OMN-SF-100-MEC-218100-100 REV C
-
Upload
sakthikumar-chandrasekaran -
Category
Documents
-
view
30 -
download
1
description
Transcript of OMN-SF-100-MEC-218100-100 REV C
OMN-SAF-100-MEC-00003-001 Page 1 of 45 Revision: C 18/08/2014
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
OCCIDENTAL OF OMAN,INC.
ENGINEERING SERVICES CONTRACT FOR OMAN NORTH
OXY CONTRACT NO. SWL-CA-2013-24000039693-A
DD FOR REPLACEMENT OF CRUDE HEATER H-102 AT SGP
TECHNICAL SPECIFICATION
FOR
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
C 18/08/2014 Issued for Purchase SUM RPW PKU DVS
B 26/09/2013 Issued for Enquiry SEE T&P DOCUMENT # 2181001
A 28/07/2014 Issued for Approval SEE T&P DOCUMENT # 2181001
O 04/07/2013 First Issue SEE T&P DOCUMENT # 2181001
REV DATE REASON FOR ISSUE PREPARED CHECKED APPROVED APPROVED
TR Engineering LLC
P O Box 1597,PC 112, Ruwi, Sultanate of Oman
Tel: +968 24642100, Fax: +968 24604 414
DISCIPLINE ENGINEER
DISCIPLINE CHECK
LDE/DH PM
OXY Project No.: 1165425 W I No.: TRE-14-003 Document No. Rev. No.
TRE Job No.: J66202 OMN-SAF-100-MEC-00003-001 C
This document is the property of TRE and OXY. It is not to be copied or shown to a third party without prior consent.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 2 of 45 Revision: C 18/08/2014
CONTENTS
FRONT PAGE
CONTENTS
ABBREVIATIONS
HOLDS
1.0 INTRODUCTION 7
1.1 General 7
1.2 Intent of the enquiry 7
1.3 Definitions: 7
1.4 Broadguidelines: 7
1.5 Guarantee 8
2.0 APPLICABLE STANDARDS 9
2.1 General 9
2.2 Conflicting Requirements 9
2.3 Adherence to Specifications 9
2.4 Codes, Specifications and Standard drawing 9
3.0 GENERAL SITE CONDITIONS 12
4.0 VENDOR’S SCOPE OF SUPPLY 13
4.1 General 13
4.2 Scope of Supply of Equipment and Materials 13
4.3 Exclusions 15
5.0 DESIGN REQUIREMENTS 16
5.1 General 16
5.2 Design Guide lines 16
6.0 MATERIALS OF CONSTRUCTION 20
7.0 QUALITY ASSURANCE 21
7.1 Quality System Requirements 21
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 3 of 45 Revision: C 18/08/2014
7.2 Quality Assurance and Quality Assurance Plans 21
8.0 INSPECTION AND TESTING 22
8.1 General 22
9.0 INFORMATION TO BE SUBMITTED WITH THE TENDER 25
9.1 Technical Information 25
9.2 Separate Quotations 25
9.3 Unit Prices 25
10.0 DOCUMENTATION AND INFORMATION REQUIRED AFTER PLACEMENT ORDER 26
10.1 General 26
10.2 Drawings, Calculations and Procedures 26
10.3 Material and other Certificates 27
10.4 Spare Parts 27
11.0 SURFACE TREATMENT 28
11.1 External Painting 28
11.2 Internal Coating 28
12.0 PREPARATION FOR SHIPMENT 29
13.0 COMMISSIONING 30
13.1 Site Supervision 30
13.2 Manuals 30
13.3 Special Tools 30
14.0 APPENDICES
APPENDIX - A1 - LOCAL ENVIRONMENTAL CONDITIONS
APPENDIX- A2 - SELLER DOCUMENT REQUIREMENT LIST (SDRL)
APPENDIX - A3 - ALLOWABLE FORCES AND MOMENTS ON NOZZLES
APPENDIX - A4 -UNITS OF MEASUREMENT
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 4 of 45 Revision: C 18/08/2014
APPENDIX- B1
APPENDIX- B2 - P & ID
APPENDIX- B3–CIVIL INPUT TO VENDOR
APPENDIX- C1- TABLE OF COMPLIANCE
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 5 of 45 Revision: C 18/08/2014
ABBREVIATIONS
TRE - TECHNICAS REUNIDAS (TR) ENGINERING LLC.
SDRL - SELLER DOCUMENT REQUIREMENT LIST
SPIR - SPARE PARTS & INTERCHANGEABILITY REPORT
ITP - INSPECTION TEST PLAN
CQP - CONTRACT QUALITY PLAN
WPS - WELDING PROCEDURE SPECIFICATION
PQR - PROCEDURE QUALIFICATION RECORD
QA - QUALITY ASSURANCE
QC - QUALITY CONTROL
NDE - NON DESTRUCTIVE EXAMINATION
TPIA - THIRD PARTY INSPECTION AGENCY
AFC - APPROVED FOR CONSTRUCTION
CPF - CENTRAL PROCESSING FACILITIES
ASME - AMERICAN SOCIETY OF MECHANICAL ENGINEERS
OXY -OCCIDENTAL OF OMAN INC.
KM - KILOMETER
KMPH - KILOMETER PER HOUR
PO - PURCHASE ORDER
DFT - DRY FILM THICKNESS
WRC - WELDING RESEARCH COUNCIL
ANSI - AMERICAN NATIONAL STANDARD INSTITUTE
QCP - QUALITY CONTROL PLAN
PWHT - Post Weld Heat Treatment
NDT - Non destructive Testing
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 6 of 45 Revision: C 18/08/2014
HOLDS
1. Vessel Boot dimensions.
2. Vessel Pump connection nozzle size.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 7 of 45 Revision: C 18/08/2014
1.0 INTRODUCTION
1.1 General
This specification covers the minimum requirements for the detailed design, engineering, material procurement, fabrication, assembly, inspection, PWHT, testing, certification, painting, supply and transportation of below vessel for Safah for Occidental of Oman Inc.
• Hot Hydrocarbon Drain Vessel (01-V-169) as per attached data sheet Appendix-B1.
1.2 Intent of the enquiry
The main objective of “Replacement of Crude Heater H-102 at SGP” project is to replace existing Stabilizer Fired Heater Reboiler (H-102) with a new Fired Heater packaged unit (H-168), new Hot Hydrocarbon Drain Vessel and transfer pump. Intent of this enquiry is to install a new Hot Hydrocarbon Drain vessel (01-V-169) which is required for liquid/vapor blowdown from heater and a transfer pump.
1.3 Definitions:
Purchaser : EPC Contractor Vendor : Supplier of Equipments Consultant : TR Engineering LLC Company : Occidental of Oman Inc.
1.4 Broadguidelines:
The Vendor shall ensure that the Vessel fully complies with the applicable standards as listed in section 2 and with the requirements of this specification. The Vendor shall be responsible for:
• Detailed design, engineering, material procurement, fabrication, assembly, co-ordination, inspection, testing, PWHT, certification, painting, transportation and complete with all internals, ladders, platforms and gratings for vessel as described in this specification, appendices, referred codes and standards. The complete scope of vessel to be supplied is defined in subsequent section 4 & section 5.
• Mechanical and process hydraulic design, procurement, installation and performance guarantee of all internals of the vessel.
• Procurement and supply of spare parts for commissioning, start-up and two (2) years operation and maintenance.
• Installation and commissioning (Optional).
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 8 of 45 Revision: C 18/08/2014
• The quality control of all sub-orders.
The Vendor shall have established a quality system that complies with ISO 9001:2008, as described in section 7 of this specification.
This specification and it’s referenced standards shall in no way release the vendor from final guarantee of the entire package as to mechanical design, materials, apparatus, workmanship, control, operations, safeguarding and performance of the equipment inspected/supplied.
1.5 Guarantee
The vendor shall guarantee the equipment as follows :-
• Mechanical design, materials, apparatus, workmanship, control, operations, safeguarding etc.
• Guarantee period shall be 18 months from the date of delivery of equipment to site or 12 months from the date of commissioning of equipment whichever is earlier. If any defect is observed during guarantee period, vendor shall make all necessary alteration, repair or replacement free of charges.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 9 of 45 Revision: C 18/08/2014
2.0 APPLICABLE STANDARDS
2.1 General
This specification covers the minimum requirements for the detailed design,
engineering, material procurement, fabrication, assembly, inspection, PWHT, testing,
certification, painting, supply and transportation of one Hot Hydrocarbon Drain Vessel
(01-V-169) for Safah for Occidental of Oman Inc.
The Vessel shall be designed, manufactured, tested and supplied in accordance with this specification, codes and standards referenced herein.
2.2 Conflicting Requirements
In case of conflict between documents relating to the inquiry or purchase order, the following priority of documents shall apply.
First priority : Purchase order and agreed variation thereto
Second priority : Datasheet, drawing & Specification
Third priority : Company standards, (if any)
Fourth priority : International standards
Vendor shall seek clarification from Company and make a formal request with full supporting information when a deviation from standard is required.
2.3 Adherence to Specifications
The vendor shall comply with this purchase specification and all standards, codes and drawings listed in sub section 2.4. The Vendor shall provide an itemized list of any comments or exceptions to this specification and its appendices during technical submission phase. NO COMMENTS AND/OR EXCEPTIONS WILL BE ACCEPTABLE DURING COMMERCIAL BIDS. These shall be listed on the sheets provided in Appendix-C1, for review by the Company. Unless referred to in these listings, it will be assumed that all specifications will be adhered to and that they do not have any adverse implications with respect to cost, delivery and integrity of the plant. The Company reserves the right to consider the deviations on techno commercial ground.
2.4 Codes, Specifications and Standard drawing
The latest edition and addenda of the following Codes, standards and standard drawings forms part of this requisition. The applicable editions shall be the revisions in force at the time of the purchase order unless a specific revision has been defined. The requirements stated therein shall be complied with.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 10 of 45 Revision: C 18/08/2014
2.4.1 OXY Engineering Guidelines
EG-300 General
EG-305 Process Isolation and Emergency Shutdown
EG-309 Facility Drainage and Sewer Systems
EG-310 Pressure Relief System
EG-321 Pressure Vessels and Boilers
EG-322 Welding, Inspection and Testing
SPEC-300 Specification for Oil Field Pressure Vessel
SPEC 406 Piping Material Specification
MUK-FAC-150 Specification for General Instrumentation
MUK-FAC-153 Specification for ESD System and F&G System
MUK-FAC-154 Specification for Packaged Equipment Instrumentation
MUK-FAC-155 Specification for Basic Process Control System
MUK-FAC-255 Pressure Vessel Specification
MUK-FAC-256 Pressure Vessels for Sour Service Application
MUK-FAC-200 External Painting & Protective Coating
MUK-FAC-251 Protection of Goods during Shipment
MUK-FAC-318 External Painting & Protective Coating for Structural Steel
MUK-FAC-253 Pressure Vessel Welding Specification
MUK-FAC-300 Structural Design
2.4.2 International Standards
ASME Section VIII Div.1 - Rules for Construction of Pressure Vessel
ASME Section VIII Div.2 - Rules for Construction of Pressure Vessel
ASME Section IX - Welding and Brazing Qualifications
ASME Section V - Non-destructive Examination
ASME Section II Part A - Ferrous Material Specifications
ASME Section II Part C - Specifications for Welding Rods, Electrodes
and Filler Metals
ASME Section II Part D - Material Properties
Welding Research Council - Local Stresses in Spherical and Cylindrical
Shells Bulletin No. 107 /297 due to External
Loadings
ASME B 16.5 - Pipe Flanges and Flanged Fittings
ASME B 30.20 - Below-The-Hook Lifting Devices
ASME B 16.20 - Metallic Gaskets for Pipe Flanges,
Ring-Joint, Spiral-Wound, and Jacketed
NACE MR 0175 / ISO 15156 - Materials for use in H2S containing
environments in oil & Gas production
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 11 of 45 Revision: C 18/08/2014
ISO 10474 (1992) - Steel & Steel Products Inspection Documents
ISO 9001:2000 - Quality Systems
ASCE-7-10 - Wind Load
AISC-LRFD - Steel Construction (Load Resistant Factor
Design)
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 12 of 45 Revision: C 18/08/2014
3.0 GENERAL SITE CONDITIONS
The vessel shall be installed at Safah for Occidental of Oman Inc. Refer to Appendix-A1 for detailed data on the local environmental and meteorological conditions prevailing at site.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 13 of 45 Revision: C 18/08/2014
4.0 VENDOR’S SCOPE OF SUPPLY
4.1 General
The Vendor’s scope of supply includes all activities and deliverables required for the
execution of the design requirements as indicated in section 5.0 of this specification and
delivery to Safah for Occidental of Oman Inc, Sultanate of Oman.
The Vessel is to be Post Weld Heat Treated (PWHT).
The Vessel shall be supported on saddles as shown in respective data sheet. The
Vessel shall be completely assembled to the maximum possible extent to minimize the
installation time at site. Following items shall however, be supplied loose:
• Ladders
• Platforms (including gratings and handrails) shall be designed as per AISC-LRFD.
• Pipe supports
• Pipe Guides
Platforms, ladders and gratings shall be shop fabricated in maximum dimensions within shipping limits. Handrails shall be attached to platforms; cages shall be attached to ladders. Ladders, platforms and gratings shall be trial assembled prior to shipment. The Vendor’s scope of supply and services for Vessel, shall include, but not be limited to the scope detailed below i.e. in section 4.2. Refer Appendix- B3 for structural design of platforms & attached standard drawings of platforms & attach standard drawings for handrail, ladders, Grating & anchor bolts.
4.2 Scope of Supply of Equipment and Materials
In addition to the bare Vessel complete in all respects with nozzles, supports, fittings and appurtenances, the following are included in Vendor’s scope of supply:
• Internal ladder rungs (if required)
• External Stiffening Rings (if required)
• Manholes complete with blind flange & davit
• Blind flanges, bolts, nuts & gaskets for all spare nozzles and all other nozzles wherever specified in data sheets
• 2 Nos. Earthing bosses
• Complete fabrication, PWHT, NDT & hydrostatic test
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 14 of 45 Revision: C 18/08/2014
• Lifting lugs to facilitate handling and erection
• Pipe supports and Pipe Guides/Clips
• Platform and ladder clips
• Caged ladders and platforms with hand rail at all required locations (On unit price basis)
• SS Nameplate and bracket
• Sizing of anchor bolts
• Adjustable pads and shims (if required)
• Assistance for field erection (if required)
• Surface preparation, painting & internal coating
• Quality assurance and control
• Inspection and testing
• Spare parts for commissioning, start-up and 2 years of operation
• All documentation, drawings, calculations and reports
• Packing & Preservation of Vessel internal surfaces not painted or cladded
• Transportation from point of manufacture to Purchaser’s site
• Special tools, if any.
• Site erection/commissioning (Optional, if specified in Purchase Order)
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 15 of 45 Revision: C 18/08/2014
4.3 Exclusions
The Purchaser will provide:
• Anchor Bolts (However sizing & details of anchor bolts by vendor)
• Civil work / foundation
• Instrumentation
• Unloading at site
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 16 of 45 Revision: C 18/08/2014
5.0 DESIGN REQUIREMENTS
5.1 General
• The design of Vessel shall essentially comply with all relevant International Standards.
• The Vessel shall have a minimum design life of 25 years.
• Corrosion allowance of 3 mm is to be considered for all carbon steel surfaces exposed to product.
• Dimensional tolerance of the fabricated Vessel shall be in accordance with ASME Section VIII Div.1.
• Vessel shall be provided with at least two (2) earthing lugs welded to the Vessel saddles support.
5.2 Design Guide lines
5.2.1 Mechanical Design
• The mechanical design, fabrication and testing of the Vessel shall be carried out in accordance with ASME Sec VIII Div.1.
• The vessel shall be ASME “U” code stamped.
• The nozzles load analysis in accordance with WRC bulletin 107/297 for the allowable forces and moments on nozzles as per Appendix-A3. Vendor to calculate the Final allowable nozzle loadings and shall be shown on General Arrangement drawing.
• Lifting lugs shall be designed for a total load of 1.5 times the lifted weight of the Vessel to allow for dynamic effect.
• The wind load shall be applied in accordance with Appendix-A1 of this specification.
• All equipment and materials must be new and not previously owned or used by another party.
• Reinforcement for nozzles and manways shall be in accordance with the specified design code for the Maximum Allowable Pressure of the un-corroded Vessel at test temperature and the Maximum Allowable Working Pressure of the corroded Vessel at design temperature.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 17 of 45 Revision: C 18/08/2014
• The Vessel connections shall be flanged to ANSI B 16.5 WNRF smooth finish for sizes DN 600 and less.
• Bolt holes in flanges of nozzles and manways located in heads of Vessel shall straddle the principal centerlines of the Vessel or lines parallel thereto. Bolt holes in flanges of nozzles and manways located in shells shall straddle the vertical centerline of the Vessel.
• All nozzles shall be flushed with inside of the Vessel unless otherwise noted.
• Nozzles with blind flanges shall be provided with gaskets, bolts and nuts.
• All flanges not supplied with blind flanges shall be protected with wooden blanks. These blanks shall be securely attached to the flanges with at least four bolts with a neoprene gasket.
• All machined surfaces and gasket facings shall be protected with an easy removable anti-corrosion compound.
• All sharp corners to be rounded off to smooth radius.
• Gaskets and bolting used for hydro test shall be same type as service gaskets and bolting.
• Cathodic Protection (if required).
• The minimum wall thickness of the nozzle shall be as follows: Nozzle size Pipe Schedule
2" 160
3", 4", 6", 8" 80
≥10" Extra strong
5.2.2 Fabrication, Welding and Post Weld Heat Treatment
The fabrication, Welding and Post Weld Heat Treatment of Vessel as per applicable code ASME Section VIII Div.1.
Fabrication :
When welding is completed, flux residues and weld spatter shall be- removed
mechanically using stainless steel tools.
Grinding wheels or belts used to remove excess weld metal has not been
previously used on other metals.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 18 of 45 Revision: C 18/08/2014
Weld seams are to clear all nozzles and attachments.
Welding and Post Weld Heat Treatment:
The Vendor shall be responsible for developing the weld procedures necessary for
this contract, in accordance with relevant Company and ASME codes. All welders
shall be qualified to these procedures. Welding procedure specifications (WPS)
and supporting procedure qualification records (PQR) shall be subject to the
approval of the Company.
It is the responsibility of the Vendor to submit to the Purchaser all his sub-supplier’s
fabrication and welding procedures and to ensure compliance with contract
requirements before submittal to the Purchaser.
No fabrication may commence until the Vendor’s Contract Quality Plan, related
fabrication drawings, weld procedures (WPS & PQR), NDE procedures,
Fabrication Repair Procedure, Hydro test Procedure, and all calculations have
been reviewed and approved by the Purchaser.
Post weld heat treatment (if required) shall be carried for the complete Vessel in
single furnace heat.
No welding or thermal cutting is permitted on stress relieved Vessels after
completion of final post weld heat treatment (PWHT).
5.2.3 Fabrication Repairs
The Vendor shall not proceed with the following repairs without Purchaser’s approval. If parts/items/components are repaired without obtaining Purchaser’s prior approval, they will be rejected by Purchaser.
a) Major Repairs. b) Repairs to leaking pressure containing parts. c) Rectification of fits/tolerances by the application of metal coatings or overlays. d) Repairs necessitated by internal rubs for any reason.
5.2.4 Pressure Testing
• The hydrostatic test procedure, test pressure and minimum pressurisation temperature shall meet the requirements of the ASME Section VIII Div. 1
• Upon completion of the hydro test, water shall be completely drained out. Wetted surfaces shall be washed with potable water and completely dried. Particular attention shall be given to low spots, crevices and similar areas. Hot air drying is not permitted.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 19 of 45 Revision: C 18/08/2014
• All reinforcing pads shall be tested with 1 bar(g) air and soap suds solution after completion of final post weld heat treatment.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 20 of 45 Revision: C 18/08/2014
6.0 MATERIALS OF CONSTRUCTION
Materials of construction for the Vessel and internals shall be as specified in the
datasheet under Appendix-B1. The materials shall be suitable for Sour Service and
comply to standard MUK-FAC-256.
All materials shall be accordance with ASME Standards. All materials for Vessel shall be procured from Company approved vendors/manufacturers. All attachments welded directly to the Vessel shall be the same grade of steel as that of the Vessel.
All materials in contact with process fluid shall comply with NACE MR-0175/ISO 15156.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 21 of 45 Revision: C 18/08/2014
7.0 QUALITY ASSURANCE
7.1 Quality System Requirements
The Vendor should be ISO 9001:2008 3rd Party certified and should submit a Quality Plan with the quotation. These requirements apply equally to Vendor’s sub-contractors and suppliers. The Vendor shall enforce these requirements accordingly.
Purchaser/Company reserves the right to audit the Vendor’s quality system (and/or subcontractor/supplier’s quality systems). Such audit may be carried out either by Purchaser/Company or an appointed third party inspection agency.
7.2 Quality Assurance and Quality Assurance Plans
Vendor shall submit the following documentation with his tender, and also submit updated documentation within 2 weeks of purchase order as a part of his contractual obligations unless specified otherwise on the purchase order Appendix-A2 ‘Seller Document Requirement List’:
• Certification or evidence that the Quality system complies with ISO 9001:2008
• Quality Manual
• CQP - Contract Quality Plan
• QCP - Quality Control Plan (Inspection and Test Plan) All quality control plans shall be agreed, prior to commencement of fabrication.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 22 of 45 Revision: C 18/08/2014
8.0 INSPECTION AND TESTING
8.1 General
Inspection and testing for the vessel shall be generally in line with the pressure vessel code ASME Section VIII Div. 1 and attached data sheets.
The Vendor shall specify all the inspection and testing requirements in the quality control plan which shall identify the activities requiring the Purchaser's/ Company’s approval, review, witnessing etc.
Purchaser / Company and his authorized representative reserve the right to inspect every component or item, which will form part of the Equipment. The responsibility for the inspection, certification, etc. of all materials lie with the Vendor.
Not withstanding the above, the Purchaser / Company or his authorized representative shall have free access to all parts of the Vendor's and his sub-vendor’s works at all times during the manufacturing period.
The Vendor shall be responsible for coordinating the inspection and testing of sub-vendor supplied equipment, and for ensuring that the Purchaser's/ Company’s representatives are given the necessary access for inspection, and adequate warning of inspection and witness tests.
The Vendor (and all sub vendors) shall give the Purchaser/ Company, as required, without charge, all reasonable facilities for the purpose of inspecting the equipment to ensure that it is manufactured in accordance with the requisition, drawings and technical specification and QA/QC procedures and practices.
The Purchaser/ Company shall be given a minimum of 10 working days notice prior to carrying out any tests on the equipment covered by this specification.
All equipment shall be inspected for compliance with:
• Approved for Construction drawings, latest revision.
• Requirements of the Purchaser's requisition and correspondence thereafter.
• Applicable standards, which shall also include the sub-referenced standards therein.
• Inspection and Test plans produced by the Vendor as part of the Contract Quality Plan.
Except as approved by the Purchaser/ Company, all equipment shall be presented for inspection in an unpainted condition.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 23 of 45 Revision: C 18/08/2014
All measuring instruments required for shop testing shall be furnished by the Vendor, and be supported by valid calibration certification.
All spare parts shall be subject to the same inspection standards and full material certification as the main order.
Inspectors have the right to request additional inspections or tests to ensure that the equipment complies with this specification and all relevant codes and standards.
Vendor shall furnish Inspection Test Plan specifying the responsibility scope of TPI & TPIA. The minimum requirements of shop witnessed inspections are:
• The verification of materials and certificates for conformity with the specification requirement
• The verification of welding procedures, welder’s qualifications, NDT results, heat treatment charts.
• The dimensional check of the equipment including internals as per approved drawing.
• Hydro test.
• The surface preparation and painting and coating application.
• The testing of the lifting frame for the transportation of the vessel. The lifting frame shall be certified.
• The completeness of shipment including checking of supply of spares and accessories.
• Material test certification in accordance with ISO 10474 and any additional requirements of the requisition.
Mill and shop inspection shall not relieve the Vendor from his contractual responsibility for replacing any defective material and for repairing any defective workmanship that may be identified in the field. Any defects found by the TPIA shall be rectified in his presence. Where this is not possible or practical, checklists shall be prepared and signed by the TPIA stating all 'pending items'. Copies of these lists shall be sent to the Purchaser/ Company to enable their subsequent checking. The equipment shall not be tested or leave the factory before all identified defects have been rectified.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 24 of 45 Revision: C 18/08/2014
8.1.1 Site Acceptance Tests (SAT)
The Site Acceptance Test (SAT) shall be done to demonstrate that the equipment
performance is in accordance with the specification requirements.
After installation and commissioning at the Company's site, the SAT shall be executed
for at least 72 hours without any interruptions. Every interruption during the SAT will
result in restarting the SAT by resetting the elapsed time of the test to zero (0) hours.
The Company’s confirmation of successful completion of the performance test shall be
mandatory for final acceptance of the system.
After satisfactory completion of the SAT the Company's authorized site representative
shall sign the 'System Acceptance Note’, which shall mean acceptance of the system
for operation.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 25 of 45 Revision: C 18/08/2014
9.0 INFORMATION TO BE SUBMITTED WITH THE TENDER
In addition to the documents required as per Appendix-A2 ‘Seller Document Requirement List’, Vendor shall submit the following-
9.1 Technical Information
• Completed Table of Compliance (Appendix-C1)
• List of Proposed Materials
• Location of Manufacturing Facility
• Reference List of Vessel of Similar Design, Installed & Operating under analogous conditions
• List of Proposed Suppliers for Vessel Internals (if any)
9.2 Separate Quotations
The bidder shall furnish with the proposal the following separate quotations:
• Two years operating spare part and other parts recommended by manufacturer
• Special tools (if any)
• Installation and commissioning (Optional)
9.3 Unit Prices
The bidder shall furnish the unit rates for the following:
• Pipe Supports, Guides/Clips
• Ladders, Platforms & Handrails and Gratings
• Nozzles (each size and rating) including blind flange, gasket and bolting.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 26 of 45 Revision: C 18/08/2014
10.0 DOCUMENTATION AND INFORMATION REQUIRED AFTER
PLACEMENT ORDER
10.1 General
All correspondence and documentation shall be in English. All measurements and units shall be as per Attachment- A4.
Requirements on number of copies for approval and final submission shall be as per Appendix-A2 ‘Seller Document Requirement List’. Vendor shall submit revised documents incorporating the client/Contractor comments within 2 weeks after the receipt of comments.
All drawings shall be drawn in AutoCAD version 2000 or higher. All documents shall be Microsoft Word / Excel-2003. The final documentation shall include electronic copy of all drawings and documents CDs. Note: The documents shall be submitted in hard copy together with soft copy. Submission of documents in soft copy only (i.e. without hard copy) is not permitted.
10.2 Drawings, Calculations and Procedures
In addition to the documents required as per Appendix-A2 ‘Seller Document Requirement List’, Vendor shall submit the following:-
• Detail Drawings / Layout: - Drawing for arrangement of Saddles, Stiffeners (if any), pipe supports and
guides, lifting lugs & associated weld details - Cross sectional drawing of nozzles & Internals with welding detail and bill of
material - Drawing for Weld location plan, Name plate / bracket and earthing details. - General arrangement and construction details of caged ladders and
platform. - Drawing showing arrangement of Vessel transportation & heavy lifting. - Sliding plate details for sliding support. - Vendor to provide anchor bolts showing dia., embedment, and projection
from top of concrete with grout thickness considered as per OXY standard drawing.
- Filled in Manufacturer’s Data report (MDR) form U-1 to be submitted by vendor.
• Calculations: - Mechanical Design Calculations - Nozzle Load Analysis - Mechanical & Process hydraulic calculations for internals (if any) - Wind and Vibration Analysis
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 27 of 45 Revision: C 18/08/2014
- Load data for empty, operating, hydro test & wind case. Also vendor to provide unbalanced dynamic loads with C.G with reference point.(Both individual C.G & combined)
• Procedures:
- Welding Consumables & Handling Procedure - Lifting Procedures
10.3 Material and other Certificates
Material certificates shall be furnished for Vessel in accordance with the relevant international standards. As a Minimum following certification shall include:
Chemical analysis : ISO 10474-3.1B Mechanical Properties : ISO 10474-3.1B
10.4 Spare Parts
The Vendor shall include in his quotation a separate itemized price list of spare parts for Commissioning, start-up and two (2) years normal operation and maintenance spares.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 28 of 45 Revision: C 18/08/2014
11.0 SURFACE TREATMENT
The surface preparation and application of the coating / painting material shall be done by a qualified subcontractor duly approved by the painting material manufacturer.
11.1 External Painting
The external carbon steel surface of the Hot Hydrocarbon Drain Vessel (01-V-169)
shall be painted as per painting scheme -2 of Appendix- 2 std. MUK-FAC-200.
Stainless steel components shall not be painted
The external Surface preparation of the Vessel shall be as per SSPC-SP-10., SA 2.5
Coating System
Primer
Type: Inorganic zinc-Rich
Ethyl Silicate
DFT (mil): 2-3
Mid Coat Type: Heat Resistant Aluminium (Air curing Type)
DFT (mil): 1
Finish Coat Type: Heat Resistant Silicone Aluminium (Air curing Type)
DFT (mil): 1
11.2 Internal Coating
Internal coating of the vessel shall be done by Belzona 1591.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 29 of 45 Revision: C 18/08/2014
12.0 PREPARATION FOR SHIPMENT
The preparation for shipment of Vessel and its materials shall be in accordance with Purchaser standards MUK-FAC-251. Special care should be taken for the packaging of delicate equipment.
All the platforms and ladder shall be packed separately and supplied to site along with equipment.
In general, within Oman, all items shall be transported to site by truck. The majority of roads are rough, corrugated, dusty desert graded roads. The equipment and packing must be able to withstand rougher than normal treatment, with greater use made of shock absorbent materials.
As a part of this order, Vendor shall deliver the Vessel to Purchaser’s plant at Safah for Occidental of Oman Inc.
The exterior of all crated parts shall be clearly identified in accordance with the purchase order and a minimum shall include the following:
Project details such as:
• Purchase order number, and Year of supply
• Project name “Replacement of Crude Heater H-102 at SGP”
• Destination, 01-V-169 at Safah, Occidental of Oman Inc.
• Nearest Port
• Country, Sultanate of Oman – Muscat
• Vessel dimensions and gross weight
• Specific storage instructions
• Package item x of y (for what unit package number)
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 30 of 45 Revision: C 18/08/2014
13.0 COMMISSIONING
13.1 Site Supervision
The Purchaser will install and commission the Vessel (if not included in Vendor scope). The Vendor shall detail in his tender the extent of specialist supervision and commissioning he deems necessary to satisfy himself that installation and operation of the package meets the specification and warranty requirements.
13.2 Manuals
For field commissioning, the Vendor shall provide the results of all the shop tests executed prior to shipment of Vessel.
The Vendor shall provide, as detailed in the Appendix-A2 ‘Seller Document Requirement List’, complete instruction manual which shall include instructions for installation, operation and maintenance along with all technical data and test results.
The Vendor shall provide to the Purchaser instructions on specific safety procedures for the installation of the Vessel.
13.3 Special Tools
Special tools and fixtures for transport, installation, commissioning, operation and /or maintenance:
Where specialist lifting equipment such as lifting or spreader beams are required, Vendor shall supply all necessary slings (of correct length), pins, shackles or turnbuckles etc. All lifting devices shall be designed, fabricated and certified in accordance with ANSI/ASME B 30.20 and ON color code system.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 31 of 45 Revision: C 18/08/2014
14.0 APPENDICES
A. Supplementary Information and Data
A1 Local Environmental Conditions 1 Sheet
A2 Seller Document Requirement List 1 Sheet
A3 Allowable Forces and Moments on Nozzles 2 Sheets
A4 Units of Measurement 1 Sheet
B. Technical Datasheets
B1 Data sheet for 2171001 Rev O Data sheet for Hot Hydrocarbon
Drain Vessel (01-V-169) 6 Sheets
B2 P & ID 1 Sheet
B3 Civil Input to Vendor 8 Sheets
C. General
C1. Table of Compliance 2 Sheets
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 32 of 45 Revision: C 18/08/2014
APPENDIX - A1 - LOCAL ENVIRONMENTAL CONDITIONS
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 33 of 45 Revision: C 18/08/2014
LOCAL ENVIRONMENTAL CONDITIONS
ENVIRONMENTAL DATA
The table below shall be used as the minimum environmental data required:
Site Conditions Data
Elevation
Safah
410 ft
Air Temperature
Max shade (summer)
Min shade (winter)
130 °F
41°F
Max Black Bulb 180°F
Soil Temperature
Design Max
Design Min
Winter
Summer
Average
150°F
41°F
85°F
104°F
94°F
Max Incident Solar Radiation
Typical Incident Solar Radiation
385 BTU/hr ft²
320 BTU/hr ft²
Max Relative Humidity
Min Relative Humidity
Mean Relative Humidity
98 %
30 %
74 %
Rain Intensity
1hour
Annual Average
25 mm /hr Neg
Seismic Zone 0
Wind Speed
Basic wind speed
52.7 m/s
Typical Wind Direction
March-April
May- June
Remaining months
NW
SW
SE
Atmospheric Conditions – a typical hot and dry climate prevails with frequent sand
storms. The particulate atmospheric dust can be as small as 2 microns. Rain is an
infrequent occurrence, but on such occasions is heavy.
High humidity is not the normal case. Use minimum humidity as the design case.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 34 of 45 Revision: C 18/08/2014
APPENDIX- A2 - SELLER DOCUMENT REQUIREMENT LIST (SDRL)
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 35 of 45 Revision: C 18/08/2014
APPENDIX - A3 - ALLOWABLE FORCES AND MOMENTS ON NOZZLES
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
ALLOWABLE FORCES AND MOMENTS ON NOZZLES
(EXTERNALLY APPLIED NOZZLE LOADS)
Each nozzle shall be designed to withstand the forces and moments specified in the following table. The effect on the shell or head due these externally applied loads shall be analyzed per WRC107/297 for each vessel.
With regard to the radial load (FR), calculations shall be made firstly with the force acting radial outwards in conjunction with the internal pressure and then with the force acting inwards. In the second instance, the internal pressure shall not be used to oppose the compressive stresses due to the force acting radial inwards; for this load condition a null pressure condition is to be considered to exist.
For nozzles in spherical shells, the forces FL and FC and moments ML and MC shall be combined algebraically to give resultant values.
Under vacuum condition, deflections (δ) shall be derived at locations adjacent to the nozzle to shell junction and shall be limited to:-
δ≤ 0.0025 R
Where ‘R’ is the shell or head radius.
FR = Radial Load MT = Torsional Moment
FL = Longitudinal Force ML = Longitudinal Moment
FC = Cirumferential Force MC = Circumferential Moment
Nozzle loads and moments shall be as per MUK-FAC-255.
Nozzle Mark
Nozzle Size (DN)
FR
lbf
(N)
FL lbf
(N)
FC lbf
(N)
MT
lbf.ft
(N·m)
MC
lbf.ft
(N·m)
ML
lbf.ft
(N·m)
Hot Hydrocarbon Drain Vessel (01-V-169) - Safah
N2/N5/N8/N10
50 278.8 (1240)
197.8 (880)
197.8 (880)
206.4 (280)
147.5 (200)
147.5 (200)
N3/N6 80 1102.7 (4905)
781.2 (3475)
781.2 (3475)
1220.2 (1655)
858.9 (1165)
858.9 (1165)
N7/ N9 100 1461.3 (6500)
1033.9 (4599)
1033.9 (4599)
2260.6 (3066)
1597 (2166)
(1597) 2166
N4 150 1072.3 (4770)
757.6 (3370)
757.6 (3370)
2492 (3380)
1762.1 (2390)
1762.1 (2390)
N1 200 1479.2 (6580)
1045.4 (4650)
1045.4 (4650)
4350 (5900)
3075.3 (4171)
3075.3 (4171)
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 37 of 45 Revision: C 18/08/2014
APPENDIX - A4 -UNITS OF MEASUREMENT
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 38 of 45 Revision: C 18/08/2014
UNITS OF MEASUREMENT
All documents and drawings shall contain customary units of measurement as indicated
in Table 1.
Table 1: Project Units
Parameter Customary SI
Pressure psi bar
Temperature oF oC
Capacity – gas MMscf sm3
Capacity – liquid USgal or bbl m3 or liter (l)
Flow (Weight) lb/h kg/h
Flow (Volume -gas) MMscfd sm3/hr
Flow (Volume -liquid) BPD or GPM l/min
Density lb/ft3 kg/m3
Power hp kW
Length in or ft m or mm
Length – pipeline km km
Force lbf N
Stress lbf/in2 N/m2
Weight lb kg
Energy Btu kJ
Viscosity cP cP
Composition Mol % Mol %
Note:
Pressures will be on gauge basis, unless noted otherwise.
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 39 of 45 Revision: C 18/08/2014
APPENDIX- B1
DATA SHEET FOR HOT HYDROCARBON DRAIN VESSEL
(01-V-169)(SAFAH)
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 40 of 45 Revision: C 18/08/2014
APPENDIX- B2 - P & ID
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 41 of 45 Revision: C 18/08/2014
APPENDIX- B3–CIVIL INPUT TO VENDOR
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 42 of 45 Revision: C 18/08/2014
APPENDIX- C1- TABLE OF COMPLIANCE
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 43 of 45 Revision: C 18/08/2014
TABLE OF COMPLIANCE
The vendor shall confirm below that the offer complies with all the clauses contained in this
specification or otherwise highlight deviation / exceptions under the clarification column.
SPEC.
REF.
CONFORMS ALTERNATIVE CLARIFICATION
PARAGRA
PH
Yes / No Yes / No
1.0
1.1
1.2
1.3
1.4
1.5
2.0
2.1
2.2
2.3
2.4
3.0
4.0
4.1
4.2
4.3
5.0
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 44 of 45 Revision: C 18/08/2014
5.1
5.2
6.0
7.0
7.1
7.2
6.
7.1
7.2
8.0
8.1
9.0
9.1
9.2
9.3
10.0
10.1
10.2
10.3
10.4
11.0
11.1
OCCIDENTAL OF OMAN,INC. TR ENGINEERING LLC
HOT HYDROCARBON DRAIN VESSEL (01-V-169)
OMN-SAF-100-MEC-00003-001 Page 45 of 45 Revision: C 18/08/2014
12.0
13.0
13.1
13.2
13.3
Appendix -
A1
Appendix -
A2
Appendix -
A3
Appendix -
A4
Appendix -
B1
Appendix –
B2
Appendix –
B3
Appendix -
C1