    PLANT LAYOUT A layout is a physical configuration

    of departments, work stations and

    equipments in the conversionprocess.

    It is the spatial arrangement of

    physical resources used to create aproduct.

  • 8/6/2019 Om Plant Layout Study

    2/27

    OBJECTIVES OF PLANT LAYOUT STUDY

    1. Minimize investment in equipment

    2. Minimize over all production time.

    3. Utilize existing space mosteffectively

    4. Provide for employee convenience,

    Safety and comfort5. Maintain flexibility of arrangement

    and operation.

    6. Minimize material handling cost

  • 8/6/2019 Om Plant Layout Study

    3/27

    OBJECTIVES OF PLANT LAYOUT STUDY

    7. Minimize variation in types of

    material handling equipment.

    8. Facilitate the manufacturing

    process.

  • 8/6/2019 Om Plant Layout Study

    4/27

    PLANT LAYOUT STUDY

    It is interrelated .

    Layout design

    Product design

    Schedule Design Process Design

  • 8/6/2019 Om Plant Layout Study

    5/27

    SOME MOST COMMONLY INVOLVEDFACTORS / CONSIDERATIONS

    1. Ease of future expansion

    2. Flexibility of layout3. Material handling effectiveness

    4. Space utilization

    5. Safety & Housekeeping

    6. Working Conditions

  • 8/6/2019 Om Plant Layout Study

    6/27

    SOME MOST COMMONLY INVOLVEDFACTORS / CONSIDERATIONS

    7. Ease of Supervision & Control

    8. Appearance, Promotional value

    9. Fit with Company OrganizationStructure

    10.

    Equipment utilization11. Ability to meet capacity or

    Requirements

    12. Investment or capital required.

  • 8/6/2019 Om Plant Layout Study

    7/27

    REEDS SYSTEMATIC PLAN OF ATTACKPLANT LAYOUT PROCEDURE Steps to

    be taken

    Analyse the production or processes to

    be produced Determine the process required to

    manufacture the product

    Prepare layout planning charts Determine work stations

    Analyse storage area requirements

  • 8/6/2019 Om Plant Layout Study

    8/27

    REEDS SYSTEMATIC PLAN OF ATTACKPLANT LAYOUT PROCEDURE Steps to

    be taken

    Establish minimum aisle widths

    Establish office requirements Consider personnel facilities and

    services

    Survey plant services Provide for future expansion

  • 8/6/2019 Om Plant Layout Study

    9/27

    THE MOST POPULAR APPROACHDEVELOPED BY MUTHER - SLP

    The procedure applied to:

    1. Production2. Transportation

    3. Storage

    4. Support services5. Office activities etc

  • 8/6/2019 Om Plant Layout Study

    10/27

    1. Flow of

    Material

    2. Activity

    Relationships

    INPUT DATA AND ACTIVITIES

    3.RelationshipDiagram

    4. SpaceRequirements

    5. SpaceAvailable

    6. Space RelationshipDiagram

    7. ModifyingConsiderations

    8. PracticalLimitations

    9. Develop LayoutAlternatives

    10. Evaluation

    Sele

    ction

    Search

    Analysis

  • 8/6/2019 Om Plant Layout Study

    11/27

    TYPES OF FLOW PATTERNS

    Classifications of flow patterns Horizontal or vertical

    a) b)

    c) d)

  • 8/6/2019 Om Plant Layout Study

    12/27

    TYPES OF FLOW PATTERNS

    Classifications of flow patterns Horizontal or vertical

    e)

    f)

  • 8/6/2019 Om Plant Layout Study

    13/27

    TYPES OF FLOW PATTERNS Vertical flow patterna) b) c)

  • 8/6/2019 Om Plant Layout Study

    14/27

    TYPES OF FLOW PATTERNS Vertical flow patternd) e) f)

  • 8/6/2019 Om Plant Layout Study

    15/27

    TYPES OF LAYOUT

    Four General layout categoriesare:-

    1. Fixed or Static product Layout

    2. Product layout

    3. Process Layout

    4. Product Layout

  • 8/6/2019 Om Plant Layout Study

    16/27

    Fixed position layout It is not feasible to move the

    product

    Product stays in one location;tools,men,material etc. arebrought to it.

  • 8/6/2019 Om Plant Layout Study

    17/27

    FIXED PRODUCT LAYOUT

    WORK PIECE

    Paint

    Mill

    Weld

    Drill

    Lathe Grind

    AssemblySaw

    Stores Warehouse

  • 8/6/2019 Om Plant Layout Study

    18/27

    PRODUCT LAYOUT

    Saw

    Saw

    Grind

    Weld Grind

    Mill

    Mill

    Lathe Mill

    Drill Paint

    Paint

    DrillLathe

    Drill

    Drill

    Assembl

    y

    Warehous

    e

    Stores

  • 8/6/2019 Om Plant Layout Study

    19/27

    Product layout or line

    production Appropriate for producing one

    standard product in large quantities

    Each unit of output require the samesequence of operations frombeginning to end

    Work centers and equipments arearranged in a line

  • 8/6/2019 Om Plant Layout Study

    20/27

    Process layout or layout by

    function Work centres and departments are

    grouped together according to their

    function or type Useful where volume of

    manufacture is low and variety is

    high Provides tremendous flexibility- no

    solid sequencing

  • 8/6/2019 Om Plant Layout Study

    21/27

    GROUP LAYOUT

    Saw

    Saw

    Grind

    Lathe Mill

    Paint

    Mill

    Lathe

    Assemb

    ly

    Warehouse

    Stores

    Paint

    Drill

    Drill

    Group A

    Group B

  • 8/6/2019 Om Plant Layout Study

    22/27

    ADVANTAGES & LIMITATIONS OFLAYOUTS

    Fixed Product Layout

    Advantages Limitations1. Material movement is

    reduced

    2. Promotes Job enlargement

    by allowing individuals orteams to perform the wholejob

    3. Continuity of Operationsand responsibility resultsfrom team

    4. Highly flexible; canaccommodate changes inproduct design, product mixand production volume

    5. Independence of productioncenters allows schedulingto achieve min. total prodn

    1. Increased movement ofpersonal and equipment.

    2. Equipment duplication may

    occur3. Higher skill requirements for

    personnel

    4. General supervisionrequired

    5.

    Cumbersome and costlypositioning of material andmachinery

    6. Low equipment utilization

  • 8/6/2019 Om Plant Layout Study

    23/27

    ADVANTAGES & LIMITATIONS OFLAYOUTS

    Product Layout

    Advantages Limitations1. Since the layout

    corresponds to thesequence of operations,smooth and logical flow lineresult.

    2. Since the work from oneprocess is fed directly intothe next, small in processinventories result.

    3. Total production time perunit is short.

    4. Since the m/cs are locatedso as to minimize distancesb/w consecutive operations,materials handling is

    reduced.

    1. A breakdown of onemachine may lead to acomplete stoppage of theline that follows thatmachine.

    2. Since the layout isdetermined by the product,a change in product designmay require major

    alterations in the layout.3. The pace of production is

    determined by the slowestmachine.

    4. Supervision is general,rather than specialized.

    5. Comparatively high

  • 8/6/2019 Om Plant Layout Study

    24/27

    ADVANTAGES & LIMITATIONS OFLAYOUTS

    Group Layout

    Advantages Limitations1. Increased machine

    utilization.

    2. Team attitude and job

    enlargement tend to occur.3. Compromise between

    product layout and processlayout, with associatedadvantages

    4. Supports the use of general

    purpose equipment.5. Shorter travel distances

    and smoother flow linesthan for process layout.

    1. General supervisionrequired.

    2. Higher skill levels required

    of employees than forproduct layout.

    3. Compromize betweenproduct layout and processlayout with associatedlimitations.

    4. Depends on balancedmaterial flow through thecell; otherwise buffers andwork-in-process storage arerequired.

    5. Lower machine utilization

    than for process layout.

  • 8/6/2019 Om Plant Layout Study

    25/27

    ADVANTAGES & LIMITATIONS OFLAYOUTS

    Process Layout

    Advantages Limitations1. Better utilization of

    machines can result;consequently fewermachines are required.

    2. A high degree of flexibilityexists relative to equipmentor manpower allocations forspecific tasks.

    3. Comparatively low

    investment in machines isrequired.

    4. The diversity of tasks offersa more interesting andsatisfying occupations forthe operator.

    5. Specialized supervision is

    1. Since longer flow lineusually results, materialshandling is more expensive.

    2. Production planing andcontrol system are moreinvolved.

    3. Total production time isusually longer

    4. Comparatively large amount

    of in-process inventoryresult.

    5. Space and capital are tiedup by work in process.

    6. Because of the diversity ofjobs in specializeddepartments, higher grades

  • 8/6/2019 Om Plant Layout Study

    26/27

    Space for Future Expansion

    Space for FutureExpansion

    Copper TeeProduction (Assembly)Operations1. Cu-Wire Rewinding

    / Cleaning2. Winding3. Tying4. Pouching5. Assembling6. Sealing7. QA

    QA

    Cu-T Moulding

    Component Store

    Receiving Bay

    Raw Matl for Cu-TMoulding

    Final Packing AreaFor Cu-T

    Finished Product

    Store

    Quarantine