Project: Online Bus Reservation System
ONLINE BUS RESERVATION SYSTEM
SOUMITH CHUNCHU
SUBJECT : SOF501_7DFC
DATE : 12/17/2015
1
Project: Online Bus Reservation System
Content
S.NO Topic Page No1 Abstract 22 Project Integration Management 33 Project Scope Management 44 Work Breakdown Structure(WBS) 55 Project Cost Management 5 6 Project Time Management 8 7 Gantt Chart 88 Network Diagram 8 9 Project Quality management 1010 HR Management 1011 Procurement Management 1212 Stakeholder management 1313 Communication Management 20 14 Risk Management 2115 Use cases and Use Case Diagram 22 16 Test case design and Description 5117 Conclusion 60
18 References 61
2
Project: Online Bus Reservation System
Abstract
Now-a-days substantial numbers of people prefer bus transportation. Because of the
increasing
traffic and pollution in every country. Especially in India travelling through bus is a rapidly
growing business. Because India is the country with second highest population in the world.
In
India manual bus reservation system is in existence. It consumes lots of time to the
passengers.
Due to this reason a productive system is to be proposed in this paper to solve the issue of bus
reservation. The system is a web based online system and allows the passengers to check the
availability of buses, booking tickets online, availability of seats, timings of buses,
cancellation
of tickets. By using this system people can book tickets from any part of the country though
internet. This provides people an easy and faster way of reserving tickets for bus
transportation.
The online bus ticket reservation system (ORBS) can be used in many countries throughout the
world where there is manual reservation system. In this system validation of user is done in a
secure and efficient way. ORBS provides a group of works with interface environments. Also
there will be a database which will keep all the records that done by user while visiting the
page.
ORBS is connected with a company server database, thus no more connection with other
systems
is needed. In this paper the proposed reservation system for booking tickets online is built by
using java script, PHP, html, SQL and cascading style sheet.
Keywords: bus reservation, passengers, transportation, India
3
Project: Online Bus Reservation System
Project Integration Management: Project integration management includes initiation,
planning, execution, monitoring, and closing of the project.
Initiation: The Initiating Process Group is an essential step in completing your process. This
is the phase where you define your project and obtain authorization to complete your goals.
Planning: Project Planning Phase is to identify and document scope, business requirements,
tasks, schedules, costs, risk, quality, and staffing needs.
Execution: It is the execution of plans, processes, and procedures summarized and referenced
in the Project Plan. Particular attention is paid to the production and quality of the project.
Monitoring: The Monitoring and Controlling process oversees all the tasks and metrics
necessary to ensure that the approved and authorized project is within scope, on time, and on
budget so that the project proceeds with minimal risk.
Closing: The Closing phase includes all the activities necessary for the project are completed
and closing of the project.
4
Project: Online Bus Reservation System
Project Scope Management:
Our System will manage records of all users. Provides facilities for customers to reserve seats.
All details of the customers are collected. Design of a system that will benefit to operators and
passengers of all categories in traveling bus. Develop a cost effective, efficient and user
friendly graphic interface for bus reservation system. Provides timely and accurate report of
bus operational delay and other road mishaps. To perform the task of bus seat reservation
efficiently and effectively. Administrator will to generate and update the various types of
information and perform the reservation.
1. Analyzing the existing system
2. Manage record of all our users.
3. Provides facilities for customers to reserve seats.
4. All details of the customers are collected.
5. Design of a system that will benefit to operators and passengers of all categories in
5
Project: Online Bus Reservation System
traveling bus.
6. Develop a cost effective, efficient and user friendly graphic interface for bus reservation
system.
7. Provides timely and accurate report of bus operational delay and other road mishaps.
8. To perform the task of bus seat reservation efficiently and effectively.
9. To generate and update the various types of information and perform the reservation.
WORK BREAKDOWN STRUCTURE (WBS):-
Project Cost Management:
Managing the product cost is a major task in the project undertaking process. Because the
project must be completed within the given budget. Cost estimation is made at the initiation of
the project. An efficient product should be produced within the given budget. Project cost
estimation is done through COCOMO.
6
Project: Online Bus Reservation System
Project Cost Estimation by using COCOMO’81 (Constructive Cost Model)
Basic COCOMO
Type Effort Schedule
Semi PM= 2.4 (KLOC)1.05 TD= 2.5(PM)0.38
PM= person-month (effort)
KLOC= lines of code, in thousands
TD= number of months estimated for software development (duration)
Effort Estimation:
Assuming that the project is consist of 5,000 source lines of code
Effort = 2.4* (5)1.05 = 13 Person-Months
COCOMO estimates that 13 Person-Months of effort is required to complete it.
Project /product Costing:-
Type of component Complexity of
Components
Lo Avera
g
e
Hig Tot
External inputs 5 1 0 6
External outputs 2 1 0 3
External inquiries 2 2 0 4
Internal logical file 3 2 5
External interface
files
3 2 0 5
7
Project: Online Bus Reservation System
Total no of un adjusted Function points 23
Function point Analysis:-
Calculate Fi's Value
Data communications 2
Distributed data
processing
3
Performance 4
Heavily used
configuration
3
On-Line data entry 3
End-user efficiency 5
On-Line update 5
Complex processing 3
Reusability 4
Operational ease 5
Multiple sites 0
Facilitate change 3
Total 40
To compute function points (FP), the following relationship is used:
FP est. = Count Total * [0.65+ 0.01 *(Fi)]
= 23 * [0.65 + 0.01 * 40]
= 24.15
Project Time management:
8
Project: Online Bus Reservation System
Time for the project is based on the requirement of the customer. A clear schedule is prepared
between the projects initiations to termination to deliver the project to the costumer within the
given time. In some case to increase the deliverability some changes are made to the planned
schedule of the project. Duration of the project is estimated by using:-
Duration Estimation:
The duration of a project is based on the effort predicted by the effort equation:
TD = 2.5 * (Effort) 0.38
TD=2.5 * (13)0.38 =7 Months
Gantt chart:
NETWORK DIAGRAM:
Critical Path Identification Table:
9
Project: Online Bus Reservation System
Determining the following six parameters for each activity which can identify the critical
path:
ES: earliest start time
ES (K) = max [EF (J) J is an immediate predecessor of K]
EF: earliest finish time
EF (K) = ES (K) + Duration (K)
LF: latest finish time
LF (K) = min [LS (J): J is a successor of K]
LS: latest start time
LS (K) = LF (K) – Duration (K)
TS: Total Slacks
TS (K) = LS (K) – ES (K)
FS: Free Slack
FS (K) = min [ES (J): J is successor of K] – EF (K)
Activity Duration ES EF LS LF TS FS
A 5 0 5 0 5 0 0
B 3 0 3 3 6 3 0
C 8 5 13 5 13 0 0
D 7 5 12 6 13 1 2
E 7 0 7 6 13 6 0
F 4 13 17 13 17 0 6
G 5 17 22 17 22 0 0
The parameters and slacks are calculated as follows:
The critical path is: A, C, F, and G
Project Quality Management:
10
Project: Online Bus Reservation System
Maintaining the quality of the product that is delivered is one of the main function. The
product should satisfy the requirements of the customer including the standard of quality
required for the costumer. Quality of the product is tested by employing:-
ISO 15504 (Software Process Improvement and Capability Determination or SPICE)
ISO 9000
HR Management:
Human resource management follows the recruitment of candidates required for the
completion of the project. Human resource manager should review the resumes of the
candidates and select the candidates required for the project. HR manager recruit the
candidates basing on skills, experience, and requirement of the project.
Allocation of People to Activities:
11
Project: Online Bus Reservation System
Days
Members
Name
Rahul
Nitesh
Soumith
Muqeet
Shahab
OBS:
12
Project: Online Bus Reservation System
Activity Bar Chart
+
Procurement Management:
13
Project: Online Bus Reservation System
It is a process of acquiring the required equipment and tools that are required for the project
undertaken. Following processes are included in the procurement management:-
Identify the goods and services to procure.
Complete Purchase Orders and issue to suppliers.
Agree on delivery timeframes and methods.
Receive goods and services from suppliers.
Review and accept the items procured.
Approving the supplier payments.
Hardware and Software Specification:
RAM 64 MB
Processor 1 GHz
Operating System Windows
Type 32bits, 64bits.
Tools and technologies Used
Language: PHP, HTML, CSS, JavaScript, AJAX , J Query.
Tools :- Notepad++, Dreamweaver, XAMPP.
Stakeholder management:
Stakeholders are the people involved in the project directly or indirectly. In our project
stakeholders directly involved are the customers (DAEWO COUSTMERS). Stakeholders
involved in the project indirectly are the people who use the OBRS. Managing the
Stakeholder is an important task because it provides the up-to-date requirements of the
project. Necessary changes should be made to the project at some stages by considering the
requirements of the stakeholder. Steps followed in stakeholder management is as following:-
Identify Stakeholders
14
Project: Online Bus Reservation System
Sample Stakeholder Analysis
Classify Stakeholder Positions
Determine Stakeholder Management Approach
Designing the requested deliverables
Stakeholder Initial Requirements:
Para Initial Requirements
1.0 Administration login.
1.0 Administration logout.
1.0 A customer “shall” visit himself to the system for buses and ticket information
1.0 A client shall requests for a ticket he needed
1.0 Feedback from users
1.0 System shall update the client Request.
1.0 A unique seat number shall be issued for every individual passenger.
1.0 A system will view the passenger information.
2.0 A system will search the seats.
2.0 A system will accept or reject the client request.
2.0 A system will generate confirmation message
2.0 The System “shall” generate an action event for a corresponding administrator when a
request is placed for updating of passenger details etc
2.0 Corresponding administrator “shall ” view his Action List containing different
actions, and correspondingly process these pending actions
Allocate requirements
Para Initial Requirements Use Case Name
15
Project: Online Bus Reservation System
1.0 Administration login. UC_ login
1.0 Administration logout. UC_ logout
1.0 A customer “shall” visit himself
to the system for buses
and ticket information
UC_Information_Request
1.0 Feedback from users UC_ feedback
1.0 A client shall requests for a
ticket he needed.
UC_Place_Order_Request
1.0 System shall update the client
Request
UC_update_request
1.0 A unique seat number shall be
issued for every
individual passenger.
UC_Number_seats_Request
1.0 A system will view the
passenger information
UC_View_Request
2.0 A system will search the seats. UC_search_request
2.0 A system will accept or reject
the client.
UC_accept_Request
UC_reject_Request
2.0 A system will generate
confirmation message
UC_Number_conformtion_messae_Request
2.0 The System “shall” generate an
action event for a
corresponding
administrator when a
request is placed for
updating of passenger
details etc
UC_create_action
16
Project: Online Bus Reservation System
2.0 Corresponding administrator
“shall ” view his Action
List containing different
actions, and
correspondingly process
these pending actions
UC_view_action
Prioritize requirements
Par Rank Initial
Requir
ements
Use
C
a
s
e
I
D
Use Case Name
1.0 Highest Administration
login.
UC_1 UC_ login
1.0 Highest Administration
logout.
UC_2 UC_ logout
1.0 Highest A customer
“shall”
visit
himself
to the
system
for
UC_3 UC_Information_Request
17
Project: Online Bus Reservation System
buses
and
ticket
informa
tion
1.0 Highest A client shall
request
s for a
ticket
he
needed.
UC_4 UC_Place_Order_Request
1.0 Highest System shall
update
the
client
Reques
t
UC_5 UC_update_request
1.0 Highest A unique seat
number
shall be
issued
for
every
individ
ual
passeng
er.
UC_6 UC_Number_seats_Request
1.0 Mediu
m
Feedback from
users
UC_7 UC_ feedback
1.0 Mediu
m
A system will
view
UC_8 UC_Update_Request
18
Project: Online Bus Reservation System
the
passeng
er
informa
tion
2.0 Mediu
m
A system will
search
the
seats.
UC_9 UC_search_request
2.0 Mediu
m
A system will
accept
or
reject
the
client.
UC_10 UC_accept_Request
UC_reject_Request
2.0 Mediu
m
A system will
generat
e
confirm
ation
receipt
UC_11 UC_Number_conformaion__Requ
est
2.0 Low The System
“shall”
generat
e an
action
event
for a
corresp
onding
UC_12 UC_create_action
19
Project: Online Bus Reservation System
adminis
trator
when a
request
is
placed
for
updatin
g of
passeng
er
details
etc
2.0 Low Corresponding
adminis
trator
“shall ”
view
his
Action
List
contain
ing
differen
t
actions,
and
corresp
ondingl
y
process
UC_13s
s
UC_view_action
20
Project: Online Bus Reservation System
these
pendin
g
actions
Requirements Traceability Matrix:
Sr# Para System Specification
Text
Build Use Case Name Category
1 1.0 A customer “shall” visit
himself to the
system for buses
and ticket
information
B1 UC_Information_Request Business
2 1.0 A client shall requests for
a ticket he
needed.
B1 UC_Place_Order_Request Business
3 1.0 System shall update the
client Request
B1 UC_update_request
Business
4 1.0 A unique seat number
shall be issued for
every individual
passenger.
B1 UC_Number_seats_Request
Business
5 1.0 A system will view the
passenger
information
B1 UC_Update_Request Business
6 2.0 A system will search the
seats.
B1 UC_search_request Business
7 2.0 A system will accept or B1 UC_accept_Request Business
21
Project: Online Bus Reservation System
reject the client
request.
UC_reject_Request
8 2.0 A system will generate
confirmation
message.
B1 UC_Number_recipient_Request Business
9 2.0 The System “shall”
generate an action
event for a
corresponding
administrator
when a request is
placed for
updating of
passenger details
etc
B1 UC_create_action Business
10 2.0 Corresponding
administrator
“shall ” view his
Action List
containing
different actions,
and
correspondingly
process these
pending actions
B1 UC_view_action Business
Communication Management:
Communication among the employees of the project should be effective. Communication
management involves the following:-
22
Project: Online Bus Reservation System
communication skills
organizational skills
leadership Skills
Team building skills
technology skills
Risk management:
It is a process of identification, analysis and either acceptance or mitigation of uncertainty in
investment decision-making. Risks can be avoided by following the plans that are employed
at the process of initiation of the project. Risks like cost overflow can be avoid by monitoring
the cost throughout the execution process and by preparing a proper estimation cost of the
project.
23
IT Project
Business
Competitors
Suppliers
Cash flow
Technical
Hardware
Software
Network
Organizational
Executivesupport
User support
Team support
ProjectManagement
Estimates
Communication
Resources
Project: Online Bus Reservation System
SCOPE
Primary Actor
Online Bus Reservation System
Administrator, User
Stakeholder & Interest Actor wants accurate processing of login page.
So, that no one else accesses the website actor
panel.
Description The Actor get login into actor panel of website.
Precondition The server is in running state.
Success Guarantee (Post Condition): The actor logged in successfully.
Main Success Scenario: *. The Actor enters user name and password.
*. The username and password is validated from
the database.
*. Create session and bring administrator to actor
panel if the username and password is correct.
Extension: At any time system fails to connect database.
*. System displays an error message.
*. Ask actor to re-enter username and password.
Special Requirement: The process will work well with good internet
speed.
24
Project: Online Bus Reservation System
Use Case UC1: Administrator Login
25
Project: Online Bus Reservation System
26
Use Case UC2: Administrator Logout
SCOPE Online Bus Reservation System
Primary Actor Administrator, System
Stakeholder & Interest Admin logout.
Description The system interacts with queries.
Precondition The server is in running state.
Success Guarantee (Post Condition): The system interacts with request successfully.
Main Success Scenario: *. Admin logout successfully.
Extension: At any time system fails to connect database.
*. System displays an error message.
Special Requirement: The process will work well with good internet
speed.
Project: Online Bus Reservation System
SCOPE Online Bus Reservation System
Primary Actor Administrator, System, User
Stakeholder & Interest Admin login.
Description The system interacts with queries and then show seats.
Precondition The server is in running state.
Success Guarantee (Post Condition): The system interacts with request successfully.
Main Success Scenario: *. Admin login successfully.
Extension: At any time system fails to connect database.
*. System displays an error message.
Special Requirement: The process will work well with good internet speed.
Use Case UC3: View seats
27
Project: Online Bus Reservation System
Use Case UC4: Update seats
SCOPE Online Bus Reservation System
Primary Actor Administrator or System.
Stakeholder & Interest The administrator wants the successful
updated seats record in the database.
Description The system updated record in the database.
Precondition The administrator is logged into admin panel.
Success Guarantee (Post Condition): *. The record is updated in the database.
*. Give message that records updated
successfully.
Main Success Scenario: *. The admin enters admin panel by login.
*. Update the record in record section.
*. The records are saved in the database.
Extension: At any time system fails to connect database.
*. System displays an error message.
*. Ask actor to re-enter username and
password.
Special Requirement: The process will work well with good internet
speed.
28
Project: Online Bus Reservation System
SCOPE Online Bus Reservation System
Primary Actor Administrator
Stakeholder & Interest The administrator wants the successful edited
record in the database.
Description The administrator edited seats record in the
database.
Precondition The administrator is logged into admin panel.
Success Guarantee (Post Condition): *. The record is edited in the database.
*. Give message that records edited
successfully.
Main Success Scenario: *. The admin enters admin panel by login.
*. Edit the record in record section.
*. The records are saved in the database.
Extension: At any time system fails to connect database.
*. System displays an error message.
*. Ask actor to re-enter username and
password.
Special Requirement: The process will work well with good internet
speed.
Use Case UC5: Edit seats
29
Project: Online Bus Reservation System
SCOPE Online Bus Reservation System
Primary Actor User
Stakeholder & Interest The user wants to successfully search the
information from website.
Description The user searches the required information.
Precondition Records/ Information is added in the database.
Success Guarantee (Post Condition): Information is searched successfully and
showed to user.
Main Success Scenario: *. The user enters the keyword of information
in search text box.
*. Press/ Click the search button.
*. Relevant record is fetched from database
and showed to the user.
Extension: At any time system fails to connect database.
*. System displays an error message.
*. Ask actor to re-enter username and
password.
Special Requirement: The process will work well with good internet
speed.
Use Case UC6: Search Information
30
Project: Online Bus Reservation System
SCOPE Online Bus Reservation System
Primary Actor Administrator
Stakeholder & Interest The Administrator wants to successfully delete
the information from website.
Description The Administrator deletes the required
information.
Precondition Records/ Information is deleted from the
database.
Success Guarantee (Post Condition): Information is searched successfully and
showed to administrator.
Main Success Scenario: *. The administrator enters the keyword of
information in search text box.
*. Press/ Click the search button.
*. Relevant record is fetched from database
and showed to the administrator.
Extension: At any time system fails to connect database.
*. System displays an error message.
*. Ask actor to re-enter username and
password.
Special Requirement: The process will work well with good internet
speed.
Use Case UC7: Delete Seats
31
Project: Online Bus Reservation System
SCOPE Online Bus Reservation System
Primary Actor User, Administrator
Stakeholder & Interest Actor wants to view the seats records
available.
Description The actor get login into admin panel of
website.
Precondition The actor successfully logged in.
Success Guarantee (Post Condition): The actor logged in successfully and views the
required seat records.
Main Success Scenario: *. The actor enters the keyword of information
in search text box.
*. Press/ Click the search button.
*. Relevant record is fetched from database
and showed to the actor.
Extension: At any time system fails to connect database.
*. System displays an error message.
*. Ask actor to re-enter username and
password.
Special Requirement: The process will work well with good internet
speed.
Use Case UC8: View Seats Records
32
Project: Online Bus Reservation System
SCOPE Online Bus Reservation System
Primary Actor User, Administrator
Stakeholder & Interest Actor wants to view the routs information
available.
Description The actor get login into admin panel of
website.
Precondition The actor successfully logged in.
Success Guarantee (Post Condition) The actor logged in successfully and views the
required rout information.
Main Success Scenario *. The actor enters the keyword of information
in search text box.
*. Press/ Click the search button.
*. Relevant record is fetched from database and
showed to the actor.
Extension At any time system fails to connect database.
*. System displays an error message.
*. Ask actor to re-enter username and
password.
Special Requirement The process will work well with good internet
speed.
Use Case UC9: Routs Information
33
Project: Online Bus Reservation System
Use cases & Use case Diagrams
34
Project: Online Bus Reservation System
35
Project: Online Bus Reservation System
36
Project: Online Bus Reservation System
37
Project: Online Bus Reservation System
Admin login
In admin panel,firstly admin will give his/her name and password then he/she will get access
to this site.After login he/she will be able to perform some importand function like he/she will
add schedule,view users,view feedback.All these activites will automatically be stored in
database.
38
Project: Online Bus Reservation System
Add Schedule
After login admin will be able to add/delete/edit schedule, like he/she will add/set
sources,destination,depart time,arival time,cost of travels.
39
Project: Online Bus Reservation System
View User
Admin will be able to see users details like user’s name, conic, cell no, source, destination,
depart time, no of seats that user booked. Admin will also be able to cancel booking of users.
40
Project: Online Bus Reservation System
View comment
Admin will be able to see user’s comments (feedback), after reading comments he/she will be
able to delete comments.
41
Project: Online Bus Reservation System
Home page:
This is home page of our website. Different terminals of different cities are shown here.
Facilities in Daewoo are shortly describe for example punctuality, audio/visual entertainment,
luxury buses and luggage etc. Also overview of Daewoo Express is describe.
42
Project: Online Bus Reservation System
Schedule:
At this page schedule of buses are shown. Select source and destination from option and click
on submit button. Then new page open which tells about depart time, arrival time, travel time
and fare.
Services:
Services which are mention on home page, at this page briefly describe. Punctuality,
audio/visual entertainment, luggage and luxury buses.
43
Project: Online Bus Reservation System
Terminals
In this page of our website, we tell about some popular terminals of Daewoo, and also given
brief contact information and address of these terminals one by one.
44
Project: Online Bus Reservation System
Booking
In this module user will do booking of seats by filling this form, like he/she have to select
source, destination, timing, must have to fill no of seats which he/she want to reserve from
available seats, name, mobile no, conic no.
45
Project: Online Bus Reservation System
Feedback
In this module user will be able to give us feedback if he/she want to do, its up to their own
choice either they want to or not.
46
Project: Online Bus Reservation System
About Us
In this user will be able to know our company.
47
Project: Online Bus Reservation System
Document Information
Category Information
Customer All users
Project <Online bus reservation system >
Document Test Plan
Document Version 1.0
Identifier PGBH01-2003-TP
Status Draft
Author(s) <BSSE-F10-008,BSSE-F10-017 >
Approver(s) PM
Issue Date May 01, 2014
Document Location
Distribution
1. Advisor
2. PM
3. Project Office
Definition of Terms, Acronyms and Abbreviations
This section should provide the definitions of all terms, acronyms, and abbreviations required
to interpret the terms used in the document properly.
Term DescriptionOBRS Online bus reservation system
48
Project: Online Bus Reservation System
Purpose of Document
This chapter is intended to deliver a high level overview of “Online Bus Reservation System”.
Software developers, System Engineers and Testers (with a basic knowledge of software;
what is it? how it is generally tested) will benefit from this chapter.
Project Overview
We are developing an Online Bus Reservation System through which people can reserve
seats. Reservation System is an Internet based application that can be access throughout the
Internet and can be access by anyone who has a net connection. OBRS will automate the
reservation of tickets and enquires about availability of the tickets. OBRS includes email
information for the tickets. OBRS provides a group of works with interface environments.
Also there will be a database which will keep all the records that done by user while visiting
the page. OBRS is connected with a company server database, thus no more connection with
other systems is needed.
Scope of Testing
The scope of our test plan is to find and report as many bugs as possible to improve the
integrity of our program. Although exhaustive testing is not possible, we will exercise a broad
range of tests to achieve our goal. We will be testing Online Bus Reservation System that
includes the data entry and data related work. Our user interface to utilize these functions is
designed to be user-friendly and provide easy manipulation of the data.
Test Plan Strategy
These test plans should be able to show all the Online Bus Reservation System functionality
and features defined in the requirements document. For each level of testing, a separate test
plan is prepared with the following set of deliverables:
Test Case Number
Features to be tested
49
Project: Online Bus Reservation System
Items to be tested
Pass / Fail criteria
Input
Output Results
Unit Testing
Definition:
Unit testing means testing in which each function independently verify correct processing in a
standalone environment. Unit Test consists of testing individual programs or subroutines as
they are written instead of testing the entire system after it has been written. The testing of the
smaller building blocks is done first and then these blocks are combined and tested. Unit
testing will be conducted to verify the implementation of each necessary requirement changes.
The requirements will be tested and verified by members only. After any new requirement is
added, unit testing will be done for these features.
Participants:
Developers, Test Team & some other project personnel are involved in unit testing
Methodology:
Initial Unit Test will be conducted by the developers.
As the completed modules are received from the development department, the test team will
start the Unit Test on these modules
Integration Testing
Definition:
Integration testing is to ensure that all interacting subsystems in a system interface correctly
with one another to produce the desired results. Furthermore, in trying to attain this goal,
50
Project: Online Bus Reservation System
integration tests will ensure that the introduction of one or more subsystems into the system
does not have an adverse effect on existing functionality.
Participants
This phase is performed by an independent test team.
Methodology:
Integration tests will be run according to the Integration Test Plans by the Test Team Leader
or Test Team Member.
If any of the actual results do not agree with expected results, the person performing the test
will complete a Problem Report (PR).
After the necessary action has been taken to resolve the problem, the test run will be
performed again from the beginning of the test step .The Test Plan may need to be updated,
depending on the results of the test.
System Testing
Definition:
The goal of System Testing is to ensure that the system performs as per the functional
requirements specified by client. A system test covers the testing of functions within the
system. System testing is performed once integration testing has been completed.
Participants:
System Tests shall be run by the System Testing Team.
Methodology:
a. Verify that the System Test Environment has been created and that it is functional.
b. Execute the system test plan scenarios as assigned to each test team member
c. Create a problem report for deviations from the expected results documented in the
system test plan scenario. Interact with support team to help resolve problem reports.
d. Update the tracking report to reflect test step execution and completion.
Test Environment
The goal is to create a testing environment as close to the development environment as
51
Project: Online Bus Reservation System
possible and to provide an automated black box test suite that can be run when changes are
made to the software. The test environment is the same windows environment used for
software
development. Below are the hardware and software requirements for the test environment.
Hardware
The hardware and network requirements for testing activities are:
Ref Hardware Purpose
1. Any PC where we can
connect to database
To be able to run the prototype of
OBRS
Software
The software requirements for testing activities are:
Ref Software Purpose
1. Windows 2007,2008 etc. The system shall operate in
Windows operating systems
2. SQL Server 2005 For the database server as all the
development will be done in SQL
2005
3. Microsoft VS For designing and developing the
application
52
Project: Online Bus Reservation System
Schedule
Testing Activities Begin End
__________________________________________________________________________
Designing Test Cases 05-10-2015 07-12-2015
Executing Test Cases 08-10-2015 13-12-2015
Unit Testing 07-10-2015 12-12-2015
Integration Testing 14-10-2015 15-12-2015
System Testing 13-10-2015 14-12-2015
Control Activities
Reviews
The project team will perform reviews for each Phase. (i.e. Requirements Review, Design
Review, Code Review, Test Plan Review, Test Case Review and Final Test Summary
Review). A meeting notice, with related documents, will be emailed to each participant.
Bug Review meetings
Regular weekly meeting will be held to discuss reported defects. The development department
will provide status/updates on all defects reported and the test department will provide
addition defect information if needed. All member of the project team will participate. Test
preparation and testing progress will be formally reported during a weekly Status Meeting.
Change Request
Once testing begins, changes to the system are discouraged. If functional changes are
required, these proposed changes will be discussed with the Change Control Board. The
Change Control Board will determine the impact of the change and if/when it should be
implemented.
Defect Reporting
53
Project: Online Bus Reservation System
When defects are found, the testers will complete a defect report on the defect tracking
system. The defect tracking Systems is accessible by testers, developers & all members of the
project team. When a defect has been fixed or more information is needed, the developer will
change the status of the defect to indicate the current state. Once a defect is verified, as
FIXED by the testers, the testers will close the defect report.
This section also indicates when and how the review meetings will be conducted and who
would participate in these activities.
A status report will be prepared by the Test Controller to facilitate this meeting. This report
will contain the following information:-
1. Current Status v. Plan (Ahead/Behind/On Schedule)
2. Progress of tasks planned for previous week
3. Tasks planned for next week including tasks carried from previous week
4. Issues/Risks
Functions to be tested
List of all functions needed to be test. The following scheme is recommended for listing and
description of requirements to be tested.
1.1 Login Functionality
1.2 View Functionality
1.3 Search information Functionality
1.4 Edit Functionality
1.5 Reserve seats functionality
1.6 Feedback functionality
Functions not to be tested
This is a listing of what is 'not' to be tested from the user's viewpoint of what the system does.
This is not a technical description of the software, but a user's view of the functions. Identify
why the feature is not to be tested, there can be any number of reasons. They may include
functions i.e.
54
Project: Online Bus Reservation System
Not to be included in this release of the Software.
Low risks, has been used before and was considered stable.
Will be released but not tested or documented as a functional part of the release of this
version of the software.
According to above mention points, neither there are such functions present in OBRS that
can’t be test, nor function that don’t require testing.
Test Case Design and Description
Summarize the common attributes of test cases.
Test Case ID: 1
Test Case ID: Id # 1 QA Test Engineer
Test case Version: Version # 1 Reviewed By
Test Date: 10-11-2015 Use Case Reference(s)
Revision History No
Objective Whether admin is successfully login or not.
Product/Ver/Module Login of OBRS.
Environment: RAM 64 MB,Processor 1 GHz,Operating System Window ,Type 32bits, 64bits, Window 7
and above
Assumptions: Power failure, testers team are not available, time shorten
Pre-Requisite: Database should be properly connected and in working form
Step No.
Execution description
Procedure result
1
2
3
4
Open OBRS homepage
'Enter Designation, User ID and password and press LOGIN
Button
i.e. Designation= Admin
i.e. User ID= Iqra
Enter Password and press LOGIN Button
i.e. 'Password= 12345
Enter user ID and Password and press LOGIN Button i.e.
'USER ID= XYX & Password = XYZ
Display Warning Message Box "Please
Enter Password"
Display Warning Message Box "Please
Enter User ID "
Display Warning Message Box "Please
Enter Correct User ID and
Password”
55
Project: Online Bus Reservation System
5 For User there is no need to login, he/she can use the site
without login.
……
Comments; In above Test case correct User ID” 123#@!” and password is “ABC”
Passed Failed Not Executed
Test Case ID: 2
Test Case ID: 2 QA Test Engineer
Test case Version: Version # 1 Reviewed By
Test Date: 10-11-2015 Use Case Reference(s) Relation to use case #1
Revision History
No
Objective Whether admin can view users or not.
Product/Ver/Module Registration module Of OBRS
Environment: RAM 64 MB,Processor 1 GHz,Operating System Window ,Type 32bits, 64bits, Window 7
and above
Assumptions: Power failure, testers team are not available, time shorten
Pre-Requisite: Database should be properly connected and manager must be login
Step No.
Execution description
Procedure result
1
2
3
Admin can see users and can take actions.
Admin selects the “View User” option
Enter the action
System displays a view seats page
System display the form
System and admin verifies the form if
it is correct then the
information Is stored. Updated
in the database.
Comments
Passed Failed Not Executed
56
Project: Online Bus Reservation System
Test Case ID: 3
Test Case ID: 6 QA Test Engineer
Test case Version: Version # 1 Reviewed By
Test Date: 15-11-2015 Use Case Reference(s) Relation to use case # 1,2
Revision History No
Objective Test whether Edit functionality working is valid or invalid
Product/Ver/Module Edit module Of OBRS
Environment: RAM 64 MB,Processor 1 GHz,Operating System Windows
Type 32bits, 64bits,Window 7 and above
Assumptions: Power failure, testers team are not available, time shorten
Pre-Requisite: Database & internet should be properly connected.
Step No.
Execution description
Procedure result
1
2
3
Administrator must login
Admin: Select add schedule/view user /view comment
which you want to Edit
Enter Ok button
There form open
System displays a form
Enter new details
Comments:
Passed Failed Not Executed
Test Case ID: 4
Test Case ID: 4 QA Test Engineer
57
Project: Online Bus Reservation System
Test case Version: Version # 1 Reviewed By
Test Date: 15-11-2015 Use Case Reference(s) Relation to use case # 1,2
Revision History No
Objective Test whether the user can easily search schedule and seat information
Product/Ver/Module Search module Of OBRS
Environment: RAM 64 MB,Processor 1 GHz,Operating System Window ,Type 32bits, 64bits, Window 7
and above
Assumptions: Power failure, testers team are not available, time shorten
Pre-Requisite: Database & internet should be properly connected.
Step No.
Execution description
Procedure result
1
2
User can see services and terminal information
User : Search pages from menu
Select “Search” option from the menu
Relevant pages will be open
Site display pages
Comments:
Passed Failed Not Executed
Test Case ID: 5
Test Case ID: 5 QA Test Engineer
Test case Version: Version # 1 Reviewed By
Test Date: 17-11-2015 Use Case Reference(s) Relation to use case # 1,2
Revision History No
Objective Test reservation seat functionality work properly or not
Product/Ver/Module Reserve seat module of OBRS
Environment: RAM 64 MB,Processor 1 GHz,Operating System Window ,Type 32bits, 64bits, Window 7
and above
Assumptions: Power failure, testers team are not available, time shorten
58
Project: Online Bus Reservation System
Pre-Requisite: Database & internet should be properly connected.
Step No.
Execution description
Procedure result
1
2
User will see schedule
User will do booking according to schedule
There form open
System displays a form
Comments:
Passed Failed Not Executed
Test Case ID: 6
Test Case ID: 6 QA Test Engineer
Test case Version: Version # 1 Reviewed By
Test Date: 17-11-2015 Use Case Reference(s) Relation to use case # 1,2
Revision History No
Objective Test whether Feedback functionality working is valid or invalid
Product/Ver/Module Feedback module Of OBRS
Environment: RAM 64 MB,Processor 1 GHz,Operating System Window ,Type 32bits, 64bits, Window 7
and above
Assumptions: Power failure, testers team are not available, time shorten
Pre-Requisite: Database & internet should be properly connected.
Step No.
Execution description
Procedure result
1
2
3
User will give feedback
Enter Name
Enter Suggestion
Click on Submit button
There form open
Success message shows
59
Project: Online Bus Reservation System
Comments:
Passed Failed Not Executed
Traceability Matrix
<Test case name/Id>
Sr.
no.
Requirement ID Use Case ID GUI ID Test case ID Status Date
Completed1
2
3
4
5
6
Requirement #1
Requirement #2
Requirement #3
Requirement #4
Requirement #5
Requirement #6
use case #1
use case #2
use case #3
use case #4
use case #5
use case #6
GUI ref# 1
GUI ref#2
GUI ref#3
GUI ref#4
GUI ref#5
GUI ref#6
Test case ID#1
Test case ID#2
Test case ID#3
Test case ID#4
Test case ID#5
Test case ID#6
Complete
Complete
Complete
Complete
Complete
Complete
10-05-2014
10-05-2014
10-05-2014
15-05-2014
17-05-2014
17-05-2014
Major Deliverables
This section lists what will be delivered at the end of the test phase, such as:
Test plan
Test cases
Test summary report
Risks and Assumptions
60
Project: Online Bus Reservation System
Below are the issues that may affect the development and operation of the test plan, e.g.
communications, security, training.
Ref Issue Action
1. Testing Group needs to be
trained.
Requirements will be explained to
the testing group.
2. Testing Group needs to be
trained on security
processes check.
Security is an important component
of this prototype. Testing group
needs to be training on security
processes and Web services.
Assumptions
All assumptions regarding the test plan are below.
Ref Assumption Impact
1. Database SQL Server
2005 is running and
system tables are
installed.
To be able to access OBRS
system tables and process
requests.
2. All testers have database
connectivity.
To be able to test some of the test
cases.
3 Testers have username
and passwords setup for
by administrators.
Login pages will be required for
tester. To be able to test some test
cases.
Dependencies
The main dependencies of our system regarding the plan are:
61
Project: Online Bus Reservation System
Ref Dependency Action
1. Database availability. Required tables and process will be
setup from the database server for
tester to be able to access.
Exit Criteria
The Exit Criteria detailed below must be achieved before the software can be recommended
for promotion to Acceptance status. Furthermore, it is recommend that there be a minimum 2
days effort for Final Integration testing AFTER the final fix/change has been retested.
All High Priority errors from System Test must be fixed and tested.
All functions identified in the requirement document are present and working.
No more than three medium priority problems open.
If any medium or low-priority errors are outstanding - the implementation risk
must be signed off as acceptable by Business Analyst and Business Expert
Project Integration Test must be signed off by Test Controller and Business
Analyst.
Business Acceptance Test must be signed off by Business Expert.
62
Project: Online Bus Reservation System
Conclusion
Daewoo is Online Bus reservation System which provides online reservation of bus.
This system is user friendly and accurate.
This system is available 24 hours and efficient in reservation.
It has no hidden costs in fares.
63
Project: Online Bus Reservation System
References
Frame, J. Davidson, Managing Projects in Organizations: How to Make the Best Use of Time,
Techniques, and People, 3rd edition, Jossey-Bass, 2003
Kerzner, Harold, Project Management: Project Management: A Systems Approach to
Planning, Scheduling, and Controlling, 10th edition, Wiley, 2009
Larson, Elizabeth and Richard, Requirements Management, Part 1: Requirements Planning,
Watermark Learning, Inc., 2009
Lewis, James, The Project Manager's Desk Reference, 3rd edition, McGraw-Hill, 2006
Martin, Paula, Tate, Karen, the Project Management Memory Jogger: A Pocket Guide for
Project Teams, GOAL/QPC, 1997
Meredith, R. Jack and Mantel, Jr., Samuel J., Project Management: A Managerial Approach,
7th edition, Wiley, 2008
64