidays

E-11 Delays to Crane

Rate in USD After30minutesidling,perhourorpartthereof(perCrane) USD300.00

Deployedfornon-operationalreasonsperhourorpartthereof(percrane) USD1500.00

Terms & Conditions: • Alsoapplicableincaseofcancellationofcallordelayinvesselarrivalwithoutatleast24hrsadvancenotice

E-12 Miscellaneous Services

Upto 20 foot Over 20 foot1 SweepingContainers USD15.00 USD30.00

2 WashingContainers USD30.00 USD60.00

3 FittingorremovingTarpaulins USD25.00 USD50.00

4 Unstuffing/(re)stuffingofcargoinCustomsInspectionarea USD60.00 USD120.00

5 KnockingdownendsofFlatbedContainers,perunit USD12.50 USD12.50

6 BundlingFlatbedContainers,perbundle USD50.00 USD50.00

7 Application/removalofplacards,perplacard USD7.50 USD7.50

8 CostofplacardifprovidedbyPort,perplacard USD5.00 USD5.00

9 Sealnumbercheckingatgate,perseal USD7.50 USD7.50

10 Sealnumbercheckingintheyardorvesselside,perseal USD25.00 USD25.00

11 Sealfixing(customerprovidesseal),perseal USD7.50 USD7.50

12 MeasuringOverdimensionalcontainers,percontainer USD50.00 USD50.00

13 PTI(PreTripInspection)forReeferContainers(excludingcleaning&washing),percontainer

USD50.00 USD50.00

14 RetrievingDatafromDataLogger,percontainer USD20.00 USD20.00

15 Inspectionofdamaged/leakingboxes,percontainer USD200.00 USD200.00

16 Inspectionofreefermalfunctiononboard,percontainer USD50.00 USD50.00

Terms & Conditions: • Theaboveratesareexclusiveofanyshifting(s)thatmayberequired.ShiftingchargeswillbechargedseparatelyasperSectionE-7.

Page 40:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

40

Tariff Book: 1st April 2017

E-13 Administrative Charges

Rate in USD1 DataAmendment,percontainer USD15.00

2 Re-nominationCharge,percontainer USD50.00

3 Documentorprintoutissuedatrequestofcustomer,perdocument USD25.00

4 FineforUndeclared,wronglydeclared,poorlystowedorincorrectlypackaged:

HazardousCargoEveryOffence USD700.00

OverdimensionalContainersEveryOffence USD700.00

Terms & Conditions: • DataAmendmentchargeappliesin,butisnotlimitedto:

•TransshipmenttolocalandV/V•CYtoCFSdeliveryandV/V• Non-declarationofoutboundcarrierafteroperationalcut-off• ChangeinPortofDischargeafteroperationalcutoff• Non-declarationofoutboundcarrierafteroperationalcut-off• Changeinoutboundcarrierand/oroutboundvesselafteroperationalcut-off• AnyDataAmendmentthatinvolvestheboxbeingshiftedfromonestacktoanotherwillalsoincurshifting

charge• Re-nominationChargeappliestoContainersbookedforaparticularvesselbutnotshippedforwhateverreason,andincludesbothdataamendmentandshiftingcharge

• OverdimensionalContainerFineincludescostofmeasuringcargo,decisionofthePortisfinalincaseofanydispute.

• HazardousCargoandoverdimensionalContainerFinesareexclusiveofanyseparatepenaltiesthatmaybelevied byGovernmentAuthorities

E-14 Charges for Break Bulk Cargo at Container TerminalLoading/DischargingofBreakBulkCargoImport,ExportorTransshipmentCargowillbebilledatarateof25 timestheapplicabletarifforcontractualload/dischargeratefora20’ladencontainer,foreachhourofoperationprorated.

Terms & Conditions: • ChargesasperE-11DelaystoCraneareapplicable• Useofnon-standardhandlingequipment,including,butnotlimitedto,slings,chains,wireropesandshackles,

• shallbebilledattheapplicablerateaspertheGeneralCargoTerminalTariff• Forthepurposesofthissection,anassumptionismadeofstandardcraneproductivityatthecontainerterminalof25movesperhour.

• AdditionalmanpowerchargesasrequiredfortheoperationswillbeapplicableasperGeneralCargoTerminalTariff

• AdditionalequipmentchargesasrequiredfortheoperationswillbeapplicableasperGeneralCargoTerminalTariff

• StoragechargesasperGCTtarifftoapply-SectionB1• Shiftingwillbebasedonequipmentusage

Section F – Charges at CFS (Container Freight Station)

Upto 20 foot Over 20 foot

F-1 CompositeRateCYtoCFSorV/V USD160.00 USD220.00

Page 41:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

41

www.salalahport.com

Terms & Conditions: • Ratesincludethefollowingactivities:

• InboundContainer-shiftingofloadedboxfromCYtoCFS,un-stuffing,andshiftingofemptyboxbacktoCY• OutboundContainer-shiftingofemptyboxfromCYtoCFS,stuffing,andshiftingofloadedboxbacktoCY• DataAmendmentchargeappliesoninboundCFSboxesnotdeclaredpriortooperationalcut-off• Additionalchargeswillbeleviedforun-stuffingorstuffingcargoesrequiringadditionallabororequipment

Upto 20 foot Over 20 footF-2 GoodsReceivingorDeliveringChargeto/fromCFS USD8.50 USD8.50

Terms & Conditions: • FreetimeandDemurrageatCFSisbasedonScheduleinE-5ofContainerTerminalTariff• Additionalchargeswillbeleviedforreceivingordeliveringcargoesrequiringadditionallabororequipment

Section G - Entry pass - Port reserves the right to admission

Type Rate in OMR1 IndividualEntryFee:

Daily 0.300Weekly 1.000Monthly 2.5003Months 6.0006Months 12.000Annual 20.000

Note:Portusersshallpre-agreetheapplicablechargeswiththeportforitemswhicharenotspecificallystatedinthepublishedtariff.

Section H – HSSE Charges

Type Rate in USD1 ChemicalTransportbyTankTrailer USD132.502 HSSEsupervisionX-stuffing,hazardousoperation–perHour USD250.003 HSSEsupervisionX-stuffingtheNon-hazardous–perhour USD200.004 Firetruckattendedrequiredforthehazardous–perhour USD300.005 POSnurseaccompanypatienttohospitals-pertrip USD300.00

Terms & Conditions: • Theaboverateswillbeincreasedby50%onFridays,Saturday&PublicHolidays.

Concrete Barrier Rate in USD1 Chargesperbarrierperdayorpartthereof USD10.002 Shiftingchargesperbarrierpermove(includingequipmentforshiftingandhandling) USD25.00

Terms & Conditions: • NoadditionalsurchargeonFridays,Saturdays&PublicHolidays.• Itismandatoryforallpassengervesselsandnavyvesselstohaveaconcretebarrieraroundthepassenger/crew&cargoexchangeareas.

• ConcretebarrierchargewillbeeffectiveforNavyVesselsfrom1stApril2017andforcruisevesselsfromthe1stSeptember2017

Page 42:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

42

Tariff Book: 1st April 2017

Schedule V – Hire of EquipmentForuseindischarging/loading(subjecttominimum2hours)

Equipment Capacity Unit Rate in OMR Rate in USDForkLift 3Tons Perhour 10.000 26.00

ForkLift 5Tons Perhour 11.250 29.25

ForkLift 6Tons Perhour 11.250 29.25

ForkLift 10Tons Perhour 15.000 39.00

ForkLift 15Tons Perhour 18.750 48.75

ForkLift 20Tons Perhour 22.500 58.50

Cranes Upto50Tons PerHour 27.000 70.20

Crane Morethan50Tons PerHour 66.000 171.60

Trailer PerHour 5.000 13.00

LowBedTrailer PerHour 7.000 18.20

TowingTractor PerHour 15.000 19.51

ReachStacker 45Tons PerHour 37.500 97.53

WheelLoader(Normalworkingdays) PerHour 13.000 33.80

WheelLoader(PublicHolidays) PerHour 15.000 39.00

Ambulance PerHour 30.000 78.00

Powerpackhirecharges PerDay 800.000 2,080.00

Hirechargesofportgrabs 6CBM Perhour 15.00 39.00

Hirechargesofportgrabs 12CBM PerHour 25.00 65.00

Hirechargesofportgrabs 21CBM PerHour 35.000 91.00

SmallSpotLightGenerator Perday 25.000 65.00

CherryPicker PerHour 25.000 65.00

ServiceBucket PerHour 5.000 13.00

AnimalSteelBucket Pershipment 25.000 65.00

Animalgangway Pershipment 25.000 65.00

Page 43:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

43

www.salalahport.com

Terms & Conditions: • Rateswillbechargedbasisperhourorpartthereoforperdayorpartthereof• Theaboverateswillbeincreasedby50%onFridays,Saturday&PublicHolidays.• Specialrateforleaseofequipmentoutsideofportboundary100%extracharges.• Allaboveequipmentareinclusiveofdriverandfuel• Forcraneabove50Tons,followingreductionwillbeappliedforutilizationofabovecraneand21CBMgrabspershipment:

Usage DiscountLessthan24Hours 10%

From24to48Hours 25%

From48to72Hours 35%

From72to84Hours 40%

From84to96Hours 45%

Above96Hours 50%

Page 44:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

44

Tariff Book: 1st April 2017

Schedule VI – Maintenance and Repair

Section A - Container Repairs

Rate in OMR Rate in USD PTI(PreTripInspection)perContainer 13.500 35.00

Repair–Manhourrateformachineries(unit) 13.500 35.00

Repair–Manhourrateforstructuralrepairs(box) 9.500 25.00

MaterialCharges NetPrice+25% NetPrice+25%

Shiftingcontainerfromyardtoworkshopandviceversaperboxshallapplyforrepairingcontainers

7.500 20.00

Downloading / retrieving and sending data through data logger percontainer

7.500 20.00

Receiving/deliveringparts/materialsfromvesseltoworkshopandviceversaperhour

13.500 35.00

ColdStoragechargesperday 30.00 78.00

Washing Military Cargo

20Dry 45.00

40Dry 90.00

20Flat 45.00

40Flat 90.00

LightVehicle 133.00

HeavyVehicle(Wheeled) 145.00

Heavyvehicle(tracked)<25MT 145.00

Heavyvehicle(tracked)>25MT 145.00

Quadcon/tricon(each) 107.00

ISUcontainer 107.00

Generalcargo(palletorMT) 107.00

Inopvehiclesurcharge 82.00

ShiftingChargesforWashingcontainers–perunit 50.00

Terms & Conditions: • Hireofpersonnelwillbechargedasperapplicabletariffforcargohandling.• Hirershallberesponsibleforanydamagestopropertyorequipment

Page 45:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

45

www.salalahport.com

Section B - Vessel Repairs (Under Normal conditions)

Rate in OMR Rate in USD Structural(welding,fabricating)-Permanhour 19.000 50.00

Mechanical,electricalorelectronic–Permanhour 27.000 70.00

GearboxCertification–Peritem 96.000 250.00

Section B – All Other Repairs (Under Normal conditions)

Rate in OMR Rate in USD Structural(welding,fabricating)-Permanhour 15.000 40.00

Mechanical,electricalorelectronic–Permanhour 19.00 50.00

MaterialCharges NetPrice+25% NetPrice+25%

Note:Portusersshallpre-agreetheapplicablechargeswiththeport for itemswhicharenotspecificallystated inthepublished tariff.

Page 46:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...
Page 47:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

47

www.salalahport.com

Page 48:  · installation or facilitiesunder the operational or administrative control of the Port Operators. ... Safety All port users ... and against all losses, claims ...

48

Tariff Book: 1st April 2017