COURSE DESCRIPTION COURSE OUTLINE
3.0 - site spill hazards, cleaning the site, station
security, doors, gates, looks…etc.
- Security procedures
Site Visit
Day One
Day Two
Introduction
Sewage
Pumping
Station
Health &
Safety
Instructions
and
Requirements
Welcome, Training Course Outline,
Expectations, Pre-course test.
- Components of sewage pumping station
- Hydraulics of sewage pumping stations
- Responsibilities of sewage pumping station
operator
- Personal protective equipments
- Safety equipments at the site
- Equipment hazards: safety measures in handling
motors, controls, pumps, electrical systems...etc.
1.5
4.5
3.0
Time (H)DetailsTopicDayThis training course aims at training the operators how to operate
and maintain sewage pumping stations and overcome common
daily problems and at introducing them to relevant health and
safety measurements.
Jordanian Guideline No. 503 Operating Instructions for the
Personnel of Wastewater Pumping Installation and further material.
Technical staff, operators and engineers who are working in the
field of operating and maintenance of sewage pumping stations
Maximum 20 Participants.
Eng. Abdelrahman Al-omari: Operation and maintenance Water
Expert at Engicon with 43 years of experience in the field of O&M in
the water utilities and the private sector.
Eng. Wael Zureikat: Head of Mechanical Engineering Department at
Engicon
Eng. Maher Haddadin: Senior Mechanical Engineer, owner and
manager of Modern Industrial Services Establishment
Lectures, site visits, discussions, practical training.
Arabic/English
26 - 30 of August 2012
Engicon O&M Training Centre, Amman
5 days (30 hours)
Written test, minimum. 0.5 hour Multiple Choice Test
Certificate will be issued by ACWUA, Engicon O&M and DWA to all
attendees completing minimum of 85% of the total training hours.
Objectives
Contents
Target Group
No. of participants
Trainers
TrainingMethods
Training Language
Date
Location
Duration
Test
Certificate
![Page 2: Operations and Maintenance of Sewage Pumping Stations, General Procedures](https://reader031.fdocuments.us/reader031/viewer/2022020419/568bd8951a28ab2034a3e197/html5/thumbnails/2.jpg)
Total Training Hours: 30
COURSE OUTLINE
Day Topic Details Time (hour)
2.0
2.0
2.0
1.5
- Pumps types/wet & dry
- Installation of pumps
- Pumps selection
- Maintenance of pumps
- Main valves
- Installation of valves
- Functions of valves
- Inspection of valves
- Connection of the electrical parts
- Operation of electrical installations
- Inspection of electrical installations
- Maintenance of electrical installations
- Daily operation requirements
- Normal start up
- Start up after hydraulic maintenance
Pumps
Valves
Electrical Installations
Operating of pumping
stations
Day Three
Day Four
Day Four
Processing
Data, Site Visit
Emergency Operating
Plans and Procedures
Maintenance Procedures
Reporting & documenting
- Full shut down
- Partial shut down
- Bypassing procedures
Vulnerability analysis for emergency conditions:
- Power failure, equipment failure
- Natural disasters
- Failure of emergency warning system
Methods to reduce vulnerability
Emergency notification system
- Preventive maintenance
- Lubrication schedule and type of lubricant
- Trouble shooting, Water hammer
- Bad odor & corrosion prevention
- Preparing of daily O&M forms
- Recording of operating faults
1.5
1.5
1.5
4.0
0.5
0.5
0.5
0.5
- Operating procedures
- Maintenance procedures
Multiple Choice
Practical Training
Course Overview
Feedback/Evaluation
Test
Closing Ceremony
Day Five
Water Utilities
Management Capacity
Building Program
WUM-CBP
O&M of Sewage Pumping Stations
General Procedures
26-30 August 2012, Amman - Jordan