OMB CONTROL NUMBER: 2120-0569EXPIRATION DATE: /3 /201
FAA Form 5370-1 ( ) SUPERCEDES PREVIOUS EDITION
U.S. Department of Transportation Federal Aviation Administration
Construction Progress and Inspection Report
Airport Grant Program
Period Ending
Project Number
Airport Name
)
Project Description Contractor’s Name
1. Contract Time No. Days Charged to Date Last Working Day Charged (Date
2. Brief Weather Summary this Period, including Approximate Rainfall and Periods of Below Freezing Temperature
(On earthwork jobs, include soil conditions.)
3. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading,drainage, base, surface, lighting, etc.)
4. Work Completed or In Progress this Period
5a. Summary of Laboratory and Field Testing this Period (Note failing tests and any retests. Summarize out-of-tolerance.)
5b. Material (Identify material subject to pay reduction.)
6. Description of Anticipated Work by Contractor for Next Period
7. Problem Areas/Other Comments (Include revisions to plans and specifications approved or denied, delays, difficulties,etc. and actions taken.)
SPONSOR’S INSPECTOR OR REPRESENTATIVE
Date Typed or Printed Name and Title Signatureure
02/08/2019
3-37-0021-045-2017
Fayetteville Regional Airport
Airline Terminal Improvements - Part 1 Resolute Building Company
396 02/08/2019
Temperatures have averaged in the mid 70's
Concourse A 74%, New Connector 95%, Rotunda 28%
Installed sanitary sewer behind concourse A, installed window frame near elevator, started exterior wall framing, installed roof ladder
None
None
Continue general construction of Concourse A and Rotunda, start roofing of rotunda
None
02/08/2019 Jason D. Pike
-
Storm water sewer installation (Near Concoure A) Install exterior metal studs (Concoure A)
Install storefront near elevator (Concourse A) Roof drain installation (Concourse A)
HVAC duct installation (Concourse A) Communication box installation (Near Conc. A)
-
X
X
32 / 65 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 1 1 General escort & supervision
Ivey Plumbing 0
Ivey HVAC 0
M-R Electric 0
Trinity 0
New Shine 4 4 Picked up concrete blankets & sawcut c.t. jts.
Simmons Masonry 0
Sammax 0
Jones & Smith 0
Grieme Roofing 0
2nd Wind 0
Sanford Steel 8 8 Installing rotunda decking
Dixie Painting 0
ECS 0
VSC 0
Southern Glass 0
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 1 0 8 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 13
X
Notes: 1)
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
2-Feb-19
Sunny Cloudy
Temperature:
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site:
Crane
Backhoe / Excavator
Leroy Haskins Bulldozer
Stephanie Maslouski
Frozen
Rainy
Loader
Snow Lightning
Ground: Dry Wet
Randy Grubb
degrees Precipitation: inches
-
X
X
39 / 71 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 1 1 2 General escort & supervision
Ivey Plumbing 3 2 5 Installing roof drain piping
Ivey HVAC 2 1 3 Hanging duct work supports
M-R Electric 2 3 5 Installing panels @ Conc A
Trinity 4 4 Finishing gyp bd & framing ext. walls
New Shine 0
Simmons Masonry 0
Sammax 6 1 7 Installing sewer lines near Conc A
Jones & Smith 0
Grieme Roofing 0
2nd Wind 0
Sanford Steel 6 6 Installing rotunda decking
Dixie Painting 0
Premier 2 2 Inspecting jobsite
VSC 0
Southern Glass 2 2 Installing window frame near elevator
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 1 0 6 3 0 4 0 2 2 17 0 0 0 0 1 0 0 0 0 0 0 0 0 36
X
Notes: 1)
Frozen
Rainy
Loader
Snow Lightning
Ground: Dry Wet
Randy Grubb
degrees Precipitation: inchesTemperature:
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site:
Crane
Backhoe / Excavator
Leroy Haskins Bulldozer
Stephanie Maslouski
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
4-Feb-19
Sunny Cloudy
-
X
X
39 / 78 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 3 1 4 General escort & supervision
Ivey Plumbing 3 2 5 Installing roof drain piping
Ivey HVAC 2 2 4 Hanging duct work supports
M-R Electric 2 3 5 Installing panels @ Conc A
Trinity 4 4 Finishing gyp bd & framing ext. walls
New Shine 0
Simmons Masonry 0
Sammax 6 1 7 Installing sewer lines near Conc A
Jones & Smith 0
Grieme Roofing 0
2nd Wind 0
Sanford Steel 6 6 Installing rotunda decking
Dixie Painting 0
Premier 0
VSC 2 2 Installing sprinkler piping
Southern Glass 0 Installing window frame near elevator
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 2 2 Laying out sewer lines
Martin Architectural 0
Totals: 3 0 6 3 0 4 0 2 2 18 0 0 0 0 1 0 0 0 0 0 0 0 0 39
X
X
X
Notes: 1)
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
5-Feb-19
Sunny Cloudy
Temperature:
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site:
Crane
Backhoe / Excavator
Leroy Haskins Bulldozer
Stephanie Maslouski
Contractor warned about trash and construction debris laying around job site.
Frozen
Rainy
Loader
Snow Lightning
Ground: Dry Wet
Randy Grubb
degrees Precipitation: inches
-
X
X
47 / 79 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 3 1 4 General escort & supervision
Ivey Plumbing 3 2 5 Installing roof drain piping
Ivey HVAC 2 2 4 Hanging duct work supports
M-R Electric 2 3 5 Installing panels @ Conc A
Trinity 3 3 Finishing gyp bd & framing ext. walls
New Shine 0
Simmons Masonry 0
Sammax 6 1 7 Installing sewer lines near Conc A
Jones & Smith 0
Grieme Roofing 0
2nd Wind 0
Sanford Steel 2 2 Installing perimiter clips @ rotunda
Dixie Painting 0
Premier 0
VSC 2 2 Installing sprinkler piping
Southern Glass 0
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 3 0 2 3 0 3 0 2 2 16 0 0 0 0 1 0 0 0 0 0 0 0 0 32
X
X
X
Notes: 1)
Frozen
Rainy
Loader
Snow Lightning
Ground: Dry Wet
Randy Grubb
degrees Precipitation: inchesTemperature:
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site:
Crane
Backhoe / Excavator
Leroy Haskins Bulldozer
Stephanie Maslouski
Contractor notified about debris laying around job site.
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
6-Feb-19
Sunny Cloudy
-
X
X
59 / 81 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 3 1 4 General escort & supervision
Ivey Plumbing 3 2 5 Installing roof drain piping
Ivey HVAC 2 2 4 Hanging duct work supports
M-R Electric 2 4 1 7 Installing panels @ Conc A
Trinity 4 4 Finishing gyp bd & framing ext. walls
New Shine 0
Simmons Masonry 0
Sammax 6 1 7 Installing sewer lines near Conc A
Jones & Smith 0
Grieme Roofing 0
2nd Wind 0
Sanford Steel 4 4 Misc fit-up welding
Dixie Painting 0
Premier 0
VSC 0
Southern Glass 1 1 Assembling rotunda window frames
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 3 0 4 3 0 4 0 2 2 16 0 0 0 0 2 0 0 0 0 0 0 0 0 36
X
X
X
Notes: 1)
Frozen
Rainy
Loader
Snow Lightning
Ground: Dry Wet
Randy Grubb
degrees Precipitation: inchesTemperature:
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site:
Crane
Backhoe / Excavator
Leroy Haskins Bulldozer
Stephanie Maslouski
Contractor notified about miscilanious debris laying around job site.
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
7-Feb-19
Sunny Cloudy
-
X
X
50 / 82 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 2 1 3 General escort & supervision
Ivey Plumbing 0
Ivey HVAC 0
M-R Electric 1 1 2 Installing conduit @ Conc A
Trinity 3 3 Finishing gyp bd & framing ext. walls
New Shine 0
Simmons Masonry 0
Sammax 6 1 7 Installing sewer lines near Conc A
Jones & Smith 0
Grieme Roofing 0
2nd Wind 0
Sanford Steel 4 4 Misc fit-up welding, installing roof ladder
Dixie Painting 0
Premier 0
VSC 0
Southern Glass 0
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 2 0 4 0 0 3 0 1 0 8 0 0 0 0 1 0 0 0 0 0 0 0 0 19
X
X
Notes: 1)
Frozen
Rainy
Loader
Snow Lightning
Ground: Dry Wet
Randy Grubb
degrees Precipitation: inchesTemperature:
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site:
Crane
Backhoe / Excavator
Leroy Haskins Bulldozer
Stephanie Maslouski
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
8-Feb-19
Sunny Cloudy