Options from the Crowding Project Team (CPT) Community Conversations Summer 2008
-
Upload
fitzgerald-prince -
Category
Documents
-
view
28 -
download
0
description
Transcript of Options from the Crowding Project Team (CPT) Community Conversations Summer 2008
![Page 1: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/1.jpg)
Options from the Crowding Options from the Crowding Project Team (CPT)Project Team (CPT)
Community ConversationsCommunity ConversationsSummer 2008Summer 2008
![Page 2: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/2.jpg)
CPT MembershipCPT MembershipMeg Tuccillo Assistant Superintendent,
Administrative Services
Alison Denton Facilities Planner
Mark Macekura Special Projects Coordinator
Mark Johnston Assistant Superintendent, Instruction
Linda Erdos Assistant Superintendent, School & Community Relations
Kathleen Bragaw Special Projects Specialist
Julie Crawford Director, Special Education
C.R. Lyons Director, Maintenance Services
![Page 3: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/3.jpg)
CPT’s WorkCPT’s Work
Pursuant to the School Board’s direction provided on February 14, 2008, a staff group, the Crowding Project Team (CPT), was convened to accomplish the following work and analyses:
• to identify and analyze options to relieve crowding in March; • to meet with interested groups about the options in April and May; • to discuss the options with members of the Senior Staff in
May; • to refine the options after securing feedback; and • to assist the Superintendent with preparing a report to the
School Board in June.
![Page 4: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/4.jpg)
CPT FactorsCPT Factors
The CPT considered possible issues related to each option to determine its feasibility based on four factors, including:
• How does the option affect instruction?
• How does the option reduce crowding?
• How does the option impact the budget?
• How does the option move students?
![Page 5: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/5.jpg)
CPT OptionsCPT Options
• 33 elementary school options or variations on an option
• 7 middle school options or variations on an option
![Page 6: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/6.jpg)
Create Capacity inNorth Arlington
Increase ChoiceOptions
Revise AdmissionsPolicies
Build New Relocatables
Reclaim Space
Language
Second ATS
Montessori
Other Focus
Transpor-tation
Gunston/Jefferson
ATS
Reed
Wilson
Langston
Program remains,Neighbd pref
Program moves,Neighbd sch
ControlledChoice
Choice atGrade 1
Grand-fathering
SiblingTransfers
Elementary Options OverviewElementary Options Overview
![Page 7: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/7.jpg)
![Page 8: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/8.jpg)
http://www.arlington.k12.va.us/1540105301526476http://www.arlington.k12.va.us/154010530152647640/site/default.asp40/site/default.asp
![Page 9: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/9.jpg)
DateDate TimeTime PlacePlace
July 9July 9 8:00 a.m.8:00 a.m. Board RoomBoard Room
July 31July 31 7:00 p.m.7:00 p.m. Board RoomBoard Room
August 18August 18 7:00 p.m.7:00 p.m. Board RoomBoard Room
Summer ConversationsSummer Conversations
![Page 10: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/10.jpg)
Capacities and Enrollment ProjectionsCapacities and Enrollment Projections
![Page 11: Options from the Crowding Project Team (CPT) Community Conversations Summer 2008](https://reader036.fdocuments.us/reader036/viewer/2022071807/56812ac2550346895d8e8db8/html5/thumbnails/11.jpg)
Options from the Crowding Options from the Crowding Project Team (CPT)Project Team (CPT)
Community ConversationsCommunity ConversationsSummer 2008Summer 2008