DNV GL © 2013
Ungraded
02 November 2016 SAFER, SMARTER, GREENERDNV GL © 2013
Ungraded
02 November 2016Mike White
OIL & GAS
Site-Specific Assessment of Jack-UpsPart 1: Jack-Up Basics & Why We Do Site-Specific Assessments
1
Noble Denton marine services
![Page 2: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/2.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Overview
What are we talking about?
Why do Site-Specific Assessment Analyses (SSAAs)?
Some jack-up basics.
What do we assess?
2
![Page 3: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/3.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Definitions
A jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which:
Are raised above the hull to move from one location to another.
Are lowered below the hull and founded on the seabed when operating to provide a stable platform for offshore applications such as drilling, work-over, tender assist, accommodation, wind turbine installation, etc., etc.
Figure: Age of drillingjack-ups versusyear built.
3
![Page 4: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/4.jpg)
DNV GL © 2013
Ungraded
02 November 2016
The First Salt-Water Jack-Up ?
4
William Arrol’s Tay Bridge jack-up - 1882
![Page 5: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/5.jpg)
DNV GL © 2013
Ungraded
02 November 2016
The First O&G Jack-Up
5
Zapata Scorpion – LeTourneau - 1955
![Page 6: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/6.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Designs from 1970’s and 1980’s
6
LeTourneau 116-C Friede & Goldman L780 Mod II
![Page 7: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/7.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Designs from the 2010’s
7
KFELS N-Class GustoMSC CJ80-X175A
![Page 8: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/8.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Why do we do Site-Specific Assessment Analyses?
Site parameters will differ fromdesign assumptions, e.g.:– Wave height / Wind speed / Current.– Leg penetration.– Water depth.– Airgap.
Some aspects cannot be considered in design:– Site-specific spudcan foundation stiffness
and load capacity.– Regulator or hirer requirements differ
from those used for Classed approval.– Environmental directionality.– Changes in technology.
Other:– Required by Insurer or Hirer.– Required by Marine Warranty Surveyor
(for insurance).
To safeguard life, property and the environment.
8
![Page 9: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/9.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Site Values vs. Design Values in Marine Operations Manual
WD(m)
WH(m)
Wind(m/s)
Curr(m/s)
Airgap(m)
Design 91.4 23.8 51.5 1.03 18.3
Site 91.0 25.0 43.0 0.80 23.0
9
![Page 10: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/10.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Some Jack-up BasicsStructural System
A jack-up is a giant portal frame - it relies on the ability of the leg-to-hull connection to carry bending moment:
10
Shear
BM Pinned footing
WEIGHTENVIRONMENTAL LOAD
WEIGHTENVIRONMENTAL LOAD
![Page 11: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/11.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Foundation Fixity is the Key
Fixity can roughly halve the bending moment at the hull.
Increase the sway stiffness by a factor of 4 and halve the natural period.
Dynamics are important and a function of foundation fixity.
Foundation fixity can reduce as loads increase (due to yielding of the soil under the spudcans).
11
Shear
BM pinned
spudcan
WEIGHT
WINDBM
fixed spudcan
WAVE/CURRENT
![Page 12: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/12.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Design Variations - from the 1980’s
12
LeTourneau Gorilla Friede & Goldman1983 L780 Mod V
![Page 13: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/13.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Typical Leg Configurations
13
![Page 14: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/14.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Pinions and Rack-Chocks (Fixation Systems)
14
![Page 15: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/15.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Transfer of Leg Bending Moment to Hull
15
Lower Guide Reaction, RLG
Upper Guide Reaction, RUG
M
H
RUG = RLG = M/L
M
Pinion Reaction,
RLPinion Reaction, RR
W
RL = RR = M/W
More moment carried by guides. More moment carried by pinions or chocks.
Need strong braces (see next). Braces can be less strong.Leg more robust. Leg less robust.
![Page 16: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/16.jpg)
DNV GL © 2013
Ungraded
02 November 2016
A Softer Vertical Connection Makes Braces & Chords Work Harder
16
RLG
RUG
Tension member
Compression member
![Page 17: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/17.jpg)
DNV GL © 2013
Ungraded
02 November 2016
So Which Rig Is The More Capable ?
Jack-up on right has storm capability as good as the one on the left.
17
![Page 18: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/18.jpg)
DNV GL © 2013
Ungraded
02 November 2016
What Do We Assess?
Checks made on:
– Spudcan penetration & potential for punch-through or rapid penetration.
– Geometry.
– Overturning stability.
– Foundation strength.
– Structural strength.
Typically rely on design stage / Class for:
– Strength of hull.
– Strength of spudcans.
Typically rely on Class for:
– Condition of jack-up.
18
![Page 19: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/19.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Site-Specific Assessment Checks
Checks made on:
– Penetration & punch-through
– Geometry
19
Leg penetration
Water depth
Air gap
Reserve of leg above jack-house
![Page 20: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/20.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Site-Specific Assessment Checks
Checks made on:
– Overturning stability
20
Weight
Leeward leg settling ?
Weight
Windward leg sliding ?
Wind load
Wave & current load
![Page 21: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/21.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Site-Specific Assessment Checks
Checks made on:– Foundation strength.
Install legs by preloading to develop capacity to resist storm loading. Preload proves vertical
capacity only. Horizontal (and moment)
loads reduce vertical capacity. When capacity is exceeded
additional penetration will occur - and the capacity envelope will (usually) expand – with a range of consequences.
21
Vertical spudcan
load
Horizontal spudcan load
Foundation failure envelope
Sliding limit
Preload
Leeward leg(s)
12
12
Windward leg(s)
Still-water (static) load
![Page 22: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/22.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Site-Specific Assessment Checks
Checks made on:
– Structural Strength.
22
Wind load
Guide reactionWave &
current load
![Page 23: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/23.jpg)
DNV GL © 2013
Ungraded
02 November 2016
Conclusions
History.
Why we do SSAAs.
Some jack-up basics.
What we assess:
– Spudcan penetration & punch-through.
– Geometry.
– Overturning stability.
– Foundation strength.
– Structural strength.
23
![Page 24: OIL & GAS Site-Specific Assessment of Jack-Ups - Why Site-Assessment_tcm14-80214.pdfA jack-up (or self-elevating platform) is a buoyant barge-like hull with legs which: Are raised](https://reader034.fdocuments.us/reader034/viewer/2022042023/5e7ae46892325f5efc57d1c1/html5/thumbnails/24.jpg)
DNV GL © 2013
Ungraded
02 November 2016
SAFER, SMARTER, GREENER
www.dnvgl.com
Questions?
24