Oilsands power and process engineering lab generic version 2013 updates el

13

Transcript of Oilsands power and process engineering lab generic version 2013 updates el

$22 million state-of-the-art laboratory and classroom facilities

Will feature a power and H-VAC plant.

Lab will provide steam time for 4th

and 3rd class power engineers.

Enables new programming in: instrumentation, fluid mechanics, pneumatics and building operations.

0

500

1000

1500

2000

2500

3000

Low Scenario Growth Scenario

850

2700

1700

2800

Operators (Steam/Non-Steam) needed in Alberta 2010-2020

Alberta (non oilsands)

Oilsands

Total: 2550

Total: 5500

Source: The Decade Ahead: Labour Market Projections & Analysis for Canada’s Oil & Gas Industry to 2020 -Petroleum Human Resources Council of Canada (March 2011)

Currently Keyano instructs 165 students per year in power engineering and process operations co-op programs.

The new lab will increase our instructional capacity to 468 steam time blocks per year.

0

100

200

300

400

500

Current Expected

165

468

Steam Time Blocks

Classrooms have direct visibility into the laboratories.

Steam turbine generators, high pressure boilers and turbine steam condensers are aligned as in an actual oils sands facility.

Locally trained graduates are more likely to stay, work and live in the oilsands region.

The Oilsands Power & Process Engineering Laboratory will provide our industry partners with access to skilled employees with a solid understanding of oilsands operations - without the added costs of outside recruitment.

Lead Sponsor

Groundbreaking Ceremony: June 1st, 2012

Expected completion: Late Fall 2013

First intake of new students: January 2014