on access to site. COLLEGE PARK · Retain bike stands New electric vehicle charging points to be...
Transcript of on access to site. COLLEGE PARK · Retain bike stands New electric vehicle charging points to be...
Shared access
Pedestrian routes
Contractor compound
- 25th September 2015
Teaching: 28th September 2015
IRCEP
BUILDING
Teaching Centre
C
O
LLE
G
E
P
A
R
K
Lanyon South
E
lectric
al
substatio
n
Exams: 11th January 2016
Teaching: 1st February 2016
Teaching: 11th April 2016
Exams: 19th May 2016
Contractor possession of all
areas within site boundary
Contractor access and deliveries from
college park and via QUB car park. Note
QUB access to administration building to
be maintained
Contractors vechicular entry &
exit route along pedestrian
East-West Link
P
edestrian access m
aintained on N
orth S
outh link
E
ast - W
est lin
k
Key:
Contractor Access only
Administration Building
Deliveries to
admin building
Old Physics
Pedestrian East-West Link
Maintain pedestrian access along
East-West link at all times
Main entrance to Old Physics and fire exit
from the Administration Building to be kept
clear at all times.
on access to site.
New Physics
Maintain pedestrian access along
East-West link at all times
East -
W
est lin
k
Maintain escape
routes from
existing building
Contractor compound.
All deliveries to be
between 0700-0800 and
1800-1900.
Bicycle shed to remain in place
throughout works
Drainage works outside the
compound and under the bicycle
shed to be arranged in advance with
QUB Estates
East -
W
est lin
k
Retain bike
stands
New electric vehicle
charging points to be
retained and not to
be interrupted
Hoarding
Welcome Week: 21st September 2015
- 18th December 2015
- 26th January 2016
- 18th March 2016
- 13th May 2016
- 4th June 2016
CONSTRUCTION
EPD CODE: 10 009
REVISIONS DATEBY
SAFETY HEALTH AND ENVIRONMENTAL INFORMATION
For details of site-wide and general risks, to be read in conjunction
with these notes, see Drg No.
In addition to the risks normally associated with the types of work
detailed on this drawing, note the following risks and information:
CONSTRUCTION
DISMANTLING / DEMOLITION (Future)
For information relating to Use, Cleaning and Maintenance see H&S File
It is assumed that all works will be carried out by a competant contractor
working, where appropriate, to an approved method statement.
© Copyright Hamilton Architects
DO NOT SCALE FROM THIS DRAWINGAll dimensions are in millimetres unless otherwise indicated
t: +44 (0) 28 9033 4250
f: +44 (0) 28 9023 3249
Hamilton House
3 Joy Street
Belfast
BT2 8LE
PROJECT:
No:
DRAWING:
No:
ESTATES DEPARTMENT
Administration Building
Belfast BT7 1NN
School of Mathematics and Physics
Reorganisation - Teaching Centre
P/13/802
WD A (00) 05 [002] RevB
Teaching Centre
Site Constraints Drawing
drawn bydatescale checked by
ARCHITECT'S PROJECT INFORMATION
project no: 1366 - School of Maths and Physics
Reorganisation - Teaching Centre
client: Queen's University Belfast
Estates Department
1:250@A1 APRIL'15 DF DD
WORKING DRAWING
CONTRACTORS ARE NOT TO
SCALE FROM THIS DRAWING
DO NOT SCALE THIS DRAWING
Site Constraints Drawing
A Key dates revised AD 21.09.15
B Contractors compound
area revised
AD 16.11.15