Operating Performance Update
S&C Draft of 5/26/10
![Page 2: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/2.jpg)
2INTERNAL
Production Milestones• June 26, 2012
First Nickel test briquettes were sintered.
• August 18, 2012 Single largest batch of slurry sent from the Mine (18,980 t), ex-
ceeding the Financial Completion target of 674 t/h.
• September 9, 2012 First Cobalt test briquettes were sintered.
• September 13, 2012 Operating permit granted.
• November 1, 2012 5 Autoclaves on line with dual slurry feed pumps
• November 8, 2012 First international shipment of refined nickel (40 t)
• November 13, 2012 First international shipment of refined cobalt (168 t)
2
![Page 3: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/3.jpg)
3INTERNAL
Production Achievements to November 30, 2012
3
• Mixed Sulphides to Refinery:
Ni+Co contained, t 6,900
• Nickel Reduced, t
5,512
• Cobalt Reduced, t
488
• Amsul Produced, t
10,695
Note: The Project achieved “Commencement of Commercial Production” as described in the Finance Documents on November 26, 2012.
![Page 4: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/4.jpg)
INTERNAL
PAL Overview
• Autoclaves PAL Autoclave Operating Hours
• Operated approximately 1,788 hours in November
Ore Throughput in the PAL Autoclaves• Processed 191,085 tonnes in November
• PAL Mixed Sulphide Production Produced approximately 1,763 tonnes of mixed sul-
phides (ni+co contained) in November
4
![Page 5: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/5.jpg)
5INTERNAL
Refinery Overview
5
• Sulphide Leaching In November we processed 1,694 tonnes of nickel and
cobalt contained in mixed sulphides
• Nickel Reduction In November we reduced 1,592 tonnes of nickel pow-
der
• Cobalt Reduction In November we reduced 164 tonnes of cobalt pow-
der
• Metals Handling Produced 1,199 tonnes of nickel briquettes in No-
vember Produced 100 tonnes of cobalt briquettes in Novem-
ber
![Page 6: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/6.jpg)
6INTERNAL
Operating Performance – PAL Ramp-Up Curve
6
![Page 7: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/7.jpg)
7INTERNAL
Operating Performance – Refinery Ramp-Up Curve
7
![Page 8: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/8.jpg)
8INTERNAL
Operating Performance – Ore Throughput
8
![Page 9: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/9.jpg)
9INTERNAL
Operating Performance – Nickel Produced
9
![Page 10: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/10.jpg)
10INTERNAL
Nickel Quality Analysis
10
• Nickel meets LME spec for all elements except silicon.
• Silicon contamination has occurred from late October and into November as Si level in Refinery solution has increased.
• Refinery is currently progressing initiatives to purge silicon from the circuit.
![Page 11: Operating Performance Update](https://reader036.fdocuments.us/reader036/viewer/2022062813/56816471550346895dd65591/html5/thumbnails/11.jpg)
INTERNAL
Questions?