Operating Performance Update

11
INTERNAL Operating Performance Update S&C Draft of 5/26/10

description

S&C Draft of 5/26/10. Operating Performance Update. Production Milestones. June 26, 2012 First Nickel test briquettes were sintered. August 18, 2012 Single largest batch of slurry sent from the Mine (18,980 t), exceeding the Financial Completion target of 674 t/h. September 9, 2012 - PowerPoint PPT Presentation

Transcript of Operating Performance Update

Page 1: Operating Performance Update

INTERNAL

Operating Performance Update

S&C Draft of 5/26/10

Page 2: Operating Performance Update

2INTERNAL

Production Milestones• June 26, 2012

First Nickel test briquettes were sintered.

• August 18, 2012 Single largest batch of slurry sent from the Mine (18,980 t), ex-

ceeding the Financial Completion target of 674 t/h.

• September 9, 2012 First Cobalt test briquettes were sintered.

• September 13, 2012 Operating permit granted.

• November 1, 2012 5 Autoclaves on line with dual slurry feed pumps

• November 8, 2012 First international shipment of refined nickel (40 t)

• November 13, 2012 First international shipment of refined cobalt (168 t)

2

Page 3: Operating Performance Update

3INTERNAL

Production Achievements to November 30, 2012

3

• Mixed Sulphides to Refinery:

Ni+Co contained, t 6,900

• Nickel Reduced, t

5,512

• Cobalt Reduced, t

488

• Amsul Produced, t

10,695

Note: The Project achieved “Commencement of Commercial Production” as described in the Finance Documents on November 26, 2012.

Page 4: Operating Performance Update

INTERNAL

PAL Overview

• Autoclaves PAL Autoclave Operating Hours

• Operated approximately 1,788 hours in November

Ore Throughput in the PAL Autoclaves• Processed 191,085 tonnes in November

• PAL Mixed Sulphide Production Produced approximately 1,763 tonnes of mixed sul-

phides (ni+co contained) in November

4

Page 5: Operating Performance Update

5INTERNAL

Refinery Overview

5

• Sulphide Leaching In November we processed 1,694 tonnes of nickel and

cobalt contained in mixed sulphides

• Nickel Reduction In November we reduced 1,592 tonnes of nickel pow-

der

• Cobalt Reduction In November we reduced 164 tonnes of cobalt pow-

der

• Metals Handling Produced 1,199 tonnes of nickel briquettes in No-

vember Produced 100 tonnes of cobalt briquettes in Novem-

ber

Page 6: Operating Performance Update

6INTERNAL

Operating Performance – PAL Ramp-Up Curve

6

Page 7: Operating Performance Update

7INTERNAL

Operating Performance – Refinery Ramp-Up Curve

7

Page 8: Operating Performance Update

8INTERNAL

Operating Performance – Ore Throughput

8

Page 9: Operating Performance Update

9INTERNAL

Operating Performance – Nickel Produced

9

Page 10: Operating Performance Update

10INTERNAL

Nickel Quality Analysis

10

• Nickel meets LME spec for all elements except silicon.

• Silicon contamination has occurred from late October and into November as Si level in Refinery solution has increased.

• Refinery is currently progressing initiatives to purge silicon from the circuit.

Page 11: Operating Performance Update

INTERNAL

Questions?

S&C Draft of 5/26/10