Open Workbench
By Wilmer Arellano
Spring 2008
![Page 2: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/2.jpg)
![Page 3: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/3.jpg)
This is just an example, you can customize as you like.
![Page 4: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/4.jpg)
In Favorites Gantt Charts, double-click the little square and enter:
• A new Phase with:
•Name
•Category
•And ID
Make sure to select phase
![Page 5: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/5.jpg)
The first phase has been created
![Page 6: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/6.jpg)
In Favorites Gantt Charts, double-click the little square and enter:
•The Tasks with:
•Names
•Category
•And ID
•Duration
Make sure to select task
![Page 7: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/7.jpg)
The first task has been entered
![Page 8: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/8.jpg)
This is how it would look after all tasks for the first phase have been entered
![Page 9: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/9.jpg)
To indicate task’s dependencies drag from the end of one task to the beginning of the next one
![Page 10: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/10.jpg)
Click here to auto-schedule
![Page 11: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/11.jpg)
This is how it would look like
Red Color indicates the Critical Path
![Page 12: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/12.jpg)
1.1 Antenna DesignTheorical Design 5%Antenna Construction 10%Antenna testing 5%
1. Transmiter Antenna Packaging 3%Antenna Design 25% Monitoring 2%
1. Transmiter Modulator Design 25% 1.2 Modulator DesignAudio interface Module 10%
Power Amplifier Design 50% Mixer Module 10%Output Stage Module 5%
1.3 Power Amplifier Design
![Page 13: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/13.jpg)
Project with two phases included
It is a coincidence that the two phases have same duration
![Page 14: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/14.jpg)
Click to see the PERT
The zoom commands were used to fit the chart in the window
![Page 15: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/15.jpg)
On planning, Resource assignment, double click the little square to enter the resources and their costs
![Page 16: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/16.jpg)
Do the same for non labor resources
Use Equipment for Space
![Page 17: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/17.jpg)
You can add the cost of components as “material”
![Page 18: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/18.jpg)
Right click on the tasks and select assignment to assign resources to the tasks
![Page 19: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/19.jpg)
Right click on the tasks and select assignment to assign resources to the tasks.
Enter estimated hours in Estimate
![Page 20: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/20.jpg)
As components were entered with a rate of $100, 1.5 will represent $150
![Page 21: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/21.jpg)
The yellow color indicates that the task is low in resources, more hours or space or equipment, etc are needed
If you need to add a new task or phase in between tasks or phases, right click the square and select insert task
![Page 22: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/22.jpg)
There will be a problem if you click schedule again
![Page 23: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/23.jpg)
As the Audio Interface Module and the Mixer Module were using the same resources, they were converted to sequential.
You would need to add more resources to keep the tasks in parallel
The zoom commands were used to fit the chart in the window
![Page 24: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/24.jpg)
•Another Low Frequency Engineer was included
•Two more Lab Spaces were included
•It was not necessary to increase the project duration
![Page 25: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/25.jpg)
Click on controlling and then Revise Schedule to see the budget
![Page 26: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/26.jpg)
Set The base Line
Updating The Project Status
![Page 27: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/27.jpg)
Updating The Project Status
![Page 28: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/28.jpg)
Updating The Project Status
![Page 29: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/29.jpg)
Updating The Project Status
The task bar changes colour to reflect status (Red / Blue – Not Started)(Purple – Started)(Grey – Progress completed)The task name changes colour to reflect status (Red – Not Started)(Purple – Started)(Green – Completed)
![Page 30: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/30.jpg)
Updating The Project Status
If the task is completed enter 0 in Estimate
![Page 31: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/31.jpg)
Updating The Project Status
We reduced 20 hours but because of the weekend it appears to be a longer time
![Page 32: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/32.jpg)
Milestones
![Page 33: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/33.jpg)
Milestones
Drag the milestone to the desired location
![Page 34: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/34.jpg)
Milestones
![Page 35: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/35.jpg)
Copy and Paste
Table cells can be copied and pasted into excel
By the way, this is a representation of the WBS
![Page 36: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/36.jpg)
Phase 1.1 Antenna Design HardwareTask 1.1.1 Theoretical Design HardwareTask 1.1.2 Antenna Construction HardwareTask 1.1.3 Antenna Testing HardwareTask 1.1.4 Antenna Packaging HardwareTask 1.1.5 Monitoring HardwarePhase 1.2 Modulator Design HardareTask 1.2.1 Audio Interface ModuleTask 1.2.2 Mixer Module HardwareTask 1.2.3 Output Stage ModuleMilestone Prototype Prototype Ready Hardware
Task 1.1.1 Theoretical Design HardwareTask 1.1.2 Antenna Construction Hardware
Phase 1.1 Antenna Design Hardware Task 1.1.3 Antenna Testing HardwareTask 1.1.4 Antenna Packaging HardwareTask 1.1.5 Monitoring Hardware
Task 1.2.1 Audio Interface ModuleTask 1.2.2 Mixer Module Hardware
Phase 1.2 Modulator Design Hardare Task 1.2.3 Output Stage ModuleMilestone Prototype Prototype Ready Hardware
![Page 37: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/37.jpg)
![Page 38: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/38.jpg)
The Budget
JohnSmith 15 $225.00
Circuits Lab 10 $70.00JohnSmith 10 $150.00
Circuits Lab 2 24 $24.00Mary Morrison 20 $300.00Circuits Lab 32 $224.00John Martinez 32 $480.00Comp Mod $150.00John Martinez 40 $600.00Lab Circuits 3 40 $280.00
$2,503.00
Even the Components are included here
![Page 39: Open Workbench](https://reader036.fdocuments.us/reader036/viewer/2022081419/56813c10550346895da585da/html5/thumbnails/39.jpg)
&&QuestionsQuestions
AnswersAnswers