On Boarding HR Presentation
-
Upload
richard-deja -
Category
Documents
-
view
54 -
download
0
Transcript of On Boarding HR Presentation
![Page 1: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/1.jpg)
On Boarding
Richard DejaPat Remus
Mandy StrayhornDaymon Johnson
![Page 2: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/2.jpg)
Recordable Injuries and Write-Ups
![Page 3: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/3.jpg)
Needs Analysis
• To achieve company goal of zero recordable and zero written reminders for any safety or legal violations.
• We are mandating training on the proper use of Personal Protective Equipment.
• The safety reinforcement sign campaign will be located throughout the facility.
![Page 4: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/4.jpg)
Employees graph
![Page 5: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/5.jpg)
Training Objectives
• Demonstrate, identify, and verbally state correct uses of Personal Protective Equipment (PPE) whenever present on the manufacturing floor.
• Identify the different types of sexual harassment and demonstrate their understanding of harassment in the workplace on a test.
• Be able to identify when, how, and why to lock out manufacturing equipment.
![Page 6: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/6.jpg)
![Page 7: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/7.jpg)
Personal Protective Equipment
Training Objectives: • Demonstrate correct use of personal protective
equipment (PPE) whenever present on the manufacturing floor
• Identify static media used to illustrate proper Personal protective equipment (PPE) used in certain working conditions
• Verbally state proper emergency protocol during crisis situation(s)
![Page 8: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/8.jpg)
Required Preparation
• Physical Environment: Classroom and manufacturing plant field observation
• Equipment and Materials:– Personal Protective Equipment– Computer/Projector – Power Point Slides– Safety Videos, folders, and cards
![Page 9: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/9.jpg)
Required Preparation
• Evaluation: – Record of employees not correctly using personal
protective equipment and being written up for it. This information will be collected in an excel spreadsheet.
– Data will be collected from all three shifts.
![Page 10: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/10.jpg)
Harassment in the Workplace
Training Objective: Identify the different types of sexual harassment
and demonstrate their understanding of harassment in the workplace on a
test.
![Page 11: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/11.jpg)
Required Preparation
• Physical Environment: Classroom Setting• Equipment and Materials: – Computer/Projector– Power Point Slides– Training Videos– Written Dialogue for skits and demonstrations– Training Videos
• Evaluation: Quiz
![Page 13: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/13.jpg)
![Page 14: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/14.jpg)
![Page 15: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/15.jpg)
![Page 16: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/16.jpg)
Lock Out Tag Out
![Page 18: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/18.jpg)
Overall Evaluation
![Page 19: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/19.jpg)
Budget
Total program costs: $23,235.30
Costs of Previous Injuries and Write-UpsTotal Costs: $344,819.00
![Page 20: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/20.jpg)
![Page 21: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/21.jpg)
![Page 22: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/22.jpg)
![Page 23: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/23.jpg)
![Page 24: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/24.jpg)
![Page 25: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/25.jpg)
![Page 26: On Boarding HR Presentation](https://reader035.fdocuments.us/reader035/viewer/2022081515/58f131321a28ab73238b45ab/html5/thumbnails/26.jpg)