Optimize CDU Revamping

CIS Conference, Baku, Dec 1-3, 2015

Eva Andersson

Market Manager Refinery

Alfa Laval Lund

Page 3: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com © Alfa Laval Slide 3

Content

• Optimize CDU Revamping

– Objectives

• Welded PHE

– Key Features,

– Comparison w S&Ts

– Market penetration

• Case study

– Major CDU HEN revamp:

1 E. European refinery, CDU capacity increase & energy

efficiency

Page 4: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com © Alfa Laval Slide 4

Max Production Yield

Lowest CAPEX

Best Energy Efficiency

Highest Availability

Optimize CDU Revamping On available plot space…

Objectives

Page 5: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

Why Welded PHEs? Key features

• Maximal

‒ Efficiency with minimal plot

space & weight

‒ Energy recovery

‒ Uptime

• Minimal

‒ Maintenance & repair

requirement

Best Project ROI

© Alfa Laval Slide 5

Page 6: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

Why Welded PHEs? Comparison with S&T technology

PROPRIETARY INFORMATION 6

• Compact and light weight

4000 m2 S&T HTA* fits in 2,9 m2 plot space

5-10 x less flooded weight

• High energy efficiency

Temperature approach of 3-5°C

3-5 x higher heat transfer efficiency

• Low fouling tendency & easy to clean

3 times longer operating period in-

between maintenance

1-3 days of down-time for cleaning

• Corrosion-free material,

no inter-plate gaskets

* Equals 850 m2 WPHE area

Page 7: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com © Alfa Laval

Introduced in beg of 90’s, gaining market share since beg 00’s

0

50

100

150

200

250

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

No HXs

Year

Total ADU/VDU

Annual volume of

around 200 HXs

Why Welded PHEs? A well-proven technology...

Page 8: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com © Alfa Laval

45% of all delivered CPs are for ADU/VDU processes, first introduced in 1994-6

0

100

200

300

400

500

600

700

800

900 No HXs

80% of HXs

delivered

Why Welded PHEs? Used in all major refinery processes...

Page 9: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com © Alfa Laval

Installations in 50 countries, industry standard in Russia

W Eur Germany

USA

Italy

Russia

S & L Am

Canada

NE Asia

E Eur

Brazil

SEA

ME

China

Australia India

0

100

200

300

400

500

600

700

1990 1992 1994 1996 1998 2000 2002 2004 2006

No HXs

Year of Introduction

50% delivered to

BRIC countries

Why Welded PHEs? In most countries...

Page 10: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

Russian ADU/VDUs with WPHEs

• >400 Welded PHEs in 21 different sites

– First in Rosneft Tuapse, AR/Crude (2002)

• 18 Complete ADU & VDU preheat trains

– First in Slavneft Yaroslav, VDU PHT (13 WPHEs in 2005)

• 26 OVHD condensers (ADU & VDU)

– Both for vapour condensign & crude preheating

– First in Moscow Refinery (2006)

© Alfa Laval Slide 10

Page 11: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

ADU OVHD condenser Crude preheating – >70 units Country

# units Delivery

Year

MOC Status

Switzerland 2 1996 Titanium In operation

Bulgaria 2 2006 HC276 In operation

US 4 2007 & 12 SMO / HC In operation

Russia 2 2008 SMO254 In operation

China 28 2008 - 13 SMO254 / Ti 70% in operation

Croatia 5 2009 HC276 In operation

Italy 3 2009 & 14 HC276 2 in operation

Malaysia 2 2013 & 14 SMO254 In operation

Korea 4 2013 HC276 In operation

Thailand 1 2014 HC276 In operation

Singapore 2 2014 HC2000 Not yet

Spain 3 2014 HC276 In operation

Taiwan 8 2014 SMO254 Unknown

Turkey 8 2015 HC276 Not in operation © Alfa Laval Slide 11

Page 12: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

CDU REVAMP IN E. EUROPE CDU capacity increase & energy efficiency

© Alfa Laval Slide 12

Page 13: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

E. European Refinery CDU capacity increase & energy efficiency project

• 750 m3/h, 2 types of crude (API 29 & 36)

• Objective is to

– Increase capacity to 1000 m3/h

– Increase fired heater efficiency from 75 to 93%

– Increase CIT from 230 to 295 degC

• Basic Engineering was done in 2012 by FW (Italy & Turkey)

• Lots of modification to existing PHT (around 20 positions).

• 5 new heat exchanger positions added in PHT

• 2 new heat exchanger positions added on side streams

© Alfa Laval Slide 13

Page 14: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com © Alfa Laval Slide 14

Item No Duty Type

E-7125A/D T-7202 OVHD-Crude New Equipment = Plate

E-7102A/B AR / Crude Fluids in existing S&T will swop sides

E-7124A/D T-7201 OVHD-Crude New Equipment = Plate

E-7111 LGO / desalted crude Existing S&T will be changed to new position & service

E-7109A/B AR / desalted crude Existing S&Ts will be changed to new position

E-7126 AR / desalted crude New Equipment - S&T

E-7110 & 17 BPA / desalted crude Existing S&Ts will be changed to parallel service

E-7110 will be changed to new service

E-7122A/D Diesel / desalted crude New Equipment – S&T

E-7104A/B TPA / desalted crude Existing S&T will be changed to new position & service

E-7120A/D AR / desalted crude Existing S&Ts will be changed to 2 * 2 installation

instead of 4 exchangers in series

E-7123A/B AR / desalted crude New Equipment = Plate

E-7113A/B BPA / flashed crude Existing S&Ts will be changed to new position & service

E-7127 A/D AR / flashed crude New Equipment - S&T

E-7309 Stabilised / unstabilised naphtha New Equipment = Plate

E-7212 Kerosene/Fuel Gas New Equipment = Plate

All existing exchangers are subject to bundle modification except E-7305A/B, E-7306A/B & E-7307

E. European Refinery Modifications required

Page 15: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

Desalter

1000

m3/h

02

AB

25

A

D

03 08

AB

HS Legend:

PF OVHD vapor

OVHD vapour

TopPA

Mid PA

Btm PA

AR

LGO

HGO

05

AB

06

AB 07

04

AB

11

16

09

AB

26

10

18

17

19

24

A

D

22

A

D

20

A

D

23

A

D

Pre

-fla

sh

13

AB 27

A

D

295

deg C

E. European Refinery New PHT Lay-Out

Page 16: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com © Alfa Laval Slide 16

E. European Refinery PF & Main column OVHD condensers

E-7124A-D E7125A-D

Vapour PF Main

Heat Load, MW 7-13 29-32

MTD, deg C 11-18 37-43

T cross, deg C 3-4 No

dP, kPa 15 20

MOC HC276 HC276

Plot space, m 4 * 1,5 * 1,5 4 * 1,5 * 1,5

Weight, tonnes 4 * 18,3 4 * 18,3

Page 17: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com © Alfa Laval Slide 17

E. European Refinery AR vs Desalted Crude

E-7123A-B

Heat Load, MW 23

MTD, deg C 33

T cross, deg C 8

dP, kPa 30

Vaporization, % 12

MOC 316L

Plot space, m 1,5 * 3,2

Weight, tonnes 2 * 23

Page 18: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

E. European Refinery Project Economics

• Total project cost: 72 MUSD +/- 30%

• Savings:

– Energy: 40 Gcal/hr

– Yearly saving: 19,5 MUSD

– NPV: ~ 15 year 62 MUSD

– IRR: ~ 15 year 42%

– EII reduction: 6,6 points

© Alfa Laval Slide 18

Page 19: Optimize CDU Revamping - wraconferences.com CDU Revamping CIS Conference, Baku, Dec 1-3, 2015 Eva Andersson Market Manager Refinery Alfa Laval Lund

www.alfalaval.com

Summary

PROPRIETARY INFORMATION 19

By using Welded PHEs, it is possible to

Maximize uptime & production capacity

Maximize Energy Efficiency

Minimize cleaning & repair cost

Minimize project TIC

Around 900 WPHEs in CDU HENs in 60 different sites!