Transcript of Oil & gas project dBasic Versus Detaled
-
Discipline Deliverable/activity FEED DETAILGeneral Basic Engineering Design Data x x
HAZOP x xHAZID x xQRA If required by Authorities xHazardous area classification drawings IFD IFCFire water demand calculation Preliminary finalFire & Gas detection layout xFire water network layout drawing IFD IFCSafety philosophy x xEnvironment impact Assessment x xProcess Flow Diagrams (PFDs) x xHeat & Material Balances (HMB) x xEquipment list x xP&IDs IFD IFC
P&IDs - packaged units Preliminary (main principles) xProcess description x xOperating manual xEquipment Process Data Sheets x x
Instrument Process Data SheetsControl & ON/OFF valves, analysers, flowmeters, PSVs all
Packaged units duty specifications x xEmergency shutdown philosophy x xCauses & Effects diagrams x x
Heat exchangers thermal design & data sheets x xUtility balance preliminary finalFlare study relief load summary complete reportEquipment specifications x xEquipment mechanical design x xEquipment Mechanical Data Sheet x xRequisition for inquiry For main equipment For allRequisition for purchase For LLI For allTechnical Bid Tabulation For main equipment For allVendor follow-up xGeneral Plot Plan x xUnit Plot Plan IFD IFC
3D model reviewEquipment + main process lines only x
Piping routing drawings xPiping studies and Layout drawings xPiping General Arrangement drawings xIsometric drawings xGeneral specification for piping materials x xPiping classes summary x xMaterial selection and corrosion control report x xSpecial piping items specification xPiping Material Classes Specifications x xStandard drawings design installation
Piping MTO
from P&ID (item count) and Plot Plan/Piping routing drawings (lengths)
from Piping layout studies/3D model
Design specification (piping stress design basis) x x
Piping stress calculations
Simplified calculation of critical lines with impact on Plant Layout x
Piping support drawings and list x
FEED vs DETAIL ENGINEERING DELIVERABLES
(c) T
he O
il &
Gas
Eng
inee
ring
Gui
de, H
erv
Bar
on, E
ditio
ns T
echn
ip, 2
015
PipingInstallation
Piping/Material
Piping/Stress
Safety
Process
Mechanical
Plant Layout
-
Discipline Deliverable/activity FEED DETAIL
FEED vs DETAIL ENGINEERING DELIVERABLES
Control system specification x x
Instrument data sheets
ON/OFF valves, control valves, PSVs, flowmeters, analysers all
Instrumentation & Automation design specification x xSystem architectural drawing x xSystems I/O sizing x xInstrument list x xMaterial Requisitions xMaterial Take-Off xCable schedule xLoop diagrams xHook-up drawings standard assignedControl and technical roms/buildings Equipment Arrangement drawings
Preliminary (size of building only) x
Cable routing drawings Main routings only all routings
Soil investigation specification xfor additional soil investigations
Underground networks drawings General (1:200 scale) Area (1:50 scale)Design specifications x xCivil works specifications Main allGuide / outline drawings If needed to perform MTODesign drawings xCalculation & calculation notes xDrainage network calculation x xConcrete/steel standard drawings design constructionBuildings architectural drawings x xMaterial take-off preliminary xOne Line Diagram General Switchgear'sElectrical consumers list preliminary finalEquipment general specification x xElectrical design specification x xEquipment data sheet HV, MV LVMaterial Requisitions xStandard drawings design installationSpecification for bulk x
MTOpreliminary (for bulk: cables only) all
Cable schedule preliminary final
Substation Equipment arrangement drawingspreliminary (size of sub-station only) x
Cable routing drawings Main routings only all routingsCalculations Some AllSpecifications x xStandard drawings x
(c) T
he O
il &
Gas
Eng
inee
ring
Gui
de, H
erv
Bar
on, E
ditio
ns T
echn
ip, 2
015
Civil
Electrical
Painting, Coating, Insulation
Instrumentation & Control