Project “OPM2” Workshop
Estimation
February 16, 201113:00 – 17:00
Conducted by: Marwan Farrukh
Workshop No. WS01A
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Agenda
Brief IntroductionDistribution of L0 ChartsListing of the Major ProcessesCompleting Chart L0Distribution of L1 ChartsListing of the Major StepsCompleting Charts L1Conclusion
2
© Amana Group Project OPM2 WS01B - Estimation
l l3
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
INTRODUCTION
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Introduction
Workshop will be conducted based on the method explained in the
“OPM2” Project Introduction Presentations
Each Branch to advise their processes for the relevant Project
Lifecycle Stage
Listing will be compared and agreed
Charts L0 will be completed and handed over
Each branch to provide the major steps in the listed processes
Major steps will be discussed, compared and agreed
Charts L1 will be completed and handed over
4
© Amana Group Project OPM2 WS01B - Estimation
l l5
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
Distribution of Chart L0
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L0 – Stage A - Blank
6
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L0 – Stage B - Blank
7
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L0 – Stage C - Blank
8
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L0 – Stage C1 - Blank
9
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L0 – Stage C2 - Blank
10
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L0 – Stage C3 - Blank
11
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L0 – Stage D - Blank
12
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L0 – Stage E - Blank
13
© Amana Group Project OPM2 WS01B - Estimation
l l14
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
Listing of Major Processes
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Process Mapping Result
15
Amana Operational Processes (Level 0)
Tendering(A)
A.1 Prepare, Estimate & Submit Tender
A.2 Prepare Design Package for Design & Build Projects
A.3 Value Engineering By Engineering
A.4 BDE & Estimation Support By Procurement
A.5 Preparation of Tender Schedule
A.6 Request, Receive & Return Tender Bonds
A.7 Preparation of Tender Health and Safety Plan
A.8 Preparation of Tender QA/QC Plan
A.9 Post Tender Communication
Job Award(B)
B.1 Kick Off Meeting
B.2 Issuing of Insurance
B.3 Request, Receive & Return Performance Bonds
Budgeting & Planning (C)
C.1 Apply for Building Permit
C.2 Site Mobilization
C.3 Prepare Job Budget
C.4 Prepare Baseline Plan / Internal Plan
C.5 Prepare Project Health and Safety Plan
C.6 Prepare Project QA/QC Plan
C.7 Value Engineering By Construction
Procurement& Construction (D)
D.1 Request & Receive Advance Paym. Guarantee
D.2 MRF Item and Quantity Verification
D.3 LPO Rates Verification
D.4 Subcontract Agreement
D.5 Material Purchase Process
D.6 Preparing Letter of Credit
D.7 Prepare, Submit & Approve Shop Drawings
D.8 Prepare, Submit & Approve Material
D.9 Prepare Risk Assessment
D.10 Prepare Method Stat. & Inspect./Test Plan
D.11 Material Inspection & Approval
D.12 Conducting Safety Induction
D.13 Prepare Training Plan and Conduct Training
D.14 Conduct Tool Box Talks
D.15 Construction Activities Site Inspect. & Approv.
D.16 Prepare Daily Quality Control Report
D.17 Submit & Approve Test Reports
D.18 Prepare & Close Internal NCR For QA/QC
D.19 Close External NCR For QA/QC
D.20 Prepare & Close Internal NCR for HSE
D.21 Close External NCR for HSE
D.22 Daily Labor Productivity Report
D.23 Daily and Weekly Inspections
D.24 Prepare Client Weekly / Monthly Report
D.25 Prepare Recovery Schedule
D.26 Prepare & Update Micro Schedules
D.27 Monthly Auditing and Reporting
D.28 Conduct Monthly HSE Audits
D.29 Raise Monthly Progress Invoice
D.30 Prepare Internal Monthly Progress Report
D.31 Sub-Contractor Paym. Certification
D.32 Process Suppl. Inv. & Sub-contractor PC’s
D.33 Raise Variations
D.34 Support for Preparation of Time Claims
Job Closure(E)
E.1 Prepare Testing & Commissioning Documents
E.2 Prepare Operation & Maintenance Manual
E.3 Prepare & Close Punch List
E.4 Prepare As‐Built Drawings
E.5 Request & Receive Mainten. Guarantee
E.6 Project Hand Over
E.7 Close Inactive LPO
E.8 Prepare Project Safety Report at Closing stage
E.9 Prepare Close Out Report By Cost Control
Maintenance(F)
F.1 Raise Final Invoice
Illustra
tive E
xample
© Amana Group Project OPM2 WS01B - Estimation
l l16
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
Completing Chart L0
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Work Flow Chart L0
17
© Amana Group Project OPM2 WS01B - Estimation
l l18
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
Distribution of Chart L2
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Chart L1 – Blank
19
© Amana Group Project OPM2 WS01B - Estimation
l l20
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
Listing of Major Steps in Processes
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Completed Chart L1 - Sample
21
Retu
rn
© Amana Group Project OPM2 WS01B - Estimation
l l22
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
Completing Chart L1
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Charts L1 - Completed
The number of L1 Charts per stage shall equal the number of the Major process in a Project Life Cycle Stage.
23
© Amana Group Project OPM2 WS01B - Estimation
l l24
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
Conclusion
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Summary “OPM2” Charts Levels’
25
Level
3 (L-3)
Process
Maps
What tools to
use
Responsibility/
Accountability
Level
2 (L-2)
Process
Maps
How to
do
work
Flow
of activities
Level
1 (L-1)
Process
Maps
Process steps’
overview
Key activities
Level 0: The Blueprint of Amana… Grouping of Mega & Major Processes!
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Project “OPM2” Manual (3)
26
OPM2Processes
Organisation
Key Controls
KPIs
Technology
Roles
L1
L2Dept
L3
Position
s
© Amana Group Project OPM2 WS01B - Estimation
l l27
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
THANKYOU
© Amana Group Project OPM2 WS01B - Estimation
l l
APPENDIX
28
Volume DIV.DPT.FUN
OPM 2
Procedure No.: BRN-DIV.DPT.FUN-PR: SN.VN Issue Date: 25 January 2011
Department Name
© Amana Group Project OPM2 WS01B - Estimation
l ll l
New Project Lifecycle
29
© Amana Group Project OPM2 WS01B - Estimation
l ll l
Project Lifecycle Stages Definitions
30
(Definition in line with the proposed names for Mega Processes)