ONTRAS – VNG Gastransport GmbH
PRICE LIST FOR NETWORK ACCESS
from July, 15th 2009
Connect with us.
ONTRAS - VNG Gastransport GmbH
Price list
for network access
July 15, 2009
Convenience translation the German text is binding.
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
2
1. Entry and Exit Tariffs Entry and exit tariffs for the respective entry and exit points are calculated on the basis of the prices in the following tables: Entry Point Tariff [EUR/(kWh/h)p.a.]
BioEnergiePark Güstrow 2.23
Deutschneudorf 2.18
E.ON Hanse Kraak storage facility 7.17
UGS Peckensen 3.12
Groß Köris 1.46
Kamminke Entry 1.14
Steinitz 3.12
Bernburg underground storage facility 1.67
Buchholz underground storage facility 1.92
Bad Lauchstädt underground storage facility 2.16
Kirchheilingen underground storage facility 2.71
Kienbaum 1.62
Mallnow 0.18
Exit Point
Tariff Zone
Tariff [EUR/(kWh/h)p.a.]
plus specific biogas
redistribution levy according Nr. 5.1. b) Abs. 2 Satz 2
appendix 4 KoV III [EUR/(kWh/h)p.a.]
Deutschneudorf-Exit 1.87 -
DREWAG Zone Zone 1 3.20 0.22
E.ON avacon Zone Zone 3 1.80 0.22
E.ON edis Zone Zone 5 5.90 0.22
E.ON Hanse Kraak storage facility 4.22 -
E.ON Hanse Zone Zone 5 5.90 0.22 UGS Peckensen underground storage facility 0.88 -
EMS Zone Zone 3 1.80 0.22
ENSO Zone Zone 1 3.20 0.22
ETG Zone Zone 4 2.50 0.22
EV Schwarze Elster Zone Zone 1 3.20 0.22
EWA Zone Zone 3 1.80 0.22
EWE Zone 1.34 0.22
EWP Zone Zone 2 2.50 0.22
Gubin 4.43 -
GV Görlitz Zone Zone 1 3.20 0.22
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
3
GV Vorpommern Zone Zone 5 5.90 0.22
Köthen Zone Zone 3 1.80 0.22
Lasow 4.43 -
MITGAS BTG Zone Zone 3 1.80 0.22
MITGAS Zone 1 Zone 3 1.80 0.22
MITGAS Zone 2 Zone 3 1.80 0.22
NAP Ahrensfelde I Zone 2 2.50 0.22
NAP Bernburg Zone 3 1.80 0.22
NAP Bitterfeld II Zone 3 1.80 0.22
NAP Böhlen Zone 3 1.80 0.22
NAP Burggraf-Bernsdorf Zone 3 1.80 0.22
NAP Coswig II Zone 1 3.20 0.22
NAP Crimmitschau Zone 4 2.50 0.22
NAP Dampferzeuger Anlage Areal A Zone 3 1.80 0.22
NAP Dresden Zone 1 3.20 0.22
NAP Eisenhüttenstadt Zone Zone 2 2.50 0.22
NAP Frömmstedt Zone 4 2.50 0.22
NAP Gasturbine Wolfen Zone 3 1.80 0.22
NAP Gräfenhainichen Zone 2 2.50 0.22
NAP Hennigsdorf II Zone 2 2.50 0.22
NAP Kirchmöser Zone 2 2.50 0.22
NAP Lenz Zone 1 3.20 0.22
NAP Marienehe Zone 5 5.90 0.22
NAP Meerane Zone 4 2.50 0.22
NAP Merseburg Zone Zone 3 1.80 0.22
NAP Mosel Zone 4 2.50 0.22
NAP Nünchritz Zone 1 3.20 0.22
NAP Obertopfstädt Zone 4 2.50 0.22
NAP Radebeul Friedrich-List-Str. Zone 1 3.20 0.22
NAP Schkopau Zone 3 1.80 0.22
NAP Schwarze Pumpe Zone 1 3.20 0.22
NAP Schwarzheide I Zone 1 3.20 0.22
NAP Schwarzheide II Zone 1 3.20 0.22
NAP Spreetal Kraftwerk Zone 1 3.20 0.22
NAP Staßfurt Zone 3 1.80 0.22
NAP Thyrow Zone 2 2.50 0.22
NAP Torgau Zone 3 1.80 0.22
NAP Wittenberg Zone Zone 3 1.80 0.22
NAP Wolfen II Zone 3 1.80 0.22
NBB Zone 1 Zone 2 2.50 0.22
NBB Zone 2 Zone 2 2.50 0.22
NBB Zone 3 Zone 2 2.50 0.22
NG Halle NAP Zone 3 1.80 0.22
NG Halle Zone Zone 3 1.80 0.22
NG Schwerin Zone Zone 5 5.90 0.22
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
4
NGC Zone Zone 4 2.50 0.22 ONTRAS-envia INFRA Chemiepark Areal A Zone 3 1.80 0.22 ONTRAS-EW Bautzen Neusalzaer Straße Zone 1 3.20 0.22 ONTRAS-GV Eisenhüttenstadt An der B 112 Zone 2 2.50 0.22
ONTRAS-GV Vorpommern Kamminke 2.40 0.22
ONTRAS-MSW Steinweg Zone 1 3.20 0.22
ONTRAS-SÜW Lübben Zone 1 3.20 0.22
ONTRAS-SW Arneburg Zone 3 1.80 0.22
ONTRAS-SW Burg Zone 3 1.80 0.22
ONTRAS-SW Döbeln Eichhardt Zone 3 1.80 0.22
ONTRAS-SW Senftenberg Peickwitz Zone 1 3.20 0.22
ONTRAS-TWN Henne Zone 4 2.50 0.22
ONTRAS-VB Hoyerswerda Bergen Zone 1 3.20 0.22
PVU Zone Zone 2 2.50 0.22
REDINET Zeitz Zone Zone 3 1.80 0.22
SL Wittenberg Zone Zone 3 1.80 0.22
SpreeGas Zone Zone 1 3.20 0.22
Stadtwerke Freiberg Zone Zone 4 2.50 0.22
Steinitz 0.88 -
Südsachsen Netz Zone Zone 4 2.50 0.22
SÜW Luckau-Lübbenau Zone Zone 1 3.20 0.22
SW Bernau Zone Zone 2 2.50 0.22
SW Elbtal Zone Zone 1 3.20 0.22
SW Finsterwalde Zone Zone 1 3.20 0.22
SW Güstrow Zone Zone 5 5.90 0.22
SW Haldensleben Zone Zone 3 1.80 0.22
SW Leipzig Zone Zone 3 1.80 0.22
SW Neustrelitz Zone Zone 5 5.90 0.22
SW Riesa Zone Zone 1 3.20 0.22
SW Rostock Zone Zone 5 5.90 0.22
SW Spremberg Zone Zone 1 3.20 0.22
SW Stendal Zone Zone 3 1.80 0.22
SW Zittau Zone Zone 1 3.20 0.22
SWM Zone Zone 3 1.80 0.22
TEN Zone Zone 4 2.50 0.22 Bad Lauchstädt underground storage facility 0.80
-
Bernburg underground storage facility 0.83 -
Buchholz underground storage facility 0.95 - Kirchheilingen underground storage facility 1.78
-
Verpachtung E.ON Hanse Zone 5 5.90 0.22
Wendorf Zone 5 5.90 0.22
ZEV Zone Zone 4 2.50 0.22
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
5
a) The entry and exit tariffs include charges for system services pursuant to § 5, section 1 of the gas network access regulation (GasNZV) and for metering and billing pursuant to § 13, section 3, phrase 4 of the gas network tariffs regulation (GasNEV). This does not apply for new equipment required to implement substitute nomination procedures.
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
6
Overview of the tariff zones:
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
7
b) The following tariff factors apply for booked capacity held for monthly, quarterly and semi-annual reservation periods:
Factor
Reservation period
monthly quarterly semi-annually
October 0.20
November 0.20
December 0.30
0.60
January 0.30
February 0.30
March 0.20
0.75
1.00
April 0.10
May 0.10
June 0.10
0.30
July 0.10
August 0.10
September 0.10
0.30
0.60
c) The tariff factor for a weekly reservation period is 40 % of the respective
monthly tariff as listed in the above table. The month on which the calculation of the tariff factor for a weekly reservation period is based on is determined by the first day of the week on which the reservation period begins. A gas week is defined as the period from Monday, 6.00 a.m. to Monday, 6.00 a.m. of the following week.
d) The tariff factor for a daily reservation period is 10 % of the respective
monthly tariff as listed in the above table. A gas day is defined as the period from 6.00 a.m. on one day until 6.00 a.m. on the following day.
e) The ceiling for tariffs determined by the factors set out in this section b) is
determined by the tariffs for the next longer reservation period, i.e. a capacity booking for a reservation period of three or four weeks is no more expensive than the respective tariff for a monthly reservation period.
f) The following discounts are granted on entry and exit tariffs for long-term
capacity bookings by shippers:
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
8
Contract term Discount
5 years 10 %
6 years 12 %
7 years 14 %
8 years 16 %
9 years 18 %
10 years 20 %
11 years and beyond 22 %
2. Tariff for Interruptible Capacity The tariff for interruptible capacity corresponds to the entry and exit tariffs pursuant to Section 1 above. In the event of an interruption, ONTRAS will refund the shipper 1.5 times the entry or exit tariff applicable for the period during which transportation was interrupted, but no more than 95 % of the monthly capacity charge. In the case of entry and exit contracts with a term of less than one month, the maximum refund shall be 95 % of the entry or exit charge for the period concerned. 3. Charge for Utilization of the Virtual Trading Point A charge of 0.001 EURcent/kWh is charged for gas quantities transferred between balancing groups via the virtual trading point. 4. Short-Haul Tariff ONTRAS offers a short-haul tariff of 0.24 EUR/(kWh/h) p. a. for the route Steinitz – underground storage facility UGS Peckensen. For using the short-haul tariff it is necessary to book the capacities on www.marktgebiete.com. ONTRAS has to be informed that the short-haul tariff should be used. The short-haul capacities must be included in a separate balancing group contract. Neither the Virtual Trading Point nor any other entries or exits may be included in this banlancing group. The technical capacity on the short haul Steinitz - UGS Peckensen is 899,489 kWh/h. Interruptible capacities up to maximum of 899,489 kWh/h at entry Steinitz for the short-houl UGS Peckensen are treated as firm capacities.
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
9
5. Counter-current capacities ONTRAS offers counter-current capacities on an interruptible basis at the following stations:
Exit station Charge in EUR/(kWh/h)p.a.
Groß Köris 0.88
Kienbaum 0.97
Entry station Charge in EUR/(kWh/h)p.a.
Lasow 2.66
6. Penalty for Booked Capacity Overrun The penalty (V) incurred by the shipper for each overrun of booked capacity pursuant to § 41, number 5 of the Network Access Conditions is determined as follows:
V = (TN-TG) x Sd x F
where V: penalty [EUR/d] TN: used capacity [kWh/h] TG: booked capacity pursuant to §§ 11 resp. 13 Network Access conditions [kWh/h] TN-TG: capacity overrun [kWh/h] Sd: specific tariff for the gas day [EUR/(kWh/h)/d] F: factor The specific entry/exit tariff (Sd) for a gas day is calculated as follows as a function of the billing month: Sd = Sa x Fd Sa: specific entry/exit tariff for a year [EUR/(kWh/h)p.a.] Fd: tariff factor for a daily reservation period The factor F is determined as follows as a function of used capacity (TN): F = 2 where TG < TN < TG x 1.04 F = 4 where TG x 1.04 < TN < TG x 1.10 F = 8 where TG x 1.10 < TN
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
10
Booked capacity overrun(s) exceeding 4 % will be calculated on a pro-rata basis using the factors specified above. Only one penalty will be charged in the event of several capacity overruns in any single gas day. In this case, the applicable penalty is determined by the highest capacity overrun on the respective gas day. 7. Charges for substitute nomination procedure
The balancing group manager shall pay the following charges for the time offset procedure:
a) One-off setting-up charges:
Service Charge in EUR
Setting-up of time offset procedure 2,000.00 per balancing group including six exit points
Setting-up of further exit points 165.00 for each additional exit point
Setting-up of data polling by land line
365.00 per exit point
Setting-up of data polling by mobile phone
365.00 per exit point
Setting-up of data polling and measurement point
970.00 per exit point
b) Monthly charges:
Service Charge in EUR
Data polling by land line 260.00 per exit point
Data polling by mobile phone 330.00 per exit point
Data polling including measurement point set-up
425.00 per exit point
1,000.00 per balancing group Implementation of substitute nomination procedure
330.00 per exit point
8. Hourly allocation data for network connection points
The balancing group manager shall pay the following charges for hourly allocation data for
network connection points:
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
11
a) One-off set-up charges:
Service Charge in EUR
Setting-up of data polling by land line
365.00 per exit point
Setting-up of data polling by mobile phone
365.00 per exit point
Setting-up of data polling and measurement point
970.00 per exit point
b) Monthly charges:
Service Charge in EUR
Data polling by land line 260.00 per exit point
Data polling by mobile phone 330.00 per exit point
Data polling including measurement point set-up
425.00 per exit point
Implementation of allocation data provision
55.00 per exit point
9. Charge for Ex-Post-Balancing A charge of 0.001 EURct/kWh is payable for the absolute value of gas quantities transferred between balancing groups under ex-post-balancing. 10. Charge for balancing entry and exit differences between balancing groups The balancing group manager of the invoicing balancing group shall pay a non-recurring charge of 500.00 EUR for setting up an invoicing and subordinate balancing group. 11. Charge for balancing between market areas The balancing group manager shall pay an implementation charge of 750.00 EUR for balancing between market areas. Furthermore, the balancing group manager shall pay a charge of 0.001 EURct/kWh on the sums due for the hourly differences in quantities balanced between market areas.
ONTRAS - VNG Gastransport GmbH Price List from July 15, 2009
12
12. Balancing energy charges
The reference prices to be used for calculating balancing energy charges in accordance with
Article 27 Annex 3 CoA III are available at www.eex.com or www.apxgroup.com.
13. Variable structuring charge Structuring charges are published in each case ten working days before the beginning of the next transport month. 14. Control energy levy
The current control energy levy of ONTRAS is published on the Internet at www.ontras.com.