OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: …...Randy Grubb degrees Precipitation: inches. X X...

8
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: /3 /201 FAA Form 5370-1 ( ) SUPERCEDES PREVIOUS EDITION U.S. Department of Transportation Federal Aviation Administration Construction Progress and Inspection Report Airport Grant Program Period Ending Project Number Airport Name ) Project Description Contractor’s Name 1. Contract Time No. Days Charged to Date Last Working Day Charged (Date 2. Brief Weather Summary this Period, including Approximate Rainfall and Periods of Below Freezing Temperature (On earthwork jobs, include soil conditions.) 3. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading, drainage, base, surface, lighting, etc.) 4. Work Completed or In Progress this Period 5a. Summary of Laboratory and Field Testing this Period (Note failing tests and any retests. Summarize out-of-tolerance.) 5b. Material (Identify material subject to pay reduction.) 6. Description of Anticipated Work by Contractor for Next Period 7. Problem Areas/Other Comments (Include revisions to plans and specifications approved or denied, delays, difficulties, etc. and actions taken.) SPONSOR’S INSPECTOR OR REPRESENTATIVE Date Typed or Printed Name and Title Signature u re 02/08/2019 3-37-0021-045-2017 Fayetteville Regional Airport Airline Terminal Improvements - Part 1 Resolute Building Company 396 02/08/2019 Temperatures have averaged in the mid 70's Concourse A 74%, New Connector 95%, Rotunda 28% Installed sanitary sewer behind concourse A, installed window frame near elevator, started exterior wall framing, installed roof ladder None None Continue general construction of Concourse A and Rotunda, start roofing of rotunda None 02/08/2019 Jason D. Pike

Transcript of OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: …...Randy Grubb degrees Precipitation: inches. X X...

  • OMB CONTROL NUMBER: 2120-0569EXPIRATION DATE: /3 /201

    FAA Form 5370-1 ( ) SUPERCEDES PREVIOUS EDITION

    U.S. Department of Transportation Federal Aviation Administration

    Construction Progress and Inspection Report

    Airport Grant Program

    Period Ending

    Project Number

    Airport Name

    )

    Project Description Contractor’s Name

    1. Contract Time No. Days Charged to Date Last Working Day Charged (Date

    2. Brief Weather Summary this Period, including Approximate Rainfall and Periods of Below Freezing Temperature

    (On earthwork jobs, include soil conditions.)

    3. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading,drainage, base, surface, lighting, etc.)

    4. Work Completed or In Progress this Period

    5a. Summary of Laboratory and Field Testing this Period (Note failing tests and any retests. Summarize out-of-tolerance.)

    5b. Material (Identify material subject to pay reduction.)

    6. Description of Anticipated Work by Contractor for Next Period

    7. Problem Areas/Other Comments (Include revisions to plans and specifications approved or denied, delays, difficulties,etc. and actions taken.)

    SPONSOR’S INSPECTOR OR REPRESENTATIVE

    Date Typed or Printed Name and Title Signatureure

    02/08/2019

    3-37-0021-045-2017

    Fayetteville Regional Airport

    Airline Terminal Improvements - Part 1 Resolute Building Company

    396 02/08/2019

    Temperatures have averaged in the mid 70's

    Concourse A 74%, New Connector 95%, Rotunda 28%

    Installed sanitary sewer behind concourse A, installed window frame near elevator, started exterior wall framing, installed roof ladder

    None

    None

    Continue general construction of Concourse A and Rotunda, start roofing of rotunda

    None

    02/08/2019 Jason D. Pike

  • Storm water sewer installation (Near Concoure A) Install exterior metal studs (Concoure A)

    Install storefront near elevator (Concourse A) Roof drain installation (Concourse A)

    HVAC duct installation (Concourse A) Communication box installation (Near Conc. A)

  • X

    X

    32 / 65 0.00

    Su

    pe

    rvis

    or

    Ca

    rpe

    nte

    rs

    Iro

    nw

    ork

    ers

    Plu

    mb

    er

    Ma

    son

    Dry

    wa

    ll

    Co

    ncr

    ete

    Ele

    ctri

    cia

    n

    Me

    cha

    nic

    al

    Lab

    ore

    r (G

    en

    era

    l)

    Lab

    ore

    r (L

    an

    dsc

    ap

    e)

    Sh

    ee

    t M

    eta

    l

    Me

    cha

    nic

    Lab

    ore

    r (P

    ipe

    lay

    er)

    Lab

    ore

    r (M

    aso

    nry

    )

    Op

    era

    tor

    (Ba

    ckh

    oe

    /

    Exc

    av

    ato

    r)

    Op

    era

    tor

    (Bu

    lld

    oze

    r)

    Op

    era

    tor

    (Cra

    ne

    )

    Op

    era

    tor

    (Fo

    rkli

    ft)

    Op

    era

    tor

    (Gra

    de

    r)

    Op

    era

    tor

    (Lo

    ad

    er)

    Pa

    inte

    r

    Ro

    ofe

    r

    Tru

    ck D

    riv

    er

    To

    tal

    nu

    mb

    er

    of

    wro

    ke

    rs

    Work Performed

    Resolute 1 1 General escort & supervision

    Ivey Plumbing 0

    Ivey HVAC 0

    M-R Electric 0

    Trinity 0

    New Shine 4 4 Picked up concrete blankets & sawcut c.t. jts.

    Simmons Masonry 0

    Sammax 0

    Jones & Smith 0

    Grieme Roofing 0

    2nd Wind 0

    Sanford Steel 8 8 Installing rotunda decking

    Dixie Painting 0

    ECS 0

    VSC 0

    Southern Glass 0

    Terry's Floor 0

    Great Escape Cab. 0

    Joyner Keeny 0

    Martin Architectural 0

    Totals: 1 0 8 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 13

    X

    Notes: 1)

    Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

    Date:

    Weather:

    2-Feb-19

    Sunny Cloudy

    Temperature:

    Philip Crosby

    Resolute Supervisors on site included: Dan Shields Equipment used on site:

    Crane

    Backhoe / Excavator

    Leroy Haskins Bulldozer

    Stephanie Maslouski

    Frozen

    Rainy

    Loader

    Snow Lightning

    Ground: Dry Wet

    Randy Grubb

    degrees Precipitation: inches

  • X

    X

    39 / 71 0.00

    Su

    pe

    rvis

    or

    Ca

    rpe

    nte

    rs

    Iro

    nw

    ork

    ers

    Plu

    mb

    er

    Ma

    son

    Dry

    wa

    ll

    Co

    ncr

    ete

    Ele

    ctri

    cia

    n

    Me

    cha

    nic

    al

    Lab

    ore

    r (G

    en

    era

    l)

    Lab

    ore

    r (L

    an

    dsc

    ap

    e)

    Sh

    ee

    t M

    eta

    l

    Me

    cha

    nic

    Lab

    ore

    r (P

    ipe

    lay

    er)

    Lab

    ore

    r (M

    aso

    nry

    )

    Op

    era

    tor

    (Ba

    ckh

    oe

    /

    Exc

    av

    ato

    r)

    Op

    era

    tor

    (Bu

    lld

    oze

    r)

    Op

    era

    tor

    (Cra

    ne

    )

    Op

    era

    tor

    (Fo

    rkli

    ft)

    Op

    era

    tor

    (Gra

    de

    r)

    Op

    era

    tor

    (Lo

    ad

    er)

    Pa

    inte

    r

    Ro

    ofe

    r

    Tru

    ck D

    riv

    er

    To

    tal

    nu

    mb

    er

    of

    wro

    ke

    rs

    Work Performed

    Resolute 1 1 2 General escort & supervision

    Ivey Plumbing 3 2 5 Installing roof drain piping

    Ivey HVAC 2 1 3 Hanging duct work supports

    M-R Electric 2 3 5 Installing panels @ Conc A

    Trinity 4 4 Finishing gyp bd & framing ext. walls

    New Shine 0

    Simmons Masonry 0

    Sammax 6 1 7 Installing sewer lines near Conc A

    Jones & Smith 0

    Grieme Roofing 0

    2nd Wind 0

    Sanford Steel 6 6 Installing rotunda decking

    Dixie Painting 0

    Premier 2 2 Inspecting jobsite

    VSC 0

    Southern Glass 2 2 Installing window frame near elevator

    Terry's Floor 0

    Great Escape Cab. 0

    Joyner Keeny 0

    Martin Architectural 0

    Totals: 1 0 6 3 0 4 0 2 2 17 0 0 0 0 1 0 0 0 0 0 0 0 0 36

    X

    Notes: 1)

    Frozen

    Rainy

    Loader

    Snow Lightning

    Ground: Dry Wet

    Randy Grubb

    degrees Precipitation: inchesTemperature:

    Philip Crosby

    Resolute Supervisors on site included: Dan Shields Equipment used on site:

    Crane

    Backhoe / Excavator

    Leroy Haskins Bulldozer

    Stephanie Maslouski

    Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

    Date:

    Weather:

    4-Feb-19

    Sunny Cloudy

  • X

    X

    39 / 78 0.00

    Su

    pe

    rvis

    or

    Ca

    rpe

    nte

    rs

    Iro

    nw

    ork

    ers

    Plu

    mb

    er

    Ma

    son

    Dry

    wa

    ll

    Co

    ncr

    ete

    Ele

    ctri

    cia

    n

    Me

    cha

    nic

    al

    Lab

    ore

    r (G

    en

    era

    l)

    Lab

    ore

    r (L

    an

    dsc

    ap

    e)

    Sh

    ee

    t M

    eta

    l

    Me

    cha

    nic

    Lab

    ore

    r (P

    ipe

    lay

    er)

    Lab

    ore

    r (M

    aso

    nry

    )

    Op

    era

    tor

    (Ba

    ckh

    oe

    /

    Exc

    av

    ato

    r)

    Op

    era

    tor

    (Bu

    lld

    oze

    r)

    Op

    era

    tor

    (Cra

    ne

    )

    Op

    era

    tor

    (Fo

    rkli

    ft)

    Op

    era

    tor

    (Gra

    de

    r)

    Op

    era

    tor

    (Lo

    ad

    er)

    Pa

    inte

    r

    Ro

    ofe

    r

    Tru

    ck D

    riv

    er

    To

    tal

    nu

    mb

    er

    of

    wro

    ke

    rs

    Work Performed

    Resolute 3 1 4 General escort & supervision

    Ivey Plumbing 3 2 5 Installing roof drain piping

    Ivey HVAC 2 2 4 Hanging duct work supports

    M-R Electric 2 3 5 Installing panels @ Conc A

    Trinity 4 4 Finishing gyp bd & framing ext. walls

    New Shine 0

    Simmons Masonry 0

    Sammax 6 1 7 Installing sewer lines near Conc A

    Jones & Smith 0

    Grieme Roofing 0

    2nd Wind 0

    Sanford Steel 6 6 Installing rotunda decking

    Dixie Painting 0

    Premier 0

    VSC 2 2 Installing sprinkler piping

    Southern Glass 0 Installing window frame near elevator

    Terry's Floor 0

    Great Escape Cab. 0

    Joyner Keeny 2 2 Laying out sewer lines

    Martin Architectural 0

    Totals: 3 0 6 3 0 4 0 2 2 18 0 0 0 0 1 0 0 0 0 0 0 0 0 39

    X

    X

    X

    Notes: 1)

    Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

    Date:

    Weather:

    5-Feb-19

    Sunny Cloudy

    Temperature:

    Philip Crosby

    Resolute Supervisors on site included: Dan Shields Equipment used on site:

    Crane

    Backhoe / Excavator

    Leroy Haskins Bulldozer

    Stephanie Maslouski

    Contractor warned about trash and construction debris laying around job site.

    Frozen

    Rainy

    Loader

    Snow Lightning

    Ground: Dry Wet

    Randy Grubb

    degrees Precipitation: inches

  • X

    X

    47 / 79 0.00

    Su

    pe

    rvis

    or

    Ca

    rpe

    nte

    rs

    Iro

    nw

    ork

    ers

    Plu

    mb

    er

    Ma

    son

    Dry

    wa

    ll

    Co

    ncr

    ete

    Ele

    ctri

    cia

    n

    Me

    cha

    nic

    al

    Lab

    ore

    r (G

    en

    era

    l)

    Lab

    ore

    r (L

    an

    dsc

    ap

    e)

    Sh

    ee

    t M

    eta

    l

    Me

    cha

    nic

    Lab

    ore

    r (P

    ipe

    lay

    er)

    Lab

    ore

    r (M

    aso

    nry

    )

    Op

    era

    tor

    (Ba

    ckh

    oe

    /

    Exc

    av

    ato

    r)

    Op

    era

    tor

    (Bu

    lld

    oze

    r)

    Op

    era

    tor

    (Cra

    ne

    )

    Op

    era

    tor

    (Fo

    rkli

    ft)

    Op

    era

    tor

    (Gra

    de

    r)

    Op

    era

    tor

    (Lo

    ad

    er)

    Pa

    inte

    r

    Ro

    ofe

    r

    Tru

    ck D

    riv

    er

    To

    tal

    nu

    mb

    er

    of

    wro

    ke

    rs

    Work Performed

    Resolute 3 1 4 General escort & supervision

    Ivey Plumbing 3 2 5 Installing roof drain piping

    Ivey HVAC 2 2 4 Hanging duct work supports

    M-R Electric 2 3 5 Installing panels @ Conc A

    Trinity 3 3 Finishing gyp bd & framing ext. walls

    New Shine 0

    Simmons Masonry 0

    Sammax 6 1 7 Installing sewer lines near Conc A

    Jones & Smith 0

    Grieme Roofing 0

    2nd Wind 0

    Sanford Steel 2 2 Installing perimiter clips @ rotunda

    Dixie Painting 0

    Premier 0

    VSC 2 2 Installing sprinkler piping

    Southern Glass 0

    Terry's Floor 0

    Great Escape Cab. 0

    Joyner Keeny 0

    Martin Architectural 0

    Totals: 3 0 2 3 0 3 0 2 2 16 0 0 0 0 1 0 0 0 0 0 0 0 0 32

    X

    X

    X

    Notes: 1)

    Frozen

    Rainy

    Loader

    Snow Lightning

    Ground: Dry Wet

    Randy Grubb

    degrees Precipitation: inchesTemperature:

    Philip Crosby

    Resolute Supervisors on site included: Dan Shields Equipment used on site:

    Crane

    Backhoe / Excavator

    Leroy Haskins Bulldozer

    Stephanie Maslouski

    Contractor notified about debris laying around job site.

    Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

    Date:

    Weather:

    6-Feb-19

    Sunny Cloudy

  • X

    X

    59 / 81 0.00

    Su

    pe

    rvis

    or

    Ca

    rpe

    nte

    rs

    Iro

    nw

    ork

    ers

    Plu

    mb

    er

    Ma

    son

    Dry

    wa

    ll

    Co

    ncr

    ete

    Ele

    ctri

    cia

    n

    Me

    cha

    nic

    al

    Lab

    ore

    r (G

    en

    era

    l)

    Lab

    ore

    r (L

    an

    dsc

    ap

    e)

    Sh

    ee

    t M

    eta

    l

    Me

    cha

    nic

    Lab

    ore

    r (P

    ipe

    lay

    er)

    Lab

    ore

    r (M

    aso

    nry

    )

    Op

    era

    tor

    (Ba

    ckh

    oe

    /

    Exc

    av

    ato

    r)

    Op

    era

    tor

    (Bu

    lld

    oze

    r)

    Op

    era

    tor

    (Cra

    ne

    )

    Op

    era

    tor

    (Fo

    rkli

    ft)

    Op

    era

    tor

    (Gra

    de

    r)

    Op

    era

    tor

    (Lo

    ad

    er)

    Pa

    inte

    r

    Ro

    ofe

    r

    Tru

    ck D

    riv

    er

    To

    tal

    nu

    mb

    er

    of

    wro

    ke

    rs

    Work Performed

    Resolute 3 1 4 General escort & supervision

    Ivey Plumbing 3 2 5 Installing roof drain piping

    Ivey HVAC 2 2 4 Hanging duct work supports

    M-R Electric 2 4 1 7 Installing panels @ Conc A

    Trinity 4 4 Finishing gyp bd & framing ext. walls

    New Shine 0

    Simmons Masonry 0

    Sammax 6 1 7 Installing sewer lines near Conc A

    Jones & Smith 0

    Grieme Roofing 0

    2nd Wind 0

    Sanford Steel 4 4 Misc fit-up welding

    Dixie Painting 0

    Premier 0

    VSC 0

    Southern Glass 1 1 Assembling rotunda window frames

    Terry's Floor 0

    Great Escape Cab. 0

    Joyner Keeny 0

    Martin Architectural 0

    Totals: 3 0 4 3 0 4 0 2 2 16 0 0 0 0 2 0 0 0 0 0 0 0 0 36

    X

    X

    X

    Notes: 1)

    Frozen

    Rainy

    Loader

    Snow Lightning

    Ground: Dry Wet

    Randy Grubb

    degrees Precipitation: inchesTemperature:

    Philip Crosby

    Resolute Supervisors on site included: Dan Shields Equipment used on site:

    Crane

    Backhoe / Excavator

    Leroy Haskins Bulldozer

    Stephanie Maslouski

    Contractor notified about miscilanious debris laying around job site.

    Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

    Date:

    Weather:

    7-Feb-19

    Sunny Cloudy

  • X

    X

    50 / 82 0.00

    Su

    pe

    rvis

    or

    Ca

    rpe

    nte

    rs

    Iro

    nw

    ork

    ers

    Plu

    mb

    er

    Ma

    son

    Dry

    wa

    ll

    Co

    ncr

    ete

    Ele

    ctri

    cia

    n

    Me

    cha

    nic

    al

    Lab

    ore

    r (G

    en

    era

    l)

    Lab

    ore

    r (L

    an

    dsc

    ap

    e)

    Sh

    ee

    t M

    eta

    l

    Me

    cha

    nic

    Lab

    ore

    r (P

    ipe

    lay

    er)

    Lab

    ore

    r (M

    aso

    nry

    )

    Op

    era

    tor

    (Ba

    ckh

    oe

    /

    Exc

    av

    ato

    r)

    Op

    era

    tor

    (Bu

    lld

    oze

    r)

    Op

    era

    tor

    (Cra

    ne

    )

    Op

    era

    tor

    (Fo

    rkli

    ft)

    Op

    era

    tor

    (Gra

    de

    r)

    Op

    era

    tor

    (Lo

    ad

    er)

    Pa

    inte

    r

    Ro

    ofe

    r

    Tru

    ck D

    riv

    er

    To

    tal

    nu

    mb

    er

    of

    wro

    ke

    rs

    Work Performed

    Resolute 2 1 3 General escort & supervision

    Ivey Plumbing 0

    Ivey HVAC 0

    M-R Electric 1 1 2 Installing conduit @ Conc A

    Trinity 3 3 Finishing gyp bd & framing ext. walls

    New Shine 0

    Simmons Masonry 0

    Sammax 6 1 7 Installing sewer lines near Conc A

    Jones & Smith 0

    Grieme Roofing 0

    2nd Wind 0

    Sanford Steel 4 4 Misc fit-up welding, installing roof ladder

    Dixie Painting 0

    Premier 0

    VSC 0

    Southern Glass 0

    Terry's Floor 0

    Great Escape Cab. 0

    Joyner Keeny 0

    Martin Architectural 0

    Totals: 2 0 4 0 0 3 0 1 0 8 0 0 0 0 1 0 0 0 0 0 0 0 0 19

    X

    X

    Notes: 1)

    Frozen

    Rainy

    Loader

    Snow Lightning

    Ground: Dry Wet

    Randy Grubb

    degrees Precipitation: inchesTemperature:

    Philip Crosby

    Resolute Supervisors on site included: Dan Shields Equipment used on site:

    Crane

    Backhoe / Excavator

    Leroy Haskins Bulldozer

    Stephanie Maslouski

    Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

    Date:

    Weather:

    8-Feb-19

    Sunny Cloudy