Oil and Gas Product Roadmap GOMaximo 2014 Houston, TX 25 ...
Transcript of Oil and Gas Product Roadmap GOMaximo 2014 Houston, TX 25 ...
Maximo
© 2014 IBM Corporation
Oil and Gas Product Roadmap GOMaximo 2014 Houston, TX 25 September 2014
Russell Bee Lead Product Architect Kyle Harding Sr. Designer Architect
Maximo Oil & Gas
© 2014 IBM Corporation
Agenda
§ Reflections on SPE Intelligent Energy 2014
§ Oil and Gas/HSE design team introduction
§ Overall Maximo product roadmap
§ Oil and Gas product roadmap
Maximo Oil & Gas
© 2014 IBM Corporation
1. Reflections on SPE Intelligent Energy Utrecht 2014 (Papers by Shell, Exxon, Aramco, Statoil, BP)
§ A consistent theme was the need to better leverage technology
§ Pushing the boundaries in harsh environments
§ The NASA Mars rover Curiosity was quoted as a good example of the application of remote technology
§ But human guidance and decision making is still vital to the missions
§ Balance technology with lean workflows and address people issues
§ We’ll come back to Maximo…..
Maximo Oil & Gas
© 2014 IBM Corporation
From Curiosity to Swiss Cheese!
Image Credit: NASA/JPL-Caltech/Malin Space Science Systems
Maximo Oil & Gas
© 2014 IBM Corporation
Oil and Gas Design team introduction
§ Russell Bee, Lead Product Architect (Manchester, UK)
§ Kyle Harding, Sr Designer Architect - Service Desk Module, Mobile Incident Reporter and visualization (Boston, MA)
§ Ana Paula Brambila, Lead Developer – Location Profile design (Sao Paulo, Brazil)
§ Gabriella Martins Orpinelli, Staff Software Engineer - Operations module design (Sao Paulo, Brazil)
§ Martin Harris, Industry SME Business process review and development (Derby, UK)
Maximo Oil & Gas
© 2014 IBM Corporation
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. THE INFORMATION PROVIDED IN THIS DOCUMENT IS DISTRIBUTED “AS IS” WITHOUT ANY WARRANTY, EITHER EXPRESS OR IMPLIED. IBM EXPRESSLY DISCLAIMS ANY WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT
Maximo Oil & Gas
© 2014 IBM Corporation
IBM Maximo - Driving New Capabilities
Functional Enhancements to drive new customer
value
Optimization for improved deployment
of resources
Mobile for improved user
experience Cloud
for reduced CAPEX costs
Analytics as new basis of
competitive advantage
Product Deployment
for faster implementation
Maximo Oil & Gas
© 2014 IBM Corporation
2014 Maximo Asset Management Roadmap Q1 2014 Q2 2014
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .
Q3 2014 Q4 2014
Maximo Fix-pack 7.5.0.6
Maximo Fix-pack 7.5.0.7
Maximo Asset Mgmt v7.Next • Usability • BI Dashboards • Reporting/KPI Improvements • Updated Platforms • Crews • Open Map API • Multi-tenancy
Maximo Anywhere v7.x • Authoring Tool • Windows • Maximo Inventory & Asset applications • RFID&GPS support • Add’l TRIRIGA
Maximo Anywhere V7.x • iOS • Application editor • File Attachments • Add’l Maximo Work Mgmt applications • TRIRIGA applications
Maximo Service Provider 7.5.2 • Billing frequency • Customer specific job plans
Asset Config Mgr 7.5.x Maximo Service
Provider 7.5.x • Conditional Pricing • Combined Billings • Customer specific vendors
Maximo Inventory Insights 1.1 • Predict out-of stock or over-stock conditions • Suggest optimized inventory levels • SaaS delivery
Maximo (SaaS) 7.5 • Full EAM functionality • Subscription based delivery model • Provides OT and IT capabilities • Hosted by IBM SoftLayer
Maximo BI Pack - Inventory Metrics
Fix packs
New Versions New Products
No-Charge Offerings
2015
Maximo Oil & Gas
© 2014 IBM Corporation
IBM Maximo Asset Management – 7.next
Expanded capabilities to support business intelligence
Intuitive navigation for users
Increased Serviceability
Improve visibility, increase resource utilization and reduce costs
§ Focus on User Experience – new look and feel, expanded start center configuration options"§ Analytical insights through Reporting, KPI’s and Dashboards improved performance, increased user access and better tools to monitor the health of your business"§ Functional Enhancements improved crew management and service addresses to support maps"§ Technology Improvements – expanded install and platform support"
Maximo Oil & Gas
© 2014 IBM Corporation
FOCUS ON REPORTING AND KPI’s
USER EXPERIENCE
§ A new look introducing updated fonts, colors and styling of applications
§ Application navigation (nested view) and Breadcrumbs across top.
§ Hover dialog provides additional field information § Startcenter –multiple objects per result set § Record Locking options, Improved Date/Time calculations
across timezones in Labor Transactions/PM’s
Maximo 7.next
§ Executive dashboards with Metric Reports and Metric Workspace Displays
§ Performance improvements in reporting solutions § Set a limit on the number of records presented from an Ad-
hoc report so users aren’t waiting for results for a long time.
§ New KPI Template and KPI Viewer Applications § Individual KPI scheduling § Ability to add calculations to ad-hoc reports
Maximo Oil & Gas
© 2014 IBM Corporation
INVESTMENT IN TECHNOLOGY
FUNCTIONAL ENHANCEMENTS
§ Capabilities to support Crews including Crew types and a Crew application
§ Service Addresses for Assets & Locations § Public Map API and Application Designer for the Map Control (Google, Bing, ESRI)
§ Introduce Log tab in Quick Reporting, PR and PO applications
§ IBM Install Manager for a consistent user experience across installation of IBM offerings § Automation of common configuration scenarios, such as middleware re-configuration, ID and password changes, and language deployment § Better installation and configuration help and progressive disclosure § Enablement for future capabilities such as fix pack and hot fix deployment § Support for multiple tenants in a single environment § A broad choice of supported technologies to best meet your requirements. (Middleware/OS/Browsers) § Scripting Enhancements
Maximo 7.next
Maximo Oil & Gas
© 2014 IBM Corporation
Maximo’s future with Supply Chain…time to think outside ‘the box’
§ Maximo Supply Chain Framework – ‘Complimentary’ to the needs of Enterprise
Asset Management
– Scenario-specific extensions to supply chain functionality delivered via industry solutions
§ Core Maximo supply chain functionality delivers the bulk of supply chain capabilities for many of our customers.
§ Addressing the remaining supply chain business requirements is best-suited by IBM’s in-house best of breed capabilities….just not necessarily in Maximo’s box.
Enter Emptoris
Maximo Oil & Gas
© 2014 IBM Corporation
Plan to Contract
A combina*on of Emptoris and Maximo extend supply chain capabili*es to Planning and Contract mgmt
+
Execute to Settle
Analyze
Spend Supplier
Selection
Supplier
Sourcing
Manage
Supplier
Contracts
Activate
Suppliers
Automate
the order
process
Logistics
Management
Supplier Compliance,
Risk & Performance
Maximo Oil & Gas
© 2014 IBM Corporation
HSE Manager/Oil and Gas Vision
• Extensive integrated process • Risk and asset health • More visual and mobile user interface • Strength in analytics
Service Request
Defect/Non Conformance Incident
Operator Log
Work Management
Investigate & Improve
Improvement
Action Tracking
Prioritization Matrix
PMsCondition Monitoring
Condition for Work
Work Orders
Quick Reporting
Engineering System
Plant Control Systems
Change Management
MOC Request
Control of Work
Risk Assessment
Permit & Certificate
Types
Projects
Manage Assets
Manage Supply Chain
MOCPurchasing
Inventory
Contracts
Locations
Assets
Compliance
Regulatory Compliance
Finance
OperationsKnowledge
Management
Benefits & Losses
Solution Search
Investigation (Lessons Learned)
Solutions
HR
People
InvestigationHazards
Risk Matrix
Key:
External Process
Maximo Process
Oil and Gas Applications
Oil & Gas Cloned Applications
Job Plan
Scheduler
Operator Tasks
Operating Policy
Drilling and Completion
Run Log
Linear Assets
Location Profile
Reporting and Analytics Layer
*
*
*
* Not part of oil and gas must be purchased separately
Operating Procedures
Asset Lists
Standard Actions
QualificationsPermit to
Work
Lock Out/Tag Out Plan Audit and
Survey
Work Order Preparation
Activities
Certifications
Spatial
Core Maximo applications
Add-on Maximo applications
Drilling
Maximo Oil & Gas
© 2014 IBM Corporation
Road map themes – multiple thread approach
§ Enhancements to integrated operational and maintenance processes
§ Focus on analytics
§ Leverage next generation mobile
§ Improved visualization and UX
§ Support for Maximo 7.x, new Installer and Scheduler 7.5.2
Maximo Oil & Gas
© 2014 IBM Corporation
Functional enhancements
§ Close gaps in data structure and business process to better support analytics
§ Adapting and extending existing capability to expand coverage in operations and safety related areas where competitive gaps have been identified
§ Keep a strong focus on continuous improvement of functional capability
Maximo Oil & Gas
© 2014 IBM Corporation
Maximo for Oil and Gas/Maximo HSE Roadmap - Functional
Release 7.x Release 7.X
All future release dates are estimates and specific content is subject to change.
Maximo 7.X Maximo 7.X
Release 7.X
Maximo 7.X
GA: GA: GA:
• Permit to Work process enh
• Operational Risk Assessment
• Isolation Certificates
• Certification templates
• Audit and Survey Likert fields
• Safety Management System enh
• Chemical management
• Simultaneous Activity Matrix
• Safety Equipment Profile
• Occupational health
• Oil and Gas Adapter enh.
• Operator Log enh.
• Miscellaneous UX enhancements
Maximo Oil & Gas
© 2014 IBM Corporation
Mobile next generation
§ Main use cases now identified § Focus on simpler request type applications and
toolbox talk § Waited until 2nd Anywhere release § Continue to define use cases and detailed
requirements § Priority is an Incident Reporter app § Mobile inspection to be a common development
Maximo Oil & Gas
© 2014 IBM Corporation
Maximo for Oil and Gas/Maximo HSE Roadmap - Mobile Release To Be Decided Release 7.X
All future release dates are estimates and specific content is subject to change.
Maximo 7.X Maximo 7.X
Release 7.X
Maximo 7.X
GA: GA: GA:
• Incident Reporter
• Operator Log Entry
• Request a Permit
• Record a Survey Entry
• Toolbox Talk
Maximo Oil & Gas
© 2014 IBM Corporation
Maximo Oil and Gas/HSE Manager – Proof of Concept and Analytics Work
§ Proof of concept work to investigate new technologies
§ Collaboration with IBM Research
§ BI Workpacks
§ Not necessarily to be delivered through formal release
Maximo Oil & Gas
© 2014 IBM Corporation
Maximo for Oil and Gas/Maximo HSE Roadmap - POCs POC Release 7.X
All future release dates are estimates and specific content is subject to change.
Maximo 7.X Maximo 7.X
Release 7.X
Maximo 7.X
GA: GA: GA:
• Cognos TM1 Analytics
• Cognos BI HSE Workpack
• Plant layout visualisation
• Turnaround Analytics
• Predictive Safety Analytics
Maximo Oil & Gas
© 2014 IBM Corporation
Cognos TM1 Analytics
§ Shows how Cognos TM1 can be integrated with Maximo Oil and Gas/HSE
§ Built example cubes – Defect elimination
– Permit to Work – Management of Change
§ Document and make available on ISM Library for customers to access
§ Review future requirements with customers
Maximo Oil & Gas
© 2014 IBM Corporation
Cognos BI HSE Workpack
§ Considering possibility of a BI Workpack for HSE focused on process safety KPIs
§ Wide customer interest and more willingness to use Cognos if standard reports are available
§ Possibility to link to a balanced scorecard
§ Gathering customer input on KPIs
Maximo Oil & Gas
© 2014 IBM Corporation
Plant Layout Visualisation
§ View permits, risks, MOCs, high priority WOs on a schematic representation of a plant layout
§ Permit to Work Simops a key use case
§ Generic approach for use by multiple products
§ Dojo GFX identified as technology platform
§ POC started in December 2013
§ Demonstrated POC February/March 2014
§ Cumulative risk use case emerged from POC
§ Overall positive user feedback and strong interest
Maximo Oil & Gas
© 2014 IBM Corporation
Turnaround Analytics
§ First of a Kind (FOAK) project with IBM Research
§ Will utilise IBM ILOG optimization product, possibly SPSS
§ Maximo Oil and Gas to provide data model
§ Will utilise Maximo Scheduler ODME integration for ILOG
§ Funding approved July 2014, 9 month project
§ In process of identifying customers to work with
Maximo Oil & Gas
© 2014 IBM Corporation
Turnaround analytics use cases
§ Use cases 1. For activities associated with a turnaround support the optimum
planning of a long term turnaround program for a major producing unit. The object is to minimise loss over multiple shutdowns taking into account equipment condition or predicted condition.
2. For activities associated with a specific turnaround support the preparation, prior to execution, of a plan that will minimise production loss. Deviations in scope prior to execution shall also be addressed.
3. Extend 1 and 2 above taking into account dependencies such as interconnected platforms, sub sea tie-ins, remote well sites, production pipelines. power and steam supply.
4. Extend 1 - 3 above to support planning associated with unplanned outages that result in short duration shutdown of producing units.
Maximo Oil & Gas
© 2014 IBM Corporation
Predictive Safety Analytics
§ Utilise IBM SPSS and IBM Research capability § Based on Oil and Gas/HSE data model § Could potentially deploy using same architecture
as Inventory Insights hybrid cloud § Use cases
– Incidents/Investigations (both structured and unstructured data)
– Audits
§ Identifying customers interested in working with us closely in this area
Maximo Oil & Gas
© 2014 IBM Corporation
Forthcoming IBM White Paper – ‘A Unified Approach to Process Safety’
§ Working with Harvard Business School and University of Manchester
§ Embed risk assessment into mainstream business processes
§ Incorporate envisioning into process
§ Incorporate ‘soft’ factors into cumulative operational risk assessment
§ A ‘unified’ approach
§ Together is better!
Maximo Oil & Gas
© 2014 IBM Corporation
Conclusion
“We can only see a short distance ahead but we can see plenty there that needs to be done”
Alan Turing OBE, FRS