THE ONBOARDING PROCESS
2
PARTICIPATION REQUEST
https://emvo-medicines.eu/pharmaceutical-companies/obp-portal/
ON-BOARDING PARTNER PORTAL
4
Step 2: Participation Agreement + Detailed information
Step 3: Approvals
Step 1: Provide Initial Information
Step 4: Technical On Boarding
STEP 1: PROVIDE INITIAL INFORMATION
5
Estimated time to complete
To add or modify the requested information
Trigger step 1:Successful Request to Participate
Status: Not StartedIn ProgressComplete
Optional step
ON-BOARDING PARTNER PORTAL
6
Step 2: Participation Agreement + Detailed information
Step 3: Approvals
Step 1: Provide Initial Information
Step 4: Technical On Boarding
STEP 2: DETAILED INFORMATION AND PARTICIPATION AGREEMENT
7
Download General Info Pack
Status: Not StartedAwaiting ApprovalApprovedRejected
Status: Not StartedCompleted
Status: Not StartedCompletedA sample of the PA is available on our website in its download section.
View and Download prefilled ParticipationAgreement (PA)
Trigger step 2:Successful Initial Information andAuthorise Representative copy of proof
PARTICIPATION AGREEMENT
8
Participation of the OBP in the Onboarding Project
Access to Software Development Kits
Right to Develop an OBP Interface
Right to upload data to the EU HUb
Usage of the EMVO Gateway
The Participation Agreement (PA)
ON-BOARDING FEE
9
One-Time Fee per OBP
Early Bird on-boarding Fee From the 15th of January 2018 From the 15th of June 2018
OBP with > 12 MAHs € 20,000.00 € 30,000.00 € 45,000.00
OBP with 6 to 12 MAHs € 10,000.00 € 15,000.00 € 22,500.00
OBP with 3 to 5 MAHs € 8,000.00 € 12,000.00 € 18,000.00
OBP With 2 MAHs € 6,000.00 € 9,000.00 € 13,500.00
OBP with 1 MAH € 3,000.00 € 4,500.00 € 6,750.00
+50% +50%
2.8 CONFIRM ALL INPUTTED INFORMATION
10
By clicking on theConfirm button the SPOC confirms theaccuracy of theinformation provided on theportal.This triggers theLegitimacyCheck.
LEGITIMACY CHECK
11
o Around 50 parameters checked
o Direct and indirect checks are conducted
o Outsourced: conducted totally independently from EMVO –ensuring efficiency, accuracy and objectivity
ON-BOARDING PARTNER PORTAL
12
Step 2: Participation Agreement + Detailed information
Step 3: Approvals
Step 1: Provide Initial Information
Step 4: Technical On Boarding
STEP 3: APPROVALS
13
Status: Not StartedPassedFailed
Trigger step 3:Step 2 completed andconfirm button pressed.
Status: Not StartedAwaiting hardcopySent back on xx:xx:xxxx
Status: No StatusAwaiting paymentPayment received
ON-BOARDING PARTNER PORTAL
14
Step 2: Participation Agreement + Detailed information
Step 3: Approvals
Step 1: Provide Initial Information
Step 4: Technical On Boarding
STEP 4: TECHNICAL ON-BOARDING
15
Purpose:
1. Facilliate all technical documentation
2. Generate Connection Pack to enable a connectionto the EU HUB
3. Perform basic tests to the OBP’s interface
STEP 4: TECHNICAL ON-BOARDING
16
Trigger step 4:• Step 3 completed
STEP 4.1 TECHNICAL INFOPACK
17
All necessary Technical Documentation to establish a Connection to the EU Hub is available in this step
Status: Not StartedCompleted
STEP 4.1 TECHNICAL INFOPACK - OVERVIEW
18
STEP 4.2.1 CONNECTION DETAILS
19
Provide information about the interface used to connect to the EU Hub
STEP 4.2.1 CONNECTION DETAILS
20
STEP 4.2.1 CONNECTION DETAILS
Direct Connection:
OBP uses internal department to develop connection or hires an IT service provider that will work exclusively with this OBP.
Gateway Connection:
OBP uses an IT Service Provider that will establish connections to the EU Hub for multiple OBPs.
STEP 4.2.1 CONNECTION DETAILS
22
Possibility to select a Registered Gateway Provider or Sponsor a new one.
STEP 4.2.1 CONNECTION DETAILS
23
Displays the list of Gateway Providers that already signed a contract with EMVO and Solidsoft (Registered Gateway Providers)
STEP 4.2.1 CONNECTION DETAILS
24
• Requested Information to Sponsor a new Gateway Provider.• EMVO will contact the sponsored company to sign a contract.
STEP 4.2.1 CONNECTION DETAILS
25
EMVO will not provide technical support if the OBP decides to usea different technology.
EU HUB ENVIRONMENTS
26
IQE environment• Integrated Quality
Environment • Used for
validation andbaseline testing.
PRD environment• Productive
Environment• Validated
environment
ITE IQE PRD
ITE environment• Integrated Test
Environment• Available only for
Direct Connections• Gateway providers
have a dedicatedenvironment withSolidsoft
STEP 4.2.2 ITE
27
STEP 4.2.2.1 INFORMATION TO CREATE CSR
28
STEP 4.2.2.1 INFORMATION TO CREATE CSR
29
Necessary information to create a CSR file:Common Name = Company Type . Organisation ID . Client ID
STEP 4.2.2.1 CREATING A CSR USING OPENSSL
30
Instructions on how to create a CSR file are available in Step 4.1 -EMVO 0117 Creating CSR files document
Note:When creating a CSR file a KEY file is alsogenerated –Keep this file in a safe location
STEP 4.2.2.2 UPLOAD CSR FILE
31
Upload the CSR file generated in the previous step. An automaticcheck of the file will occur in the HUB.
Note:The EU Hub willonly check the Common Name provided
STEP 4.2.2.3 CERTIFICATE
32
STEP 4.2.2.3 CERTIFICATE
33
• Public and Client Certificates are availableto download
• Endpoints are displayed
STEP 4.2.2.4 SESSION TOKEN
34
When this step is reached, a request for a Session Token will be sent to EMVO.
Note:This is not an automated step. EMVO willmanuallyprovide a Session Token –usually the sameday.
STEP 4.2.2.4 SESSION TOKEN
35
The Session Token will be displayed by clicking the ‘Info’ button
STEP 4.2.3.5 TEST STATUS METRICS
36
Optional Step (in ITE) that will allow the OBP to check if the transanctions between the OBPs Interface and EU Hub are successful
STEP 4.2.3 IQE
37
The same process applies for all steps of IQE, except that the Test Status Metrics are mandatory.
EMVO GATEWAY CREDENTIALS
38
• Complete all IQE Steps until 4.2.3.3 – Certificate• Generate a PFX file (instructions in document EMVO 0117 Creating
CSR Files.• Send an email to the Helpdesk with the following information:
1. PFX File2. PFX Password3. SPOC Name4. SPOC E-mail
The SPOC will receive an email from [email protected] credentials and URL to access the EMVO Gateway
STEP 4.2.3.5 TEST STATUS METRICS (BASELINE TESTS)
39
STEP 4.2.3.5 TEST STATUS METRICS (BASELINE TESTS)
40
OBP should use their Connection to upload data to the EU Hub. The OBP Portal will display if the transactions were successfull .
STEP 4.2.3.5 TEST STATUS METRICS (BASELINE TESTS)
41
Example:A Product Master Data was successfully uploaded. OBP Portal displays this dimension as ‘Passed’
STEP 4.2.3.5 TEST STATUS METRICS (BASELINE TESTS)
42
Mandatory Test Dimensions to have access to PRD:• Product Master Data• Product Pack Data • Product Pack Update
Optional dimensions to test:• Product Pack Verification • Report Process
STEP 4.2.3.5 TEST STATUS METRICS (BASELINE TESTS)
43
Important Notes:• All tests of the test status metrics should use product data which is
uploaded in the emulated markets (XX, XY and XZ). • A 30 minutes timeframe is available to execute, check and submit
the test results by clicking the button ‘Submit’ in the OBP Portal. • After the 30 minutes timeframe the status will automatically reset to
‘Failed’ even if the tests were passed and submitted.
STEP 4.2.3.5 TEST STATUS METRICS (BASELINE TESTS)
44
• The IQE Test Status Metrics is only self-awareness tool.• Passing these tests does not mean or imply that the OBP system has
been certified or validated by EMVO.• Validation and DR compliance remains the responsibility of the OBP
in his role as system owner.
STEP 4.2.4 PRD
45
OBP will have access to PRD steps as soon as the Test Status Metricswere approved by EMVO.
STEP 4.3 CLIENT CONNECTION 2
46
Technical Onboarding for Connection 2 can be done at the sametime as Connection 1.
VISIT OUR KNOWLEDGE DB FOR MORE INFORMATION
47
THE EMVO GATEWAY
48
WHAT IS THE EMVO GATEWAY?
49
o It’s a cost free solution to connect to the EU Hub during the transition period.
o A web-based application requiring no “installed” software -Provides an ‘access anywhere’ system for interactions with the EU Hub.
o Provides a secure cloud-based interface to the EU Hub.
o A fast way to become “connected” to the EU Hub.
o Provides a great means for an OBP to send data to the EMVS for pilot and small-scale production.
OBP
OBP
EMVO Gateway Web Application
WHAT IS THE EMVO GATEWAY?
50
European Hub
OBPOBP
OBPweb-service
Interface
National Systems
OBP “https” web-
Interface
WHAT CAN THE EMVO GATEWAY DO?
51
o The EMVO gateway allows connected users to:• Upload and maintain master data• Upload and amend batch & pack data• Request reports
o Users can insert data manually (e.g. each pack at a time) or upload data by means of XML/JSON files.
o OBP’s can manage their own users and provide the users with individual roles and permissions.
o The EMVO gateway can be configured to allow an external party (e.g. a CMO) to upload data on behalf of the OBP (using the OBP account).• Note: the liability for allowing any external party to upload or amend data is entirely
that of the OBP granting permission.
WHAT THE EMVO GATEWAY IS NOT
52
o It does not generate Serialization data for the packs.
o It has no means of automation available.
o It relies on human interaction.
o For heavy use nor as a primary interface for OBP’s of reasonable annual pack volume / SKU count (specifically because of its manual nature).
SCREEN SAMPLES
53
o EMVO Gateway Home Screen (Landing Page)
SCREEN SAMPLES
54
o Organisational Data View
SCREEN SAMPLES
55
o Manufacturing Source Data View
SCREEN SAMPLES
56
o Results View
QUESTIONS?
57