1975 Travel trailer UAF

1983 13 ATCO units (dorms, etc) UAF

1993 Wet, Dry, and Winter labs NSF OPP- ASA

1996 GIS, meeting trailer UAF

1998 Winter Quarters NSF/UAF

1999 Labs 1-4 NSF OPP - PICO

2000 Cooperative Agreement-1 Barnes, James, Abels

2003 Cotton Grass NSF OPP - VECO

2005 Cooperative Agreement-2 Barnes, Bret-Harte, Abels

2006 Generator move NSF OPP - VPS

2010 Dining Hall NSF OPP - CPS

2011 Cooperative Agreement-3 Bret-Harte, Barnes, Abels

Operational highlights in the history of the Toolik Field Station

Page 3: Operational highlights in the history of the  Toolik  Field Station

• The Toolik Field Station (TFS) is operated and managed by the Institute of Arctic Biology of the University of Alaska Fairbanks (UAF) with cooperative agreement support from the Division of Arctic Sciences of the Office of Polar Programs at the National Science Foundation (NSF).

• TFS provides housing, meals, and laboratories in addition to support services for arctic research and education to scientists and students from universities, institutions, and agencies from throughout the US and the world. Research support includes GIS and mapping services, technical and IT assistance, shared commonly used equipment, and collection of standardized environmental data.

Page 4: Operational highlights in the history of the  Toolik  Field Station

• A user-day fee contributes to costs of operations, and a Steering Committee and science user input advises TFS management on the direction and extent of science support and station operations.

• Through NSF’s Arctic Research Support and Logistics contractor, CH2MHill Polar Services (CPS), TFS is also provided with research helicopter support and its infrastructure is developed and maintained. TFS infrastructure and equipment are owned by either UAF or NSF.

Page 5: Operational highlights in the history of the  Toolik  Field Station

Steve Oberbauer, co-chairFlorida International University

Donie Bret-Harte, co-chairUniversity of Alaska Fairbanks

Michael WeintraubUniversity of Toledo

Gus ShaverMarine Biological Laboratory

Michelle MackUniversity of Florida

Breck BowdenUniversity of Vermont

Page 6: Operational highlights in the history of the  Toolik  Field Station

Elissa SchuettUniversity of Vermont

Amanda KoltzDuke University

Brian BarnesUniversity of Alaska Fairbanks

Michael AbelsUniversity of Alaska Fairbanks

Mike McKibben (ex officio seat)CH2MHill

Renee Crain (ex officio seat)NSF

Pat Haggerty (ex officio seat)NSF

Page 7: Operational highlights in the history of the  Toolik  Field Station

Sik-siks’ sense of time.Urocitellus parryii

Page 8: Operational highlights in the history of the  Toolik  Field Station

314 female arctic ground squirrel

8/1/98 12/1/98 4/1/99 8/1/99 12/1/99 4/1/00

body

tem

pera

ture

(°C

)

-5

0

5

10

15

20

25

30

35

40

45

Fall Winter Spring Summer Fall Winter Spring

Two year record of body temperatures of a free-living arctic ground squirrel in northern Alaska

Page 9: Operational highlights in the history of the  Toolik  Field Station

Diurnal rhythms of Tb persist during the active season.

376 male arctic ground squirrel

body

tem

pera

ture

(°C

)

36

37

38

39

40

41

3 4 5 6 7 8 9 10 11 12 13 14 15

1 2July

Page 10: Operational highlights in the history of the  Toolik  Field Station

arctic ground squirrels – timing of body temperature peaks May-Aug

M

J

J

A

Page 11: Operational highlights in the history of the  Toolik  Field Station

Williams, Barnes, and Buck (2012) Biology Letters

euthermic pre-emergence interval, arhythmic

euthermic post-immergence interval, free-running

entrained active season

Page 12: Operational highlights in the history of the  Toolik  Field Station

1 June

4 June

9 June

14 June

0 6 12 18 20 24

ags trapped 1 June and brought to TFS chambers on16L:8D: lights on 6am, off 10pm

after 3-4 day adjustment period (is this necessary?), phase delay lights on by 6 h; lights on 12 noon, off at 4am0 4 6 12 18 20 24

after 5 days, phase delay an additional 6 h; lights on at 6pm, off at 10am 0 6 10 12 18 20 24

after 5 days, release phase shifted animals at home burrow at 7pm

Draft protocol for ags phase shift experiment with schedule for changing light cycle. Control ags would remain in condition 1 (june 1) throughout the experiment.

Page 13: Operational highlights in the history of the  Toolik  Field Station
Page 14: Operational highlights in the history of the  Toolik  Field Station

Ch 1 Ch 2

RACK

RACK

Winter Lab

Deck

0-25 C control, + 1 CLED lighting on ceiling and opposite wallVentilation control 0-10 room changes of air/hourSingle HVAC unit below deck, but plumb chambers for separate HVAC units in the future

Stairs

Enclosed foyer, light control

Page 15: Operational highlights in the history of the  Toolik  Field Station