OPC connectivity in the feedback of a municipal-wide heating closed control
system
Mariusz PostółPrzemyslaw Malek
www.cas.eu
![Page 2: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/2.jpg)
2
CONTROL PROCESS
• Łódź citizens #: 1M
• Heating plants: 3
• Total thermal output: 2560MW
• Heat distribution network: ~800km
~500miles
• Number of nodes: ~7 000
• Production in cogeneration:– Hot water– Electric power– Steam
![Page 3: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/3.jpg)
3
PRODUCTION OBJECTIVES
=f( )
=y( )
![Page 4: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/4.jpg)
4
CONTROL OBJECTIVE
HEAT STREAM
H1 H2
H3
Heat stream = f(weather)
![Page 5: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/5.jpg)
5
SUPPLY AREA MANAGEMENT
![Page 6: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/6.jpg)
6
K-231
K-1266
K-209
K-101
K-751
K-762
K-736
SMULSKO
K-510K-617
K-110 K-104/30
K-164
K-175
K-104/A
K-199
K-1014/1
K-22
K-1023
K-637
FIRST STAGE
HDCR
OFFICE
![Page 7: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/7.jpg)
7
K-231
K-1266
K-209
K-101
K-751
K-762
K-736
SMULSKO
K-510K-617
K-110 K-104/30
K-164
K-175
K-104/A
K-199
K-1014/1
K-22
K-1023
K-637
COMMON AREAS
![Page 8: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/8.jpg)
8
Punkt krytyczny
Punkt krytyczny
Punkt krytyczny
Punkt krytycznyPunkt krytyczny
Łódź
Śródmieście
Janów
Chojny
Smulsko
Teofilów
Radogoszcz
Dąbrowa
![Page 9: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/9.jpg)
9
AUTOMATIC LOAD CONTROL
K-101
F3
REFILL
F4
SUWSUW
K-164
P
G
LOAD
SE
PA
RA
TIO
N
P
P P
P P
LOAD
REFILL
AREA 1AREA 1 AREA 2AREA 2
![Page 10: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/10.jpg)
10
HDCSHDCS
HDCSHDCS
AUTOMATIC LOAD CONTROL
K-101
LOAD
REFILLSUW
K-164
P
LOAD
SUW
REFILL
OPC Connectivity
PLCPLC
PLCPLC
OPCOPC
![Page 11: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/11.jpg)
11
Communication paths
EC-3 EC-2
K-101
ODBIORY
F1=constF2
F3
UZUPEŁNIANIE
F4
UZUPEŁNIANIE
SUWSUW
K-164
P
P P
P P
PG
G
P
ODBIORY
P
SAIAPCD2
SAIAPCD4
SAIAPCD4
Wizcon
SIEĆ TECHNOLOGICZNA
SAIAPCD2
Budynek Łączności EC2
FO
Wizcon1
Wizcon2
Stacja bazowa
RS 232
RS 232
`
RS 485
ZSC
`
KościuszkiMDS
DS
RS 232 over TCP/IP
Interfejs dla innych
urządzeń
K954
FzPzPp
SAIAPCD1
Stacja Demi
Fu1Fu2 Wizcon
SAIAPCD1
`
SAIAPCD1
![Page 12: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/12.jpg)
12
Communication paths
Power Plant #1
Power Plant #2
Regulation Heating Chamber
Division Heating Chamber
Redundancy
![Page 13: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/13.jpg)
13
COMMUNICATION SERVER
CHANNELS
OPC Connectivity
MEDIUM
PROTOCOL
MEDIUM
PROTOCOL
MEDIUM
PROTOCOL
MEDIUM
PROTOCOL
SEGMENTSEGMENT
MEDIUM
PROTOCOLSEGMENT
SEGMENTSEGMENT
PIPE
interface
interface
PIPEPIPE
interface
interface
PIPE PIPE
interface
interface
PIPE PIPEin
terface
interface
PIPE
SCADA Stations
![Page 14: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/14.jpg)
14
Example – Lodz common heating network
Power Plant #1
Power Plant #2
Regulation Heating Chamber
Division Heating Chamber
OPC Connectivity
SCADA Stations
CHANNELS
Ethernet
SBUS/UDP
SEGMENT
RADIO
SBUS
SEGMENTSEGMENT
PIPE
interface
interface
PIPE PIPE
interface
interface
PIPEPIPE
interface
interface
PIPEPIPE
interface
interface
PIPE
GPRS
SBUS/UDP
SEGMENT
![Page 15: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/15.jpg)
15
Commserver - Redundancy
Primary Station
Standard solution – better case
Backup Station
LAN
Wait for failure
Active
SERVICE
Active
![Page 16: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/16.jpg)
16
Commserver - Redundancy
Commserver solution
SERVICE
Standby
ActiveStandby
Active
Standby
Active
Fail
![Page 17: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/17.jpg)
17
WS
WS
ES
DEVICE COMMUNICATION MESS
![Page 18: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/18.jpg)
18
DEVICE COMMUNICATION MANAGEMENT
SERVER
SC
AN
NE
R
CA
CH
E
OP
C -
Inte
rfac
e
WS
WS
ES
F( ) ?
![Page 19: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/19.jpg)
19
PROCESS REQUIREMENTS
DIR
EC
TIO
N K
101
DIRECTION K617
![Page 20: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/20.jpg)
20MINUTESMINUTES MONTHSMONTHSMONTHSMONTHS
DIAGRAM OF DIRECTION STATES
CLOSEDCLOSED
CLOSINGCLOSING
OPENEDOPENED
OPENINGOPENING
DONE
CLOSE
DONE
OPEN
ACCEPTEDLATENCY
HOURS
ACCEPTEDLATENCY
HOURS
ACCEPTEDLATENCY
HOURS
ACCEPTEDLATENCY
HOURS
ACCEPTEDLATENCYSECONDS
ACCEPTEDLATENCYSECONDS
![Page 21: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/21.jpg)
21
ADAPTIVE APPROACH
CLOSEDCLOSED OPENEDOPENED
CLOSINGCLOSING
OPENINGOPENING
SLOWSLOW SLOWSLOWFASTFAST
STATE DRIVEN SCANNING POLICY
SLOW:POLICY SLOW:POLICYFAST:POLICY
SCANNING ON DEMANDSCANNING ON DEMAND
![Page 22: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/22.jpg)
22
Commserver – SCANNING ON DEMAND
Normal state – slow scanning
![Page 23: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/23.jpg)
23
Commserver – SCANNING ON DEMAND
Alarm state – fast scanning
![Page 24: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/24.jpg)
24
Commserver – multi-channel
GPRS round trip > 2 sec. => Cycle time > 0.5h
Typical solution Object #1
Object #2
Object #3
Object #n
![Page 25: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/25.jpg)
25
Commserver - Multichannel
Object #1
Object #2
Object #3
Object #4
250 channels
Multichannel solution
Object #5
Object #6
Object #7
Object #8
Object #n
Object #n+1
Object #n+2Object #n+3
![Page 26: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/26.jpg)
26
OP
CT
SQ
L
P1 = aa+a+...
PUSH(Q1, d+c)
OPC TRANSPORTER
SQL CONNECTIVITY
XML CONNECTIVITY
OPC CONNECTIVITY
a = aa + 10 bb
Average(a, b, c, d)
HORIZONTAL
VE
RT
ICA
L
XM
L
- P1- P2- P3- P4
TAGS
- Q1- Q2- Q3- Q4
QUEUES
OP
CS
- aa- bb- cc- dd
TAGS
OP
CS
- a- b- c- d
TAGS
![Page 27: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/27.jpg)
27
Thank you for your time
![Page 28: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/28.jpg)
28
NAT
KxxxKxxx
KxxxKxxx
SCk
VLANSYM
SOC
SOC
SB
s
SCs
SOCSOC K
Ds
SPM
TCH
TCH
Corporate field network
EC EC EC
KOM
KOM
ORACLE
View
SE
RW
ER
Corporate network
GIS
View
SB
k
SYSTEMS INTEGRATION - GIS
WIZ
OP
CS
OP
CS
OP
CSS
OC
GISUNTOUCHABLE
UNTOUCHABLE
![Page 29: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/29.jpg)
29
MASTER
RS485 ETHERNET
WS
WS
PASSIVE OPC SERVER
PASSIVE
MONITOR
CACHE
OPC
INTERFACES
![Page 30: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/30.jpg)
30
Integration
Access Points 1000 pcs. Communication
Servers
Data Sources
Heat meters 5000 pcs.
(70000 variables)
Thermal-PowerPlants
60 pcs.(1000 variables)
Heating chambers, Pomp stations
25 pcs. (3000 variables)
ERP, CRM, DB, Accounting
Cor
pora
te L
AN
Business Services
serwerOPC
SCADA, Reports
Presentation ServicesObject Services
Data Services
OPC, SQL,XML/HTML
![Page 31: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/31.jpg)
31
Hydrostatic
P limit
Hydrostatic
Thermostatic
Hydrodynamic
![Page 32: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/32.jpg)
32
SOC
SOC
SB
s
Corporate network
SE
RV
R
View
GIS
View
SCs
Corporate field network
SOCSOC K
Ds
SPM
EC EC EC
TCH
TCH
SYSTEM INTEGRATION
![Page 33: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/33.jpg)
33
NAT
KxxxKxxx
KxxxKxxx
VLANSYM
SOC
SOC
SOCSOC
TCH
TCH
Corporate field network
EC EC EC
KOM
KOM
SQL
SYSTEMS INTEGRATION
View
SE
RV
ER
Corporate network
GIS
View
SB
k
WALL SCREEN
SQL OPC
![Page 34: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/34.jpg)
34
OP
C T
RA
NS
PO
RT
ER
OPC TRANSPORTER
CONFIGURATIONCONFIGURATION
GIS
SMALLWORD
OPC
COMMSERVER
SQL
ORACLE
ST
AT
IST
IC P
RO
CE
SS
OR
TR
AN
SP
OR
T E
NG
INE
SQ
LO
PC
XM
L
![Page 35: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/35.jpg)
35
AUTOMATIC LOAD CONTROL
EC -3 EC -2
K-101
ODBIORY
F1=constF2
F3
UZUPEŁNIANIE
F4
UZUPEŁNIANIE
SUWSUW
K-164
P
PG
G
P
ODBIORY
PO
DZ
IAŁ
P
P P
P P
![Page 36: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/36.jpg)
36
Crash
OP
CS
WS WS
OP
CS
![Page 37: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/37.jpg)
37
Solution
OP
CS
OP
CS
WS WS
REPLACE
![Page 38: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/38.jpg)
38
Solution
OP
CS
OP
CS
WS WS
ISLA
ND
O
F A
UTO
MA
TIO
N
ISLA
ND
O
F A
UTO
MA
TIO
N
ISLA
ND
O
F A
UTO
MA
TIO
N
CONTROL
CONTROL
MUTUALY
ECLUSIVE
![Page 39: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/39.jpg)
39
DEVELOPMENTDEVELOPMENT
APPAPP
INTEGRATIONINTEGRATION
THE MESSAGE IS:
SOCSOC CFISCFIS
HARDWARE
HARDWARE
SOFTWARE
SOFTWARE
TECHNOLOGY
TECHNOLOGY SKILLSSKILLS KNOWLEDGE
KNOWLEDGE
OPC
![Page 40: OPC connectivity in the feedback of a municipal-wide heating closed control system](https://reader031.fdocuments.us/reader031/viewer/2022020208/56813ee6550346895da95e07/html5/thumbnails/40.jpg)
41
Commserver - Redundancy
Primary Station
Standard solution – worse case
Backup Station
LAN
Wait for failure
Active
SERVICE