OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

24
OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT DARMSTADT, 21 NOVEMBER 2019 SVEN REINSTÄDLER AN INNOVATIVE SIMFLOW GENERATING A DATA SHEET FOR A THERMAL BRIDGE

Transcript of OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

Page 1: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

OPTIMIZATION AND PROCESSAUTOMATION USING ISIGHT

DARMSTADT, 21 NOVEMBER 2019

SVEN REINSTÄDLER

AN INNOVATIVE SIMFLOW GENERATINGA DATA SHEET FOR A THERMAL BRIDGE

Page 2: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

AGENDA

Thermal analysis• Motivation• Modeling• Characteristics

Isight workflow• Data management• Optimization• Postprocessing

Page 3: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

THERMAL ANALYSIS: MOTIVATION

12/4/2019 3

Mould formation in

residential buildings

RELEVANT STANDARDS

DIN EN ISO 10211

Requirements to the temperature field along the inner surfaces of the walls

DIN EN ISO 6946

Building components and building elements – Thermal resistance and thermal transmittance – Calculation methods

Thermal insulation and energy economy in building; Supplement 2: Thermal bridges – Examples for planning and performance, with CD-ROM

DIN 4108 Supplement 2

Thermal bridges in building construction – Heat flows and surface temperatures – Detailed calculations

Building materials and products – Hygrothermal properties – Tabulated design values and procedures for determining declared and design thermal values

DIN EN ISO 10456

Page 4: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

THERMAL ANALYSIS: MOTIVATION

12/4/2019 4

Accurate computation of the

required thermal energy

needed for heating a building

(primary energy consumption)

𝐿 =

𝑘=1

𝐾

𝑈𝑘 𝐴𝑘 +

𝑚=1

𝑀

𝜓𝑚 𝑙𝑚 +

𝑛=1

𝑁

𝜒𝑛

Classification of buildings

according to the German Energy

Conservation Regulation – EnEV

Keyword: Low-energy building

DIN EN ISO 10211-1 : 1995-11

LINEAR HEAT TRANSMITTANCE 𝜓

Thermal conductance

Page 5: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

THERMAL ANALYSIS: MOTIVATION

12/4/2019 5

www.leitl.at/assets/upload/download/info/2016-01-14_Waermebrückenkatalog_Initiative_Ziegel_-_Zusammenstellung_GESAMT.pdf

THERMAL BRIDGE – DATA SHEET

Page 6: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

THERMAL ANALYSIS: MOTIVATION

12/4/2019 6

www.leitl.at/assets/upload/download/info/2016-01-14_Waermebrückenkatalog_Initiative_Ziegel_-_Zusammenstellung_GESAMT.pdf

THERMAL BRIDGE – DATA SHEET

U-Wert Ziegelwand mit WDVS [W/m2K]

𝜓[W

/mK]

Page 7: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

THERMAL ANALYSIS: MODELING

12/4/2019 7

Co

ncr

ete𝑅𝑠𝑖 = 0.13 𝑚2𝐾

𝑊𝑅𝑠𝑒 = 0.04 𝑚2𝐾𝑊

𝑞 = 0 𝑊𝑚2

𝑑𝐵 = 0.2 𝑚

𝑑𝐼 = ?

𝜆𝐶 = 1.6 Τ𝑊 𝑚𝐾

𝜆𝐼 = 0.04 Τ𝑊 𝑚𝐾

Iso

lati

onThermal resistance

𝑇𝑖 = 293 𝐾

Temperature

𝑇𝑒 = 263 𝐾

𝑇𝑠𝑖

Differential equation

Boundary conditions

𝑞 = ℎ (𝑇𝑠𝑖 − 𝑇𝑖)

𝑞 = ℎ (𝑇𝑒 − 𝑇𝑠𝑒)

𝑞 = 0

𝑞 = −𝜆 𝑇

Critical temperature

of the inner surface𝑇𝑠𝑖 ~ 283 𝐾

Point of condensation assuming relative humidity of 50 % inside the building

𝑥

𝑦

𝑙 = 0.6 𝑚

Temperature

Thermal resistance

MODEL EQUATIONS AND BOUNDARY CONDITIONS

OUTSIDE INSIDE

Page 8: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

THERMAL ANALYSIS: CHARACTERISTICS

12/4/2019 8

𝑇 𝐾

𝑇𝑠𝑖 < 287.6 𝐾

𝑞 ∝ 𝑇

THERMAL IMAGE

Page 9: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW

12/4/2019 9

OVERVIEW - SIMFLOW

SELECTED COMPONENTS

Excel WordCommand Line Script Data Exchanger

Optimization

PostprocessingData management

Page 10: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: DATA MANAGEMENT

12/4/2019 10

OS COMMAND

Page 11: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: DATA MANAGEMENT

12/4/2019 11

DATA-EXCHANGER

Page 12: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: OPTIMIZATION

12/4/2019 12

DATA-EXCHANGER

Page 13: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: OPTIMIZATION

12/4/2019 13

python

Used modules:

• os

• csv

• re

SCRIPTING

Page 14: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: OPTIMIZATION

12/4/2019 14

ABAQUS

Page 15: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: OPTIMIZATION

12/4/2019 15

SCRIPTING

Page 16: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: POSTPROCESSING

12/4/2019 16

SCRIPTING

Page 17: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: POSTPROCESSING

12/4/2019 17

EXCEL

Page 18: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: POSTPROCESSING

12/4/2019 18

EXCEL

Page 19: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: POSTPROCESSING

12/4/2019 19

EXCEL-DATA-SHEET

Page 20: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: POSTPROCESSING

12/4/2019 20

WORD

Page 21: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: POSTPROCESSING

12/4/2019 21

WORD

Page 22: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: POSTPROCESSING

12/4/2019 22

WORD-DATA-SHEET

Page 23: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

ISIGHT WORKFLOW: POSTPROCESSING

12/4/2019 23

WORD-DATA-SHEET

𝐿 =

𝑘=1

𝐾

𝑈𝑘 𝐴𝑘 +

𝑚=1

𝑀

𝜓𝑚 𝑙𝑚 +

𝑛=1

𝑁

𝜒𝑛

Page 24: OPTIMIZATION AND PROCESS AUTOMATION USING ISIGHT

THANK YOU FOR YOURATTENTION

SVEN REINSTÄDLERDr.-Ing.

+49 711 7825 [email protected]

CENIT AGIndustriestraße 52-5470565 Stuttgartwww.cenit.com