Shared access Pedestrian routes Contractor compound - 25th September 2015 Teaching: 28th September 2015 IRCEP BUILDING Teaching Centre COLLEGE PARK h Electrical substation Exams: 11th January 2016 Teaching: 1st February 2016 Teaching: 11th April 2016 Exams: 19th May 2016 Contractor possession of all areas within site boundary %QPVTCEVQTU %QORQWPF Contractor access and deliveries from college park and via QUB car park. Note QUB access to administration building to be maintained Contractors vechicular entry & exit route along pedestrian East-West Link Pedestrian access maintained on North South link East - West link Key: Contractor Access only Administration Building Deliveries to admin building Old Physics Pedestrian East-West Link Maintain pedestrian access along East-West link at all times Main entrance to Old Physics and fire exit from the Administration Building to be kept clear at all times. on access to site. New Physics Maintain pedestrian access along East-West link at all times East - West link Maintain escape routes from existing building Contractor compound. All deliveries to be between 0700-0800 and 1800-1900. Bicycle shed to remain in place throughout works Drainage works outside the compound and under the bicycle shed to be arranged in advance with QUB Estates East - West link HV UKVG EQPVCKPGT Retain bike stands New electric vehicle charging points to be retained and not to be interrupted (KTG GUECRG VQ DG OCKPVCKPGF Hoarding Welcome Week: 21st September 2015 - 18th December 2015 - 26th January 2016 - 18th March 2016 - 13th May 2016 - 4th June 2016 HV UKVG EQPVCKPGT 5MKR CONSTRUCTION EPD CODE: 10 009 REVISIONS DATE BY SAFETY HEALTH AND ENVIRONMENTAL INFORMATION For details of site-wide and general risks, to be read in conjunction with these notes, see Drg No. In addition to the risks normally associated with the types of work detailed on this drawing, note the following risks and information: CONSTRUCTION DISMANTLING / DEMOLITION (Future) For information relating to Use, Cleaning and Maintenance see H&S File It is assumed that all works will be carried out by a competant contractor working, where appropriate, to an approved method statement. &RS\ULJKW +DPLOWRQ $UFKLWHFWV DO NOT SCALE FROM THIS DRAWING All dimensions are in millimetres unless otherwise indicated t: +44 (0) 28 9033 4250 f: +44 (0) 28 9023 3249 e: [email protected] Hamilton House 3 Joy Street Belfast BT2 8LE PROJECT: No: DRAWING: No: ESTATES DEPARTMENT Administration Building Belfast BT7 1NN School of Mathematics and Physics Reorganisation - Teaching Centre P/13/802 WD A (00) 05 [002] RevB Teaching Centre Site Constraints Drawing drawn by date scale checked by ARCHITECT'S PROJECT INFORMATION project no: 1366 - School of Maths and Physics Reorganisation - Teaching Centre client: Queen's University Belfast Estates Department 1:250@A1 APRIL'15 DF DD WORKING DRAWING CONTRACTORS ARE NOT TO SCALE FROM THIS DRAWING DO NOT SCALE THIS DRAWING Site Constraints Drawing A Key dates revised AD 21.09.15 B Contractors compound area revised AD 16.11.15

Transcript of on access to site. COLLEGE PARK · Retain bike stands New electric vehicle charging points to be...

Page 1: on access to site. COLLEGE PARK · Retain bike stands New electric vehicle charging points to be retained and not to be interrupted (KTG GUECRG VQ DG OCKPVCKPGF Hoarding Welcome Week:

Shared access

Pedestrian routes

Contractor compound

- 25th September 2015

Teaching: 28th September 2015

IRCEP

BUILDING

Teaching Centre

C

O

LLE

G

E

P

A

R

K

Lanyon South

E

lectric

al

substatio

n

Exams: 11th January 2016

Teaching: 1st February 2016

Teaching: 11th April 2016

Exams: 19th May 2016

Contractor possession of all

areas within site boundary

Contractor access and deliveries from

college park and via QUB car park. Note

QUB access to administration building to

be maintained

Contractors vechicular entry &

exit route along pedestrian

East-West Link

P

edestrian access m

aintained on N

orth S

outh link

E

ast - W

est lin

k

Key:

Contractor Access only

Administration Building

Deliveries to

admin building

Old Physics

Pedestrian East-West Link

Maintain pedestrian access along

East-West link at all times

Main entrance to Old Physics and fire exit

from the Administration Building to be kept

clear at all times.

on access to site.

New Physics

Maintain pedestrian access along

East-West link at all times

East -

W

est lin

k

Maintain escape

routes from

existing building

Contractor compound.

All deliveries to be

between 0700-0800 and

1800-1900.

Bicycle shed to remain in place

throughout works

Drainage works outside the

compound and under the bicycle

shed to be arranged in advance with

QUB Estates

East -

W

est lin

k

Retain bike

stands

New electric vehicle

charging points to be

retained and not to

be interrupted

Hoarding

Welcome Week: 21st September 2015

- 18th December 2015

- 26th January 2016

- 18th March 2016

- 13th May 2016

- 4th June 2016

CONSTRUCTION

EPD CODE: 10 009

REVISIONS DATEBY

SAFETY HEALTH AND ENVIRONMENTAL INFORMATION

For details of site-wide and general risks, to be read in conjunction

with these notes, see Drg No.

In addition to the risks normally associated with the types of work

detailed on this drawing, note the following risks and information:

CONSTRUCTION

DISMANTLING / DEMOLITION (Future)

For information relating to Use, Cleaning and Maintenance see H&S File

It is assumed that all works will be carried out by a competant contractor

working, where appropriate, to an approved method statement.

© Copyright Hamilton Architects

DO NOT SCALE FROM THIS DRAWINGAll dimensions are in millimetres unless otherwise indicated

t: +44 (0) 28 9033 4250

f: +44 (0) 28 9023 3249

e: [email protected]

Hamilton House

3 Joy Street

Belfast

BT2 8LE

PROJECT:

No:

DRAWING:

No:

ESTATES DEPARTMENT

Administration Building

Belfast BT7 1NN

School of Mathematics and Physics

Reorganisation - Teaching Centre

P/13/802

WD A (00) 05 [002] RevB

Teaching Centre

Site Constraints Drawing

drawn bydatescale checked by

ARCHITECT'S PROJECT INFORMATION

project no: 1366 - School of Maths and Physics

Reorganisation - Teaching Centre

client: Queen's University Belfast

Estates Department

1:250@A1 APRIL'15 DF DD

WORKING DRAWING

CONTRACTORS ARE NOT TO

SCALE FROM THIS DRAWING

DO NOT SCALE THIS DRAWING

Site Constraints Drawing

A Key dates revised AD 21.09.15

B Contractors compound

area revised

AD 16.11.15