Project No. 148039
PID 88721
MOT-SR 48-16.21
Federal
Type: SIGNALIZATION
Completion Date: 9/30/2015
Award Amount: $1,448,177.85
Contract Awarded To: BANSAL CONSTRUCTION INC
Letting Date: 1/15/2015
Engineer's Estimate: $1,509,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BANSAL CONSTRUCTION INC
3263 HOMEWARD WAY
FAIRFIELD, OH 45014
Butler
Bidder 1
Bid $1,448,177.85
CAPITAL ELECTRIC LINE BUILDERS INC
4400 NW MATTOX RD
RIVERSIDE, MO 64150
Bidder 2
Bid $1,469,421.80
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 3
Bid $1,486,420.80
JESS HOWARD ELECTRIC CO
6630 TAYLOR RD
BLACKLICK, OH 43004
Franklin
Bidder 4
Bid $1,534,455.45
ELEX INC
11000 WINTON RD
CINCINNATI, OH 45218
Hamilton
Bidder 5
Bid $1,542,350.00
MILLER CABLE COMPANY
210 S BROADWAY ST P O BOX 68
GREEN SPRINGS, OH 44836
Seneca
Bidder 6
Bid $1,598,355.00
DAVIS H ELLIOT CONSTRUCTION COMPANY INC
673 BLUE SKY PARKWAY
LEXINGTON, KY 40509
Bidder 7
Bid $1,992,500.00
148039 - Page 1
Ref #1 202E30000 WALK REMOVED, (6311 SF)
Awd $15,777.50$2.50
2 $17,292.14$2.74
3 $12,622.00$2.00
4 $20,952.52$3.32
5 $22,088.50$3.50
6 $15,777.50$2.50
7 $31,555.00$5.00
Ref #2 202E30800 TRAFFIC ISLAND REMOVED, (141 SY)
Awd $6,768.00$48.00
2 $7,425.06$52.66
3 $2,961.00$21.00
4 $7,193.82$51.02
5 $20,022.00$142.00
6 $7,050.00$50.00
7 $7,755.00$55.00
Ref #3 202E32001 CURB REMOVED, AS PER PLAN, (748 FT)
Awd $11,968.00$16.00
2 $13,127.40$17.55
3 $5,610.00$7.50
4 $9,933.44$13.28
5 $17,204.00$23.00
6 $12,716.00$17.00
7 $5,984.00$8.00
Ref #4 608E10000 4" CONCRETE WALK, (3947 SF)
Awd $17,564.15$4.45
2 $19,261.36$4.88
3 $35,523.00$9.00
4 $37,259.68$9.44
5 $31,576.00$8.00
6 $19,735.00$5.00
7 $24,550.34$6.22
Ref #5 608E52011 CURB RAMP, TYPE A1, AS PER PLAN, (408 SF)
Awd $3,978.00$9.75
2 $4,365.60$10.70
3 $6,405.60$15.70
4 $4,993.92$12.24
5 $5,508.00$13.50
6 $4,182.00$10.25
7 $10,142.88$24.86
Ref #6 608E52021 CURB RAMP, TYPE A2, AS PER PLAN, (280 SF)
Awd $2,912.00$10.40
2 $3,194.80$11.41
3 $4,648.00$16.60
4 $3,427.20$12.24
5 $4,200.00$15.00
6 $3,080.00$11.00
7 $5,062.40$18.08
148039 - Page 2
Ref #7 608E52031 CURB RAMP, TYPE B1, AS PER PLAN, (247 SF)
Awd $2,642.90$10.70
2 $2,899.78$11.74
3 $4,100.20$16.60
4 $3,023.28$12.24
5 $3,952.00$16.00
6 $2,778.75$11.25
7 $5,023.98$20.34
Ref #8 608E52041 CURB RAMP, TYPE B2, APP, (927 SF)
Awd $10,938.60$11.80
2 $11,995.38$12.94
3 $14,461.20$15.60
4 $11,346.48$12.24
5 $15,527.25$16.75
6 $11,587.50$12.50
7 $20,950.20$22.60
Ref #9 608E52045 CURB RAMP, TYPE B3, AS PER PLAN, (277 SF)
Awd $3,670.25$13.25
2 $4,027.58$14.54
3 $4,847.50$17.50
4 $3,390.48$12.24
5 $4,986.00$18.00
6 $3,878.00$14.00
7 $5,008.16$18.08
Ref #10 608E52051 CURB RAMP, TYPE C1, AS PER PLAN, (94 SF)
Awd $1,066.90$11.35
2 $1,170.30$12.45
3 $1,400.60$14.90
4 $1,150.56$12.24
5 $1,504.00$16.00
6 $1,128.00$12.00
7 $2,124.40$22.60
Ref #11 608E52061 CURB RAMP, TYPE C2, AS PER PLAN, (473 SF)
Awd $5,321.25$11.25
2 $5,836.82$12.34
3 $6,669.30$14.10
4 $5,789.52$12.24
5 $6,740.25$14.25
6 $5,676.00$12.00
7 $11,758.78$24.86
Ref #12 608E53020 DETECTABLE WARNING, (170 SF)
Awd $7,310.00$43.00
2 $8,018.90$47.17
3 $4,080.00$24.00
4 $5,700.10$33.53
5 $4,760.00$28.00
6 $7,650.00$45.00
7 $5,763.00$33.90
148039 - Page 3
Section 1 - ROADWAY - Totals
Awd $89,917.55
2 $98,615.12
3 $103,328.40
4 $114,161.00
5 $138,068.00
6 $95,238.75
7 $135,678.14
Ref #13 659E10000 SEEDING AND MULCHING, (135 SY)
Awd $472.50$3.50
2 $1,036.80$7.68
3 $1,350.00$10.00
4 $2,359.80$17.48
5 $1,080.00$8.00
6 $945.00$7.00
7 $945.00$7.00
Ref #14 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (165 TON)
Awd $37,125.00$225.00
2 $40,726.95$246.83
3 $8,250.00$50.00
4 $12,243.00$74.20
5 $7,260.00$44.00
6 $32,175.00$195.00
7 $3,300.00$20.00
Section 2 - EROSION CONTROL - Totals
Awd $37,597.50
2 $41,763.75
3 $9,600.00
4 $14,602.80
5 $8,340.00
6 $33,120.00
7 $4,245.00
Ref #15 611E00400 4" CONDUIT, TYPE E, (300 FT)
Awd $2,250.00$7.50
2 $2,391.00$7.97
3 $6,000.00$20.00
4 $2,025.00$6.75
5 $2,700.00$9.00
6 $840.00$2.80
7 $1,500.00$5.00
Ref #16 611E98651 CATCH BASIN FRAME AND GRATE, AS PER PLAN, (1 EACH)
Awd $1,800.00$1,800.00
2 $1,974.60$1,974.60
3 $4,000.00$4,000.00
4 $489.80$489.80
5 $2,720.00$2,720.00
6 $2,100.00$2,100.00
7 $5,000.00$5,000.00
148039 - Page 4
Section 3 - DRAINAGE - Totals
Awd $4,050.00
2 $4,365.60
3 $10,000.00
4 $2,514.80
5 $5,420.00
6 $2,940.00
7 $6,500.00
Ref #17 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (115 FT)
Awd $6,095.00$53.00
2 $6,686.10$58.14
3 $5,520.00$48.00
4 $2,838.20$24.68
5 $6,900.00$60.00
6 $6,325.00$55.00
7 $5,198.00$45.20
Ref #18 609E26001 CURB, TYPE 6, AS PER PLAN, (619 FT)
Awd $24,450.50$39.50
2 $26,821.27$43.33
3 $17,332.00$28.00
4 $15,276.92$24.68
5 $22,284.00$36.00
6 $24,760.00$40.00
7 $24,481.45$39.55
Ref #19 609E54000 6" CONCRETE TRAFFIC ISLAND, (75 SY)
Awd $4,500.00$60.00
2 $4,936.50$65.82
3 $6,300.00$84.00
4 $6,504.00$86.72
5 $5,250.00$70.00
6 $5,250.00$70.00
7 $10,950.00$146.00
Section 4 - PAVEMENT - Totals
Awd $35,045.50
2 $38,443.87
3 $29,152.00
4 $24,619.12
5 $34,434.00
6 $36,335.00
7 $40,629.45
Ref #20 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (97 FT)
Awd $873.00$9.00
2 $957.39$9.87
3 $1,067.00$11.00
4 $890.46$9.18
5 $873.00$9.00
6 $776.00$8.00
7 $679.00$7.00
148039 - Page 5
Ref #21 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (22 FT)
Awd $220.00$10.00
2 $241.34$10.97
3 $308.00$14.00
4 $224.40$10.20
5 $220.00$10.00
6 $264.00$12.00
7 $176.00$8.00
Ref #22 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE, (8 EACH)
Awd $1,600.00$200.00
2 $1,755.20$219.40
3 $1,280.00$160.00
4 $1,632.64$204.08
5 $800.00$100.00
6 $2,000.00$250.00
7 $792.00$99.00
Ref #23 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (114 EACH)
Awd $28,500.00$250.00
2 $31,264.50$274.25
3 $28,500.00$250.00
4 $29,081.40$255.10
5 $13,110.00$115.00
6 $30,210.00$265.00
7 $60,192.00$528.00
Ref #24 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (4 EACH)
Awd $320.00$80.00
2 $351.04$87.76
3 $280.00$70.00
4 $326.56$81.64
5 $120.00$30.00
6 $480.00$120.00
7 $124.00$31.00
Ref #25 630E80100 SIGN, FLAT SHEET, (857 SF)
Awd $17,140.00$20.00
2 $18,802.58$21.94
3 $14,569.00$17.00
4 $17,482.80$20.40
5 $17,140.00$20.00
6 $12,855.00$15.00
7 $11,998.00$14.00
Ref #26 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (10 EACH)
Awd $150.00$15.00
2 $164.60$16.46
3 $150.00$15.00
4 $153.20$15.32
5 $150.00$15.00
6 $140.00$14.00
7 $290.00$29.00
148039 - Page 6
Ref #27 644E00600 CROSSWALK LINE, (2337 FT)
Awd $7,828.95$3.35
2 $8,576.79$3.67
3 $8,179.50$3.50
4 $7,992.54$3.42
5 $7,828.95$3.35
6 $9,348.00$4.00
7 $16,359.00$7.00
Ref #28 645E30000 REMOVAL OF PAVEMENT MARKINGS, (2322 FT)
Awd $5,224.50$2.25
2 $5,735.34$2.47
3 $5,805.00$2.50
4 $5,340.60$2.30
5 $65,596.50$28.25
6 $8,707.50$3.75
7 $6,966.00$3.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $61,856.45
2 $67,848.78
3 $60,138.50
4 $63,124.60
5 $105,838.45
6 $64,780.50
7 $97,576.00
Ref #32 625E25400 CONDUIT, 2", 725.04, (820 FT)
Awd $4,838.00$5.90
2 $6,773.20$8.26
3 $11,480.00$14.00
4 $9,471.00$11.55
5 $4,920.00$6.00
6 $9,840.00$12.00
7 $4,100.00$5.00
Ref #33 625E25500 CONDUIT, 3", 725.04, (514 FT)
Awd $6,013.80$11.70
2 $6,928.72$13.48
3 $9,252.00$18.00
4 $8,542.68$16.62
5 $5,859.60$11.40
6 $9,766.00$19.00
7 $4,112.00$8.00
Ref #34 625E25501 CONDUIT, 3", 725.04, AS PER PLAN, AS PER PLAN, (40 FT)
Awd $468.00$11.70
2 $924.40$23.11
3 $1,400.00$35.00
4 $884.80$22.12
5 $480.00$12.00
6 $880.00$22.00
7 $320.00$8.00
148039 - Page 7
Ref #35 625E25600 CONDUIT, 4", 725.04, (91 FT)
Awd $1,446.90$15.90
2 $1,502.41$16.51
3 $5,005.00$55.00
4 $1,422.33$15.63
5 $1,456.00$16.00
6 $2,366.00$26.00
7 $1,365.00$15.00
Ref #36 625E25907 CONDUIT, JACKED OR DRILLED, 725.051, AS PER PLAN3", (1239 FT)
Awd $40,577.25$32.75
2 $33,304.32$26.88
3 $24,780.00$20.00
4 $32,102.49$25.91
5 $37,170.00$30.00
6 $37,170.00$30.00
7 $24,780.00$20.00
Ref #37 625E25907 CONDUIT, JACKED OR DRILLED, 725.051, AS PER PLAN4", (409 FT)
Awd $16,360.00$40.00
2 $12,302.72$30.08
3 $12,270.00$30.00
4 $14,196.39$34.71
5 $12,679.00$31.00
6 $13,497.00$33.00
7 $12,270.00$30.00
Ref #38 625E29003 TRENCH, 24" DEEP, AS PER PLAN, (1633 FT)
Awd $10,614.50$6.50
2 $10,320.56$6.32
3 $11,839.25$7.25
4 $42,637.63$26.11
5 $15,105.25$9.25
6 $10,614.50$6.50
7 $22,862.00$14.00
Ref #39 625E30700 PULL BOX, 725.08, 18", (59 EACH)
Awd $30,975.00$525.00
2 $31,602.76$535.64
3 $44,250.00$750.00
4 $30,235.14$512.46
5 $39,530.00$670.00
6 $39,825.00$675.00
7 $70,800.00$1,200.00
Ref #40 625E30706 PULL BOX, 725.08, 24", (6 EACH)
Awd $4,500.00$750.00
2 $3,806.22$634.37
3 $5,400.00$900.00
4 $3,541.56$590.26
5 $4,470.00$745.00
6 $4,800.00$800.00
7 $12,000.00$2,000.00
148039 - Page 8
Ref #41 625E31600 PULL BOX, MISC.:REMOVAL AND REINSTALLATION, (2 EACH)
Awd $1,660.00$830.00
2 $814.06$407.03
3 $1,400.00$700.00
4 $1,172.90$586.45
5 $1,160.00$580.00
6 $600.00$300.00
7 $2,000.00$1,000.00
Ref #42 625E32000 GROUND ROD, (69 EACH)
Awd $12,420.00$180.00
2 $7,863.24$113.96
3 $13,800.00$200.00
4 $10,684.65$154.85
5 $11,385.00$165.00
6 $10,005.00$145.00
7 $10,350.00$150.00
Ref #43 625E36000 PLASTIC CAUTION TAPE, (1663 FT)
Awd $332.60$0.20
2 $83.15$0.05
3 $498.90$0.30
4 $31.60$0.02
5 $83.15$0.05
6 $831.50$0.50
7 $415.75$0.25
Ref #44 632E05007 VEHICULAR SIGNAL HEAD, (LED), BLACK, 3-SECTION, 12, (70 EACH)
Awd $52,150.00$745.00
2 $51,588.60$736.98
3 $49,000.00$700.00
4 $45,789.10$654.13
5 $50,750.00$725.00
6 $59,500.00$850.00
7 $56,000.00$800.00
Ref #45 632E05087 VEHICULAR SIGNAL HEAD, (LED), BLACK, 5-SECTION, 12, (17 EACH)
Awd $18,275.00$1,075.00
2 $16,751.97$985.41
3 $17,000.00$1,000.00
4 $19,082.16$1,122.48
5 $19,975.00$1,175.00
6 $21,250.00$1,250.00
7 $20,400.00$1,200.00
Ref #46 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (59 EACH)
Awd $30,680.00$520.00
2 $29,733.64$503.96
3 $29,500.00$500.00
4 $24,083.80$408.20
5 $29,942.50$507.50
6 $38,350.00$650.00
7 $47,200.00$800.00
148039 - Page 9
Ref #47 632E26000 PEDESTRIAN PUSHBUTTON, (39 EACH)
Awd $6,240.00$160.00
2 $5,596.89$143.51
3 $9,750.00$250.00
4 $8,464.17$217.03
5 $4,680.00$120.00
6 $3,900.00$100.00
7 $7,800.00$200.00
Ref #48 632E26500 DETECTOR LOOP, (6 EACH)
Awd $5,340.00$890.00
2 $7,247.28$1,207.88
3 $7,200.00$1,200.00
4 $11,514.12$1,919.02
5 $7,230.00$1,205.00
6 $7,200.00$1,200.00
7 $9,000.00$1,500.00
Ref #49 632E27200 LOOP DETECTOR TIE IN, (10 EACH)
Awd $360.00$36.00
2 $514.90$51.49
3 $1,000.00$100.00
4 $542.90$54.29
5 $550.00$55.00
6 $1,500.00$150.00
7 $2,000.00$200.00
Ref #50 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (14029 FT)
Awd $17,536.25$1.25
2 $27,917.71$1.99
3 $28,058.00$2.00
4 $16,834.80$1.20
5 $28,759.45$2.05
6 $39,281.20$2.80
7 $14,029.00$1.00
Ref #51 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (6209 FT)
Awd $9,003.05$1.45
2 $13,535.62$2.18
3 $17,074.75$2.75
4 $8,444.24$1.36
5 $13,970.25$2.25
6 $18,006.10$2.90
7 $9,313.50$1.50
Ref #52 632E64010 SIGNAL SUPPORT FOUNDATION, (18 EACH)
Awd $71,064.00$3,948.00
2 $49,971.60$2,776.20
3 $50,400.00$2,800.00
4 $44,863.38$2,492.41
5 $79,830.00$4,435.00
6 $100,620.00$5,590.00
7 $72,000.00$4,000.00
148039 - Page 10
Ref #53 632E64020 PEDESTAL FOUNDATION, (44 EACH)
Awd $40,700.00$925.00
2 $28,420.04$645.91
3 $39,600.00$900.00
4 $23,930.72$543.88
5 $25,520.00$580.00
6 $19,800.00$450.00
7 $44,000.00$1,000.00
Ref #54 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG, (556 FT)
Awd $1,390.00$2.50
2 $1,573.48$2.83
3 $2,224.00$4.00
4 $1,445.60$2.60
5 $1,445.60$2.60
6 $1,112.00$2.00
7 $1,112.00$2.00
Ref #55 632E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG, (615 FT)
Awd $1,537.50$2.50
2 $1,740.45$2.83
3 $2,460.00$4.00
4 $1,654.35$2.69
5 $1,599.00$2.60
6 $1,230.00$2.00
7 $1,230.00$2.00
Ref #56 632E70000 POWER SERVICE, (8 EACH)
Awd $21,432.00$2,679.00
2 $10,549.44$1,318.68
3 $8,000.00$1,000.00
4 $11,950.00$1,493.75
5 $9,600.00$1,200.00
6 $18,000.00$2,250.00
7 $24,000.00$3,000.00
Ref #57 632E70600 CONDUIT RISER, 3" DIAMETER, (9 EACH)
Awd $5,805.00$645.00
2 $3,954.33$439.37
3 $9,000.00$1,000.00
4 $5,208.48$578.72
5 $5,400.00$600.00
6 $2,250.00$250.00
7 $4,500.00$500.00
Ref #58 632E75112 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 12 POLE, WITH, (1 EACH)
Awd $7,940.00$7,940.00
2 $10,434.93$10,434.93
3 $10,000.00$10,000.00
4 $9,932.09$9,932.09
5 $11,505.00$11,505.00
6 $9,000.00$9,000.00
7 $9,500.00$9,500.00
148039 - Page 11
Ref #59 632E75152 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 5 POLE, WITH , (1 EACH)
Awd $8,655.00$8,655.00
2 $10,633.97$10,633.97
3 $10,500.00$10,500.00
4 $10,188.31$10,188.31
5 $12,065.00$12,065.00
6 $9,600.00$9,600.00
7 $10,600.00$10,600.00
Ref #60 632E75208 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 7 POLE, WITH , (1 EACH)
Awd $11,164.00$11,164.00
2 $13,914.61$13,914.61
3 $14,000.00$14,000.00
4 $12,782.23$12,782.23
5 $16,525.00$16,525.00
6 $13,500.00$13,500.00
7 $13,000.00$13,000.00
Ref #61 632E75410 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 8 POLE, WITH , (1 EACH)
Awd $12,819.00$12,819.00
2 $15,155.80$15,155.80
3 $15,500.00$15,500.00
4 $14,539.96$14,539.96
5 $19,145.00$19,145.00
6 $15,500.00$15,500.00
7 $15,500.00$15,500.00
Ref #62 632E75454 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 9 POLE, WITH , (2 EACH)
Awd $28,564.00$14,282.00
2 $33,056.30$16,528.15
3 $35,000.00$17,500.00
4 $31,761.36$15,880.68
5 $43,790.00$21,895.00
6 $36,000.00$18,000.00
7 $34,000.00$17,000.00
Ref #64 632E75484 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 10 POLE, WITH, (1 EACH)
Awd $15,164.00$15,164.00
2 $18,280.67$18,280.67
3 $18,500.00$18,500.00
4 $17,029.65$17,029.65
5 $21,965.00$21,965.00
6 $20,000.00$20,000.00
7 $18,500.00$18,500.00
Ref #65 632E77231 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS, (9 EACH)
Awd $1,485.00$165.00
2 $7,261.83$806.87
3 $9,000.00$1,000.00
4 $9,342.36$1,038.04
5 $6,120.00$680.00
6 $8,550.00$950.00
7 $9,000.00$1,000.00
148039 - Page 12
Ref #66 632E80102 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 1, (1 EACH)
Awd $3,397.00$3,397.00
2 $3,553.23$3,553.23
3 $4,250.00$4,250.00
4 $3,383.96$3,383.96
5 $5,290.00$5,290.00
6 $3,500.00$3,500.00
7 $6,300.00$6,300.00
Ref #67 632E80402 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4, (3 EACH)
Awd $15,417.00$5,139.00
2 $17,491.92$5,830.64
3 $18,000.00$6,000.00
4 $16,090.68$5,363.56
5 $21,285.00$7,095.00
6 $20,400.00$6,800.00
7 $27,600.00$9,200.00
Ref #68 632E80628 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 14, (1 EACH)
Awd $8,924.00$8,924.00
2 $11,866.56$11,866.56
3 $11,000.00$11,000.00
4 $9,418.91$9,418.91
5 $12,085.00$12,085.00
6 $11,250.00$11,250.00
7 $13,500.00$13,500.00
Ref #69 632E90000 PEDESTAL, 11', TRANSFORMER BASE, (42 EACH)
Awd $12,810.00$305.00
2 $17,957.94$427.57
3 $25,200.00$600.00
4 $19,624.50$467.25
5 $14,700.00$350.00
6 $21,000.00$500.00
7 $33,600.00$800.00
Ref #70 632E90010 PEDESTAL, MISC.:REMOVAL AND REINSTALLATION, (2 EACH)
Awd $1,190.00$595.00
2 $302.24$151.12
3 $1,200.00$600.00
4 $802.00$401.00
5 $2,500.00$1,250.00
6 $200.00$100.00
7 $600.00$300.00
Ref #71 632E90103 REMOVAL OF TRAFFIC SIGNAL INSTALLATION FOR STORAGE, (8 EACH)
Awd $29,520.00$3,690.00
2 $34,859.60$4,357.45
3 $14,400.00$1,800.00
4 $55,130.48$6,891.31
5 $18,400.00$2,300.00
6 $8,800.00$1,100.00
7 $40,000.00$5,000.00
148039 - Page 13
Ref #72 632E90203 REUSE OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN, (4 EACH)
Awd $940.00$235.00
2 $606.28$151.57
3 $1,600.00$400.00
4 $1,082.08$270.52
5 $2,200.00$550.00
6 $2,400.00$600.00
7 $1,200.00$300.00
Ref #73 632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN, (4 EACH)
Awd $800.00$200.00
2 $79.72$19.93
3 $800.00$200.00
4 $574.88$143.72
5 $700.00$175.00
6 $400.00$100.00
7 $400.00$100.00
Ref #74 632E90500 SIGNALIZATION, MISC.:REMOVAL AND REINSTALLATION OF, (650 FT)
Awd $4,485.00$6.90
2 $2,236.00$3.44
3 $2,600.00$4.00
4 $1,332.50$2.05
5 $1,495.00$2.30
6 $1,950.00$3.00
7 $1,300.00$2.00
Ref #75 633E67101 CABINET FOUNDATION, AS PER PLAN, (9 EACH)
Awd $7,425.00$825.00
2 $11,626.47$1,291.83
3 $15,300.00$1,700.00
4 $12,383.64$1,375.96
5 $14,400.00$1,600.00
6 $23,400.00$2,600.00
7 $27,000.00$3,000.00
Ref #76 633E67201 CONTROLLER WORK PAD, AS PER PLAN, (9 EACH)
Awd $2,700.00$300.00
2 $3,093.03$343.67
3 $8,100.00$900.00
4 $6,362.46$706.94
5 $3,060.00$340.00
6 $1,440.00$160.00
7 $9,000.00$1,000.00
Ref #77 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN, (10 EACH)
Awd $48,900.00$4,890.00
2 $41,055.90$4,105.59
3 $40,000.00$4,000.00
4 $40,010.90$4,001.09
5 $36,000.00$3,600.00
6 $42,500.00$4,250.00
7 $75,000.00$7,500.00
148039 - Page 14
Ref #100 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (73 EACH)
Awd $2,044.00$28.00
2 $7.30$0.10
3 $2,190.00$30.00
4 $23,796.54$325.98
5 $2,190.00$30.00
6 $1,460.00$20.00
7 $3,650.00$50.00
Ref #101 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD, (17 EACH)
Awd $476.00$28.00
2 $1.70$0.10
3 $510.00$30.00
4 $1,724.82$101.46
5 $510.00$30.00
6 $340.00$20.00
7 $850.00$50.00
Ref #102 632E30600 TETHER WIRE, WITH ACCESSORIES, (248 FT)
Awd $3,100.00$12.50
2 $4,759.12$19.19
3 $4,960.00$20.00
4 $7,015.92$28.29
5 $1,178.00$4.75
6 $6,944.00$28.00
7 $992.00$4.00
Ref #103 632E75132 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 5 POLE, WITH , (1 EACH)
Awd $8,200.00$8,200.00
2 $9,579.75$9,579.75
3 $9,500.00$9,500.00
4 $9,816.64$9,816.64
5 $12,780.00$12,780.00
6 $10,300.00$10,300.00
7 $12,000.00$12,000.00
Ref #104 632E75206 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 7 POLE, WITH , (1 EACH)
Awd $11,921.00$11,921.00
2 $14,215.19$14,215.19
3 $14,000.00$14,000.00
4 $13,815.62$13,815.62
5 $15,385.00$15,385.00
6 $12,200.00$12,200.00
7 $17,500.00$17,500.00
Ref #105 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, (2 EACH)
Awd $12,848.00$6,424.00
2 $14,950.26$7,475.13
3 $15,000.00$7,500.00
4 $12,693.90$6,346.95
5 $17,270.00$8,635.00
6 $15,400.00$7,700.00
7 $20,200.00$10,100.00
148039 - Page 15
Ref #106 632E80700 SIGNAL SUPPORT, MISC.:TYPE TC-12.30, DESIGN 12 POL, (2 EACH)
Awd $38,704.00$19,352.00
2 $43,171.96$21,585.98
3 $38,000.00$19,000.00
4 $41,194.16$20,597.08
5 $48,830.00$24,415.00
6 $44,000.00$22,000.00
7 $44,000.00$22,000.00
Ref #107 632E90400 SIGNALIZATION, MISC.:VERIZON CELLULAR MODEM, FURNI, (8 EACH)
Awd $8,800.00$1,100.00
2 $9,346.48$1,168.31
3 $12,000.00$1,500.00
4 $9,150.80$1,143.85
5 $10,640.00$1,330.00
6 $9,200.00$1,150.00
7 $12,800.00$1,600.00
Ref #108 632E90400 SIGNALIZATION, MISC.:AT&T CELLULAR MODEM, FURNISH , (2 EACH)
Awd $2,200.00$1,100.00
2 $2,336.62$1,168.31
3 $4,000.00$2,000.00
4 $2,396.22$1,198.11
5 $2,660.00$1,330.00
6 $2,300.00$1,150.00
7 $3,200.00$1,600.00
Ref #109 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE, (4 EACH)
Awd $35,560.00$8,890.00
2 $35,824.16$8,956.04
3 $48,800.00$12,200.00
4 $34,312.56$8,578.14
5 $34,400.00$8,600.00
6 $38,000.00$9,500.00
7 $38,000.00$9,500.00
Ref #110 809E69000 ADVANCE RADAR DETECTION, (22 EACH)
Awd $153,890.00$6,995.00
2 $149,065.18$6,775.69
3 $154,000.00$7,000.00
4 $153,750.74$6,988.67
5 $132,000.00$6,000.00
6 $143,000.00$6,500.00
7 $176,000.00$8,000.00
Ref #111 816E30001 VIDEO DETECTION SYSTEM, AS PER PLAN, (9 EACH)
Awd $120,600.00$13,400.00
2 $141,018.39$15,668.71
3 $130,500.00$14,500.00
4 $138,703.05$15,411.45
5 $136,350.00$15,150.00
6 $135,900.00$15,100.00
7 $225,000.00$25,000.00
148039 - Page 16
Section 7 - TRAFFIC SIGNALS - Totals
Awd $1,032,360.85
2 $1,043,064.82
3 $1,100,051.90
4 $1,098,874.91
5 $1,090,972.80
6 $1,140,628.30
7 $1,377,751.25
Ref #113 AA2 633E01541 CONTROLLER UNIT, TYPE TS2/A2, AS PER PLANTYPE TS2,, (1 EACH)
Awd $1,900.00$1,900.00
2 $2,448.55$2,448.55
3 $4,250.00$4,250.00
4 $4,771.68$4,771.68
5 $2,015.00$2,015.00
6 $3,600.00$3,600.00
7 $4,500.00$4,500.00
Ref #115 AB2 633E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (8 EACH)
Awd $66,400.00$8,300.00
2 $85,975.68$10,746.96
3 $96,000.00$12,000.00
4 $81,862.40$10,232.80
5 $70,680.00$8,835.00
6 $88,000.00$11,000.00
7 $120,000.00$15,000.00
Section 8 - TRAFFIC SIGNALS ALTERNATES - Totals
Awd $68,300.00
2 $88,424.23
3 $100,250.00
4 $86,634.08
5 $72,695.00
6 $91,600.00
7 $124,500.00
Ref #83 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (60 HOUR)
Awd $3,300.00$55.00
2 $3,949.20$65.82
3 $3,900.00$65.00
4 $5,859.60$97.66
5 $3,600.00$60.00
6 $5,100.00$85.00
7 $3,600.00$60.00
Ref #84 614E12500 REPLACEMENT SIGN, (30 EACH)
Awd $3,750.00$125.00
2 $4,113.90$137.13
3 $3,000.00$100.00
4 $3,826.80$127.56
5 $3,750.00$125.00
6 $1,050.00$35.00
7 $3,750.00$125.00
148039 - Page 17
Ref #85 614E12600 REPLACEMENT DRUM, (50 EACH)
Awd $2,500.00$50.00
2 $2,742.50$54.85
3 $2,000.00$40.00
4 $4,922.00$98.44
5 $2,500.00$50.00
6 $1,650.00$33.00
7 $2,500.00$50.00
Section 9 - MAINTENANCE OF TRAFFIC - Totals
Awd $9,550.00
2 $10,805.60
3 $8,900.00
4 $14,608.40
5 $9,850.00
6 $7,800.00
7 $9,850.00
Ref #86 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $14,389.35$14,389.35
3 $10,000.00$10,000.00
4 $9,693.88$9,693.88
5 $30,001.75$30,001.75
6 $11,812.45$11,812.45
7 $15,000.00$15,000.00
Ref #87 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $31,182.18$31,182.18
3 $7,000.00$7,000.00
4 $34,073.30$34,073.30
5 $17,500.00$17,500.00
6 $58,000.00$58,000.00
7 $64,770.16$64,770.16
Ref #88 619E16010 FIELD OFFICE, TYPE B, (4 MNTH)
Awd $3,000.00$750.00
2 $2,632.80$658.20
3 $4,000.00$1,000.00
4 $16,000.00$4,000.00
5 $5,740.00$1,435.00
6 $6,600.00$1,650.00
7 $14,000.00$3,500.00
Ref #89 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $14,000.00$14,000.00
2 $12,504.88$12,504.88
3 $4,000.00$4,000.00
4 $8,362.84$8,362.84
5 $5,990.00$5,990.00
6 $9,500.00$9,500.00
7 $7,000.00$7,000.00
148039 - Page 18
Ref #90 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $15,380.82$15,380.82
3 $40,000.00$40,000.00
4 $47,185.72$47,185.72
5 $17,500.00$17,500.00
6 $40,000.00$40,000.00
7 $95,000.00$95,000.00
Section 10 - INCIDENTALS - Totals
Awd $109,500.00
2 $76,090.03
3 $65,000.00
4 $115,315.74
5 $76,731.75
6 $125,912.45
7 $195,770.16
148039 - Page 19
Project No. 150002
PID 92853
ADA-SR 247-1.20 Slide Repair
Federal
Type: SLIDE REPAIR
Completion Date: 6/30/2015
Award Amount: $428,691.20
Contract Awarded To: D G M INC
Letting Date: 1/15/2015
Engineer's Estimate: $564,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
D G M INC
1881 ADAMS RD
BEAVER, OH 45613
Pike
Bidder 1
Bid $428,691.20
ALAN STONE CO INC
1324 ELLIS RUN RD
CUTLER, OH 45724
Washington
Bidder 2
Bid $432,573.90
SUBURBAN MAINTENANCE & CONSTRUCTION INC
16330 YORK RD
NORTH ROYALTON, OH 44133
Cuyahoga
Bidder 3
Bid $493,819.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $521,081.80
150002 - Page 20
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $8,500.00$8,500.00
3 $15,000.00$15,000.00
4 $5,000.00$5,000.00
Ref #2 202E35200 PIPE REMOVED, OVER 24", (63 FT)
Awd $1,575.00$25.00
2 $945.00$15.00
3 $1,575.00$25.00
4 $945.00$15.00
Ref #3 203E10000 EXCAVATION, (144 CY)
Awd $2,880.00$20.00
2 $2,880.00$20.00
3 $1,728.00$12.00
4 $2,448.00$17.00
Ref #4 203E20000 EMBANKMENT, (131 CY)
Awd $2,620.00$20.00
2 $1,310.00$10.00
3 $1,572.00$12.00
4 $1,572.00$12.00
Ref #5 606E15050 GUARDRAIL, TYPE MGS, (725 FT)
Awd $10,875.00$15.00
2 $10,875.00$15.00
3 $10,512.50$14.50
4 $10,875.00$15.00
Ref #6 606E26100 ANCHOR ASSEMBLY, TYPE E, (2 EACH)
Awd $4,000.00$2,000.00
2 $3,800.00$1,900.00
3 $3,900.00$1,950.00
4 $4,020.00$2,010.00
Section 1 - ROADWAY - Totals
Awd $34,450.00
2 $28,310.00
3 $34,287.50
4 $24,860.00
Ref #7 659E10000 SEEDING AND MULCHING, (1234 SY)
Awd $3,085.00$2.50
2 $1,542.50$1.25
3 $3,085.00$2.50
4 $3,702.00$3.00
Ref #8 659E14000 REPAIR SEEDING AND MULCHING, (62 SY)
Awd $3.10$0.05
2 $77.50$1.25
3 $62.00$1.00
4 $62.00$1.00
Ref #9 659E20000 COMMERCIAL FERTILIZER, (0.17 TON)
Awd $51.00$300.00
2 $102.00$600.00
3 $85.00$500.00
4 $90.10$530.00
150002 - Page 21
Ref #10 659E31000 LIME, (0.26 ACRE)
Awd $26.00$100.00
2 $52.00$200.00
3 $52.00$200.00
4 $57.20$220.00
Ref #11 659E35000 WATER, (7 MGAL)
Awd $7.00$1.00
2 $7.00$1.00
3 $7.00$1.00
4 $7.00$1.00
Ref #12 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $4,172.10
2 $2,781.00
3 $4,291.00
4 $4,918.30
Ref #13 601E34100 ROCK CHANNEL PROTECTION, TYPE B WITHOUT FILTER, (7 CY)
Awd $560.00$80.00
2 $700.00$100.00
3 $595.00$85.00
4 $1,120.00$160.00
Ref #14 602E20000 CONCRETE MASONRY, (2 CY)
Awd $2,500.00$1,250.00
2 $2,000.00$1,000.00
3 $2,000.00$1,000.00
4 $2,400.00$1,200.00
Ref #15 611E20700 48" CONDUIT, TYPE A, (53 FT)
Awd $14,575.00$275.00
2 $5,035.00$95.00
3 $18,550.00$350.00
4 $8,480.00$160.00
Ref #16 613E41250 LOW STRENGTH MORTAR BACKFILL (TYPE 1), (63 CY)
Awd $3,465.00$55.00
2 $3,780.00$60.00
3 $6,300.00$100.00
4 $5,355.00$85.00
Section 3 - DRAINAGE - Totals
Awd $21,100.00
2 $11,515.00
3 $27,445.00
4 $17,355.00
150002 - Page 22
Ref #17 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1556 SY)
Awd $6,768.60$4.35
2 $7,780.00$5.00
3 $10,892.00$7.00
4 $7,002.00$4.50
Ref #18 407E10000 TACK COAT, (117 GAL)
Awd $877.50$7.50
2 $351.00$3.00
3 $292.50$2.50
4 $234.00$2.00
Ref #19 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (62 GAL)
Awd $465.00$7.50
2 $186.00$3.00
3 $155.00$2.50
4 $124.00$2.00
Ref #20 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (54 CY)
Awd $11,340.00$210.00
2 $11,448.00$212.00
3 $11,340.00$210.00
4 $11,880.00$220.00
Ref #21 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (87 CY)
Awd $15,660.00$180.00
2 $17,400.00$200.00
3 $17,400.00$200.00
4 $18,270.00$210.00
Section 4 - PAVEMENT - Totals
Awd $35,111.10
2 $37,165.00
3 $40,079.50
4 $37,510.00
Ref #22 621E00100 RPM, (78 EACH)
Awd $2,574.00$33.00
2 $3,120.00$40.00
3 $3,510.00$45.00
4 $2,730.00$35.00
Ref #23 626E00100 BARRIER REFLECTOR, (16 EACH)
Awd $128.00$8.00
2 $112.00$7.00
3 $120.00$7.50
4 $128.00$8.00
Ref #24 642E00090 EDGE LINE, 4", (0.02 MILE)
Awd $900.00$45,000.00
2 $624.20$31,210.00
3 $860.00$43,000.00
4 $900.00$45,000.00
Ref #25 642E00290 CENTER LINE, (0.01 MILE)
Awd $450.00$45,000.00
2 $624.20$62,420.00
3 $430.00$43,000.00
4 $450.00$45,000.00
150002 - Page 23
Section 5 - TRAFFIC CONTROL - Totals
Awd $4,052.00
2 $4,480.40
3 $4,920.00
4 $4,208.00
Ref #26 507E00100 STEEL PILES HP10X42, FURNISHED, (280.5 FT)
Awd $8,415.00$30.00
2 $6,451.50$23.00
3 $5,610.00$20.00
4 $9,817.50$35.00
Ref #27 507E00400 STEEL PILES, MISC.:W12X53, FURNISHED, (2797 FT)
Awd $83,910.00$30.00
2 $69,925.00$25.00
3 $67,128.00$24.00
4 $72,722.00$26.00
Ref #28 511E71100 CONCRETE, MISC.:LEVELING PAD, (9 CY)
Awd $3,600.00$400.00
2 $3,780.00$420.00
3 $4,500.00$500.00
4 $1,440.00$160.00
Ref #29 512E10000 SEALING OF CONCRETE SURFACES, (44 SY)
Awd $1,980.00$45.00
2 $1,320.00$30.00
3 $748.00$17.00
4 $660.00$15.00
Ref #30 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (23 CY)
Awd $1,840.00$80.00
2 $3,450.00$150.00
3 $1,610.00$70.00
4 $3,795.00$165.00
Ref #31 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE, (1936 FT)
Awd $58,080.00$30.00
2 $73,568.00$38.00
3 $56,144.00$29.00
4 $110,352.00$57.00
Ref #32 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER, (1202 FT)
Awd $58,898.00$49.00
2 $78,130.00$65.00
3 $112,988.00$94.00
4 $81,736.00$68.00
Ref #33 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 24" DIAMETER, UNR, (1631 FT)
Awd $57,085.00$35.00
2 $61,978.00$38.00
3 $45,668.00$28.00
4 $92,967.00$57.00
Ref #34 610E50010 SPECIAL - RETAINING WALL, MISC.:PRECAST REINFORCED, (320 SF)
Awd $7,248.00$22.65
2 $13,120.00$41.00
3 $16,000.00$50.00
4 $7,040.00$22.00
150002 - Page 24
Section 6 - RETAINING WALLS - Totals
Awd $281,056.00
2 $311,722.50
3 $310,396.00
4 $380,529.50
Ref #35 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $5,000.00$5,000.00
3 $7,500.00$7,500.00
4 $3,000.00$3,000.00
Ref #36 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $14,000.00$14,000.00
2 $5,000.00$5,000.00
3 $15,000.00$15,000.00
4 $10,800.00$10,800.00
Ref #37 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $3,750.00$1,250.00
2 $3,600.00$1,200.00
3 $2,400.00$800.00
4 $8,700.00$2,900.00
Ref #38 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $3,000.00$3,000.00
3 $2,500.00$2,500.00
4 $9,201.00$9,201.00
Ref #39 624E10000 MOBILIZATION, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $20,000.00$20,000.00
3 $45,000.00$45,000.00
4 $20,000.00$20,000.00
Section 7 - INCIDENTALS - Totals
Awd $48,750.00
2 $36,600.00
3 $72,400.00
4 $51,701.00
150002 - Page 25
Project No. 150004
PID 94005
CUY-IR 271-06.04
Federal
Type: TWO LANE RESURFACING
Completion Date: 10/15/2015
Award Amount: $3,350,765.80
Contract Awarded To: KARVO PAVING COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $3,890,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
KARVO PAVING COMPANY
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 1
Bid $3,350,765.80
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 2
Bid $3,686,053.05
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 3
Bid $3,873,792.25
BURTON SCOT CONTRACTORS LLC
11330 KINSMAN RD
NEWBURY, OH 44065
Geauga
Bidder 4
Bid $4,117,435.30
150004 - Page 26
Ref #1 202E30000 WALK REMOVED, (2381 SF)
Awd $3,452.45$1.45
2 $5,238.20$2.20
3 $8,333.50$3.50
4 $8,928.75$3.75
Ref #2 202E30900 PORTION OF TRAFFIC ISLAND REMOVED, (24 SY)
Awd $552.00$23.00
2 $600.00$25.00
3 $1,200.00$50.00
4 $1,200.00$50.00
Ref #3 202E32000 CURB REMOVED, (380 FT)
Awd $2,166.00$5.70
2 $2,280.00$6.00
3 $6,080.00$16.00
4 $6,840.00$18.00
Ref #4 209E60201 LINEAR GRADING, AS PER PLAN, (690 STA)
Awd $10,350.00$15.00
2 $34,500.00$50.00
3 $24,150.00$35.00
4 $27,600.00$40.00
Ref #5 608E10000 4" CONCRETE WALK, (548 SF)
Awd $2,603.00$4.75
2 $3,288.00$6.00
3 $2,740.00$5.00
4 $2,740.00$5.00
Ref #6 608E52011 CURB RAMP, TYPE A1, AS PER PLAN, (160 SF)
Awd $1,712.00$10.70
2 $2,240.00$14.00
3 $2,400.00$15.00
4 $2,880.00$18.00
Ref #7 608E52021 CURB RAMP, TYPE A2, AS PER PLAN, (294 SF)
Awd $3,087.00$10.50
2 $4,116.00$14.00
3 $4,410.00$15.00
4 $5,292.00$18.00
Ref #8 608E52031 CURB RAMP, TYPE B1, AS PER PLAN, (704 SF)
Awd $5,984.00$8.50
2 $9,856.00$14.00
3 $10,560.00$15.00
4 $12,672.00$18.00
Ref #9 608E52045 CURB RAMP, TYPE B3, AS PER PLAN, (432 SF)
Awd $4,104.00$9.50
2 $6,480.00$15.00
3 $6,480.00$15.00
4 $7,776.00$18.00
Section 1 - ROADWAY - Totals
Awd $34,010.45
2 $68,598.20
3 $66,353.50
4 $75,928.75
150004 - Page 27
Ref #10 659E98700 SEEDING, MISC.: SEEDING AND MULCHING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $3,600.00$3,600.00
3 $3,500.00$3,500.00
4 $3,500.00$3,500.00
Ref #11 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $6,000.00
2 $4,600.00
3 $4,500.00
4 $4,500.00
Ref #12 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (22 EACH)
Awd $14,850.00$675.00
2 $8,250.00$375.00
3 $15,400.00$700.00
4 $15,400.00$700.00
Ref #13 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (2 EACH)
Awd $2,000.00$1,000.00
2 $3,500.00$1,750.00
3 $2,600.00$1,300.00
4 $2,800.00$1,400.00
Ref #14 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (11 EACH)
Awd $4,950.00$450.00
2 $3,850.00$350.00
3 $5,500.00$500.00
4 $7,700.00$700.00
Ref #15 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN, (1 EACH)
Awd $950.00$950.00
2 $1,800.00$1,800.00
3 $1,100.00$1,100.00
4 $1,400.00$1,400.00
Ref #16 611E99820 SPECIAL - MISCELLANEOUS METAL, (5000 LB)
Awd $5,000.00$1.00
2 $4,500.00$0.90
3 $6,250.00$1.25
4 $7,500.00$1.50
Section 3 - DRAINAGE - Totals
Awd $27,750.00
2 $21,900.00
3 $30,850.00
4 $34,800.00
150004 - Page 28
Ref #17 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, A, (750 SY)
Awd $11,250.00$15.00
2 $28,500.00$38.00
3 $37,500.00$50.00
4 $22,500.00$30.00
Ref #18 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, B, (1500 SY)
Awd $72,000.00$48.00
2 $165,000.00$110.00
3 $112,500.00$75.00
4 $90,000.00$60.00
Ref #19 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, C, (500 SY)
Awd $12,500.00$25.00
2 $52,500.00$105.00
3 $47,500.00$95.00
4 $65,000.00$130.00
Ref #20 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (326813 SY)
Awd $326,813.00$1.00
2 $245,109.75$0.75
3 $277,791.05$0.85
4 $490,219.50$1.50
Ref #21 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (24511 GAL)
Awd $67,405.25$2.75
2 $79,660.75$3.25
3 $91,916.25$3.75
4 $122,555.00$5.00
Ref #22 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (12496 CY)
Awd $1,980,616.00$158.50
2 $2,249,280.00$180.00
3 $2,249,280.00$180.00
4 $2,499,200.00$200.00
Ref #23 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (1121 CY)
Awd $199,538.00$178.00
2 $207,385.00$185.00
3 $212,990.00$190.00
4 $218,595.00$195.00
Ref #24 609E26000 CURB, TYPE 6, (212 FT)
Awd $3,180.00$15.00
2 $4,664.00$22.00
3 $6,360.00$30.00
4 $6,360.00$30.00
Ref #25 609E70000 4" CONCRETE MEDIAN, (6 SY)
Awd $912.00$152.00
2 $660.00$110.00
3 $450.00$75.00
4 $450.00$75.00
Ref #26 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (425 CY)
Awd $17,000.00$40.00
2 $31,875.00$75.00
3 $42,500.00$100.00
4 $21,250.00$50.00
150004 - Page 29
Ref #27 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (14.37 MILE)
Awd $17,244.00$1,200.00
2 $16,525.50$1,150.00
3 $17,244.00$1,200.00
4 $8,334.60$580.00
Section 4 - PAVEMENT - Totals
Awd $2,708,458.25
2 $3,081,160.00
3 $3,096,031.30
4 $3,544,464.10
Ref #28 621E00100 RPM, (1737 EACH)
Awd $35,087.40$20.20
2 $35,434.80$20.40
3 $35,087.40$20.20
4 $35,087.40$20.20
Ref #29 621E54000 RAISED PAVEMENT MARKER REMOVED, (1700 EACH)
Awd $3,825.00$2.25
2 $2,550.00$1.50
3 $6,800.00$4.00
4 $6,800.00$4.00
Ref #30 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, , (300 SF)
Awd $3,000.00$10.00
2 $3,600.00$12.00
3 $3,600.00$12.00
4 $3,600.00$12.00
Ref #31 646E10010 EDGE LINE, 6", (20.49 MILE)
Awd $48,356.40$2,360.00
2 $48,151.50$2,350.00
3 $48,151.50$2,350.00
4 $48,151.50$2,350.00
Ref #32 646E10110 LANE LINE, 6", (19.06 MILE)
Awd $21,919.00$1,150.00
2 $18,107.00$950.00
3 $18,107.00$950.00
4 $18,107.00$950.00
Ref #33 646E10300 CHANNELIZING LINE, 8", (2663 FT)
Awd $3,328.75$1.25
2 $3,461.90$1.30
3 $3,461.90$1.30
4 $3,461.90$1.30
Ref #34 646E10310 CHANNELIZING LINE, 12", (18819 FT)
Awd $27,287.55$1.45
2 $27,287.55$1.45
3 $27,287.55$1.45
4 $27,287.55$1.45
Ref #35 646E10400 STOP LINE, (270 FT)
Awd $3,415.50$12.65
2 $2,430.00$9.00
3 $2,430.00$9.00
4 $2,430.00$9.00
150004 - Page 30
Ref #36 646E10500 CROSSWALK LINE, (1330 FT)
Awd $7,913.50$5.95
2 $5,985.00$4.50
3 $5,985.00$4.50
4 $5,985.00$4.50
Ref #37 646E10600 TRANSVERSE/DIAGONAL LINE, (840 FT)
Awd $7,056.00$8.40
2 $5,040.00$6.00
3 $5,040.00$6.00
4 $5,040.00$6.00
Ref #38 646E20300 LANE ARROW, (38 EACH)
Awd $5,320.00$140.00
2 $5,700.00$150.00
3 $5,700.00$150.00
4 $5,700.00$150.00
Ref #39 646E20350 LANE REDUCTION ARROW, (2 EACH)
Awd $430.00$215.00
2 $550.00$275.00
3 $550.00$275.00
4 $550.00$275.00
Ref #40 646E20410 WORD ON PAVEMENT, 96", (6 EACH)
Awd $1,110.00$185.00
2 $1,110.00$185.00
3 $1,110.00$185.00
4 $1,110.00$185.00
Ref #41 646E20504 DOTTED LINE, 6", (9528 FT)
Awd $7,146.00$0.75
2 $7,622.40$0.80
3 $7,622.40$0.80
4 $7,622.40$0.80
Ref #42 646E20510 DOTTED LINE, 12", (3745 FT)
Awd $3,745.00$1.00
2 $4,119.50$1.10
3 $4,119.50$1.10
4 $4,119.50$1.10
Ref #43 646E98000 PAVEMENT MARKING, MISC.: WRONG WAY ARROW, (1 EACH)
Awd $225.00$225.00
2 $250.00$250.00
3 $250.00$250.00
4 $250.00$250.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $179,165.10
2 $171,399.65
3 $175,302.25
4 $175,302.25
Ref #44 632E26501 DETECTOR LOOP, AS PER PLAN, (9 EACH)
Awd $7,650.00$850.00
2 $7,650.00$850.00
3 $7,965.00$885.00
4 $8,100.00$900.00
150004 - Page 31
Section 6 - TRAFFIC SIGNALS - Totals
Awd $7,650.00
2 $7,650.00
3 $7,965.00
4 $8,100.00
Ref #45 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (500 HOUR)
Awd $31,250.00$62.50
2 $29,250.00$58.50
3 $32,500.00$65.00
4 $35,000.00$70.00
Ref #46 614E11500 WORKSITE TRAFFIC SUPERVISOR, (4 MNTH)
Awd $1,000.00$250.00
2 $1,800.00$450.00
3 $24,000.00$6,000.00
4 $2,000.00$500.00
Ref #47 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (20 EACH)
Awd $3,000.00$150.00
2 $3,000.00$150.00
3 $3,000.00$150.00
4 $3,000.00$150.00
Ref #48 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P, (50 CY)
Awd $10,750.00$215.00
2 $6,000.00$120.00
3 $12,500.00$250.00
4 $10,000.00$200.00
Ref #49 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (120 DAY)
Awd $3,600.00$30.00
2 $4,200.00$35.00
3 $3,600.00$30.00
4 $3,600.00$30.00
Ref #50 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (37.64 MILE)
Awd $18,820.00$500.00
2 $7,904.40$210.00
3 $7,904.40$210.00
4 $7,904.40$210.00
Ref #51 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (36.46 MILE)
Awd $23,699.00$650.00
2 $15,130.90$415.00
3 $15,130.90$415.00
4 $15,130.90$415.00
Ref #52 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (39172 FT)
Awd $19,586.00$0.50
2 $15,668.80$0.40
3 $15,668.80$0.40
4 $15,668.80$0.40
Ref #53 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (26546 FT)
Awd $13,273.00$0.50
2 $9,291.10$0.35
3 $9,291.10$0.35
4 $9,291.10$0.35
150004 - Page 32
Ref #54 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (340 FT)
Awd $918.00$2.70
2 $765.00$2.25
3 $765.00$2.25
4 $765.00$2.25
Ref #55 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT, (1830 FT)
Awd $3,660.00$2.00
2 $3,660.00$2.00
3 $3,660.00$2.00
4 $3,660.00$2.00
Ref #56 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, (28 EACH)
Awd $1,176.00$42.00
2 $1,120.00$40.00
3 $1,120.00$40.00
4 $1,120.00$40.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $130,732.00
2 $97,790.20
3 $129,140.20
4 $107,140.20
Ref #57 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $15,000.00$15,000.00
3 $15,000.00$15,000.00
4 $25,000.00$25,000.00
Ref #58 108E30000 SPECIAL - CPM PROGRESS SCHEDULE SHORT DURATION PRO, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $750.00$750.00
3 $3,850.00$3,850.00
4 $2,500.00$2,500.00
Ref #59 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $98,405.00$98,405.00
3 $225,000.00$225,000.00
4 $85,000.00$85,000.00
Ref #60 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (6 MNTH)
Awd $10,500.00$1,750.00
2 $13,800.00$2,300.00
3 $13,800.00$2,300.00
4 $7,200.00$1,200.00
Ref #61 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $6,000.00$6,000.00
4 $7,500.00$7,500.00
Ref #62 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
4 $40,000.00$40,000.00
150004 - Page 33
Section 8 - INCIDENTALS - Totals
Awd $257,000.00
2 $232,955.00
3 $363,650.00
4 $167,200.00
150004 - Page 34
Project No. 150005
PID 23961
CUY-/GEA-US 422-18.31/00.00
Federal
Type: FOUR LANE RESURFACING
Completion Date: 10/15/2015
Award Amount: $5,842,287.01
Contract Awarded To: SHELLY COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $6,407,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $5,842,287.01
KARVO PAVING COMPANY
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 2
Bid $6,447,080.91
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $6,580,135.80
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 4
Bid $7,015,892.41
ANTHONY ALLEGA CEMENT CONTRACTOR INC
5585 CANAL RD
VALLEY VIEW, OH 44125
Cuyahoga
Bidder 5
Bid $7,295,122.84
150005 - Page 35
Ref #1 202E23000 PAVEMENT REMOVED, (5508 SY)
Awd $29,467.80$5.35
2 $112,914.00$20.50
3 $77,112.00$14.00
4 $110,160.00$20.00
5 $75,735.00$13.75
Ref #2 202E32000 CURB REMOVED, (180 FT)
Awd $2,250.00$12.50
2 $1,890.00$10.50
3 $1,260.00$7.00
4 $1,080.00$6.00
5 $1,854.00$10.30
Ref #3 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (26213 FT)
Awd $47,183.40$1.80
2 $47,183.40$1.80
3 $49,804.70$1.90
4 $47,183.40$1.80
5 $52,426.00$2.00
Ref #4 202E98300 REMOVAL MISC.: SLEEPER SLAB REMOVED, (338 SY)
Awd $15,767.70$46.65
2 $12,675.00$37.50
3 $6,760.00$20.00
4 $10,140.00$30.00
5 $8,652.80$25.60
Ref #5 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN, (270 STA)
Awd $38,664.00$143.20
2 $38,664.00$143.20
3 $40,500.00$150.00
4 $38,664.00$143.20
5 $42,525.00$157.50
Ref #6 209E70000 BORROW, (934 CY)
Awd $38,527.50$41.25
2 $38,527.50$41.25
3 $40,629.00$43.50
4 $38,527.50$41.25
5 $42,403.60$45.40
Ref #7 606E15050 GUARDRAIL, TYPE MGS, (21338 FT)
Awd $294,464.40$13.80
2 $294,464.40$13.80
3 $298,732.00$14.00
4 $294,464.40$13.80
5 $325,404.50$15.25
Ref #8 606E15400 MGS GUARDRAIL, TYPE 8, (1738 FT)
Awd $34,325.50$19.75
2 $34,325.50$19.75
3 $36,498.00$21.00
4 $34,325.50$19.75
5 $37,888.40$21.80
150005 - Page 36
Ref #9 606E17500 POST END ANCHOR (OR CONCRETE BLOCK END ANCHOR), (7 EACH)
Awd $6,440.00$920.00
2 $6,440.00$920.00
3 $6,790.00$970.00
4 $6,440.00$920.00
5 $7,112.00$1,016.00
Ref #10 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (25 EACH)
Awd $45,500.00$1,820.00
2 $45,500.00$1,820.00
3 $48,000.00$1,920.00
4 $45,500.00$1,820.00
5 $50,250.00$2,010.00
Ref #11 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (22 EACH)
Awd $16,280.00$740.00
2 $16,280.00$740.00
3 $17,160.00$780.00
4 $16,280.00$740.00
5 $17,979.50$817.25
Ref #12 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (24 EACH)
Awd $46,800.00$1,950.00
2 $46,800.00$1,950.00
3 $48,000.00$2,000.00
4 $46,800.00$1,950.00
5 $51,686.40$2,153.60
Ref #13 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (14 EACH)
Awd $5,250.00$375.00
2 $5,250.00$375.00
3 $5,530.00$395.00
4 $5,250.00$375.00
5 $5,796.00$414.00
Ref #203 203E10000 EXCAVATION, (918 CY)
Awd $13,770.00$15.00
2 $5,508.00$6.00
3 $9,180.00$10.00
4 $36,720.00$40.00
5 $23,041.80$25.10
Ref #204 204E10000 SUBGRADE COMPACTION, (5508 SY)
Awd $1,652.40$0.30
2 $6,609.60$1.20
3 $12,668.40$2.30
4 $17,901.00$3.25
5 $12,393.00$2.25
Section 1 - ROADWAY - Totals
Awd $636,342.70
2 $713,031.40
3 $698,624.10
4 $749,435.80
5 $755,148.00
150005 - Page 37
Ref #14 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
Ref #15 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN A, (1000 SY)
Awd $27,750.00$27.75
2 $13,000.00$13.00
3 $30,000.00$30.00
4 $30,000.00$30.00
5 $21,000.00$21.00
Ref #16 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN B, (9200 SY)
Awd $159,160.00$17.30
2 $138,000.00$15.00
3 $184,000.00$20.00
4 $322,000.00$35.00
5 $193,200.00$21.00
Ref #17 252E01500 FULL DEPTH PAVEMENT SAWING, (5604 FT)
Awd $10,647.60$1.90
2 $14,010.00$2.50
3 $11,208.00$2.00
4 $5,604.00$1.00
5 $11,488.20$2.05
Ref #18 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4", (249633 SY)
Awd $149,779.80$0.60
2 $272,099.97$1.09
3 $274,596.30$1.10
4 $187,224.75$0.75
5 $444,346.74$1.78
Ref #19 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE, 1 3/, (506 SY)
Awd $2,909.50$5.75
2 $708.40$1.40
3 $809.60$1.60
4 $506.00$1.00
5 $5,566.00$11.00
Ref #20 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/2", (2223 SY)
Awd $2,889.90$1.30
2 $3,001.05$1.35
3 $4,223.70$1.90
4 $2,445.30$1.10
5 $6,335.55$2.85
150005 - Page 38
Ref #21 301E46000 ASPHALT CONCRETE BASE, PG64-22, (1382 CY)
Awd $116,088.00$84.00
2 $187,952.00$136.00
3 $179,660.00$130.00
4 $276,400.00$200.00
5 $277,920.20$201.10
Ref #22 304E20000 AGGREGATE BASE, 6", (917 CY)
Awd $45,850.00$50.00
2 $34,846.00$38.00
3 $88,032.00$96.00
4 $91,700.00$100.00
5 $38,284.75$41.75
Ref #23 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (20298 GAL)
Awd $71,043.00$3.50
2 $60,894.00$3.00
3 $71,043.00$3.50
4 $76,117.50$3.75
5 $94,385.70$4.65
Ref #24 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (10095 GAL)
Awd $35,332.50$3.50
2 $30,285.00$3.00
3 $35,332.50$3.50
4 $37,856.25$3.75
5 $46,941.75$4.65
Ref #25 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (1025 CY)
Awd $174,250.00$170.00
2 $174,250.00$170.00
3 $225,500.00$220.00
4 $179,375.00$175.00
5 $203,411.25$198.45
Ref #26 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (10515 CY)
Awd $1,577,250.00$150.00
2 $1,734,975.00$165.00
3 $1,682,400.00$160.00
4 $1,945,275.00$185.00
5 $1,985,442.30$188.82
Ref #27 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (12268 CY)
Awd $1,288,140.00$105.00
2 $1,533,500.00$125.00
3 $1,349,480.00$110.00
4 $1,594,840.00$130.00
5 $1,586,252.40$129.30
Ref #28 609E24000 CURB, TYPE 4-A, (480 FT)
Awd $21,600.00$45.00
2 $21,600.00$45.00
3 $22,080.00$46.00
4 $9,600.00$20.00
5 $14,832.00$30.90
150005 - Page 39
Ref #29 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (1433 CY)
Awd $31,526.00$22.00
2 $35,825.00$25.00
3 $57,320.00$40.00
4 $71,650.00$50.00
5 $94,578.00$66.00
Ref #30 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (22 MILE)
Awd $14,300.00$650.00
2 $16,500.00$750.00
3 $17,160.00$780.00
4 $11,499.84$522.72
5 $18,390.90$835.95
Ref #31 690E98000 SPECIAL - MISC.: ROADWAY MOUNTED PAVEMENT SENSOR, , (1 EACH)
Awd $2,250.00$2,250.00
2 $2,750.00$2,750.00
3 $2,300.00$2,300.00
4 $2,250.00$2,250.00
5 $2,475.00$2,475.00
Ref #32 690E98000 SPECIAL - MISC.: WEATHER STATION AND ROADWAY MOUNT, (1 EACH)
Awd $500.00$500.00
2 $1,000.00$1,000.00
3 $530.00$530.00
4 $500.00$500.00
5 $550.00$550.00
Ref #200 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE, 3" T, (422 SY)
Awd $5,486.00$13.00
2 $2,637.50$6.25
3 $3,798.00$9.00
4 $3,376.00$8.00
5 $7,427.20$17.60
Ref #201 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 5-1/2", (671 SY)
Awd $5,703.50$8.50
2 $5,502.20$8.20
3 $5,368.00$8.00
4 $5,368.00$8.00
5 $7,448.10$11.10
Ref #202 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (91 CY)
Awd $20,020.00$220.00
2 $21,385.00$235.00
3 $16,744.00$184.00
4 $20,475.00$225.00
5 $24,752.00$272.00
Section 3 - PAVEMENT - Totals
Awd $3,762,475.80
2 $4,304,721.12
3 $4,261,585.10
4 $4,874,062.64
5 $5,085,028.04
150005 - Page 40
Ref #33 620E00500 DELINEATOR, POST MOUNTED, (244 EACH)
Awd $11,346.00$46.50
2 $11,346.00$46.50
3 $12,200.00$50.00
4 $11,346.00$46.50
5 $8,369.20$34.30
Ref #34 620E31200 REMOVAL OF DELINEATOR, (163 EACH)
Awd $489.00$3.00
2 $489.00$3.00
3 $489.00$3.00
4 $489.00$3.00
5 $1,727.80$10.60
Ref #35 621E00100 RPM, (646 EACH)
Awd $13,404.50$20.75
2 $13,410.96$20.76
3 $14,212.00$22.00
4 $13,566.00$21.00
5 $14,761.10$22.85
Ref #36 621E54000 RAISED PAVEMENT MARKER REMOVED, (482 EACH)
Awd $1,928.00$4.00
2 $964.00$2.00
3 $2,169.00$4.50
4 $2,410.00$5.00
5 $2,892.00$6.00
Ref #37 626E00100 BARRIER REFLECTOR, TYPE A, (304 EACH)
Awd $1,915.20$6.30
2 $1,915.20$6.30
3 $2,128.00$7.00
4 $1,915.20$6.30
5 $2,115.84$6.96
Ref #38 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, , (300 SF)
Awd $3,600.00$12.00
2 $3,000.00$10.00
3 $3,798.00$12.66
4 $3,000.00$10.00
5 $11,790.00$39.30
Ref #39 646E10010 EDGE LINE, 6", (16.29 MILE)
Awd $38,688.75$2,375.00
2 $40,334.04$2,476.00
3 $42,354.00$2,600.00
4 $40,334.04$2,476.00
5 $42,557.63$2,612.50
Ref #40 646E10110 LANE LINE, 6", (7.36 MILE)
Awd $6,992.00$950.00
2 $9,715.20$1,320.00
3 $10,304.00$1,400.00
4 $9,715.20$1,320.00
5 $7,691.20$1,045.00
150005 - Page 41
Ref #41 646E10310 CHANNELIZING LINE, 12", (4616 FT)
Awd $9,001.20$1.95
2 $8,124.16$1.76
3 $8,770.40$1.90
4 $8,124.16$1.76
5 $9,924.40$2.15
Ref #42 646E10400 STOP LINE, (103 FT)
Awd $1,030.00$10.00
2 $1,030.00$10.00
3 $1,081.50$10.50
4 $1,030.00$10.00
5 $1,133.00$11.00
Ref #43 646E20300 LANE ARROW, (15 EACH)
Awd $2,175.00$145.00
2 $1,980.00$132.00
3 $2,100.00$140.00
4 $1,980.00$132.00
5 $2,392.50$159.50
Ref #44 646E20504 DOTTED LINE, 6", (3913 FT)
Awd $7,826.00$2.00
2 $7,434.70$1.90
3 $7,826.00$2.00
4 $7,434.70$1.90
5 $8,608.60$2.20
Section 4 - TRAFFIC CONTROL - Totals
Awd $98,395.65
2 $99,743.26
3 $107,431.90
4 $101,344.30
5 $113,963.27
Ref #45 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (600 HOUR)
Awd $39,000.00$65.00
2 $37,500.00$62.50
3 $40,800.00$68.00
4 $39,000.00$65.00
5 $59,100.00$98.50
Ref #46 614E11500 WORKSITE TRAFFIC SUPERVISOR, (6 MNTH)
Awd $3,000.00$500.00
2 $1,500.00$250.00
3 $69,000.00$11,500.00
4 $12,600.00$2,100.00
5 $24,000.00$4,000.00
Ref #47 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (20 EACH)
Awd $3,000.00$150.00
2 $3,000.00$150.00
3 $3,160.00$158.00
4 $3,600.00$180.00
5 $3,880.00$194.00
150005 - Page 42
Ref #48 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (250 CY)
Awd $28,750.00$115.00
2 $21,250.00$85.00
3 $43,750.00$175.00
4 $25,000.00$100.00
5 $47,500.00$190.00
Ref #49 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (24 SNMT)
Awd $21,600.00$900.00
2 $21,600.00$900.00
3 $21,600.00$900.00
4 $10,800.00$450.00
5 $16,872.00$703.00
Ref #50 614E20101 WORK ZONE LANE LINE, CLASS I, 642 PAINT, AS PER PL, (32.43 MILE)
Awd $7,685.91$237.00
2 $7,685.91$237.00
3 $8,107.50$250.00
4 $7,685.91$237.00
5 $17,836.50$550.00
Ref #51 614E22101 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, AS PER PL, (69.18 MILE)
Awd $38,740.80$560.00
2 $38,740.80$560.00
3 $41,508.00$600.00
4 $38,740.80$560.00
5 $61,639.38$891.00
Ref #52 614E23201 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, A, (8421 FT)
Awd $6,315.75$0.75
2 $6,399.96$0.76
3 $6,736.80$0.80
4 $6,399.96$0.76
5 $4,631.55$0.55
Ref #53 614E24201 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, AS PER , (7194 FT)
Awd $4,316.40$0.60
2 $4,244.46$0.59
3 $4,316.40$0.60
4 $4,244.46$0.59
5 $3,597.00$0.50
Ref #54 614E26201 WORK ZONE STOP LINE, CLASS I, 642 PAINT, AS PER PL, (138 FT)
Awd $414.00$3.00
2 $414.00$3.00
3 $414.00$3.00
4 $414.00$3.00
5 $345.00$2.50
Ref #55 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, (18 EACH)
Awd $720.00$40.00
2 $720.00$40.00
3 $756.00$42.00
4 $720.00$40.00
5 $891.00$49.50
150005 - Page 43
Ref #205 622E41001 PORTABLE BARRIER, 32", AS PER PLAN, (240 FT)
Awd $4,080.00$17.00
2 $5,280.00$22.00
3 $2,640.00$11.00
4 $720.00$3.00
5 $2,760.00$11.50
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $157,622.86
2 $148,335.13
3 $242,788.70
4 $149,925.13
5 $243,052.43
Ref #57 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (167 FT)
Awd $20,040.00$120.00
2 $20,040.00$120.00
3 $21,209.00$127.00
4 $20,040.00$120.00
5 $23,881.00$143.00
Ref #58 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #59 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (270 SY)
Awd $35,100.00$130.00
2 $35,100.00$130.00
3 $36,990.00$137.00
4 $35,100.00$130.00
5 $20,088.00$74.40
Ref #60 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #61 847E30300 WEARING COURSE REMOVED, ASPHALT, (270 SY)
Awd $6,750.00$25.00
2 $6,750.00$25.00
3 $7,020.00$26.00
4 $6,750.00$25.00
5 $9,261.00$34.30
Ref #62 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
150005 - Page 44
Section 6 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $65,190.00
2 $64,390.00
3 $70,567.00
4 $64,390.00
5 $55,061.80
Ref #63 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (188 FT)
Awd $22,560.00$120.00
2 $22,560.00$120.00
3 $23,876.00$127.00
4 $22,560.00$120.00
5 $26,884.00$143.00
Ref #64 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #65 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (308 SY)
Awd $40,040.00$130.00
2 $40,040.00$130.00
3 $42,196.00$137.00
4 $40,040.00$130.00
5 $21,144.20$68.65
Ref #66 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (4 CY)
Awd $1,400.00$350.00
2 $1,400.00$350.00
3 $1,480.00$370.00
4 $1,400.00$350.00
5 $1,144.40$286.10
Ref #67 847E30300 WEARING COURSE REMOVED, ASPHALT, (308 SY)
Awd $7,700.00$25.00
2 $7,700.00$25.00
3 $8,008.00$26.00
4 $7,700.00$25.00
5 $10,564.40$34.30
Ref #68 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $74,300.00
2 $73,500.00
3 $80,168.00
4 $73,500.00
5 $60,882.20
150005 - Page 45
Ref #69 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (160 FT)
Awd $19,200.00$120.00
2 $19,200.00$120.00
3 $20,320.00$127.00
4 $19,200.00$120.00
5 $22,880.00$143.00
Ref #70 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #71 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (112 SY)
Awd $14,560.00$130.00
2 $14,560.00$130.00
3 $15,344.00$137.00
4 $14,560.00$130.00
5 $14,739.20$131.60
Ref #72 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (112 SY)
Awd $14,560.00$130.00
2 $14,560.00$130.00
3 $15,344.00$137.00
4 $14,560.00$130.00
5 $16,016.00$143.00
Ref #73 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #74 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
Ref #75 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 8 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $57,220.00
2 $56,420.00
3 $62,180.00
4 $56,420.00
5 $63,150.20
150005 - Page 46
Ref #76 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (148 FT)
Awd $17,760.00$120.00
2 $17,760.00$120.00
3 $18,796.00$127.00
4 $17,760.00$120.00
5 $21,164.00$143.00
Ref #77 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #78 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (224 SY)
Awd $29,120.00$130.00
2 $29,120.00$130.00
3 $30,688.00$137.00
4 $29,120.00$130.00
5 $16,665.60$74.40
Ref #79 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #80 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
Ref #81 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 9 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $55,780.00
2 $54,980.00
3 $60,656.00
4 $54,980.00
5 $47,344.60
Ref #82 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (84 FT)
Awd $10,080.00$120.00
2 $10,080.00$120.00
3 $10,668.00$127.00
4 $10,080.00$120.00
5 $12,499.20$148.80
150005 - Page 47
Ref #83 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #84 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (112 SY)
Awd $14,560.00$130.00
2 $14,560.00$130.00
3 $15,344.00$137.00
4 $14,560.00$130.00
5 $14,739.20$131.60
Ref #85 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (112 SY)
Awd $14,560.00$130.00
2 $14,560.00$130.00
3 $15,344.00$137.00
4 $14,560.00$130.00
5 $16,016.00$143.00
Ref #86 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #87 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
Ref #88 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 10 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $48,100.00
2 $47,300.00
3 $52,528.00
4 $47,300.00
5 $52,769.40
Ref #89 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (84 FT)
Awd $10,080.00$120.00
2 $10,080.00$120.00
3 $10,668.00$127.00
4 $10,080.00$120.00
5 $12,978.00$154.50
150005 - Page 48
Ref #90 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #91 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (224 SY)
Awd $29,120.00$130.00
2 $29,120.00$130.00
3 $30,688.00$137.00
4 $29,120.00$130.00
5 $16,665.60$74.40
Ref #92 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #93 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
Ref #94 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 11 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $48,100.00
2 $47,300.00
3 $52,528.00
4 $47,300.00
5 $39,158.60
Ref #95 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (86 FT)
Awd $10,320.00$120.00
2 $10,320.00$120.00
3 $10,922.00$127.00
4 $10,320.00$120.00
5 $13,287.00$154.50
Ref #96 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
150005 - Page 49
Ref #97 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (224 SY)
Awd $29,120.00$130.00
2 $29,120.00$130.00
3 $30,688.00$137.00
4 $29,120.00$130.00
5 $16,665.60$74.40
Ref #98 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #99 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
Ref #100 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 12 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $48,340.00
2 $47,540.00
3 $52,782.00
4 $47,540.00
5 $39,467.60
Ref #101 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (86 FT)
Awd $10,320.00$120.00
2 $10,320.00$120.00
3 $10,922.00$127.00
4 $10,320.00$120.00
5 $13,287.00$154.50
Ref #102 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #103 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (224 SY)
Awd $29,120.00$130.00
2 $29,120.00$130.00
3 $30,688.00$137.00
4 $29,120.00$130.00
5 $16,665.60$74.40
150005 - Page 50
Ref #104 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #105 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
Ref #106 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 13 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $48,340.00
2 $47,540.00
3 $52,782.00
4 $47,540.00
5 $39,467.60
Ref #107 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (87 FT)
Awd $10,440.00$120.00
2 $10,440.00$120.00
3 $11,049.00$127.00
4 $10,440.00$120.00
5 $13,441.50$154.50
Ref #108 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #109 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (112 SY)
Awd $14,560.00$130.00
2 $14,560.00$130.00
3 $15,344.00$137.00
4 $14,560.00$130.00
5 $14,739.20$131.60
Ref #110 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (112 SY)
Awd $14,560.00$130.00
2 $14,560.00$130.00
3 $15,344.00$137.00
4 $14,560.00$130.00
5 $16,016.00$143.00
150005 - Page 51
Ref #111 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #112 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
Ref #113 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 14 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $48,460.00
2 $47,660.00
3 $52,909.00
4 $47,660.00
5 $53,711.70
Ref #114 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (82 FT)
Awd $9,840.00$120.00
2 $9,840.00$120.00
3 $10,414.00$127.00
4 $9,840.00$120.00
5 $13,530.00$165.00
Ref #115 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #116 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (224 SY)
Awd $29,120.00$130.00
2 $29,120.00$130.00
3 $30,688.00$137.00
4 $29,120.00$130.00
5 $16,665.60$74.40
Ref #117 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
150005 - Page 52
Ref #118 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
Ref #119 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 15 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $47,860.00
2 $47,060.00
3 $52,274.00
4 $47,060.00
5 $39,710.60
Ref #120 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (78 FT)
Awd $9,360.00$120.00
2 $9,360.00$120.00
3 $9,906.00$127.00
4 $9,360.00$120.00
5 $12,870.00$165.00
Ref #121 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #122 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (224 SY)
Awd $29,120.00$130.00
2 $29,120.00$130.00
3 $30,688.00$137.00
4 $29,120.00$130.00
5 $16,665.60$74.40
Ref #123 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #124 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
150005 - Page 53
Ref #125 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 16 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $47,380.00
2 $46,580.00
3 $51,766.00
4 $46,580.00
5 $39,050.60
Ref #126 519E11720 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: TOP , (78 FT)
Awd $9,360.00$120.00
2 $9,360.00$120.00
3 $9,906.00$127.00
4 $9,360.00$120.00
5 $12,870.00$165.00
Ref #127 530E00400 SPECIAL - STRUCTURE, MISC.:EMERGENCY ASPHALT PAVIN, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $2,920.00$1,460.00
4 $200.00$100.00
5 $230.00$115.00
Ref #128 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (112 SY)
Awd $14,560.00$130.00
2 $14,560.00$130.00
3 $15,344.00$137.00
4 $14,560.00$130.00
5 $14,739.20$131.60
Ref #129 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (112 SY)
Awd $14,560.00$130.00
2 $14,560.00$130.00
3 $15,344.00$137.00
4 $14,560.00$130.00
5 $16,016.00$143.00
Ref #130 847E20001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $700.00$350.00
2 $700.00$350.00
3 $740.00$370.00
4 $700.00$350.00
5 $686.60$343.30
Ref #131 847E30300 WEARING COURSE REMOVED, ASPHALT, (224 SY)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,824.00$26.00
4 $5,600.00$25.00
5 $7,683.20$34.30
150005 - Page 54
Ref #132 847E50000 HAND CHIPPING, (8 SY)
Awd $1,600.00$200.00
2 $1,600.00$200.00
3 $1,688.00$211.00
4 $1,600.00$200.00
5 $915.20$114.40
Section 17 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $47,380.00
2 $46,580.00
3 $51,766.00
4 $46,580.00
5 $53,140.20
Ref #133 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $50,000.00$50,000.00
3 $25,000.00$25,000.00
4 $35,000.00$35,000.00
5 $49,950.00$49,950.00
Ref #134 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $300,000.00$300,000.00
2 $262,000.00$262,000.00
3 $315,000.00$315,000.00
4 $252,774.54$252,774.54
5 $205,454.00$205,454.00
Ref #135 619E16020 FIELD OFFICE, TYPE C, (12 MNTH)
Awd $24,000.00$2,000.00
2 $26,400.00$2,200.00
3 $25,800.00$2,150.00
4 $18,000.00$1,500.00
5 $53,112.00$4,426.00
Ref #136 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $15,000.00$15,000.00
3 $10,000.00$10,000.00
4 $7,500.00$7,500.00
5 $5,500.00$5,500.00
Ref #137 624E10000 MOBILIZATION, (LUMP SUM)
Awd $200,000.00$200,000.00
2 $200,000.00$200,000.00
3 $200,000.00$200,000.00
4 $200,000.00$200,000.00
5 $200,000.00$200,000.00
Section 18 - INCIDENTALS - Totals
Awd $550,000.00
2 $553,400.00
3 $575,800.00
4 $513,274.54
5 $514,016.00
150005 - Page 55
Project No. 150006
PID 90936
WAY-SRTS Creston Inf.
Federal
Type: MISCELLANEOUS
Completion Date: 6/30/2015
Award Amount: $307,116.45
Contract Awarded To: STANLEY MILLER CONSTRUCTION COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $249,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 1
Bid $307,116.45
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $309,053.20
PARELLA-PANNUNZIO INC
720 NORTH MERIDIAN RD
YOUNGSTOWN, OH 44509
Mahoning
Bidder 3
Bid $310,360.30
R W ROBINSON INC
87 EAST STATE
BELLVILLE, OH 44813
Richland
Bidder 4
Bid $319,238.80
FECHKO EXCAVATING INC
865 W LIBERTY ST 120
MEDINA, OH 44256
Medina
Bidder 5
Bid $322,719.10
G E BAKER CONSTRUCTION INC
6555 WHARTON RD
SHREVE, OH 44676
Wayne
Bidder 6
Bid $367,950.00
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 7
Bid $388,676.05
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 8
Bid $392,917.10
150006 - Page 56
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $7,778.00$7,778.00
2 $6,000.00$6,000.00
3 $12,500.00$12,500.00
4 $16,000.00$16,000.00
5 $2,176.00$2,176.00
6 $10,000.00$10,000.00
7 $3,000.00$3,000.00
8 $5,000.00$5,000.00
Ref #2 202E30000 WALK REMOVED, (360 SF)
Awd $187.20$0.52
2 $720.00$2.00
3 $1,440.00$4.00
4 $1,080.00$3.00
5 $180.00$0.50
6 $1,800.00$5.00
7 $90.00$0.25
8 $900.00$2.50
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (11 FT)
Awd $11.00$1.00
2 $341.00$31.00
3 $220.00$20.00
4 $55.00$5.00
5 $165.00$15.00
6 $55.00$5.00
7 $110.00$10.00
8 $132.00$12.00
Ref #4 202E58100 CATCH BASIN REMOVED, (3 EACH)
Awd $450.00$150.00
2 $585.00$195.00
3 $1,200.00$400.00
4 $1,200.00$400.00
5 $606.00$202.00
6 $150.00$50.00
7 $150.00$50.00
8 $450.00$150.00
Ref #5 202E98100 REMOVAL MISC.:ROCK, (5 EACH)
Awd $250.00$50.00
2 $340.00$68.00
3 $125.00$25.00
4 $1,000.00$200.00
5 $175.00$35.00
6 $250.00$50.00
7 $250.00$50.00
8 $250.00$50.00
Ref #6 202E98100 REMOVAL MISC.:COMMERCIAL SIGN, (1 EACH)
Awd $165.00$165.00
2 $335.00$335.00
3 $500.00$500.00
4 $1,000.00$1,000.00
5 $708.00$708.00
6 $550.00$550.00
7 $500.00$500.00
8 $250.00$250.00
150006 - Page 57
Ref #7 202E98100 REMOVAL MISC.:DRIVE PAVERS/DECORATIVE ITEMS, (3 EACH)
Awd $345.00$115.00
2 $900.00$300.00
3 $300.00$100.00
4 $1,500.00$500.00
5 $1,491.00$497.00
6 $1,350.00$450.00
7 $30.00$10.00
8 $750.00$250.00
Ref #8 202E98400 REMOVAL MISC.:DRIVE GRAVEL, (327 SF)
Awd $163.50$0.50
2 $654.00$2.00
3 $3,270.00$10.00
4 $654.00$2.00
5 $245.25$0.75
6 $1,635.00$5.00
7 $327.00$1.00
8 $588.60$1.80
Ref #9 203E10000 EXCAVATION, (407 CY)
Awd $14,448.50$35.50
2 $26,455.00$65.00
3 $8,140.00$20.00
4 $12,210.00$30.00
5 $20,960.50$51.50
6 $32,560.00$80.00
7 $4,884.00$12.00
8 $8,140.00$20.00
Ref #10 203E20000 EMBANKMENT, (24 CY)
Awd $1,200.00$50.00
2 $2,280.00$95.00
3 $480.00$20.00
4 $1,320.00$55.00
5 $1,368.00$57.00
6 $1,920.00$80.00
7 $720.00$30.00
8 $480.00$20.00
Ref #11 204E10000 SUBGRADE COMPACTION, (713 SY)
Awd $713.00$1.00
2 $1,426.00$2.00
3 $1,069.50$1.50
4 $2,139.00$3.00
5 $7,664.75$10.75
6 $3,565.00$5.00
7 $713.00$1.00
8 $1,782.50$2.50
Ref #12 607E98000 FENCE, MISC.:WOOD FENCE, (65 FT)
Awd $5,026.45$77.33
2 $4,875.00$75.00
3 $4,524.00$69.60
4 $4,875.00$75.00
5 $4,972.50$76.50
6 $6,500.00$100.00
7 $325.00$5.00
8 $5,200.00$80.00
150006 - Page 58
Ref #13 608E10000 4" CONCRETE WALK, (19917 SF)
Awd $107,551.80$5.40
2 $79,668.00$4.00
3 $109,543.50$5.50
4 $137,427.30$6.90
5 $90,622.35$4.55
6 $119,502.00$6.00
7 $192,199.05$9.65
8 $189,211.50$9.50
Ref #14 608E13000 6" CONCRETE WALK, (1578 SF)
Awd $10,809.30$6.85
2 $14,517.60$9.20
3 $9,468.00$6.00
4 $12,229.50$7.75
5 $11,124.90$7.05
6 $15,780.00$10.00
7 $17,358.00$11.00
8 $16,569.00$10.50
Ref #15 608E49000 CURB RAMP, (12 EACH)
Awd $3,600.00$300.00
2 $2,700.00$225.00
3 $8,400.00$700.00
4 $4,200.00$350.00
5 $14,316.00$1,193.00
6 $6,000.00$500.00
7 $6,000.00$500.00
8 $12,000.00$1,000.00
Ref #16 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (5 EACH)
Awd $1,080.00$216.00
2 $800.00$160.00
3 $975.00$195.00
4 $1,000.00$200.00
5 $1,050.00$210.00
6 $1,250.00$250.00
7 $500.00$100.00
8 $1,000.00$200.00
Section 1 - ROADWAY - Totals
Awd $153,778.75
2 $142,596.60
3 $162,155.00
4 $197,889.80
5 $157,825.25
6 $202,867.00
7 $227,156.05
8 $242,703.60
150006 - Page 59
Ref #17 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (6 SY)
Awd $120.00$20.00
2 $426.00$71.00
3 $510.00$85.00
4 $900.00$150.00
5 $408.00$68.00
6 $600.00$100.00
7 $300.00$50.00
8 $300.00$50.00
Ref #18 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER, (1 CY)
Awd $300.00$300.00
2 $365.00$365.00
3 $120.00$120.00
4 $200.00$200.00
5 $196.00$196.00
6 $650.00$650.00
7 $100.00$100.00
8 $150.00$150.00
Ref #19 659E10000 SEEDING AND MULCHING, (809 SY)
Awd $4,045.00$5.00
2 $2,831.50$3.50
3 $2,386.55$2.95
4 $3,236.00$4.00
5 $2,871.95$3.55
6 $8,090.00$10.00
7 $809.00$1.00
8 $4,045.00$5.00
Ref #20 659E14000 REPAIR SEEDING AND MULCHING, (41 SY)
Awd $16.40$0.40
2 $18.45$0.45
3 $41.00$1.00
4 $20.50$0.50
5 $43.05$1.05
6 $20.50$0.50
7 $41.00$1.00
8 $205.00$5.00
Ref #21 659E15000 INTER-SEEDING, (41 SY)
Awd $4.10$0.10
2 $4.10$0.10
3 $16.40$0.40
4 $20.50$0.50
5 $102.50$2.50
6 $20.50$0.50
7 $41.00$1.00
8 $102.50$2.50
Ref #22 659E20000 COMMERCIAL FERTILIZER, (0.2 TON)
Awd $95.20$476.00
2 $91.00$455.00
3 $85.60$428.00
4 $100.00$500.00
5 $98.00$490.00
6 $90.00$450.00
7 $160.00$800.00
8 $160.00$800.00
150006 - Page 60
Ref #23 659E35000 WATER, (3 MGAL)
Awd $4.20$1.40
2 $4.05$1.35
3 $3.75$1.25
4 $3.00$1.00
5 $16.35$5.45
6 $3.00$1.00
7 $150.00$50.00
8 $450.00$150.00
Ref #24 832E30000 EROSION CONTROL, (23233 EACH)
Awd $23,233.00$1.00
2 $23,233.00$1.00
3 $23,233.00$1.00
4 $23,233.00$1.00
5 $23,233.00$1.00
6 $23,233.00$1.00
7 $23,233.00$1.00
8 $23,233.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $27,817.90
2 $26,973.10
3 $26,396.30
4 $27,713.00
5 $26,968.85
6 $32,707.00
7 $24,834.00
8 $28,645.50
Ref #25 602E20000 CONCRETE MASONRY, (0.7 CY)
Awd $443.80$634.00
2 $770.00$1,100.00
3 $840.00$1,200.00
4 $1,400.00$2,000.00
5 $990.50$1,415.00
6 $700.00$1,000.00
7 $700.00$1,000.00
8 $840.00$1,200.00
Ref #26 611E00100 4" CONDUIT, TYPE B, (4 FT)
Awd $200.00$50.00
2 $432.00$108.00
3 $60.00$15.00
4 $20.00$5.00
5 $90.00$22.50
6 $220.00$55.00
7 $40.00$10.00
8 $120.00$30.00
150006 - Page 61
Ref #27 611E00900 6" CONDUIT, TYPE B, (137 FT)
Awd $2,466.00$18.00
2 $4,452.50$32.50
3 $3,425.00$25.00
4 $1,370.00$10.00
5 $3,082.50$22.50
6 $3,836.00$28.00
7 $2,055.00$15.00
8 $4,110.00$30.00
Ref #28 611E01400 6" CONDUIT, TYPE E, (100 FT)
Awd $600.00$6.00
2 $2,500.00$25.00
3 $2,000.00$20.00
4 $1,000.00$10.00
5 $1,225.00$12.25
6 $2,000.00$20.00
7 $1,000.00$10.00
8 $1,500.00$15.00
Ref #29 611E01500 6" CONDUIT, TYPE F, (100 FT)
Awd $600.00$6.00
2 $2,500.00$25.00
3 $2,000.00$20.00
4 $1,000.00$10.00
5 $1,225.00$12.25
6 $2,000.00$20.00
7 $1,000.00$10.00
8 $1,500.00$15.00
Ref #30 611E01800 8" CONDUIT, TYPE B, (8 FT)
Awd $176.00$22.00
2 $600.00$75.00
3 $400.00$50.00
4 $320.00$40.00
5 $242.00$30.25
6 $480.00$60.00
7 $160.00$20.00
8 $280.00$35.00
Ref #31 611E04400 12" CONDUIT, TYPE B, (25 FT)
Awd $1,000.00$40.00
2 $2,500.00$100.00
3 $1,500.00$60.00
4 $1,500.00$60.00
5 $1,937.50$77.50
6 $1,625.00$65.00
7 $1,250.00$50.00
8 $2,250.00$90.00
Ref #32 611E05900 15" CONDUIT, TYPE B, (3 FT)
Awd $150.00$50.00
2 $465.00$155.00
3 $225.00$75.00
4 $180.00$60.00
5 $349.50$116.50
6 $360.00$120.00
7 $300.00$100.00
8 $300.00$100.00
150006 - Page 62
Ref #33 611E98390 CATCH BASIN, NO. 7, (2 EACH)
Awd $2,000.00$1,000.00
2 $2,390.00$1,195.00
3 $1,800.00$900.00
4 $3,500.00$1,750.00
5 $1,870.00$935.00
6 $2,000.00$1,000.00
7 $2,000.00$1,000.00
8 $3,000.00$1,500.00
Ref #34 611E98470 CATCH BASIN, NO. 2-2B, (1 EACH)
Awd $816.00$816.00
2 $1,765.00$1,765.00
3 $900.00$900.00
4 $1,500.00$1,500.00
5 $950.00$950.00
6 $1,000.00$1,000.00
7 $1,200.00$1,200.00
8 $1,500.00$1,500.00
Ref #35 611E99654 MANHOLE ADJUSTED TO GRADE, (2 EACH)
Awd $300.00$150.00
2 $1,200.00$600.00
3 $600.00$300.00
4 $2,000.00$1,000.00
5 $570.00$285.00
6 $800.00$400.00
7 $1,000.00$500.00
8 $600.00$300.00
Section 3 - DRAINAGE - Totals
Awd $8,751.80
2 $19,574.50
3 $13,750.00
4 $13,790.00
5 $12,532.00
6 $15,021.00
7 $10,705.00
8 $16,000.00
Ref #36 253E01000 PAVEMENT REPAIR, (13 SY)
Awd $1,300.00$100.00
2 $1,365.00$105.00
3 $975.00$75.00
4 $1,625.00$125.00
5 $1,053.00$81.00
6 $3,250.00$250.00
7 $975.00$75.00
8 $520.00$40.00
150006 - Page 63
Ref #37 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (713 SY)
Awd $44,206.00$62.00
2 $42,780.00$60.00
3 $39,215.00$55.00
4 $34,224.00$48.00
5 $40,641.00$57.00
6 $64,170.00$90.00
7 $35,650.00$50.00
8 $53,475.00$75.00
Ref #38 609E26000 CURB, TYPE 6, (112 FT)
Awd $3,696.00$33.00
2 $3,584.00$32.00
3 $2,800.00$25.00
4 $3,248.00$29.00
5 $4,592.00$41.00
6 $2,912.00$26.00
7 $2,800.00$25.00
8 $4,480.00$40.00
Section 4 - PAVEMENT - Totals
Awd $49,202.00
2 $47,729.00
3 $42,990.00
4 $39,097.00
5 $46,286.00
6 $70,332.00
7 $39,425.00
8 $58,475.00
Ref #39 638E10800 VALVE BOX ADJUSTED TO GRADE, (6 EACH)
Awd $330.00$55.00
2 $1,800.00$300.00
3 $300.00$50.00
4 $2,700.00$450.00
5 $183.00$30.50
6 $600.00$100.00
7 $300.00$50.00
8 $600.00$100.00
Section 5 - WATER WORK - Totals
Awd $330.00
2 $1,800.00
3 $300.00
4 $2,700.00
5 $183.00
6 $600.00
7 $300.00
8 $600.00
150006 - Page 64
Ref #40 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (4 EACH)
Awd $140.00$35.00
2 $640.00$160.00
3 $800.00$200.00
4 $1,200.00$300.00
5 $840.00$210.00
6 $1,200.00$300.00
7 $2,000.00$500.00
8 $800.00$200.00
Ref #41 642E00590 CROSSWALK LINE, (358 FT)
Awd $2,148.00$6.00
2 $2,685.00$7.50
3 $1,969.00$5.50
4 $2,148.00$6.00
5 $2,685.00$7.50
6 $3,222.00$9.00
7 $2,506.00$7.00
8 $3,043.00$8.50
Section 6 - TRAFFIC CONTROL - Totals
Awd $2,288.00
2 $3,325.00
3 $2,769.00
4 $3,348.00
5 $3,525.00
6 $4,422.00
7 $4,506.00
8 $3,843.00
Ref #42 616E10000 WATER, (1 MGAL)
Awd $1.00$1.00
2 $45.00$45.00
3 $100.00$100.00
4 $1.00$1.00
5 $5,775.00$5,775.00
6 $1.00$1.00
7 $50.00$50.00
8 $250.00$250.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $1.00
2 $45.00
3 $100.00
4 $1.00
5 $5,775.00
6 $1.00
7 $50.00
8 $250.00
150006 - Page 65
Ref #43 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $1,760.00$1,760.00
3 $5,000.00$5,000.00
4 $3,900.00$3,900.00
5 $3,594.00$3,594.00
6 $9,200.00$9,200.00
7 $14,000.00$14,000.00
8 $8,000.00$8,000.00
Ref #44 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $10,550.00$10,550.00
2 $32,000.00$32,000.00
3 $20,000.00$20,000.00
4 $16,200.00$16,200.00
5 $10,300.00$10,300.00
6 $8,000.00$8,000.00
7 $30,000.00$30,000.00
8 $8,000.00$8,000.00
Ref #45 619E16000 FIELD OFFICE, TYPE A, (7 MNTH)
Awd $10,220.00$1,460.00
2 $15,750.00$2,250.00
3 $4,900.00$700.00
4 $700.00$100.00
5 $10,220.00$1,460.00
6 $2,800.00$400.00
7 $700.00$100.00
8 $8,400.00$1,200.00
Ref #46 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $28,889.00$28,889.00
2 $7,500.00$7,500.00
3 $6,000.00$6,000.00
4 $2,700.00$2,700.00
5 $3,915.00$3,915.00
6 $7,000.00$7,000.00
7 $17,000.00$17,000.00
8 $3,000.00$3,000.00
Ref #47 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,288.00$10,288.00
2 $10,000.00$10,000.00
3 $26,000.00$26,000.00
4 $11,200.00$11,200.00
5 $41,595.00$41,595.00
6 $15,000.00$15,000.00
7 $20,000.00$20,000.00
8 $15,000.00$15,000.00
150006 - Page 66
Section 8 - INCIDENTALS - Totals
Awd $64,947.00
2 $67,010.00
3 $61,900.00
4 $34,700.00
5 $69,624.00
6 $42,000.00
7 $81,700.00
8 $42,400.00
150006 - Page 67
Project No. 150007
PID 87587
D05-CS-FY2015(A)
Federal
Type: CRACK SEALING
Completion Date: 6/30/2015
Award Amount: $271,359.70
Contract Awarded To: AERO-MARK INC
Letting Date: 1/15/2015
Engineer's Estimate: $348,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
AERO-MARK INC
10423 DANNER DR
STREETSBORO, OH 44241
Portage
Bidder 1
Bid $271,359.70
STRAWSER CONSTRUCTION INC
1595 FRANK RD
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $305,516.82
SCODELLER CONSTRUCTION INC
51722 GRAND RIVER AVE
WIXOM, MI 48393-2303
Bidder 3
Bid $351,354.46
DOT CONSTRUCTION CORP
535 NORTH BROAD ST STE 5
CANFIELD, OH 44406
Mahoning
Bidder 4
Bid $360,926.50
AMERICAN PAVEMENTS INC
7475 MONTGOMERY DR
PLAIN CITY, OH 43064
Madison
Bidder 5
Bid $365,414.46
SWANK CONSTRUCTION COMPANY LLC
632 HUNT VALLEY CIRCLE
NEW KENSINGTON, PA 15068
Bidder 6
Bid $373,398.54
W L MARKERS INC
2834 FISHER RD
COLUMBUS, OH 43204
Franklin
Bidder 7
Bid $389,366.46
P S CONSTRUCTION FABRICS INC
10361 PIFER RD
WADSWORTH, OH 44281
Medina
Bidder 8
Bid $559,434.36
150007 - Page 68
Ref #1 423E00250 CRACK SEALING, TYPE IV, (1009466 SY)
Awd $246,309.70$0.24
2 $272,555.82$0.27
3 $312,934.46$0.31
4 $252,366.50$0.25
5 $312,934.46$0.31
6 $191,798.54$0.19
7 $312,934.46$0.31
8 $464,354.36$0.46
Section 1 - ROADWAY - Totals
Awd $246,309.70
2 $272,555.82
3 $312,934.46
4 $252,366.50
5 $312,934.46
6 $191,798.54
7 $312,934.46
8 $464,354.36
Ref #2 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (224 HOUR)
Awd $8,960.00$40.00
2 $2,240.00$10.00
3 $15,680.00$70.00
4 $13,440.00$60.00
5 $13,440.00$60.00
6 $22,400.00$100.00
7 $17,920.00$80.00
8 $21,280.00$95.00
Ref #3 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (28 DAY)
Awd $840.00$30.00
2 $1,008.00$36.00
3 $2,240.00$80.00
4 $1,120.00$40.00
5 $1,540.00$55.00
6 $4,200.00$150.00
7 $7,812.00$279.00
8 $2,800.00$100.00
Section 2 - MAINTENANCE OF TRAFFIC - Totals
Awd $9,800.00
2 $3,248.00
3 $17,920.00
4 $14,560.00
5 $14,980.00
6 $26,600.00
7 $25,732.00
8 $24,080.00
150007 - Page 69
Ref #4 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,450.00$1,450.00
2 $950.00$950.00
3 $2,500.00$2,500.00
4 $4,000.00$4,000.00
5 $1,500.00$1,500.00
6 $5,000.00$5,000.00
7 $4,500.00$4,500.00
8 $16,000.00$16,000.00
Ref #5 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $22,000.00$22,000.00
3 $9,500.00$9,500.00
4 $80,000.00$80,000.00
5 $20,000.00$20,000.00
6 $100,000.00$100,000.00
7 $40,000.00$40,000.00
8 $45,000.00$45,000.00
Ref #6 624E10000 MOBILIZATION, (LUMP SUM)
Awd $3,800.00$3,800.00
2 $6,763.00$6,763.00
3 $8,500.00$8,500.00
4 $10,000.00$10,000.00
5 $16,000.00$16,000.00
6 $50,000.00$50,000.00
7 $6,200.00$6,200.00
8 $10,000.00$10,000.00
Section 3 - INCIDENTALS - Totals
Awd $15,250.00
2 $29,713.00
3 $20,500.00
4 $94,000.00
5 $37,500.00
6 $155,000.00
7 $50,700.00
8 $71,000.00
150007 - Page 70
Project No. 150008
PID 88964
GUE-CUL-FY2015
Federal
Type: CULVERT REPLACEMENT
Completion Date: 10/15/2015
Award Amount: $699,068.00
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/15/2015
Engineer's Estimate: $853,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $699,068.00
CROSS ROADS CONSTRUCTION INC
3155 HARDING LANE
CAMBRIDGE, OH 43725
Guernsey
Bidder 2
Bid $757,355.00
SUBURBAN MAINTENANCE & CONSTRUCTION INC
16330 YORK RD
NORTH ROYALTON, OH 44133
Cuyahoga
Bidder 3
Bid $934,710.00
BURTON SCOT CONTRACTORS LLC
11330 KINSMAN RD
NEWBURY, OH 44065
Geauga
Bidder 4
Bid $992,983.00
150008 - Page 71
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $66,000.00$66,000.00
2 $35,000.00$35,000.00
3 $50,000.00$50,000.00
4 $25,000.00$25,000.00
Ref #2 202E20010 HEADWALL REMOVED, (2 EACH)
Awd $500.00$250.00
2 $1,000.00$500.00
3 $8,000.00$4,000.00
4 $6,000.00$3,000.00
Ref #3 202E35200 PIPE REMOVED, OVER 24", (16 FT)
Awd $800.00$50.00
2 $1,600.00$100.00
3 $1,760.00$110.00
4 $5,280.00$330.00
Ref #4 202E38200 GUARDRAIL REMOVED FOR REUSE, (100 FT)
Awd $500.00$5.00
2 $2,000.00$20.00
3 $500.00$5.00
4 $2,000.00$20.00
Ref #5 203E10000 EXCAVATION, (9 CY)
Awd $630.00$70.00
2 $900.00$100.00
3 $450.00$50.00
4 $2,700.00$300.00
Ref #6 203E20000 EMBANKMENT, (1 CY)
Awd $40.00$40.00
2 $100.00$100.00
3 $50.00$50.00
4 $1,000.00$1,000.00
Ref #7 606E16500 GUARDRAIL REBUILT, TYPE 5, (100 FT)
Awd $3,000.00$30.00
2 $3,900.00$39.00
3 $1,500.00$15.00
4 $3,360.00$33.60
Ref #8 606E50000 SPECIAL - RESHAPING BERM, (50 FT)
Awd $50.00$1.00
2 $1,000.00$20.00
3 $750.00$15.00
4 $2,500.00$50.00
Section 1 - ROADWAY - Totals
Awd $71,520.00
2 $45,500.00
3 $63,010.00
4 $47,840.00
Ref #9 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (8 SY)
Awd $2,800.00$350.00
2 $1,200.00$150.00
3 $8,000.00$1,000.00
4 $5,200.00$650.00
150008 - Page 72
Ref #10 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER, (16 CY)
Awd $1,440.00$90.00
2 $1,360.00$85.00
3 $4,800.00$300.00
4 $3,200.00$200.00
Ref #11 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (16 CY)
Awd $1,440.00$90.00
2 $1,360.00$85.00
3 $3,200.00$200.00
4 $3,200.00$200.00
Ref #12 659E00510 SEEDING AND MULCHING, CLASS 2, (1200 SY)
Awd $2,880.00$2.40
2 $3,240.00$2.70
3 $3,000.00$2.50
4 $3,000.00$2.50
Ref #13 659E20000 COMMERCIAL FERTILIZER, (0.2 TON)
Awd $100.00$500.00
2 $106.00$530.00
3 $24.00$120.00
4 $106.00$530.00
Ref #14 659E31000 LIME, (0.3 ACRE)
Awd $39.00$130.00
2 $27.00$90.00
3 $24.00$80.00
4 $27.00$90.00
Ref #15 659E35000 WATER, (7 MGAL)
Awd $7.00$1.00
2 $7.00$1.00
3 $7.00$1.00
4 $7.00$1.00
Ref #16 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $9,706.00
2 $8,300.00
3 $20,055.00
4 $15,740.00
Ref #17 511E47010 CLASS QC1 CONCRETE, CULVERT, (1 CY)
Awd $750.00$750.00
2 $700.00$700.00
3 $3,500.00$3,500.00
4 $2,400.00$2,400.00
Ref #18 511E71100 CONCRETE, MISC.: CLASS QC1 CONCRETE FOR PATCH REPA, (5 CY)
Awd $5,000.00$1,000.00
2 $8,000.00$1,600.00
3 $7,500.00$1,500.00
4 $13,250.00$2,650.00
150008 - Page 73
Ref #19 602E20000 CONCRETE MASONRY, (3 CY)
Awd $3,000.00$1,000.00
2 $3,600.00$1,200.00
3 $2,700.00$900.00
4 $6,000.00$2,000.00
Ref #20 834E10000 CONDUIT RENEWAL USING RESIN BASED LINER, 42", (568 FT)
Awd $295,360.00$520.00
2 $270,936.00$477.00
3 $113,600.00$200.00
4 $369,200.00$650.00
Ref #21 834E10000 CONDUIT RENEWAL USING RESIN BASED LINER, 11'7"X7'6, (214 FT)
Awd $158,360.00$740.00
2 $160,500.00$750.00
3 $321,000.00$1,500.00
4 $246,100.00$1,150.00
Ref #22 837E10000 LINER PIPE 42" LINER PIPE, 707.12, 707.18, 707.19,, (256 FT)
Awd $62,720.00$245.00
2 $107,520.00$420.00
3 $204,800.00$800.00
4 $81,920.00$320.00
Ref #23 837E20000 BACKFILL FOR LINER PIPE, AS PER PLAN, (95 CY)
Awd $20,900.00$220.00
2 $27,075.00$285.00
3 $23,275.00$245.00
4 $34,675.00$365.00
Section 3 - DRAINAGE - Totals
Awd $546,090.00
2 $578,331.00
3 $676,375.00
4 $753,545.00
Ref #24 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (10 HOUR)
Awd $700.00$70.00
2 $650.00$65.00
3 $800.00$80.00
4 $650.00$65.00
Ref #25 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) 24", (2 EACH)
Awd $4,000.00$2,000.00
2 $5,000.00$2,500.00
3 $4,700.00$2,350.00
4 $4,290.00$2,145.00
Ref #26 614E13100 BARRIER REFLECTOR, (22 EACH)
Awd $132.00$6.00
2 $110.00$5.00
3 $385.00$17.50
4 $132.00$6.00
Ref #27 614E13350 OBJECT MARKER, ONE WAY, (22 EACH)
Awd $220.00$10.00
2 $264.00$12.00
3 $385.00$17.50
4 $286.00$13.00
150008 - Page 74
Ref #28 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (180 DAY)
Awd $6,300.00$35.00
2 $2,700.00$15.00
3 $9,000.00$50.00
4 $9,000.00$50.00
Ref #29 622E41000 PORTABLE BARRIER, 32", (1100 FT)
Awd $15,400.00$14.00
2 $27,500.00$25.00
3 $27,500.00$25.00
4 $55,000.00$50.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $26,752.00
2 $36,224.00
3 $42,770.00
4 $69,358.00
Ref #30 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $25,000.00$25,000.00
3 $15,000.00$15,000.00
4 $10,000.00$10,000.00
Ref #31 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $45,000.00$45,000.00
3 $70,000.00$70,000.00
4 $26,000.00$26,000.00
Ref #32 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,000.00$1,000.00
3 $2,500.00$2,500.00
4 $12,500.00$12,500.00
Ref #33 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $18,000.00$18,000.00
3 $45,000.00$45,000.00
4 $58,000.00$58,000.00
Section 5 - INCIDENTALS - Totals
Awd $45,000.00
2 $89,000.00
3 $132,500.00
4 $106,500.00
150008 - Page 75
Project No. 150009
PID 92453
FAY-SR 41-3.400
Federal
Type: CULVERT REPLACEMENT
Completion Date: 8/15/2015
Award Amount: $413,944.24
Contract Awarded To: COX PAVING LLC
Letting Date: 1/15/2015
Engineer's Estimate: $353,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
COX PAVING LLC
2754 ST RT 22 SW
WASHINGTON COURT HOUSE, OH 43160
Fayette
Bidder 1
Bid $413,944.24
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 2
Bid $414,711.20
DOUBLE Z CONSTRUCTION COMPANY
2550 HARRISON RD
COLUMBUS, OH 43204
Franklin
Bidder 3
Bid $419,000.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $421,184.50
D G M INC
1881 ADAMS RD
BEAVER, OH 45613
Pike
Bidder 5
Bid $422,359.30
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 6
Bid $426,887.40
EAGLE BRIDGE CO
800 S VAN DEMARK RD
SIDNEY, OH 45365
Shelby
Bidder 7
Bid $451,356.72
MC DANIELS CONSTRUCTION CORP INC
1069 WOODLAND AVE
COLUMBUS, OH 43219
Franklin
Bidder 8
Bid $459,124.00
COLUMBUS ASPHALT PAVING INC
1196 TECHNOLOGY DR
GAHANNA, OH 43230
Franklin
Bidder 9
Bid $484,704.25
150009 - Page 76
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $944.35$944.35
2 $3,500.00$3,500.00
3 $10,000.00$10,000.00
4 $9,100.00$9,100.00
5 $13,500.00$13,500.00
6 $3,000.00$3,000.00
7 $3,500.00$3,500.00
8 $4,000.00$4,000.00
9 $7,000.00$7,000.00
Ref #2 202E38000 GUARDRAIL REMOVED, (410 FT)
Awd $1,681.00$4.10
2 $1,025.00$2.50
3 $820.00$2.00
4 $1,599.00$3.90
5 $410.00$1.00
6 $1,968.00$4.80
7 $1,845.00$4.50
8 $2,460.00$6.00
9 $2,152.50$5.25
Ref #3 202E75000 FENCE REMOVED, (200 FT)
Awd $1,020.00$5.10
2 $400.00$2.00
3 $1,000.00$5.00
4 $440.00$2.20
5 $100.00$0.50
6 $440.00$2.20
7 $800.00$4.00
8 $600.00$3.00
9 $420.00$2.10
Ref #4 203E10000 EXCAVATION, (483 CY)
Awd $8,621.55$17.85
2 $7,245.00$15.00
3 $9,660.00$20.00
4 $10,143.00$21.00
5 $7,245.00$15.00
6 $6,762.00$14.00
7 $8,694.00$18.00
8 $10,626.00$22.00
9 $14,973.00$31.00
Ref #5 203E20000 EMBANKMENT, (601 CY)
Awd $11,455.06$19.06
2 $10,818.00$18.00
3 $12,020.00$20.00
4 $9,015.00$15.00
5 $9,015.00$15.00
6 $9,015.00$15.00
7 $10,818.00$18.00
8 $13,222.00$22.00
9 $7,452.40$12.40
150009 - Page 77
Ref #6 204E10000 SUBGRADE COMPACTION, (455 SY)
Awd $1,014.65$2.23
2 $1,137.50$2.50
3 $910.00$2.00
4 $1,592.50$3.50
5 $1,365.00$3.00
6 $1,137.50$2.50
7 $1,365.00$3.00
8 $2,275.00$5.00
9 $1,114.75$2.45
Ref #7 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (260 SY)
Awd $1,300.00$5.00
2 $6,500.00$25.00
3 $5,200.00$20.00
4 $3,510.00$13.50
5 $5,200.00$20.00
6 $6,500.00$25.00
7 $3,380.00$13.00
8 $6,760.00$26.00
9 $2,860.00$11.00
Ref #8 607E15000 FENCE, TYPE 47, (200 FT)
Awd $3,100.00$15.50
2 $3,600.00$18.00
3 $3,770.00$18.85
4 $3,770.00$18.85
5 $3,400.00$17.00
6 $3,770.00$18.85
7 $3,508.00$17.54
8 $3,600.00$18.00
9 $3,680.00$18.40
Section 1 - ROADWAY - Totals
Awd $29,136.61
2 $34,225.50
3 $43,380.00
4 $39,169.50
5 $40,235.00
6 $32,592.50
7 $33,910.00
8 $43,543.00
9 $39,652.65
Ref #9 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (14 SY)
Awd $1,745.38$124.67
2 $980.00$70.00
3 $1,400.00$100.00
4 $1,050.00$75.00
5 $1,400.00$100.00
6 $1,344.00$96.00
7 $1,750.00$125.00
8 $1,820.00$130.00
9 $985.60$70.40
150009 - Page 78
Ref #10 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (10 CY)
Awd $1,281.90$128.19
2 $1,100.00$110.00
3 $1,000.00$100.00
4 $1,000.00$100.00
5 $400.00$40.00
6 $710.00$71.00
7 $750.00$75.00
8 $1,000.00$100.00
9 $1,470.00$147.00
Ref #11 659E10000 SEEDING AND MULCHING, (1518 SY)
Awd $2,960.10$1.95
2 $3,187.80$2.10
3 $3,187.80$2.10
4 $3,187.80$2.10
5 $3,795.00$2.50
6 $3,187.80$2.10
7 $4,554.00$3.00
8 $3,036.00$2.00
9 $4,402.20$2.90
Ref #12 659E14000 REPAIR SEEDING AND MULCHING, (76 SY)
Awd $117.80$1.55
2 $22.80$0.30
3 $22.80$0.30
4 $22.80$0.30
5 $3.80$0.05
6 $22.80$0.30
7 $7.60$0.10
8 $76.00$1.00
9 $79.80$1.05
Ref #13 659E20000 COMMERCIAL FERTILIZER, (0.2 TON)
Awd $130.00$650.00
2 $104.80$524.00
3 $104.80$524.00
4 $104.80$524.00
5 $60.00$300.00
6 $104.80$524.00
7 $200.00$1,000.00
8 $90.00$450.00
9 $105.00$525.00
Ref #14 659E31000 LIME, (0.3 ACRE)
Awd $45.00$150.00
2 $27.00$90.00
3 $27.00$90.00
4 $27.00$90.00
5 $30.00$100.00
6 $27.00$90.00
7 $3.00$10.00
8 $60.00$200.00
9 $63.00$210.00
150009 - Page 79
Ref #15 659E35000 WATER, (12 MGAL)
Awd $12.00$1.00
2 $12.00$1.00
3 $12.00$1.00
4 $12.00$1.00
5 $12.00$1.00
6 $12.00$1.00
7 $120.00$10.00
8 $360.00$30.00
9 $12.60$1.05
Ref #16 670E00710 DITCH EROSION PROTECTION MAT, TYPE A, (378 SY)
Awd $756.00$2.00
2 $1,020.60$2.70
3 $1,020.60$2.70
4 $1,020.60$2.70
5 $1,323.00$3.50
6 $1,020.60$2.70
7 $945.00$2.50
8 $831.60$2.20
9 $774.90$2.05
Ref #17 832E30000 EROSION CONTROL, (26000 EACH)
Awd $26,000.00$1.00
2 $26,000.00$1.00
3 $26,000.00$1.00
4 $26,000.00$1.00
5 $26,000.00$1.00
6 $26,000.00$1.00
7 $26,000.00$1.00
8 $26,000.00$1.00
9 $26,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $33,048.18
2 $32,455.00
3 $32,775.00
4 $32,425.00
5 $33,023.80
6 $32,429.00
7 $34,329.60
8 $33,273.60
9 $33,893.10
Ref #18 605E31100 AGGREGATE DRAINS, (32 FT)
Awd $797.76$24.93
2 $384.00$12.00
3 $320.00$10.00
4 $640.00$20.00
5 $384.00$12.00
6 $352.00$11.00
7 $224.00$7.00
8 $704.00$22.00
9 $508.80$15.90
150009 - Page 80
Ref #19 611E00900 6" CONDUIT, TYPE B, (25 FT)
Awd $1,149.00$45.96
2 $375.00$15.00
3 $250.00$10.00
4 $375.00$15.00
5 $62.50$2.50
6 $450.00$18.00
7 $325.00$13.00
8 $400.00$16.00
9 $625.00$25.00
Ref #20 611E01400 6" CONDUIT, TYPE E, (25 FT)
Awd $1,149.00$45.96
2 $375.00$15.00
3 $250.00$10.00
4 $300.00$12.00
5 $50.00$2.00
6 $450.00$18.00
7 $325.00$13.00
8 $400.00$16.00
9 $575.00$23.00
Ref #21 611E01500 6" CONDUIT, TYPE F, (25 FT)
Awd $1,126.25$45.05
2 $375.00$15.00
3 $250.00$10.00
4 $300.00$12.00
5 $50.00$2.00
6 $475.00$19.00
7 $325.00$13.00
8 $400.00$16.00
9 $500.00$20.00
Ref #22 611E07900 18" CONDUIT, TYPE D, (17 FT)
Awd $2,574.48$151.44
2 $765.00$45.00
3 $680.00$40.00
4 $1,190.00$70.00
5 $1,700.00$100.00
6 $1,615.00$95.00
7 $2,125.00$125.00
8 $2,210.00$130.00
9 $3,298.00$194.00
Section 3 - DRAINAGE - Totals
Awd $6,796.49
2 $2,274.00
3 $1,750.00
4 $2,805.00
5 $2,246.50
6 $3,342.00
7 $3,324.00
8 $4,114.00
9 $5,506.80
150009 - Page 81
Ref #23 301E46000 ASPHALT CONCRETE BASE, PG64-22, (80 CY)
Awd $18,800.00$235.00
2 $17,200.00$215.00
3 $17,200.00$215.00
4 $17,200.00$215.00
5 $18,000.00$225.00
6 $17,200.00$215.00
7 $17,239.20$215.49
8 $17,600.00$220.00
9 $13,840.00$173.00
Ref #24 304E20000 AGGREGATE BASE, (85 CY)
Awd $5,440.00$64.00
2 $9,350.00$110.00
3 $5,525.00$65.00
4 $4,675.00$55.00
5 $4,250.00$50.00
6 $5,780.00$68.00
7 $4,590.00$54.00
8 $6,460.00$76.00
9 $3,400.00$40.00
Ref #25 407E10000 TACK COAT, (30 GAL)
Awd $271.50$9.05
2 $75.00$2.50
3 $75.00$2.50
4 $75.00$2.50
5 $75.00$2.50
6 $75.00$2.50
7 $75.30$2.51
8 $78.00$2.60
9 $330.00$11.00
Ref #26 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (30 GAL)
Awd $285.30$9.51
2 $75.00$2.50
3 $75.00$2.50
4 $75.00$2.50
5 $75.00$2.50
6 $75.00$2.50
7 $75.30$2.51
8 $78.00$2.60
9 $330.00$11.00
Ref #27 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (60 CY)
Awd $15,720.00$262.00
2 $15,600.00$260.00
3 $15,600.00$260.00
4 $15,600.00$260.00
5 $16,200.00$270.00
6 $15,600.00$260.00
7 $15,636.00$260.60
8 $16,020.00$267.00
9 $13,080.00$218.00
150009 - Page 82
Section 4 - PAVEMENT - Totals
Awd $40,516.80
2 $42,300.00
3 $38,475.00
4 $37,625.00
5 $38,600.00
6 $38,730.00
7 $37,615.80
8 $40,236.00
9 $30,980.00
Ref #28 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (9 FT)
Awd $101.25$11.25
2 $180.00$20.00
3 $135.00$15.00
4 $135.00$15.00
5 $135.00$15.00
6 $135.00$15.00
7 $135.27$15.03
8 $135.00$15.00
9 $142.20$15.80
Ref #29 630E80100 SIGN, FLAT SHEET, (1 SF)
Awd $75.00$75.00
2 $25.00$25.00
3 $45.00$45.00
4 $45.00$45.00
5 $75.00$75.00
6 $45.00$45.00
7 $35.08$35.08
8 $35.00$35.00
9 $36.80$36.80
Ref #30 642E00090 EDGE LINE, 4", (1.1 MILE)
Awd $899.80$818.00
2 $899.80$818.00
3 $486.20$442.00
4 $715.00$650.00
5 $1,100.00$1,000.00
6 $899.80$818.00
7 $1,220.51$1,109.55
8 $902.00$820.00
9 $944.90$859.00
Ref #31 642E00290 CENTER LINE, (0.6 MILE)
Awd $441.00$735.00
2 $735.00$1,225.00
3 $441.00$735.00
4 $510.00$850.00
5 $840.00$1,400.00
6 $735.00$1,225.00
7 $1,331.46$2,219.10
8 $735.00$1,225.00
9 $774.00$1,290.00
150009 - Page 83
Section 5 - TRAFFIC CONTROL - Totals
Awd $1,517.05
2 $1,839.80
3 $1,107.20
4 $1,405.00
5 $2,150.00
6 $1,814.80
7 $2,722.32
8 $1,807.00
9 $1,897.90
Ref #32 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG, (200 CY)
Awd $45,648.00$228.24
2 $30,000.00$150.00
3 $16,000.00$80.00
4 $25,000.00$125.00
5 $35,000.00$175.00
6 $42,000.00$210.00
7 $42,096.00$210.48
8 $42,800.00$214.00
9 $35,400.00$177.00
Ref #33 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)
Awd $3,500.00$35.00
2 $5,500.00$55.00
3 $5,000.00$50.00
4 $6,200.00$62.00
5 $4,250.00$42.50
6 $6,500.00$65.00
7 $5,000.00$50.00
8 $6,500.00$65.00
9 $6,000.00$60.00
Ref #34 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $4,700.00$4,700.00
2 $5,500.00$5,500.00
3 $10,000.00$10,000.00
4 $3,500.00$3,500.00
5 $4,100.00$4,100.00
6 $5,000.00$5,000.00
7 $4,500.00$4,500.00
8 $4,700.00$4,700.00
9 $4,940.00$4,940.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $53,848.00
2 $41,000.00
3 $31,000.00
4 $34,700.00
5 $43,350.00
6 $53,500.00
7 $51,596.00
8 $54,000.00
9 $46,340.00
150009 - Page 84
Ref #35 202E11001 STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $8,629.66$8,629.66
2 $5,500.00$5,500.00
3 $10,000.00$10,000.00
4 $7,500.00$7,500.00
5 $8,000.00$8,000.00
6 $35,000.00$35,000.00
7 $10,000.00$10,000.00
8 $17,000.00$17,000.00
9 $9,730.00$9,730.00
Ref #36 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $13,712.08$13,712.08
2 $4,500.00$4,500.00
3 $2,000.00$2,000.00
4 $11,000.00$11,000.00
5 $2,000.00$2,000.00
6 $3,000.00$3,000.00
7 $7,500.00$7,500.00
8 $6,000.00$6,000.00
9 $4,670.00$4,670.00
Ref #37 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING), (LUMP SUM)
Awd $3,050.56$3,050.56
2 $5,500.00$5,500.00
3 $10,000.00$10,000.00
4 $6,000.00$6,000.00
5 $1,000.00$1,000.00
6 $2,000.00$2,000.00
7 $10,000.00$10,000.00
8 $8,000.00$8,000.00
9 $9,780.00$9,780.00
Ref #38 509E10000 EPOXY COATED REINFORCING STEEL, (3214 LB)
Awd $6,428.00$2.00
2 $5,945.90$1.85
3 $3,214.00$1.00
4 $4,821.00$1.50
5 $5,624.50$1.75
6 $6,910.10$2.15
7 $6,428.00$2.00
8 $5,142.40$1.60
9 $6,749.40$2.10
Ref #39 511E46010 CLASS QC1 CONCRETE, (6 CY)
Awd $4,585.98$764.33
2 $12,000.00$2,000.00
3 $12,000.00$2,000.00
4 $12,600.00$2,100.00
5 $4,800.00$800.00
6 $9,600.00$1,600.00
7 $8,400.00$1,400.00
8 $6,600.00$1,100.00
9 $6,240.00$1,040.00
150009 - Page 85
Ref #40 511E46510 CLASS QC1 CONCRETE, FOOTING, (31 CY)
Awd $18,015.65$581.15
2 $12,400.00$400.00
3 $15,500.00$500.00
4 $31,000.00$1,000.00
5 $15,500.00$500.00
6 $14,570.00$470.00
7 $20,150.00$650.00
8 $29,450.00$950.00
9 $21,080.00$680.00
Ref #41 511E46610 CLASS QC1 CONCRETE, HEADWALL, (1 CY)
Awd $537.42$537.42
2 $550.00$550.00
3 $1,000.00$1,000.00
4 $2,050.00$2,050.00
5 $1,500.00$1,500.00
6 $1,600.00$1,600.00
7 $1,500.00$1,500.00
8 $1,100.00$1,100.00
9 $876.00$876.00
Ref #42 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (48 SY)
Awd $1,440.00$30.00
2 $1,440.00$30.00
3 $1,440.00$30.00
4 $2,160.00$45.00
5 $1,440.00$30.00
6 $2,160.00$45.00
7 $1,440.00$30.00
8 $1,440.00$30.00
9 $1,512.00$31.50
Ref #43 512E33000 TYPE 2 WATERPROOFING, (409 SY)
Awd $5,754.63$14.07
2 $7,362.00$18.00
3 $8,180.00$20.00
4 $8,180.00$20.00
5 $5,112.50$12.50
6 $8,180.00$20.00
7 $6,544.00$16.00
8 $7,362.00$18.00
9 $7,362.00$18.00
Ref #44 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (26 SF)
Awd $260.00$10.00
2 $104.00$4.00
3 $390.00$15.00
4 $104.00$4.00
5 $312.00$12.00
6 $234.00$9.00
7 $182.00$7.00
8 $156.00$6.00
9 $273.00$10.50
150009 - Page 86
Ref #45 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)
Awd $2,489.71$2,489.71
2 $3,500.00$3,500.00
3 $1,500.00$1,500.00
4 $2,000.00$2,000.00
5 $800.00$800.00
6 $1,500.00$1,500.00
7 $90.00$90.00
8 $3,600.00$3,600.00
9 $3,360.00$3,360.00
Ref #46 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH FABRIC FILTER, (70 CY)
Awd $5,046.30$72.09
2 $7,000.00$100.00
3 $5,250.00$75.00
4 $6,440.00$92.00
5 $3,500.00$50.00
6 $3,850.00$55.00
7 $3,850.00$55.00
8 $4,200.00$60.00
9 $10,500.00$150.00
Ref #47 611E96300 14' X 4' CONDUIT, TYPE A, 706.05, (124 FT)
Awd $108,625.24$876.01
2 $109,120.00$880.00
3 $94,341.68$760.82
4 $93,620.00$755.00
5 $93,620.00$755.00
6 $105,400.00$850.00
7 $117,800.00$950.00
8 $111,600.00$900.00
9 $123,628.00$997.00
Ref #48 613E41200 LOW STRENGTH MORTAR BACKFILL, (93 CY)
Awd $10,339.74$111.18
2 $10,695.00$115.00
3 $9,300.00$100.00
4 $10,230.00$110.00
5 $6,045.00$65.00
6 $6,975.00$75.00
7 $6,975.00$75.00
8 $9,300.00$100.00
9 $7,793.40$83.80
Section 7 - STRUCTURE UNDER 20 FOOT SPAN (FAY 41 - 3 - Totals
Awd $188,914.97
2 $185,616.90
3 $174,115.68
4 $197,705.00
5 $149,254.00
6 $200,979.10
7 $200,859.00
8 $210,950.40
9 $213,553.80
150009 - Page 87
Ref #49 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,162.27$2,162.27
2 $5,000.00$5,000.00
3 $5,000.00$5,000.00
4 $2,850.00$2,850.00
5 $38,500.00$38,500.00
6 $4,500.00$4,500.00
7 $3,500.00$3,500.00
8 $6,000.00$6,000.00
9 $2,880.00$2,880.00
Ref #50 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $973.79$973.79
2 $3,500.00$3,500.00
3 $6,397.12$6,397.12
4 $10,700.00$10,700.00
5 $15,000.00$15,000.00
6 $1,000.00$1,000.00
7 $1,000.00$1,000.00
8 $5,000.00$5,000.00
9 $15,000.00$15,000.00
Ref #51 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $3,500.00$3,500.00
3 $5,000.00$5,000.00
4 $5,800.00$5,800.00
5 $4,000.00$4,000.00
6 $2,000.00$2,000.00
7 $2,500.00$2,500.00
8 $2,200.00$2,200.00
9 $5,000.00$5,000.00
Ref #52 624E10000 MOBILIZATION, (LUMP SUM)
Awd $3,030.08$3,030.08
2 $11,000.00$11,000.00
3 $20,000.00$20,000.00
4 $10,000.00$10,000.00
5 $10,000.00$10,000.00
6 $10,000.00$10,000.00
7 $20,000.00$20,000.00
8 $8,000.00$8,000.00
9 $30,000.00$30,000.00
Section 8 - INCIDENTALS - Totals
Awd $8,166.14
2 $23,000.00
3 $36,397.12
4 $29,350.00
5 $67,500.00
6 $17,500.00
7 $27,000.00
8 $21,200.00
9 $52,880.00
150009 - Page 88
Ref #53 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI, (2000 DLR)
Awd $52,000.00$26.00
2 $52,000.00$26.00
3 $60,000.00$30.00
4 $46,000.00$23.00
5 $46,000.00$23.00
6 $46,000.00$23.00
7 $60,000.00$30.00
8 $50,000.00$25.00
9 $60,000.00$30.00
Section 9 - PART B - Totals
Awd $52,000.00
2 $52,000.00
3 $60,000.00
4 $46,000.00
5 $46,000.00
6 $46,000.00
7 $60,000.00
8 $50,000.00
9 $60,000.00
150009 - Page 89
Project No. 150010
PID 86212
FRA-SR 104-5.630
Federal
Type: BRIDGE REPAIR
Completion Date: 6/30/2015
Award Amount: $202,938.30
Contract Awarded To: SHELLY COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $216,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $202,938.30
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $204,414.24
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 3
Bid $222,377.26
DECKER CONSTRUCTION COMPANY
3040 MC KINLEY AVE
COLUMBUS, OH 43204
Franklin
Bidder 4
Bid $259,692.64
150010 - Page 90
Ref #1 202E38000 GUARDRAIL REMOVED, (1772 FT)
Awd $2,126.40$1.20
2 $2,658.00$1.50
3 $4,430.00$2.50
4 $2,445.36$1.38
Ref #2 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (4 EACH)
Awd $780.00$195.00
2 $840.00$210.00
3 $800.00$200.00
4 $880.00$220.00
Ref #3 202E47001 BRIDGE TERMINAL ASSEMBLY REMOVED, AS PER PLAN, (4 EACH)
Awd $320.00$80.00
2 $840.00$210.00
3 $800.00$200.00
4 $880.00$220.00
Ref #4 203E20000 EMBANKMENT, (83 CY)
Awd $4,565.00$55.00
2 $7,470.00$90.00
3 $2,075.00$25.00
4 $5,478.00$66.00
Ref #5 209E15000 RESHAPING UNDER GUARDRAIL, (17.7 STA)
Awd $708.00$40.00
2 $1,327.50$75.00
3 $4,425.00$250.00
4 $778.80$44.00
Ref #6 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (1768.75 FT)
Awd $26,885.00$15.20
2 $27,680.94$15.65
3 $26,177.50$14.80
4 $28,795.25$16.28
Ref #7 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (4 EACH)
Awd $7,140.00$1,785.00
2 $7,800.00$1,950.00
3 $7,400.00$1,850.00
4 $8,140.00$2,035.00
Ref #8 606E32500 BRIDGE TERMINAL ASSEMBLY, TYPE F, (4 EACH)
Awd $3,480.00$870.00
2 $5,700.00$1,425.00
3 $5,400.00$1,350.00
4 $5,940.00$1,485.00
Section 1 - ROADWAY - Totals
Awd $46,004.40
2 $54,316.44
3 $51,507.50
4 $53,337.41
Ref #9 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
150010 - Page 91
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
Ref #10 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (900 SY)
Awd $8,100.00$9.00
2 $9,450.00$10.50
3 $9,000.00$10.00
4 $8,604.00$9.56
Ref #11 407E13900 TACK COAT, 702.13, (178 GAL)
Awd $534.00$3.00
2 $418.30$2.35
3 $623.00$3.50
4 $623.00$3.50
Ref #12 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (118 GAL)
Awd $236.00$2.00
2 $277.30$2.35
3 $413.00$3.50
4 $413.00$3.50
Ref #13 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (66 CY)
Awd $16,830.00$255.00
2 $18,150.00$275.00
3 $15,862.44$240.34
4 $15,862.44$240.34
Ref #14 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE , (103 CY)
Awd $18,025.00$175.00
2 $18,540.00$180.00
3 $21,459.02$208.34
4 $21,459.02$208.34
Ref #15 617E10100 COMPACTED AGGREGATE, (51 CY)
Awd $5,610.00$110.00
2 $1,428.00$28.00
3 $6,120.00$120.00
4 $13,583.34$266.34
Ref #16 617E20000 SHOULDER PREPARATION, (536 SY)
Awd $804.00$1.50
2 $1,340.00$2.50
3 $2,144.00$4.00
4 $3,752.00$7.00
Ref #17 617E25000 WATER, (7 MGAL)
Awd $7.00$1.00
2 $140.00$20.00
3 $7.00$1.00
4 $700.00$100.00
150010 - Page 92
Section 3 - PAVEMENT - Totals
Awd $50,146.00
2 $49,743.60
3 $55,628.46
4 $64,996.80
Ref #18 621E00100 RPM, (11 EACH)
Awd $1,540.00$140.00
2 $1,595.00$145.00
3 $1,749.00$159.00
4 $1,863.40$169.40
Ref #19 621E54000 RAISED PAVEMENT MARKER REMOVED, (11 EACH)
Awd $66.00$6.00
2 $198.00$18.00
3 $275.00$25.00
4 $550.00$50.00
Ref #20 626E00100 BARRIER REFLECTOR, (24 EACH)
Awd $135.60$5.65
2 $288.00$12.00
3 $156.00$6.50
4 $171.60$7.15
Ref #21 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7 FT)
Awd $105.00$15.00
2 $74.20$10.60
3 $70.00$10.00
4 $77.00$11.00
Ref #22 630E80100 SIGN, FLAT SHEET, (1 SF)
Awd $40.00$40.00
2 $32.00$32.00
3 $30.00$30.00
4 $33.00$33.00
Ref #23 644E00100 EDGE LINE, 4", (0.28 MILE)
Awd $930.72$3,324.00
2 $980.00$3,500.00
3 $930.72$3,324.00
4 $1,023.79$3,656.39
Ref #24 644E00300 CENTER LINE STRUCTURE REPAIR (FRA-104-0563), (0.14 MILE)
Awd $860.58$6,147.00
2 $910.00$6,500.00
3 $860.58$6,147.00
4 $946.64$6,761.71
Section 4 - TRAFFIC CONTROL - Totals
Awd $3,677.90
2 $4,077.20
3 $4,071.30
4 $4,665.43
150010 - Page 93
Ref #25 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,800.00$70.00
2 $2,720.00$68.00
3 $3,600.00$90.00
4 $3,000.00$75.00
Ref #26 614E12460 WORK ZONE MARKING SIGN, (8 EACH)
Awd $1,000.00$125.00
2 $1,056.00$132.00
3 $1,000.00$125.00
4 $1,100.00$137.50
Ref #27 614E21600 WORK ZONE CENTER LINE, CLASS II, 740.06, TYPE I, (0.16 MILE)
Awd $800.00$5,000.00
2 $760.00$4,750.00
3 $960.00$6,000.00
4 $792.00$4,950.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $4,600.00
2 $4,536.00
3 $5,560.00
4 $4,892.00
Ref #28 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (60 FT)
Awd $2,070.00$34.50
2 $1,920.00$32.00
3 $3,300.00$55.00
4 $2,640.00$44.00
Ref #29 516E31300 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (74 FT)
Awd $13,690.00$185.00
2 $13,246.00$179.00
3 $13,690.00$185.00
4 $14,652.00$198.00
Ref #30 519E12300 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B, (142 SY)
Awd $35,500.00$250.00
2 $28,400.00$200.00
3 $51,120.00$360.00
4 $69,509.00$489.50
Section 6 - STRUCTURE REPAIR (FRA-104-0563) - Totals
Awd $51,260.00
2 $43,566.00
3 $68,110.00
4 $86,801.00
Ref #31 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $675.00$675.00
3 $4,500.00$4,500.00
4 $1,500.00$1,500.00
150010 - Page 94
Ref #32 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $40,000.00$40,000.00
3 $25,000.00$25,000.00
4 $30,000.00$30,000.00
Ref #33 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $1,250.00$1,250.00
2 $1,950.00$1,950.00
3 $2,000.00$2,000.00
4 $2,500.00$2,500.00
Ref #34 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $4,550.00$4,550.00
3 $5,000.00$5,000.00
4 $10,000.00$10,000.00
Section 7 - INCIDENTALS - Totals
Awd $46,250.00
2 $47,175.00
3 $36,500.00
4 $44,000.00
150010 - Page 95
Project No. 150011
PID 85549
GUE-IR 70-17.30
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 9/30/2015
Award Amount: $912,152.49
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/15/2015
Engineer's Estimate: $933,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $912,152.49
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 2
Bid $921,981.37
ARMSTRONG STEEL ERECTORS INC
50 SOUTH FOURTH ST P O BOX 577
NEWARK, OH 43058
Licking
Bidder 3
Bid $980,043.97
DOUBLE Z CONSTRUCTION COMPANY
2550 HARRISON RD
COLUMBUS, OH 43204
Franklin
Bidder 4
Bid $1,054,890.10
DOT CONSTRUCTION CORP
535 NORTH BROAD ST STE 5
CANFIELD, OH 44406
Mahoning
Bidder 5
Bid $1,071,994.75
OHIO-WEST VIRGINIA EXCAVATING CO
56461 FERRY LANDING ROAD
SHADYSIDE, OH 43947
Belmont
Bidder 6
Bid $1,119,207.13
150011 - Page 96
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $2,300.00$2,300.00
2 $3,500.00$3,500.00
3 $5,500.00$5,500.00
4 $4,000.00$4,000.00
5 $5,000.00$5,000.00
6 $2,500.00$2,500.00
Ref #2 202E23500 WEARING COURSE REMOVED, (143 SY)
Awd $2,431.00$17.00
2 $2,002.00$14.00
3 $1,787.50$12.50
4 $2,860.00$20.00
5 $1,430.00$10.00
6 $2,860.00$20.00
Ref #3 202E38000 GUARDRAIL REMOVED, (320 FT)
Awd $640.00$2.00
2 $448.00$1.40
3 $448.00$1.40
4 $640.00$2.00
5 $448.00$1.40
6 $720.00$2.25
Ref #4 203E10000 EXCAVATION, (38 CY)
Awd $874.00$23.00
2 $912.00$24.00
3 $570.00$15.00
4 $2,660.00$70.00
5 $1,520.00$40.00
6 $1,064.00$28.00
Ref #5 203E20000 EMBANKMENT, (29 CY)
Awd $899.00$31.00
2 $1,450.00$50.00
3 $1,571.80$54.20
4 $145.00$5.00
5 $1,571.80$54.20
6 $1,015.00$35.00
Ref #6 204E10000 SUBGRADE COMPACTION, (163 SY)
Awd $489.00$3.00
2 $489.00$3.00
3 $692.75$4.25
4 $978.00$6.00
5 $326.00$2.00
6 $855.75$5.25
Ref #7 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (3.3 STA)
Awd $594.00$180.00
2 $1,980.00$600.00
3 $825.00$250.00
4 $1,320.00$400.00
5 $990.00$300.00
6 $990.00$300.00
150011 - Page 97
Ref #8 606E15050 GUARDRAIL, TYPE MGS, (200 FT)
Awd $3,200.00$16.00
2 $3,160.00$15.80
3 $3,160.00$15.80
4 $3,160.00$15.80
5 $3,160.00$15.80
6 $3,400.00$17.00
Ref #9 606E25550 ANCHOR ASSEMBLY, MGS TYPE A, (3 EACH)
Awd $3,000.00$1,000.00
2 $2,940.00$980.00
3 $2,940.00$980.00
4 $2,940.00$980.00
5 $2,940.00$980.00
6 $3,000.00$1,000.00
Ref #10 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $7,400.00$1,850.00
2 $7,940.00$1,985.00
3 $7,940.00$1,985.00
4 $7,940.00$1,985.00
5 $7,940.00$1,985.00
6 $7,600.00$1,900.00
Ref #11 606E50000 SPECIAL - RESHAPING BERM, (408 FT)
Awd $816.00$2.00
2 $306.00$0.75
3 $306.00$0.75
4 $204.00$0.50
5 $306.00$0.75
6 $1,632.00$4.00
Section 1 - ROADWAY - Totals
Awd $22,643.00
2 $25,127.00
3 $25,741.05
4 $26,847.00
5 $25,631.80
6 $25,636.75
Ref #12 616E10000 WATER, (0.4 MGAL)
Awd $20.00$50.00
2 $120.00$300.00
3 $200.00$500.00
4 $20.00$50.00
5 $0.40$1.00
6 $4.00$10.00
Ref #13 659E00510 SEEDING AND MULCHING, CLASS 2, (500 SY)
Awd $1,000.00$2.00
2 $2,400.00$4.80
3 $2,400.00$4.80
4 $3,500.00$7.00
5 $1,975.00$3.95
6 $2,750.00$5.50
150011 - Page 98
Ref #14 659E20000 COMMERCIAL FERTILIZER, (0.07 TON)
Awd $42.00$600.00
2 $42.00$600.00
3 $42.00$600.00
4 $42.00$600.00
5 $42.00$600.00
6 $56.00$800.00
Ref #15 659E31000 LIME, (0.103 ACRE)
Awd $15.45$150.00
2 $10.00$97.09
3 $10.30$100.00
4 $10.30$100.00
5 $10.30$100.00
6 $23.18$225.05
Ref #16 659E35000 WATER, (2.7 MGAL)
Awd $2.70$1.00
2 $2.70$1.00
3 $2.70$1.00
4 $2.70$1.00
5 $2.70$1.00
6 $13.50$5.00
Ref #17 832E30000 EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
5 $1,500.00$1.00
6 $1,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $2,580.15
2 $4,074.70
3 $4,155.00
4 $5,075.00
5 $3,530.40
6 $4,346.68
Ref #18 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (668 SY)
Awd $8,016.00$12.00
2 $7,348.00$11.00
3 $8,350.00$12.50
4 $6,346.00$9.50
5 $6,680.00$10.00
6 $4,676.00$7.00
Ref #19 255E20000 FULL DEPTH PAVEMENT SAWING, (56 FT)
Awd $112.00$2.00
2 $448.00$8.00
3 $420.00$7.50
4 $112.00$2.00
5 $560.00$10.00
6 $280.00$5.00
150011 - Page 99
Ref #20 304E20000 AGGREGATE BASE, (27 CY)
Awd $2,700.00$100.00
2 $1,890.00$70.00
3 $2,295.00$85.00
4 $3,240.00$120.00
5 $1,755.00$65.00
6 $2,565.00$95.00
Ref #21 407E10000 TACK COAT, (62 GAL)
Awd $130.20$2.10
2 $248.00$4.00
3 $130.20$2.10
4 $248.00$4.00
5 $130.20$2.10
6 $263.50$4.25
Ref #22 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (33 GAL)
Awd $69.30$2.10
2 $132.00$4.00
3 $69.30$2.10
4 $132.00$4.00
5 $69.30$2.10
6 $140.25$4.25
Ref #23 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (30 CY)
Awd $12,000.00$400.00
2 $7,650.00$255.00
3 $12,000.00$400.00
4 $7,650.00$255.00
5 $12,000.00$400.00
6 $8,250.00$275.00
Ref #24 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (40 CY)
Awd $13,000.00$325.00
2 $10,200.00$255.00
3 $13,000.00$325.00
4 $10,200.00$255.00
5 $13,000.00$325.00
6 $11,000.00$275.00
Ref #25 609E24510 CURB, TYPE 4-C, (26 FT)
Awd $1,040.00$40.00
2 $832.00$32.00
3 $1,300.00$50.00
4 $1,040.00$40.00
5 $1,300.00$50.00
6 $910.00$35.00
Ref #26 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO, (31 SY)
Awd $1,240.00$40.00
2 $1,860.00$60.00
3 $620.00$20.00
4 $1,550.00$50.00
5 $1,550.00$50.00
6 $465.00$15.00
150011 - Page 100
Section 3 - PAVEMENT - Totals
Awd $38,307.50
2 $30,608.00
3 $38,184.50
4 $30,518.00
5 $37,044.50
6 $28,549.75
Ref #27 621E54000 RAISED PAVEMENT MARKER REMOVED, (10 EACH)
Awd $40.00$4.00
2 $150.00$15.00
3 $150.00$15.00
4 $400.00$40.00
5 $500.00$50.00
6 $150.00$15.00
Ref #28 626E00100 BARRIER REFLECTOR, (14 EACH)
Awd $98.00$7.00
2 $84.00$6.00
3 $84.00$6.00
4 $84.00$6.00
5 $84.00$6.00
6 $70.00$5.00
Ref #29 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (46 FT)
Awd $460.00$10.00
2 $437.00$9.50
3 $437.00$9.50
4 $437.00$9.50
5 $437.00$9.50
6 $460.00$10.00
Ref #30 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $240.00$20.00
2 $180.00$15.00
3 $180.00$15.00
4 $180.00$15.00
5 $180.00$15.00
6 $264.00$22.00
Ref #31 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (240 SF)
Awd $5,040.00$21.00
2 $5,088.00$21.20
3 $5,088.00$21.20
4 $5,088.00$21.20
5 $5,088.00$21.20
6 $5,280.00$22.00
Ref #32 630E82000 SIGN BACKING ASSEMBLY, (1 EACH)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
4 $200.00$200.00
5 $200.00$200.00
6 $225.00$225.00
150011 - Page 101
Ref #33 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (7 EACH)
Awd $350.00$50.00
2 $280.00$40.00
3 $280.00$40.00
4 $280.00$40.00
5 $280.00$40.00
6 $385.00$55.00
Ref #34 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (1 EACH)
Awd $680.00$680.00
2 $70.00$70.00
3 $70.00$70.00
4 $70.00$70.00
5 $70.00$70.00
6 $700.00$700.00
Ref #35 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO, (1 EACH)
Awd $370.00$370.00
2 $180.00$180.00
3 $180.00$180.00
4 $180.00$180.00
5 $180.00$180.00
6 $375.00$375.00
Ref #36 644E00100 EDGE LINE, 4", (0.19 MILE)
Awd $589.00$3,100.00
2 $995.98$5,242.00
3 $1,723.30$9,070.00
4 $569.05$2,995.00
5 $1,723.30$9,070.00
6 $2,280.00$12,000.00
Ref #37 644E00300 CENTER LINE, (0.1 MILE)
Awd $550.00$5,500.00
2 $920.00$9,200.00
3 $1,082.00$10,820.00
4 $526.00$5,260.00
5 $1,082.00$10,820.00
6 $1,200.00$12,000.00
Ref #38 644E00500 STOP LINE, (33 FT)
Awd $264.00$8.00
2 $445.50$13.50
3 $511.50$15.50
4 $254.10$7.70
5 $511.50$15.50
6 $363.00$11.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $8,881.00
2 $9,030.48
3 $9,985.80
4 $8,268.15
5 $10,335.80
6 $11,752.00
150011 - Page 102
Ref #39 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (20 HOUR)
Awd $1,400.00$70.00
2 $1,300.00$65.00
3 $1,600.00$80.00
4 $1,200.00$60.00
5 $1,400.00$70.00
6 $1,300.00$65.00
Ref #40 614E12421 DETOUR SIGNING, AS PER PLAN, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $4,500.00$4,500.00
3 $5,500.00$5,500.00
4 $20,000.00$20,000.00
5 $4,460.00$4,460.00
6 $13,000.00$13,000.00
Ref #41 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $4,900.00$245.00
2 $2,200.00$110.00
3 $4,000.00$200.00
4 $3,600.00$180.00
5 $4,000.00$200.00
6 $6,000.00$300.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $14,300.00
2 $8,000.00
3 $11,100.00
4 $24,800.00
5 $9,860.00
6 $20,300.00
Ref #42 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, SUPERS, (315 CY)
Awd $31,500.00$100.00
2 $55,125.00$175.00
3 $63,000.00$200.00
4 $50,400.00$160.00
5 $126,000.00$400.00
6 $66,150.00$210.00
Ref #43 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, SUBSTR, (38 CY)
Awd $14,630.00$385.00
2 $17,100.00$450.00
3 $17,100.00$450.00
4 $22,800.00$600.00
5 $11,400.00$300.00
6 $17,100.00$450.00
Ref #44 202E22900 APPROACH SLAB REMOVED, (146 SY)
Awd $3,650.00$25.00
2 $4,380.00$30.00
3 $5,475.00$37.50
4 $3,650.00$25.00
5 $3,650.00$25.00
6 $3,212.00$22.00
150011 - Page 103
Ref #45 202E38500 BRIDGE RAILING REMOVED, (619 FT)
Awd $619.00$1.00
2 $2,785.50$4.50
3 $1,547.50$2.50
4 $3,095.00$5.00
5 $1,238.00$2.00
6 $4,333.00$7.00
Ref #46 202E98000 REMOVAL MISC.: EXISTING END CROSSFRAMES, (LUMP SUM)
Awd $330.00$330.00
2 $4,000.00$4,000.00
3 $4,000.00$4,000.00
4 $5,000.00$5,000.00
5 $5,000.00$5,000.00
6 $1,400.00$1,400.00
Ref #47 202E98100 REMOVAL MISC.: SCUPPERS WITH ATTACHMENTS, (6 EACH)
Awd $120.00$20.00
2 $900.00$150.00
3 $1,200.00$200.00
4 $1,500.00$250.00
5 $1,800.00$300.00
6 $780.00$130.00
Ref #48 202E98200 REMOVAL MISC.: EXPANSION JOINT, (62 FT)
Awd $868.00$14.00
2 $4,340.00$70.00
3 $1,860.00$30.00
4 $3,720.00$60.00
5 $2,480.00$40.00
6 $744.00$12.00
Ref #49 202E98200 REMOVAL MISC.: STEEL BULB ANGLE GUTTER, (565 FT)
Awd $282.50$0.50
2 $3,955.00$7.00
3 $3,955.00$7.00
4 $11,300.00$20.00
5 $2,825.00$5.00
6 $2,825.00$5.00
Ref #50 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $600.00$600.00
3 $8,500.00$8,500.00
4 $100.00$100.00
5 $5,000.00$5,000.00
6 $5,000.00$5,000.00
Ref #51 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $6,200.00$6,200.00
2 $5,000.00$5,000.00
3 $7,500.00$7,500.00
4 $40,000.00$40,000.00
5 $10,000.00$10,000.00
6 $18,000.00$18,000.00
150011 - Page 104
Ref #52 509E10000 EPOXY COATED REINFORCING STEEL, (85513 LB)
Awd $82,947.61$0.97
2 $83,802.74$0.98
3 $76,106.57$0.89
4 $94,064.30$1.10
5 $94,064.30$1.10
6 $98,339.95$1.15
Ref #53 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (216 EACH)
Awd $4,104.00$19.00
2 $2,808.00$13.00
3 $4,860.00$22.50
4 $8,640.00$40.00
5 $10,800.00$50.00
6 $3,888.00$18.00
Ref #54 511E21526 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (268 CY)
Awd $201,000.00$750.00
2 $196,980.00$735.00
3 $196,980.00$735.00
4 $203,680.00$760.00
5 $187,600.00$700.00
6 $199,660.00$745.00
Ref #55 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET), (69 CY)
Awd $25,185.00$365.00
2 $46,920.00$680.00
3 $47,610.00$690.00
4 $37,950.00$550.00
5 $48,300.00$700.00
6 $42,435.00$615.00
Ref #56 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE, (37 CY)
Awd $30,525.00$825.00
2 $33,300.00$900.00
3 $30,525.00$825.00
4 $44,400.00$1,200.00
5 $22,200.00$600.00
6 $37,000.00$1,000.00
Ref #57 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (664 SY)
Awd $6,640.00$10.00
2 $6,308.00$9.50
3 $6,308.00$9.50
4 $7,968.00$12.00
5 $5,312.00$8.00
6 $11,952.00$18.00
Ref #58 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (3903 LB)
Awd $39,030.00$10.00
2 $37,078.50$9.50
3 $39,030.00$10.00
4 $39,030.00$10.00
5 $42,933.00$11.00
6 $35,127.00$9.00
150011 - Page 105
Ref #59 513E20000 WELDED STUD SHEAR CONNECTORS, (2128 EACH)
Awd $6,384.00$3.00
2 $6,596.80$3.10
3 $6,809.60$3.20
4 $6,384.00$3.00
5 $8,512.00$4.00
6 $8,512.00$4.00
Ref #60 513E95030 STRUCTURAL STEEL, MISC.: INTERMEDIATE CROSSFRAMES , (4 EACH)
Awd $400.00$100.00
2 $4,800.00$1,200.00
3 $4,000.00$1,000.00
4 $6,000.00$1,500.00
5 $4,800.00$1,200.00
6 $1,540.00$385.00
Ref #61 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (12403 SF)
Awd $101,704.60$8.20
2 $121,549.40$9.80
3 $86,821.00$7.00
4 $121,549.40$9.80
5 $86,821.00$7.00
6 $105,425.50$8.50
Ref #62 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (12403 SF)
Awd $26,170.33$2.11
2 $21,705.25$1.75
3 $25,426.15$2.05
4 $21,705.25$1.75
5 $25,426.15$2.05
6 $31,007.50$2.50
Ref #63 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (12403 SF)
Awd $19,720.77$1.59
2 $12,403.00$1.00
3 $28,526.90$2.30
4 $12,403.00$1.00
5 $28,526.90$2.30
6 $24,806.00$2.00
Ref #64 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (12403 SF)
Awd $19,720.77$1.59
2 $12,403.00$1.00
3 $28,526.90$2.30
4 $12,403.00$1.00
5 $28,526.90$2.30
6 $24,806.00$2.00
Ref #65 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (50 MNHR)
Awd $8,000.00$160.00
2 $6,250.00$125.00
3 $6,000.00$120.00
4 $6,250.00$125.00
5 $6,000.00$120.00
6 $5,500.00$110.00
150011 - Page 106
Ref #66 514E10000 FINAL INSPECTION REPAIR, (12 EACH)
Awd $3,300.00$275.00
2 $2,100.00$175.00
3 $3,000.00$250.00
4 $2,100.00$175.00
5 $3,000.00$250.00
6 $4,200.00$350.00
Ref #67 516E10500 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC C, (62 FT)
Awd $27,900.00$450.00
2 $24,800.00$400.00
3 $24,800.00$400.00
4 $26,660.00$430.00
5 $24,800.00$400.00
6 $26,970.00$435.00
Ref #68 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (156 FT)
Awd $1,404.00$9.00
2 $936.00$6.00
3 $2,730.00$17.50
4 $4,680.00$30.00
5 $3,120.00$20.00
6 $624.00$4.00
Ref #69 516E46701 RESET BEARING, AS PER PLAN, (16 EACH)
Awd $8,448.00$528.00
2 $8,800.00$550.00
3 $8,000.00$500.00
4 $11,200.00$700.00
5 $9,600.00$600.00
6 $8,000.00$500.00
Ref #70 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $2,500.00$2,500.00
3 $5,000.00$5,000.00
4 $4,000.00$4,000.00
5 $3,000.00$3,000.00
6 $12,000.00$12,000.00
Ref #71 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN, (10 EACH)
Awd $15,000.00$1,500.00
2 $11,500.00$1,150.00
3 $11,000.00$1,100.00
4 $17,000.00$1,700.00
5 $17,000.00$1,700.00
6 $12,000.00$1,200.00
Ref #72 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (30 CY)
Awd $3,300.00$110.00
2 $2,700.00$90.00
3 $3,750.00$125.00
4 $2,400.00$80.00
5 $1,500.00$50.00
6 $4,050.00$135.00
150011 - Page 107
Ref #73 518E39800 4" PERFORATED CORRUGATED PLASTIC PIPE, (80 FT)
Awd $240.00$3.00
2 $640.00$8.00
3 $560.00$7.00
4 $800.00$10.00
5 $960.00$12.00
6 $720.00$9.00
Ref #74 518E39900 4" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (6 FT)
Awd $24.00$4.00
2 $150.00$25.00
3 $120.00$20.00
4 $180.00$30.00
5 $72.00$12.00
6 $120.00$20.00
Ref #75 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (2 SF)
Awd $530.00$265.00
2 $400.00$200.00
3 $500.00$250.00
4 $480.00$240.00
5 $1,000.00$500.00
6 $500.00$250.00
Ref #76 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (157 SY)
Awd $36,138.26$230.18
2 $35,325.00$225.00
3 $39,250.00$250.00
4 $42,390.00$270.00
5 $35,325.00$225.00
6 $36,895.00$235.00
Section 6 - STRUCTURE 20 FOOT SPAN AND OVER (BRIDGE - Totals
Awd $739,515.84
2 $780,941.19
3 $800,377.62
4 $875,881.95
5 $868,592.25
6 $855,621.95
Ref #77 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,300.00$5,300.00
2 $8,000.00$8,000.00
3 $12,500.00$12,500.00
4 $10,000.00$10,000.00
5 $20,000.00$20,000.00
6 $20,000.00$20,000.00
Ref #78 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $45,125.00$45,125.00
2 $25,000.00$25,000.00
3 $50,000.00$50,000.00
4 $21,000.00$21,000.00
5 $35,000.00$35,000.00
6 $102,000.00$102,000.00
150011 - Page 108
Ref #79 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $7,500.00$2,500.00
2 $7,200.00$2,400.00
3 $4,500.00$1,500.00
4 $7,500.00$2,500.00
5 $4,500.00$1,500.00
6 $6,000.00$2,000.00
Ref #80 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $4,000.00$4,000.00
3 $3,500.00$3,500.00
4 $5,000.00$5,000.00
5 $10,000.00$10,000.00
6 $5,000.00$5,000.00
Ref #81 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
3 $20,000.00$20,000.00
4 $40,000.00$40,000.00
5 $47,500.00$47,500.00
6 $40,000.00$40,000.00
Section 7 - INCIDENTALS - Totals
Awd $85,925.00
2 $64,200.00
3 $90,500.00
4 $83,500.00
5 $117,000.00
6 $173,000.00
150011 - Page 109
Project No. 150012
PID 91066
HAM-IR 71-12.44
Federal
Type: INTERCHANGE
Completion Date: 10/1/2015
Award Amount: $2,589,080.15
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 1/15/2015
Engineer's Estimate: $2,358,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45005
Warren
Bidder 1
Bid $2,589,080.15
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 2
Bid $2,593,916.47
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 3
Bid $2,694,469.36
SUNESIS CONSTRUCTION CO
2610 CRESCENTVILLE RD
WEST CHESTER, OH 45069
Butler
Bidder 4
Bid $2,752,758.23
KARVO PAVING COMPANY
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 5
Bid $2,755,474.40
150012 - Page 110
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $3,641.00$3,641.00
3 $50,000.00$50,000.00
4 $17,152.32$17,152.32
5 $13,000.00$13,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (1359 SY)
Awd $19,026.00$14.00
2 $15,098.49$11.11
3 $16,308.00$12.00
4 $19,827.81$14.59
5 $19,773.45$14.55
Ref #3 202E23900 CONCRETE BASE REMOVED, (332 SY)
Awd $6,640.00$20.00
2 $8,373.04$25.22
3 $5,644.00$17.00
4 $7,619.40$22.95
5 $4,150.00$12.50
Ref #4 202E30000 WALK REMOVED, (1326 SF)
Awd $2,652.00$2.00
2 $3,328.26$2.51
3 $3,978.00$3.00
4 $1,564.68$1.18
5 $397.80$0.30
Ref #5 202E30700 CONCRETE BARRIER REMOVED, (626 FT)
Awd $9,390.00$15.00
2 $8,795.30$14.05
3 $8,764.00$14.00
4 $17,308.90$27.65
5 $13,772.00$22.00
Ref #6 202E30800 TRAFFIC ISLAND REMOVED, (45 SY)
Awd $1,350.00$30.00
2 $1,443.60$32.08
3 $1,080.00$24.00
4 $1,292.85$28.73
5 $540.00$12.00
Ref #7 202E32000 CURB REMOVED, (1306 FT)
Awd $13,060.00$10.00
2 $7,183.00$5.50
3 $6,530.00$5.00
4 $10,474.12$8.02
5 $6,203.50$4.75
Ref #8 202E35100 PIPE REMOVED, 24" AND UNDER, (313 FT)
Awd $6,260.00$20.00
2 $5,959.52$19.04
3 $5,634.00$18.00
4 $8,729.57$27.89
5 $9,859.50$31.50
150012 - Page 111
Ref #9 202E35200 PIPE REMOVED, OVER 24", (258 FT)
Awd $5,160.00$20.00
2 $17,172.48$66.56
3 $12,900.00$50.00
4 $6,751.86$26.17
5 $7,482.00$29.00
Ref #10 202E58000 MANHOLE REMOVED, (2 EACH)
Awd $2,000.00$1,000.00
2 $4,063.18$2,031.59
3 $1,800.00$900.00
4 $2,222.80$1,111.40
5 $1,820.00$910.00
Ref #11 202E58100 CATCH BASIN REMOVED, (6 EACH)
Awd $2,400.00$400.00
2 $3,747.12$624.52
3 $1,950.00$325.00
4 $2,450.88$408.48
5 $5,460.00$910.00
Ref #12 202E58200 INLET REMOVED, (3 EACH)
Awd $1,800.00$600.00
2 $3,502.83$1,167.61
3 $1,950.00$650.00
4 $980.37$326.79
5 $4,200.00$1,400.00
Ref #13 202E58500 CATCH BASIN ABANDONED, (1 EACH)
Awd $600.00$600.00
2 $1,653.09$1,653.09
3 $650.00$650.00
4 $487.24$487.24
5 $600.00$600.00
Ref #14 202E98300 REMOVAL MISC.: LANDSCAPING REMOVED, (160 SY)
Awd $320.00$2.00
2 $2,120.00$13.25
3 $1,760.00$11.00
4 $2,276.80$14.23
5 $1,536.00$9.60
Ref #15 202E98400 REMOVAL MISC.: STAMPED CONCRETE REMOVED, (724 SF)
Awd $1,448.00$2.00
2 $3,308.68$4.57
3 $2,172.00$3.00
4 $1,882.40$2.60
5 $2,642.60$3.65
Ref #16 203E10000 EXCAVATION, (3243 CY)
Awd $97,290.00$30.00
2 $49,001.73$15.11
3 $64,860.00$20.00
4 $95,182.05$29.35
5 $68,103.00$21.00
150012 - Page 112
Ref #17 203E20000 EMBANKMENT, (855 CY)
Awd $17,100.00$20.00
2 $9,712.80$11.36
3 $5,985.00$7.00
4 $10,525.05$12.31
5 $5,301.00$6.20
Ref #18 203E22000 EMBANKMENT, USING NATURAL SOILS, 703.16.A, (28.107 CY)
Awd $2,108.03$75.00
2 $3,161.48$112.48
3 $1,405.35$50.00
4 $701.55$24.96
5 $2,192.35$78.00
Ref #19 204E10000 SUBGRADE COMPACTION, (7725.266 SY)
Awd $23,175.80$3.00
2 $24,180.08$3.13
3 $13,519.22$1.75
4 $19,853.93$2.57
5 $9,656.58$1.25
Ref #20 204E13000 EXCAVATION OF SUBGRADE, 18" DEEP, (978 CY)
Awd $21,516.00$22.00
2 $20,811.84$21.28
3 $17,604.00$18.00
4 $35,726.34$36.53
5 $15,159.00$15.50
Ref #21 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, BEDROCK UNDER, (1629 CY)
Awd $42,354.00$26.00
2 $28,931.04$17.76
3 $57,015.00$35.00
4 $102,822.48$63.12
5 $53,757.00$33.00
Ref #22 204E20000 EMBANKMENT, (978 CY)
Awd $21,516.00$22.00
2 $11,980.50$12.25
3 $6,846.00$7.00
4 $11,921.82$12.19
5 $6,601.50$6.75
Ref #23 204E30020 GRANULAR MATERIAL, TYPE C, (1629 CY)
Awd $61,902.00$38.00
2 $54,962.46$33.74
3 $68,418.00$42.00
4 $79,772.13$48.97
5 $65,160.00$40.00
Ref #24 204E45000 PROOF ROLLING, (4 HOUR)
Awd $1,000.00$250.00
2 $632.28$158.07
3 $1,000.00$250.00
4 $1,471.56$367.89
5 $600.00$150.00
150012 - Page 113
Ref #25 204E50000 GEOTEXTILE FABRIC, (3044 SY)
Awd $7,610.00$2.50
2 $8,462.32$2.78
3 $7,305.60$2.40
4 $2,861.36$0.94
5 $1,522.00$0.50
Ref #26 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (55.135 CY)
Awd $4,135.13$75.00
2 $5,240.03$95.04
3 $4,410.80$80.00
4 $4,181.99$75.85
5 $5,513.50$100.00
Ref #27 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN, (380 FT)
Awd $17,100.00$45.00
2 $17,738.40$46.68
3 $15,200.00$40.00
4 $12,806.00$33.70
5 $13,300.00$35.00
Ref #28 606E10810 SPECIAL - NOISE BARRIER, MISC.: CONCRETE SHAFT REM, (14 EACH)
Awd $7,000.00$500.00
2 $6,464.78$461.77
3 $9,800.00$700.00
4 $7,248.36$517.74
5 $7,000.00$500.00
Ref #29 606E10930 SPECIAL - NOISE BARRIER, MISC.: NOISE PANEL REMOVA, (336 FT)
Awd $14,784.00$44.00
2 $16,158.24$48.09
3 $5,376.00$16.00
4 $31,261.44$93.04
5 $9,072.00$27.00
Ref #30 606E10930 SPECIAL - NOISE BARRIER, MISC.: NOISE PANEL REMOVA, (136 FT)
Awd $8,160.00$60.00
2 $7,694.88$56.58
3 $8,160.00$60.00
4 $20,746.80$152.55
5 $25,160.00$185.00
Ref #31 606E15050 GUARDRAIL, TYPE MGS, (90 FT)
Awd $1,908.00$21.20
2 $1,606.50$17.85
3 $1,606.50$17.85
4 $1,908.00$21.20
5 $1,606.50$17.85
Ref #32 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (128 FT)
Awd $3,392.00$26.50
2 $2,592.00$20.25
3 $2,592.00$20.25
4 $3,392.00$26.50
5 $2,592.00$20.25
150012 - Page 114
Ref #33 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (1 EACH)
Awd $2,085.00$2,085.00
2 $2,225.00$2,225.00
3 $2,225.00$2,225.00
4 $2,085.00$2,085.00
5 $2,225.00$2,225.00
Ref #34 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (1 EACH)
Awd $795.00$795.00
2 $1,075.00$1,075.00
3 $1,075.00$1,075.00
4 $795.00$795.00
5 $1,075.00$1,075.00
Ref #35 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (1 EACH)
Awd $2,275.00$2,275.00
2 $1,975.00$1,975.00
3 $1,975.00$1,975.00
4 $2,275.00$2,275.00
5 $1,975.00$1,975.00
Ref #36 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (1 EACH)
Awd $390.00$390.00
2 $375.00$375.00
3 $375.00$375.00
4 $390.00$390.00
5 $375.00$375.00
Ref #37 608E10000 4" CONCRETE WALK, (1016 SF)
Awd $8,382.00$8.25
2 $10,861.04$10.69
3 $6,604.00$6.50
4 $10,424.16$10.26
5 $6,350.00$6.25
Ref #38 608E52030 CURB RAMP, TYPE B1, (161 SF)
Awd $2,511.60$15.60
2 $3,474.38$21.58
3 $2,415.00$15.00
4 $3,432.52$21.32
5 $2,817.50$17.50
Ref #39 608E52044 CURB RAMP, TYPE B3, (30 SF)
Awd $468.00$15.60
2 $944.10$31.47
3 $690.00$23.00
4 $877.20$29.24
5 $1,170.00$39.00
Ref #40 609E26000 CURB, TYPE 6, (992 FT)
Awd $21,824.00$22.00
2 $23,718.72$23.91
3 $31,744.00$32.00
4 $25,286.08$25.49
5 $18,848.00$19.00
150012 - Page 115
Ref #41 609E54000 6" CONCRETE TRAFFIC ISLAND, (258 SY)
Awd $13,893.30$53.85
2 $15,784.44$61.18
3 $10,320.00$40.00
4 $15,062.04$58.38
5 $10,578.00$41.00
Ref #42 617E10100 COMPACTED AGGREGATE, (17 CY)
Awd $2,550.00$150.00
2 $3,114.57$183.21
3 $1,530.00$90.00
4 $1,977.27$116.31
5 $850.00$50.00
Ref #43 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, (208 FT)
Awd $14,976.00$72.00
2 $14,976.00$72.00
3 $17,680.00$85.00
4 $16,536.00$79.50
5 $29,328.00$141.00
Ref #44 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA, (272 FT)
Awd $28,560.00$105.00
2 $28,560.00$105.00
3 $50,320.00$185.00
4 $28,560.00$105.00
5 $37,264.00$137.00
Ref #45 622E10200 BARRIER TRANSITION, (1 EACH)
Awd $4,100.00$4,100.00
2 $4,100.00$4,100.00
3 $3,700.00$3,700.00
4 $4,100.00$4,100.00
5 $4,100.00$4,100.00
Ref #46 622E25000 CONCRETE BARRIER END SECTION, TYPE D, (2 EACH)
Awd $5,200.00$2,600.00
2 $6,382.14$3,191.07
3 $6,800.00$3,400.00
4 $5,200.00$2,600.00
5 $9,400.00$4,700.00
Ref #47 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE , (6 EACH)
Awd $13,200.00$2,200.00
2 $16,746.36$2,791.06
3 $20,400.00$3,400.00
4 $13,200.00$2,200.00
5 $35,400.00$5,900.00
Ref #48 622E25051 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE , (1 EACH)
Awd $5,000.00$5,000.00
2 $5,591.06$5,591.06
3 $5,100.00$5,100.00
4 $5,000.00$5,000.00
5 $5,900.00$5,900.00
150012 - Page 116
Ref #49 626E00100 BARRIER REFLECTOR, (10 EACH)
Awd $65.00$6.50
2 $110.10$11.01
3 $70.00$7.00
4 $65.00$6.50
5 $80.00$8.00
Ref #50 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $15,000.00$15,000.00
3 $26,000.00$26,000.00
4 $13,455.00$13,455.00
5 $19,600.00$19,600.00
Ref #307 690E98100 SPECIAL - MISC.:ROCK EXCAVATION FOR CONDUIT INSTAL, (257 FT)
Awd $7,710.00$30.00
2 $10,570.41$41.13
3 $16,705.00$65.00
4 $19,526.86$75.98
5 $26,214.00$102.00
Section 1 - ROADWAY - Totals
Awd $613,141.86
2 $524,304.27
3 $617,951.47
4 $711,651.99
5 $597,282.78
Ref #51 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (8 SY)
Awd $1,080.00$135.00
2 $628.32$78.54
3 $880.00$110.00
4 $1,234.88$154.36
5 $560.00$70.00
Ref #52 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (7 CY)
Awd $2,100.00$300.00
2 $1,355.34$193.62
3 $770.00$110.00
4 $1,410.08$201.44
5 $567.00$81.00
Ref #53 659E00100 SOIL ANALYSIS TEST, (1 EACH)
Awd $100.00$100.00
2 $200.00$200.00
3 $200.00$200.00
4 $200.00$200.00
5 $50.00$50.00
Ref #54 659E00300 TOPSOIL, (860 CY)
Awd $32,680.00$38.00
2 $24,647.60$28.66
3 $17,200.00$20.00
4 $57,061.00$66.35
5 $33,110.00$38.50
150012 - Page 117
Ref #55 659E10000 SEEDING AND MULCHING, (6577 SY)
Awd $3,222.73$0.49
2 $5,393.14$0.82
3 $5,787.76$0.88
4 $8,352.79$1.27
5 $3,222.73$0.49
Ref #56 659E14000 REPAIR SEEDING AND MULCHING, (328 SY)
Awd $114.80$0.35
2 $164.00$0.50
3 $288.64$0.88
4 $164.00$0.50
5 $114.80$0.35
Ref #57 659E15000 INTER-SEEDING, (328 SY)
Awd $114.80$0.35
2 $3.28$0.01
3 $196.80$0.60
4 $3.28$0.01
5 $114.80$0.35
Ref #58 659E20000 COMMERCIAL FERTILIZER, (1 TON)
Awd $600.00$600.00
2 $500.00$500.00
3 $500.00$500.00
4 $500.00$500.00
5 $600.00$600.00
Ref #59 659E31000 LIME, (1.35 ACRE)
Awd $270.00$200.00
2 $270.00$200.00
3 $40.50$30.00
4 $270.00$200.00
5 $270.00$200.00
Ref #60 659E35000 WATER, (35 MGAL)
Awd $875.00$25.00
2 $35.00$1.00
3 $35.00$1.00
4 $35.00$1.00
5 $875.00$25.00
Ref #61 670E00700 DITCH EROSION PROTECTION, (399 SY)
Awd $993.51$2.49
2 $778.05$1.95
3 $798.00$2.00
4 $778.05$1.95
5 $993.51$2.49
Ref #62 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,400.00$5,400.00
3 $3,000.00$3,000.00
4 $8,170.00$8,170.00
5 $6,600.00$6,600.00
150012 - Page 118
Ref #63 832E30000 EROSION CONTROL, (45000 EACH)
Awd $45,000.00$1.00
2 $45,000.00$1.00
3 $45,000.00$1.00
4 $45,000.00$1.00
5 $45,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $92,150.84
2 $84,374.73
3 $74,696.70
4 $123,179.08
5 $92,077.84
Ref #64 602E20000 CONCRETE MASONRY, (1 CY)
Awd $900.00$900.00
2 $1,120.56$1,120.56
3 $1,125.00$1,125.00
4 $742.13$742.13
5 $380.00$380.00
Ref #65 605E05100 4" SHALLOW PIPE UNDERDRAINS, (385 FT)
Awd $1,925.00$5.00
2 $4,173.40$10.84
3 $3,850.00$10.00
4 $3,060.75$7.95
5 $635.25$1.65
Ref #66 605E11100 6" SHALLOW PIPE UNDERDRAINS, (1315 FT)
Awd $15,780.00$12.00
2 $15,832.60$12.04
3 $15,780.00$12.00
4 $12,361.00$9.40
5 $6,969.50$5.30
Ref #67 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (200 FT)
Awd $3,000.00$15.00
2 $4,422.00$22.11
3 $2,800.00$14.00
4 $1,716.00$8.58
5 $1,600.00$8.00
Ref #68 605E13500 6" ROCK CUT UNDERDRAINS, (1627 FT)
Awd $26,032.00$16.00
2 $16,709.29$10.27
3 $22,778.00$14.00
4 $18,661.69$11.47
5 $14,480.30$8.90
Ref #69 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (153 FT)
Awd $3,672.00$24.00
2 $6,407.64$41.88
3 $2,448.00$16.00
4 $5,159.16$33.72
5 $2,034.90$13.30
150012 - Page 119
Ref #70 611E01500 6" CONDUIT, TYPE F, (200 FT)
Awd $4,000.00$20.00
2 $1,398.00$6.99
3 $2,500.00$12.50
4 $3,566.00$17.83
5 $1,400.00$7.00
Ref #71 611E04400 12" CONDUIT, TYPE B, (211 FT)
Awd $24,265.00$115.00
2 $19,287.51$91.41
3 $20,678.00$98.00
4 $11,765.36$55.76
5 $16,247.00$77.00
Ref #72 611E04600 12" CONDUIT, TYPE C, (162 FT)
Awd $14,580.00$90.00
2 $9,190.26$56.73
3 $12,960.00$80.00
4 $7,132.86$44.03
5 $9,720.00$60.00
Ref #73 611E09100 21" CONDUIT, TYPE C, (23 FT)
Awd $3,220.00$140.00
2 $5,968.50$259.50
3 $3,680.00$160.00
4 $2,070.69$90.03
5 $2,530.00$110.00
Ref #74 611E16400 36" CONDUIT, TYPE B, (257 FT)
Awd $41,120.00$160.00
2 $42,718.54$166.22
3 $69,390.00$270.00
4 $43,163.15$167.95
5 $41,120.00$160.00
Ref #75 611E98150 CATCH BASIN, NO. 3, (4 EACH)
Awd $11,200.00$2,800.00
2 $9,640.96$2,410.24
3 $11,600.00$2,900.00
4 $12,061.00$3,015.25
5 $11,400.00$2,850.00
Ref #76 611E98300 CATCH BASIN, NO. 5, (1 EACH)
Awd $4,000.00$4,000.00
2 $2,604.91$2,604.91
3 $3,400.00$3,400.00
4 $3,493.44$3,493.44
5 $3,100.00$3,100.00
Ref #77 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)
Awd $2,600.00$2,600.00
2 $1,937.89$1,937.89
3 $2,250.00$2,250.00
4 $2,391.10$2,391.10
5 $2,200.00$2,200.00
150012 - Page 120
Ref #78 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D, (3 EACH)
Awd $18,600.00$6,200.00
2 $20,159.04$6,719.68
3 $22,500.00$7,500.00
4 $30,910.38$10,303.46
5 $10,200.00$3,400.00
Ref #79 611E99115 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D, AS , (2 EACH)
Awd $14,000.00$7,000.00
2 $14,746.00$7,373.00
3 $18,200.00$9,100.00
4 $20,944.66$10,472.33
5 $6,800.00$3,400.00
Ref #80 611E99574 MANHOLE, NO. 3, (2 EACH)
Awd $16,000.00$8,000.00
2 $15,005.22$7,502.61
3 $7,140.00$3,570.00
4 $15,661.58$7,830.79
5 $10,400.00$5,200.00
Ref #81 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (8 EACH)
Awd $1,600.00$200.00
2 $3,544.48$443.06
3 $1,720.00$215.00
4 $1,715.52$214.44
5 $1,560.00$195.00
Section 3 - DRAINAGE - Totals
Awd $206,494.00
2 $194,866.80
3 $224,799.00
4 $196,576.47
5 $142,776.95
Ref #82 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (21393.59 SY)
Awd $48,135.58$2.25
2 $43,642.92$2.04
3 $48,135.58$2.25
4 $48,135.58$2.25
5 $52,414.30$2.45
Ref #83 301E46000 ASPHALT CONCRETE BASE, PG64-22, (2204.075 CY)
Awd $264,489.00$120.00
2 $264,202.47$119.87
3 $264,489.00$120.00
4 $264,489.00$120.00
5 $275,509.38$125.00
Ref #84 304E20000 AGGREGATE BASE, (1716.726 CY)
Awd $72,102.49$42.00
2 $96,462.83$56.19
3 $99,570.11$58.00
4 $100,703.15$58.66
5 $82,402.85$48.00
150012 - Page 121
Ref #85 407E10000 TACK COAT, (2835.998 GAL)
Awd $7,090.00$2.50
2 $7,798.99$2.75
3 $7,090.00$2.50
4 $7,090.00$2.50
5 $8,507.99$3.00
Ref #86 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (1717.644 GAL)
Awd $4,294.11$2.50
2 $4,723.52$2.75
3 $4,294.11$2.50
4 $4,294.11$2.50
5 $5,152.93$3.00
Ref #87 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (1181.666 CY)
Awd $189,066.56$160.00
2 $210,017.50$177.73
3 $189,066.56$160.00
4 $189,066.56$160.00
5 $218,608.21$185.00
Ref #88 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (834.999 CY)
Awd $112,724.87$135.00
2 $149,915.72$179.54
3 $112,724.87$135.00
4 $112,724.87$135.00
5 $151,969.82$182.00
Section 4 - PAVEMENT - Totals
Awd $697,902.61
2 $776,763.95
3 $725,370.23
4 $726,503.27
5 $794,565.48
Ref #89 638E87100 SPECIAL - RESETTING EXISTING VALVE BOX, COMPLETE (, (2 EACH)
Awd $800.00$400.00
2 $2,578.12$1,289.06
3 $560.00$280.00
4 $692.72$346.36
5 $700.00$350.00
Ref #90 638E88800 SPECIAL - RESETTING EXISTING CURB AND ROADWAY BOX , (2 EACH)
Awd $300.00$150.00
2 $1,909.76$954.88
3 $280.00$140.00
4 $692.72$346.36
5 $700.00$350.00
Section 5 - WATER WORK - Totals
Awd $1,100.00
2 $4,487.88
3 $840.00
4 $1,385.44
5 $1,400.00
150012 - Page 122
Ref #91 625E00450 CONNECTION, FUSED PULL APART, (25 EACH)
Awd $1,375.00$55.00
2 $1,375.00$55.00
3 $2,250.00$90.00
4 $1,375.00$55.00
5 $1,375.00$55.00
Ref #92 625E00460 CONNECTION, UNFUSED PULL APART, (25 EACH)
Awd $1,500.00$60.00
2 $1,500.00$60.00
3 $2,125.00$85.00
4 $1,500.00$60.00
5 $1,500.00$60.00
Ref #93 625E00470 CONNECTION, UNFUSED BOLTED, (4 EACH)
Awd $196.00$49.00
2 $196.00$49.00
3 $360.00$90.00
4 $196.00$49.00
5 $196.00$49.00
Ref #94 625E00480 CONNECTION, UNFUSED PERMANENT, (26 EACH)
Awd $1,274.00$49.00
2 $1,274.00$49.00
3 $2,470.00$95.00
4 $1,274.00$49.00
5 $1,274.00$49.00
Ref #95 625E10490 LIGHT POLE, CONVENTIONAL DESIGN AT15B32.5, (1 EACH)
Awd $2,080.00$2,080.00
2 $2,080.00$2,080.00
3 $1,850.00$1,850.00
4 $2,080.00$2,080.00
5 $2,080.00$2,080.00
Ref #96 625E14101 LIGHT POLE FOUNDATION, 24" X 8' DEEP, AS PER PLAN, (17 EACH)
Awd $27,625.00$1,625.00
2 $27,625.00$1,625.00
3 $34,000.00$2,000.00
4 $27,625.00$1,625.00
5 $27,625.00$1,625.00
Ref #97 625E14301 MEDIAN LIGHT POLE FOUNDATION, 8' DEEP, AS PER PLAN, (2 EACH)
Awd $7,350.00$3,675.00
2 $7,350.00$3,675.00
3 $8,000.00$4,000.00
4 $12,450.00$6,225.00
5 $7,350.00$3,675.00
Ref #99 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, (8962 FT)
Awd $19,716.40$2.20
2 $19,716.40$2.20
3 $17,924.00$2.00
4 $19,716.40$2.20
5 $19,716.40$2.20
150012 - Page 123
Ref #100 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (105 FT)
Awd $136.50$1.30
2 $136.50$1.30
3 $105.00$1.00
4 $136.50$1.30
5 $136.50$1.30
Ref #101 625E25400 CONDUIT, 2", 725.04, (15 FT)
Awd $88.50$5.90
2 $88.50$5.90
3 $240.00$16.00
4 $88.50$5.90
5 $88.50$5.90
Ref #102 625E25500 CONDUIT, 3", 725.04, (3157 FT)
Awd $32,738.09$10.37
2 $32,738.09$10.37
3 $44,198.00$14.00
4 $32,738.09$10.37
5 $32,738.09$10.37
Ref #103 625E25600 CONDUIT, 4", 725.04, (371 FT)
Awd $5,138.35$13.85
2 $5,138.35$13.85
3 $7,420.00$20.00
4 $5,138.35$13.85
5 $5,138.35$13.85
Ref #104 625E25903 CONDUIT, JACKED OR DRILLED, 725.04, AS PER PLAN, (292 FT)
Awd $11,388.00$39.00
2 $11,388.00$39.00
3 $8,760.00$30.00
4 $11,388.00$39.00
5 $11,388.00$39.00
Ref #105 625E27521 REMOVAL OF LUMINAIRE AND REERECTION, AS PER PLAN, (18 EACH)
Awd $6,300.00$350.00
2 $6,300.00$350.00
3 $3,150.00$175.00
4 $6,300.00$350.00
5 $6,300.00$350.00
Ref #106 625E29000 TRENCH, (3265 FT)
Awd $21,222.50$6.50
2 $21,222.50$6.50
3 $26,120.00$8.00
4 $21,222.50$6.50
5 $21,222.50$6.50
Ref #107 625E29940 BARRIER JUNCTION BOX, (4 EACH)
Awd $6,780.00$1,695.00
2 $6,780.00$1,695.00
3 $14,000.00$3,500.00
4 $6,780.00$1,695.00
5 $6,780.00$1,695.00
150012 - Page 124
Ref #108 625E30700 PULL BOX, 725.08, 18", (11 EACH)
Awd $6,710.00$610.00
2 $6,710.00$610.00
3 $8,800.00$800.00
4 $6,710.00$610.00
5 $6,710.00$610.00
Ref #109 625E31510 PULL BOX REMOVED, (15 EACH)
Awd $1,125.00$75.00
2 $1,125.00$75.00
3 $3,375.00$225.00
4 $1,125.00$75.00
5 $1,125.00$75.00
Ref #110 625E32000 GROUND ROD, (19 EACH)
Awd $3,325.00$175.00
2 $3,325.00$175.00
3 $2,850.00$150.00
4 $3,325.00$175.00
5 $3,325.00$175.00
Ref #111 625E34001 POWER SERVICE, AS PER PLAN, (1 EACH)
Awd $750.00$750.00
2 $750.00$750.00
3 $1,200.00$1,200.00
4 $750.00$750.00
5 $750.00$750.00
Ref #112 625E35001 REERECT EXISTING LIGHT POLE, AS PER PLAN, (18 EACH)
Awd $11,700.00$650.00
2 $11,700.00$650.00
3 $6,300.00$350.00
4 $11,700.00$650.00
5 $11,700.00$650.00
Ref #113 625E36000 PLASTIC CAUTION TAPE, (3265 FT)
Awd $816.25$0.25
2 $816.25$0.25
3 $2,285.50$0.70
4 $816.25$0.25
5 $816.25$0.25
Ref #114 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $25,000.00$25,000.00
3 $9,000.00$9,000.00
4 $25,000.00$25,000.00
5 $25,000.00$25,000.00
Ref #115 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT, (1 EACH)
Awd $2,080.00$2,080.00
2 $2,080.00$2,080.00
3 $2,480.00$2,480.00
4 $2,080.00$2,080.00
5 $2,080.00$2,080.00
150012 - Page 125
Ref #116 625E75400 LIGHT POLE REMOVED, (2 EACH)
Awd $900.00$450.00
2 $900.00$450.00
3 $450.00$225.00
4 $900.00$450.00
5 $900.00$450.00
Ref #117 625E75500 LIGHT POLE FOUNDATION REMOVED, (20 EACH)
Awd $2,500.00$125.00
2 $2,500.00$125.00
3 $5,000.00$250.00
4 $2,500.00$125.00
5 $2,500.00$125.00
Ref #118 625E75550 DISTRIBUTION CABLE REMOVED, (7640 FT)
Awd $7,640.00$1.00
2 $7,640.00$1.00
3 $5,348.00$0.70
4 $7,640.00$1.00
5 $7,640.00$1.00
Ref #119 625E75801 DISCONNECT CIRCUIT, AS PER PLAN, (4 EACH)
Awd $400.00$100.00
2 $400.00$100.00
3 $800.00$200.00
4 $400.00$100.00
5 $400.00$100.00
Section 6 - LIGHTING - Totals
Awd $207,854.59
2 $207,854.59
3 $220,860.50
4 $212,954.59
5 $207,854.59
Ref #120 620E00500 DELINEATOR, POST MOUNTED, (24 EACH)
Awd $840.00$35.00
2 $1,080.00$45.00
3 $1,080.00$45.00
4 $840.00$35.00
5 $840.00$35.00
Ref #121 620E31200 REMOVAL OF DELINEATOR, (26 EACH)
Awd $65.00$2.50
2 $390.00$15.00
3 $390.00$15.00
4 $130.00$5.00
5 $130.00$5.00
Ref #122 621E00100 RPM, (362 EACH)
Awd $7,294.30$20.15
2 $7,294.30$20.15
3 $7,294.30$20.15
4 $8,434.60$23.30
5 $7,294.30$20.15
150012 - Page 126
Ref #123 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (310 FT)
Awd $2,356.00$7.60
2 $2,790.00$9.00
3 $2,790.00$9.00
4 $2,480.00$8.00
5 $2,790.00$9.00
Ref #124 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (43.5 FT)
Awd $382.80$8.80
2 $402.38$9.25
3 $402.38$9.25
4 $391.50$9.00
5 $402.38$9.25
Ref #125 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9, (39.5 FT)
Awd $711.00$18.00
2 $651.75$16.50
3 $651.75$16.50
4 $632.00$16.00
5 $651.75$16.50
Ref #126 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18, (43.3 FT)
Awd $1,385.60$32.00
2 $1,299.00$30.00
3 $1,299.00$30.00
4 $1,299.00$30.00
5 $1,299.00$30.00
Ref #128 630E08600 SIGN POST REFLECTOR, (5 EACH)
Awd $175.00$35.00
2 $225.00$45.00
3 $225.00$45.00
4 $175.00$35.00
5 $225.00$45.00
Ref #129 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (2 EACH)
Awd $450.00$225.00
2 $520.00$260.00
3 $520.00$260.00
4 $550.00$275.00
5 $520.00$260.00
Ref #130 630E80100 SIGN, FLAT SHEET, (228.4 SF)
Awd $3,483.10$15.25
2 $3,711.50$16.25
3 $3,711.50$16.25
4 $3,654.40$16.00
5 $3,711.50$16.25
Ref #131 630E80101 SIGN, FLAT SHEET, AS PER PLAN, (67.5 SF)
Awd $1,080.00$16.00
2 $1,096.88$16.25
3 $1,096.88$16.25
4 $1,147.50$17.00
5 $1,096.88$16.25
150012 - Page 127
Ref #132 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (96 SF)
Awd $1,824.00$19.00
2 $1,896.00$19.75
3 $1,896.00$19.75
4 $2,400.00$25.00
5 $1,896.00$19.75
Ref #133 630E81020 CONCRETE MEDIAN BARRIER SIGN BRACKET, (1 EACH)
Awd $435.00$435.00
2 $550.00$550.00
3 $550.00$550.00
4 $485.00$485.00
5 $550.00$550.00
Ref #134 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (5 EACH)
Awd $50.00$10.00
2 $75.00$15.00
3 $75.00$15.00
4 $75.00$15.00
5 $75.00$15.00
Ref #135 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (12 EACH)
Awd $480.00$40.00
2 $660.00$55.00
3 $660.00$55.00
4 $720.00$60.00
5 $660.00$55.00
Ref #136 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO, (4 EACH)
Awd $1,140.00$285.00
2 $1,940.00$485.00
3 $1,940.00$485.00
4 $1,000.00$250.00
5 $1,940.00$485.00
Ref #137 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (14 EACH)
Awd $210.00$15.00
2 $210.00$15.00
3 $210.00$15.00
4 $280.00$20.00
5 $210.00$15.00
Ref #138 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (4 EACH)
Awd $580.00$145.00
2 $2,200.00$550.00
3 $2,200.00$550.00
4 $640.00$160.00
5 $2,200.00$550.00
Ref #139 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (11 EACH)
Awd $2,640.00$240.00
2 $1,045.00$95.00
3 $1,045.00$95.00
4 $1,925.00$175.00
5 $1,045.00$95.00
150012 - Page 128
Ref #140 630E89800 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (2 EACH)
Awd $2,640.00$1,320.00
2 $2,100.00$1,050.00
3 $2,100.00$1,050.00
4 $3,300.00$1,650.00
5 $2,100.00$1,050.00
Ref #141 644E00100 EDGE LINE, 4", (1.58 MILE)
Awd $3,239.00$2,050.00
2 $3,239.00$2,050.00
3 $3,239.00$2,050.00
4 $3,239.00$2,050.00
5 $3,239.00$2,050.00
Ref #142 644E00200 LANE LINE, 4", (0.8 MILE)
Awd $740.00$925.00
2 $740.00$925.00
3 $740.00$925.00
4 $740.00$925.00
5 $740.00$925.00
Ref #143 644E00300 CENTER LINE, (0.32 MILE)
Awd $1,216.00$3,800.00
2 $1,216.00$3,800.00
3 $1,216.00$3,800.00
4 $1,216.00$3,800.00
5 $1,216.00$3,800.00
Ref #144 644E00400 CHANNELIZING LINE, 8", (5616 FT)
Awd $5,616.00$1.00
2 $5,616.00$1.00
3 $5,616.00$1.00
4 $5,616.00$1.00
5 $5,616.00$1.00
Ref #145 644E00500 STOP LINE, (431 FT)
Awd $1,874.85$4.35
2 $1,874.85$4.35
3 $1,874.85$4.35
4 $1,874.85$4.35
5 $1,874.85$4.35
Ref #146 644E00600 CROSSWALK LINE, (280 FT)
Awd $658.00$2.35
2 $658.00$2.35
3 $658.00$2.35
4 $658.00$2.35
5 $658.00$2.35
Ref #147 644E00700 TRANSVERSE/DIAGONAL LINE, (544 FT)
Awd $2,230.40$4.10
2 $2,230.40$4.10
3 $2,230.40$4.10
4 $2,230.40$4.10
5 $2,230.40$4.10
150012 - Page 129
Ref #148 644E01300 LANE ARROW, (57 EACH)
Awd $3,705.00$65.00
2 $3,705.00$65.00
3 $3,705.00$65.00
4 $3,705.00$65.00
5 $3,705.00$65.00
Ref #149 644E01350 LANE REDUCTION ARROW, (4 EACH)
Awd $600.00$150.00
2 $600.00$150.00
3 $600.00$150.00
4 $600.00$150.00
5 $600.00$150.00
Ref #150 644E01500 DOTTED LINE, 4", (1697 FT)
Awd $1,272.75$0.75
2 $1,272.75$0.75
3 $1,272.75$0.75
4 $1,272.75$0.75
5 $1,272.75$0.75
Ref #151 644E30000 REMOVAL OF PAVEMENT MARKING, (4186 FT)
Awd $3,558.10$0.85
2 $3,558.10$0.85
3 $3,558.10$0.85
4 $3,558.10$0.85
5 $3,558.10$0.85
Ref #300 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (4 EACH)
Awd $1,260.00$315.00
2 $1,400.00$350.00
3 $1,400.00$350.00
4 $1,320.00$330.00
5 $1,400.00$350.00
Ref #301 630E11208 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 13, A, (1 EACH)
Awd $12,850.00$12,850.00
2 $11,000.00$11,000.00
3 $11,000.00$11,000.00
4 $12,850.00$12,850.00
5 $11,000.00$11,000.00
Ref #302 630E75701 SPAN WIRE SIGN SUPPORT, TYPE TC-17.10, DESIGN 7, A, (1 EACH)
Awd $10,700.00$10,700.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $10,700.00$10,700.00
5 $10,000.00$10,000.00
Ref #303 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (4 EACH)
Awd $2,920.00$730.00
2 $4,000.00$1,000.00
3 $4,000.00$1,000.00
4 $10,400.00$2,600.00
5 $4,000.00$1,000.00
150012 - Page 130
Ref #304 630E84511 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, AS PER PLA, (1 EACH)
Awd $3,150.00$3,150.00
2 $7,500.00$7,500.00
3 $7,500.00$7,500.00
4 $3,150.00$3,150.00
5 $7,500.00$7,500.00
Ref #305 630E84520 SPAN WIRE SIGN SUPPORT FOUNDATION, (2 EACH)
Awd $6,300.00$3,150.00
2 $3,600.00$1,800.00
3 $3,600.00$1,800.00
4 $6,300.00$3,150.00
5 $3,600.00$1,800.00
Ref #306 644E01410 WORD ON PAVEMENT, 96", (1 EACH)
Awd $85.00$85.00
2 $85.00$85.00
3 $85.00$85.00
4 $85.00$85.00
5 $85.00$85.00
Section 7 - TRAFFIC CONTROL - Totals
Awd $90,196.90
2 $92,431.91
3 $92,431.91
4 $100,074.10
5 $91,931.91
Ref #152 625E25400 CONDUIT, 2", 725.04, (40 FT)
Awd $236.00$5.90
2 $236.00$5.90
3 $640.00$16.00
4 $236.00$5.90
5 $236.00$5.90
Ref #153 625E25740 CONDUIT, MULTICELL, 725.051, AS PER PLAN, (1535 FT)
Awd $19,341.00$12.60
2 $19,341.00$12.60
3 $23,025.00$15.00
4 $19,341.00$12.60
5 $19,341.00$12.60
Ref #154 625E25740 CONDUIT, MULTICELL, JACKED OR DRILLED, AS PER PLAN, (107 FT)
Awd $4,815.00$45.00
2 $4,815.00$45.00
3 $3,745.00$35.00
4 $4,815.00$45.00
5 $4,815.00$45.00
Ref #155 625E29001 TRENCH, AS PER PLAN, (1555 FT)
Awd $21,381.25$13.75
2 $21,381.25$13.75
3 $23,325.00$15.00
4 $21,381.25$13.75
5 $21,381.25$13.75
150012 - Page 131
Ref #156 625E31451 PULL BOX, AS PER PLAN, (2 EACH)
Awd $3,150.00$1,575.00
2 $3,150.00$1,575.00
3 $4,000.00$2,000.00
4 $3,150.00$1,575.00
5 $3,150.00$1,575.00
Ref #157 625E31510 PULL BOX REMOVED, (2 EACH)
Awd $250.00$125.00
2 $250.00$125.00
3 $400.00$200.00
4 $250.00$125.00
5 $250.00$125.00
Ref #158 625E36000 PLASTIC CAUTION TAPE, (1555 FT)
Awd $388.75$0.25
2 $388.75$0.25
3 $1,088.50$0.70
4 $388.75$0.25
5 $388.75$0.25
Ref #159 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, (1 EACH)
Awd $2,500.00$2,500.00
2 $2,500.00$2,500.00
3 $1,300.00$1,300.00
4 $2,500.00$2,500.00
5 $2,500.00$2,500.00
Ref #160 804E19001 FIBER OPTIC CABLE, HYBRID, SM / MM, (6335 FT)
Awd $49,096.25$7.75
2 $49,096.25$7.75
3 $38,010.00$6.00
4 $49,096.25$7.75
5 $49,096.25$7.75
Ref #161 804E33990 FIBER OPTIC PATCH CORD, 1 FIBER, (32 EACH)
Awd $1,440.00$45.00
2 $1,440.00$45.00
3 $1,440.00$45.00
4 $1,440.00$45.00
5 $1,440.00$45.00
Ref #162 804E98100 FIBER OPTIC CABLE, MISC.:, (4 EACH)
Awd $1,600.00$400.00
2 $1,600.00$400.00
3 $7,600.00$1,900.00
4 $1,600.00$400.00
5 $1,600.00$400.00
Ref #163 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE, (1 EACH)
Awd $10,140.00$10,140.00
2 $10,140.00$10,140.00
3 $13,000.00$13,000.00
4 $10,140.00$10,140.00
5 $10,140.00$10,140.00
150012 - Page 132
Ref #164 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET, (1 EACH)
Awd $34,750.00$34,750.00
2 $34,750.00$34,750.00
3 $32,000.00$32,000.00
4 $34,750.00$34,750.00
5 $35,000.00$35,000.00
Section 8 - TRAFFIC SURVEILLANCE - Totals
Awd $149,088.25
2 $149,088.25
3 $149,573.50
4 $149,088.25
5 $149,338.25
Ref #165 625E25402 CONDUIT, 2", 725.05, (1250 FT)
Awd $3,125.00$2.50
2 $3,125.00$2.50
3 $6,250.00$5.00
4 $3,125.00$2.50
5 $3,125.00$2.50
Ref #166 625E25502 CONDUIT, 3", 725.05, (40 FT)
Awd $126.00$3.15
2 $126.00$3.15
3 $320.00$8.00
4 $126.00$3.15
5 $126.00$3.15
Ref #167 625E25602 CONDUIT, 4", 725.05, (85 FT)
Awd $374.00$4.40
2 $374.00$4.40
3 $850.00$10.00
4 $374.00$4.40
5 $374.00$4.40
Ref #168 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3", (66 FT)
Awd $2,574.00$39.00
2 $2,574.00$39.00
3 $1,782.00$27.00
4 $2,574.00$39.00
5 $2,574.00$39.00
Ref #169 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4", (846 FT)
Awd $38,070.00$45.00
2 $38,070.00$45.00
3 $29,610.00$35.00
4 $38,070.00$45.00
5 $38,070.00$45.00
Ref #170 625E29000 TRENCH, (1371 FT)
Awd $8,911.50$6.50
2 $8,911.50$6.50
3 $10,968.00$8.00
4 $8,911.50$6.50
5 $8,911.50$6.50
150012 - Page 133
Ref #171 625E30700 PULL BOX, 725.08, 18", (10 EACH)
Awd $6,100.00$610.00
2 $6,100.00$610.00
3 $8,000.00$800.00
4 $6,100.00$610.00
5 $6,100.00$610.00
Ref #172 625E30706 PULL BOX, 725.08, 24", (4 EACH)
Awd $2,900.00$725.00
2 $2,900.00$725.00
3 $3,800.00$950.00
4 $2,900.00$725.00
5 $2,900.00$725.00
Ref #173 625E32000 GROUND ROD, (10 EACH)
Awd $1,750.00$175.00
2 $1,750.00$175.00
3 $1,500.00$150.00
4 $1,750.00$175.00
5 $1,750.00$175.00
Ref #174 625E32001 GROUND ROD, AS PER PLAN, (2 EACH)
Awd $350.00$175.00
2 $350.00$175.00
3 $300.00$150.00
4 $350.00$175.00
5 $350.00$175.00
Ref #175 625E36000 PLASTIC CAUTION TAPE, (1371 FT)
Awd $342.75$0.25
2 $342.75$0.25
3 $959.70$0.70
4 $342.75$0.25
5 $342.75$0.25
Ref #176 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN, (5 EACH)
Awd $1,575.00$315.00
2 $1,325.00$265.00
3 $1,125.00$225.00
4 $1,375.00$275.00
5 $1,375.00$275.00
Ref #177 630E80100 SIGN, FLAT SHEET, (39.5 SF)
Awd $592.50$15.00
2 $720.88$18.25
3 $750.50$19.00
4 $632.00$16.00
5 $632.00$16.00
Ref #178 630E80224 SIGN, OVERHEAD EXTRUSHEET, (266 SF)
Awd $5,320.00$20.00
2 $5,386.50$20.25
3 $5,386.50$20.25
4 $6,650.00$25.00
5 $6,650.00$25.00
150012 - Page 134
Ref #179 632E04911 VEHICULAR SIGNAL HEAD, (LED) BLACK, 3-SECTION, 12", (23 EACH)
Awd $15,180.00$660.00
2 $15,180.00$660.00
3 $15,180.00$660.00
4 $15,180.00$660.00
5 $15,180.00$660.00
Ref #180 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (4 EACH)
Awd $1,780.00$445.00
2 $1,780.00$445.00
3 $2,080.00$520.00
4 $1,780.00$445.00
5 $1,780.00$445.00
Ref #181 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (23 EACH)
Awd $575.00$25.00
2 $575.00$25.00
3 $621.00$27.00
4 $575.00$25.00
5 $575.00$25.00
Ref #182 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $108.00$27.00
4 $100.00$25.00
5 $100.00$25.00
Ref #183 632E26500 DETECTOR LOOP, (9 EACH)
Awd $8,910.00$990.00
2 $8,910.00$990.00
3 $9,000.00$1,000.00
4 $8,910.00$990.00
5 $8,910.00$990.00
Ref #184 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (3218 FT)
Awd $5,792.40$1.80
2 $5,792.40$1.80
3 $6,757.80$2.10
4 $5,792.40$1.80
5 $5,792.40$1.80
Ref #185 632E64010 SIGNAL SUPPORT FOUNDATION, (4 EACH)
Awd $15,000.00$3,750.00
2 $15,000.00$3,750.00
3 $12,000.00$3,000.00
4 $15,000.00$3,750.00
5 $15,000.00$3,750.00
Ref #186 632E64020 PEDESTAL FOUNDATION, (3 EACH)
Awd $3,750.00$1,250.00
2 $3,750.00$1,250.00
3 $2,700.00$900.00
4 $3,750.00$1,250.00
5 $3,750.00$1,250.00
150012 - Page 135
Ref #187 632E65200 LOOP DETECTOR LEAD-IN CABLE, (4928 FT)
Awd $8,131.20$1.65
2 $8,131.20$1.65
3 $6,899.20$1.40
4 $8,131.20$1.65
5 $8,131.20$1.65
Ref #188 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG, (83 FT)
Awd $190.90$2.30
2 $190.90$2.30
3 $290.50$3.50
4 $190.90$2.30
5 $190.90$2.30
Ref #189 632E70001 POWER SERVICE, AS PER PLAN, (2 EACH)
Awd $2,500.00$1,250.00
2 $2,500.00$1,250.00
3 $3,000.00$1,500.00
4 $2,500.00$1,250.00
5 $2,500.00$1,250.00
Ref #190 632E77231 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS, (3 EACH)
Awd $1,425.00$475.00
2 $1,425.00$475.00
3 $1,620.00$540.00
4 $1,425.00$475.00
5 $1,425.00$475.00
Ref #192 632E80629 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 14, AS PER P, (2 EACH)
Awd $23,630.00$11,815.00
2 $23,630.00$11,815.00
3 $34,000.00$17,000.00
4 $23,630.00$11,815.00
5 $23,630.00$11,815.00
Ref #193 632E80700 SIGNAL SUPPORT, MISC.: SUPPORT TC-12.30 DESG 9 POL, (1 EACH)
Awd $15,735.00$15,735.00
2 $15,735.00$15,735.00
3 $16,000.00$16,000.00
4 $15,735.00$15,735.00
5 $15,735.00$15,735.00
Ref #194 632E80700 SIGNAL SUPPORT, MISC.: SUPPORT TC-12.30 DESG 11 PO, (1 EACH)
Awd $16,700.00$16,700.00
2 $16,700.00$16,700.00
3 $17,400.00$17,400.00
4 $16,700.00$16,700.00
5 $16,700.00$16,700.00
Ref #195 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN, (3 EACH)
Awd $1,710.00$570.00
2 $1,710.00$570.00
3 $1,875.00$625.00
4 $1,710.00$570.00
5 $1,710.00$570.00
150012 - Page 136
Ref #196 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (2 EACH)
Awd $5,750.00$2,875.00
2 $5,750.00$2,875.00
3 $3,000.00$1,500.00
4 $5,750.00$2,875.00
5 $5,750.00$2,875.00
Ref #197 632E90212 REUSE OF CONTROLLER, (2 EACH)
Awd $5,080.00$2,540.00
2 $5,080.00$2,540.00
3 $250.00$125.00
4 $5,080.00$2,540.00
5 $5,080.00$2,540.00
Ref #198 632E90500 SIGNALIZATION, MISC.: REUSE OF SERVICE CABLE, (2 FT)
Awd $1,660.00$830.00
2 $1,660.00$830.00
3 $350.00$175.00
4 $1,660.00$830.00
5 $1,660.00$830.00
Ref #199 633E65520 CABINET, TYPE 332, (2 EACH)
Awd $12,760.00$6,380.00
2 $12,760.00$6,380.00
3 $16,000.00$8,000.00
4 $12,760.00$6,380.00
5 $12,760.00$6,380.00
Ref #200 633E67001 CABINET RISER, AS PER PLAN, (2 EACH)
Awd $1,150.00$575.00
2 $1,150.00$575.00
3 $1,400.00$700.00
4 $1,150.00$575.00
5 $1,150.00$575.00
Ref #201 633E67100 CABINET FOUNDATION, (2 EACH)
Awd $1,500.00$750.00
2 $1,500.00$750.00
3 $3,200.00$1,600.00
4 $1,500.00$750.00
5 $1,500.00$750.00
Ref #202 633E67200 CONTROLLER WORK PAD, (2 EACH)
Awd $900.00$450.00
2 $900.00$450.00
3 $950.00$475.00
4 $900.00$450.00
5 $900.00$450.00
Ref #203 633E69101 STOP BAR DETECTION RADAR, AS PER PLAN, (6 EACH)
Awd $37,350.00$6,225.00
2 $37,350.00$6,225.00
3 $34,200.00$5,700.00
4 $37,350.00$6,225.00
5 $37,350.00$6,225.00
150012 - Page 137
Ref #204 633E75000 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, (2 EACH)
Awd $9,720.00$4,860.00
2 $9,720.00$4,860.00
3 $9,100.00$4,550.00
4 $9,720.00$4,860.00
5 $9,720.00$4,860.00
Section 9 - TRAFFIC SIGNALS - Totals
Awd $269,090.25
2 $269,035.13
3 $269,583.20
4 $270,259.75
5 $270,259.75
Ref #205 614E12350 WORK ZONE IMPACT ATTENUATOR, (6 EACH)
Awd $13,200.00$2,200.00
2 $12,252.36$2,042.06
3 $23,700.00$3,950.00
4 $13,200.00$2,200.00
5 $13,200.00$2,200.00
Ref #206 614E13302 BARRIER REFLECTOR, TYPE B2, (76 EACH)
Awd $608.00$8.00
2 $762.28$10.03
3 $608.00$8.00
4 $608.00$8.00
5 $608.00$8.00
Ref #207 614E20000 WORK ZONE LANE LINE, CLASS I, (1.88 MILE)
Awd $611.00$325.00
2 $1,330.01$707.45
3 $611.00$325.00
4 $611.00$325.00
5 $611.00$325.00
Ref #208 614E21000 WORK ZONE CENTER LINE, CLASS I, (0.36 MILE)
Awd $210.60$585.00
2 $608.19$1,689.42
3 $210.60$585.00
4 $210.60$585.00
5 $210.60$585.00
Ref #209 614E22000 WORK ZONE EDGE LINE, CLASS I, (2.885 MILE)
Awd $1,269.40$440.00
2 $3,257.94$1,129.27
3 $1,269.40$440.00
4 $1,267.21$439.24
5 $1,269.40$440.00
Ref #210 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (8233 FT)
Awd $3,704.85$0.45
2 $8,726.98$1.06
3 $3,704.85$0.45
4 $3,704.85$0.45
5 $3,704.85$0.45
150012 - Page 138
Ref #211 614E26000 WORK ZONE STOP LINE, CLASS I, (742 FT)
Awd $1,484.00$2.00
2 $6,529.60$8.80
3 $1,484.00$2.00
4 $1,484.00$2.00
5 $1,484.00$2.00
Ref #212 614E30000 WORK ZONE ARROW, CLASS I, (79 EACH)
Awd $3,555.00$45.00
2 $13,556.40$171.60
3 $3,555.00$45.00
4 $3,555.00$45.00
5 $3,555.00$45.00
Ref #213 616E10000 WATER, (28 MGAL)
Awd $315.00$11.25
2 $2,114.84$75.53
3 $2,100.00$75.00
4 $356.16$12.72
5 $560.00$20.00
Ref #214 622E41000 PORTABLE BARRIER, 32", (3556 FT)
Awd $37,338.00$10.50
2 $59,705.24$16.79
3 $71,120.00$20.00
4 $50,210.72$14.12
5 $49,784.00$14.00
Section 10 - MAINTENANCE OF TRAFFIC - Totals
Awd $62,295.85
2 $108,843.84
3 $108,362.85
4 $75,207.54
5 $74,986.85
Ref #215 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $19,765.00$19,765.00
2 $8,809.09$8,809.09
3 $20,000.00$20,000.00
4 $16,688.37$16,688.37
5 $40,000.00$40,000.00
Ref #216 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $60,000.00$60,000.00
2 $63,501.30$63,501.30
3 $60,000.00$60,000.00
4 $47,919.31$47,919.31
5 $165,000.00$165,000.00
Ref #217 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $9,554.73$9,554.73
3 $30,000.00$30,000.00
4 $11,460.00$11,460.00
5 $28,000.00$28,000.00
150012 - Page 139
Ref #218 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
4 $109,810.07$109,810.07
5 $100,000.00$100,000.00
Section 11 - INCIDENTALS - Totals
Awd $199,765.00
2 $181,865.12
3 $210,000.00
4 $185,877.75
5 $333,000.00
150012 - Page 140
Project No. 150014
PID 97134
HAM-SR 562-0.65 Queue Detection
Federal
Type: SIGNING
Completion Date: 6/30/2015
Award Amount: $429,362.00
Contract Awarded To: COMPLETE GENERAL CONSTRUCTION COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $268,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 1
Bid $429,362.00
J RANCK ELECTRIC INC
1993 GOVER PARKWAY
MT PLEASANT, MI 48858
Bidder 2
Bid $435,622.50
DAVIS H ELLIOT CONSTRUCTION COMPANY INC
673 BLUE SKY PARKWAY
LEXINGTON, KY 40509
Bidder 3
Bid $461,500.00
CAPITAL ELECTRIC LINE BUILDERS INC
4400 NW MATTOX RD
RIVERSIDE, MO 64150
Bidder 4
Bid $579,842.59
MILLER CABLE COMPANY
210 S BROADWAY ST P O BOX 68
GREEN SPRINGS, OH 44836
Seneca
Bidder 5
Bid $645,500.00
150014 - Page 141
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $3,500.00$3,500.00
3 $3,400.00$3,400.00
4 $11,200.00$11,200.00
5 $18,500.00$18,500.00
Section 1 - ROADWAY - Totals
Awd $10,000.00
2 $3,500.00
3 $3,400.00
4 $11,200.00
5 $18,500.00
Ref #2 659E00300 TOPSOIL, (48 CY)
Awd $1,680.00$35.00
2 $1,680.00$35.00
3 $1,200.00$25.00
4 $1,612.80$33.60
5 $144.00$3.00
Ref #3 659E10000 SEEDING AND MULCHING, (433 SY)
Awd $2,165.00$5.00
2 $2,381.50$5.50
3 $3,464.00$8.00
4 $2,424.80$5.60
5 $1,732.00$4.00
Ref #4 659E20000 COMMERCIAL FERTILIZER, (0.06 TON)
Awd $30.00$500.00
2 $33.00$550.00
3 $30.00$500.00
4 $33.60$560.00
5 $6.00$100.00
Ref #5 659E35000 WATER, (2 MGAL)
Awd $2.00$1.00
2 $3.00$1.50
3 $200.00$100.00
4 $2.24$1.12
5 $2.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $3,877.00
2 $4,097.50
3 $4,894.00
4 $4,073.44
5 $1,884.00
Ref #6 202E98000 REMOVAL MISC.: REMOVAL AND DISPOSAL OF EXISTING QW, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $2,700.00$2,700.00
3 $20,500.00$20,500.00
4 $8,796.93$8,796.93
5 $1,000.00$1,000.00
150014 - Page 142
Ref #7 625E22900 NO. 1/0 AWG 5000 VOLT DISTRIBUTION CABLE, (3645 FT)
Awd $18,225.00$5.00
2 $16,402.50$4.50
3 $18,225.00$5.00
4 $19,245.60$5.28
5 $17,496.00$4.80
Ref #8 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, (1480 FT)
Awd $2,960.00$2.00
2 $2,590.00$1.75
3 $2,960.00$2.00
4 $4,588.00$3.10
5 $4,440.00$3.00
Ref #9 625E25410 CONDUIT, 2", 725.052, (1180 FT)
Awd $9,440.00$8.00
2 $3,540.00$3.00
3 $1,180.00$1.00
4 $4,814.40$4.08
5 $17,700.00$15.00
Ref #10 625E25606 CONDUIT, 4", 725.052, (1265 FT)
Awd $15,180.00$12.00
2 $9,487.50$7.50
3 $2,530.00$2.00
4 $8,184.55$6.47
5 $22,770.00$18.00
Ref #11 625E25900 CONDUIT, JACKED OR DRILLED, 2", 725.04, (30 FT)
Awd $900.00$30.00
2 $2,550.00$85.00
3 $600.00$20.00
4 $2,840.70$94.69
5 $2,100.00$70.00
Ref #12 625E29010 TRENCH, 30" DEEP, (1300 FT)
Awd $7,800.00$6.00
2 $6,500.00$5.00
3 $6,500.00$5.00
4 $15,028.00$11.56
5 $28,600.00$22.00
Ref #13 625E30700 PULL BOX, 725.08, 18", (5 EACH)
Awd $4,125.00$825.00
2 $4,375.00$875.00
3 $5,000.00$1,000.00
4 $3,879.25$775.85
5 $5,000.00$1,000.00
Ref #14 625E30711 PULL BOX, 725.08, 32", AS PER PLAN, (6 EACH)
Awd $10,200.00$1,700.00
2 $13,200.00$2,200.00
3 $4,800.00$800.00
4 $11,998.14$1,999.69
5 $15,000.00$2,500.00
150014 - Page 143
Ref #15 631E95000 SIGN LIGHTING MISC.: QUEUE WARNING SYSTEM, (LUMP SUM)
Awd $86,000.00$86,000.00
2 $105,000.00$105,000.00
3 $128,099.00$128,099.00
4 $165,064.05$165,064.05
5 $170,000.00$170,000.00
Ref #16 632E62810 INTERCONNECT CABLE, MISC.: CAT 5E CABLE, OUTDOOR R, (1520 FT)
Awd $3,800.00$2.50
2 $1,520.00$1.00
3 $3,040.00$2.00
4 $3,860.80$2.54
5 $3,040.00$2.00
Ref #17 632E70001 POWER SERVICE, AS PER PLAN A, (3 EACH)
Awd $9,000.00$3,000.00
2 $8,400.00$2,800.00
3 $7,500.00$2,500.00
4 $11,637.69$3,879.23
5 $18,000.00$6,000.00
Ref #18 632E70001 POWER SERVICE, AS PER PLAN B, (7 EACH)
Awd $56,000.00$8,000.00
2 $39,900.00$5,700.00
3 $21,000.00$3,000.00
4 $40,311.39$5,758.77
5 $42,000.00$6,000.00
Ref #19 632E70601 CONDUIT RISER, 3" DIAMETER, AS PER PLAN, (5 EACH)
Awd $6,250.00$1,250.00
2 $8,500.00$1,700.00
3 $3,750.00$750.00
4 $4,698.85$939.77
5 $5,000.00$1,000.00
Ref #20 632E89301 WOOD POLE, AS PER PLAN, (1 EACH)
Awd $1,125.00$1,125.00
2 $900.00$900.00
3 $1,000.00$1,000.00
4 $3,983.08$3,983.08
5 $3,500.00$3,500.00
Ref #21 632E90400 SIGNALIZATION, MISC.: INSTALLATION OF WIRELESS BRI, (6 EACH)
Awd $3,600.00$600.00
2 $5,250.00$875.00
3 $3,000.00$500.00
4 $6,622.14$1,103.69
5 $13,200.00$2,200.00
Ref #22 633E67100 CABINET FOUNDATION, (3 EACH)
Awd $6,900.00$2,300.00
2 $6,450.00$2,150.00
3 $4,500.00$1,500.00
4 $3,983.07$1,327.69
5 $6,600.00$2,200.00
150014 - Page 144
Ref #23 804E15010 FIBER OPTIC CABLE, 24 FIBER, (1820 FT)
Awd $7,280.00$4.00
2 $5,460.00$3.00
3 $3,640.00$2.00
4 $7,625.80$4.19
5 $12,740.00$7.00
Ref #24 804E34023 TERMINATION PANEL, 24 FIBER, AS PER PLAN, (2 EACH)
Awd $2,000.00$1,000.00
2 $3,600.00$1,800.00
3 $5,000.00$2,500.00
4 $1,559.84$779.92
5 $3,000.00$1,500.00
Ref #25 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE, (3 EACH)
Awd $30,000.00$10,000.00
2 $30,000.00$10,000.00
3 $27,000.00$9,000.00
4 $26,806.62$8,935.54
5 $25,500.00$8,500.00
Ref #26 809E63010 DYNAMIC MESSAGE SIGN (DMS), FRONT-ACCESS, (2 EACH)
Awd $88,000.00$44,000.00
2 $80,000.00$40,000.00
3 $112,182.00$56,091.00
4 $96,637.54$48,318.77
5 $107,470.00$53,735.00
Ref #27 809E65000 ITS CABINET - GROUND MOUNTED, (3 EACH)
Awd $19,500.00$6,500.00
2 $19,500.00$6,500.00
3 $31,500.00$10,500.00
4 $33,416.55$11,138.85
5 $25,500.00$8,500.00
Section 3 - TRAFFIC SURVEILLANCE - Totals
Awd $393,285.00
2 $375,825.00
3 $413,506.00
4 $485,582.99
5 $549,656.00
Ref #28 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (60 HOUR)
Awd $3,900.00$65.00
2 $3,600.00$60.00
3 $3,000.00$50.00
4 $4,032.00$67.20
5 $6,000.00$100.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,900.00
2 $3,600.00
3 $3,000.00
4 $4,032.00
5 $6,000.00
150014 - Page 145
Ref #29 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $10,000.00$10,000.00
3 $3,200.00$3,200.00
4 $3,920.00$3,920.00
5 $5,180.00$5,180.00
Ref #30 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $25,000.00$25,000.00
3 $7,500.00$7,500.00
4 $53,596.93$53,596.93
5 $32,680.00$32,680.00
Ref #31 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,800.00$1,800.00
2 $3,600.00$3,600.00
3 $5,000.00$5,000.00
4 $6,479.69$6,479.69
5 $11,600.00$11,600.00
Ref #32 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $10,000.00$10,000.00
3 $21,000.00$21,000.00
4 $10,957.54$10,957.54
5 $20,000.00$20,000.00
Section 5 - INCIDENTALS - Totals
Awd $18,300.00
2 $48,600.00
3 $36,700.00
4 $74,954.16
5 $69,460.00
150014 - Page 146
Project No. 150015
PID 87307
JEF-SR 213-9.700
Federal
Type: TWO LANE RESURFACING
Completion Date: 6/30/2015
Award Amount: $1,205,846.25
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/15/2015
Engineer's Estimate: $1,251,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $1,205,846.25
THE LASH PAVING COMPANY
70700 SWINGLE RD
BRIDGEPORT, OH 43912
Belmont
Bidder 2
Bid $1,399,170.55
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 3
Bid $1,508,351.95
R T VERNAL PAVING CO INC
11299 SOUTH AVE EXTENSION PO BOX 519
NORTH LIMA, OH 44452-0519
Bidder 4
Bid $1,545,109.88
150015 - Page 147
Ref #1 202E23500 WEARING COURSE REMOVED, (1559 SY)
Awd $6,236.00$4.00
2 $9,354.00$6.00
3 $6,236.00$4.00
4 $9,354.00$6.00
Ref #2 202E98100 REMOVAL MISC.: 2'X2' SQUARE STACKED LANDSCAPE TIMB, (1 EACH)
Awd $500.00$500.00
2 $300.00$300.00
3 $310.00$310.00
4 $200.00$200.00
Ref #3 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (10.2 MILE)
Awd $9,690.00$950.00
2 $8,160.00$800.00
3 $10,200.00$1,000.00
4 $12,036.00$1,180.00
Ref #4 690E50000 SPECIAL - MAILBOX SUPPORT, (1 EACH)
Awd $500.00$500.00
2 $175.00$175.00
3 $250.00$250.00
4 $500.00$500.00
Section 1 - ROADWAY - Totals
Awd $16,926.00
2 $17,989.00
3 $16,996.00
4 $22,090.00
Ref #5 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
Ref #6 605E31100 AGGREGATE DRAINS, (936 FT)
Awd $7,488.00$8.00
2 $6,552.00$7.00
3 $4,680.00$5.00
4 $5,616.00$6.00
Section 3 - DRAINAGE - Totals
Awd $7,488.00
2 $6,552.00
3 $4,680.00
4 $5,616.00
150015 - Page 148
Ref #7 251E01010 PARTIAL DEPTH PAVEMENT REPAIR, (156 CY)
Awd $42,900.00$275.00
2 $51,480.00$330.00
3 $40,560.00$260.00
4 $54,600.00$350.00
Ref #8 253E02000 PAVEMENT REPAIR, (468 CY)
Awd $112,320.00$240.00
2 $156,780.00$335.00
3 $93,600.00$200.00
4 $140,400.00$300.00
Ref #9 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (2724 SY)
Awd $5,448.00$2.00
2 $10,896.00$4.00
3 $10,896.00$4.00
4 $16,344.00$6.00
Ref #10 407E10000 TACK COAT, (5861 GAL)
Awd $11,722.00$2.00
2 $11,722.00$2.00
3 $14,652.50$2.50
4 $14,652.50$2.50
Ref #11 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (3123 GAL)
Awd $6,246.00$2.00
2 $6,246.00$2.00
3 $7,807.50$2.50
4 $7,807.50$2.50
Ref #12 408E10001 PRIME COAT, AS PER PLAN, (4788 GAL)
Awd $14,364.00$3.00
2 $14,364.00$3.00
3 $26,334.00$5.50
4 $16,758.00$3.50
Ref #13 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS, (2788 CY)
Awd $471,172.00$169.00
2 $515,780.00$185.00
3 $529,720.00$190.00
4 $557,600.00$200.00
Ref #14 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (2167 CY)
Awd $325,050.00$150.00
2 $346,720.00$160.00
3 $487,575.00$225.00
4 $368,390.00$170.00
Ref #15 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (52 CY)
Awd $13,000.00$250.00
2 $15,080.00$290.00
3 $28,340.00$545.00
4 $15,600.00$300.00
Ref #16 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (747 CY)
Awd $33,615.00$45.00
2 $44,820.00$60.00
3 $59,760.00$80.00
4 $67,230.00$90.00
150015 - Page 149
Ref #17 617E20000 SHOULDER PREPARATION, (11967 SY)
Awd $2,991.75$0.25
2 $2,991.75$0.25
3 $11,967.00$1.00
4 $11,967.00$1.00
Section 4 - PAVEMENT - Totals
Awd $1,038,828.75
2 $1,176,879.75
3 $1,311,212.00
4 $1,271,349.00
Ref #18 621E00100 RPM, (687 EACH)
Awd $12,366.00$18.00
2 $15,457.50$22.50
3 $15,629.25$22.75
4 $17,175.00$25.00
Ref #19 621E54000 RAISED PAVEMENT MARKER REMOVED, (687 EACH)
Awd $5,152.50$7.50
2 $4,465.50$6.50
3 $4,809.00$7.00
4 $3,435.00$5.00
Ref #20 646E10000 EDGE LINE, 4", (10.4 MILE)
Awd $24,960.00$2,400.00
2 $23,920.00$2,300.00
3 $23,712.00$2,280.00
4 $26,083.20$2,508.00
Ref #21 646E10200 CENTER LINE, (5.2 MILE)
Awd $17,680.00$3,400.00
2 $8,840.00$1,700.00
3 $16,276.00$3,130.00
4 $17,903.60$3,443.00
Ref #22 646E10400 STOP LINE, (25 FT)
Awd $375.00$15.00
2 $375.00$15.00
3 $375.00$15.00
4 $412.50$16.50
Ref #23 646E20110 SCHOOL SYMBOL MARKING, 96", (1 EACH)
Awd $750.00$750.00
2 $750.00$750.00
3 $500.00$500.00
4 $550.00$550.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $61,283.50
2 $53,808.00
3 $61,301.25
4 $65,559.30
150015 - Page 150
Ref #24 614E12460 WORK ZONE MARKING SIGN, (30 EACH)
Awd $2,250.00$75.00
2 $3,600.00$120.00
3 $1,902.90$63.43
4 $3,795.00$126.50
Ref #25 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (10.58 MILE)
Awd $7,406.00$700.00
2 $6,877.00$650.00
3 $3,491.40$330.00
4 $3,840.54$363.00
Ref #26 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (10.58 MILE)
Awd $8,464.00$800.00
2 $11,214.80$1,060.00
3 $6,136.40$580.00
4 $6,750.04$638.00
Ref #27 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (50 FT)
Awd $1,500.00$30.00
2 $250.00$5.00
3 $100.00$2.00
4 $110.00$2.20
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $19,620.00
2 $21,941.80
3 $11,630.70
4 $14,495.58
Ref #28 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,700.00$5,700.00
2 $6,000.00$6,000.00
3 $25,000.00$25,000.00
4 $15,000.00$15,000.00
Ref #29 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $75,000.00$75,000.00
3 $36,532.00$36,532.00
4 $75,000.00$75,000.00
Ref #30 624E10000 MOBILIZATION, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $75,000.00$75,000.00
Section 7 - INCIDENTALS - Totals
Awd $60,700.00
2 $121,000.00
3 $101,532.00
4 $165,000.00
150015 - Page 151
Project No. 150016
PID 84542
MOE-SR 26-14.680
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/1/2015
Award Amount: $1,734,643.50
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/15/2015
Engineer's Estimate: $1,856,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $1,734,643.50
THE LASH PAVING COMPANY
70700 SWINGLE RD
BRIDGEPORT, OH 43912
Belmont
Bidder 2
Bid $2,310,332.25
150016 - Page 152
Ref #1 202E30000 WALK REMOVED, (530 SF)
Awd $2,385.00$4.50
2 $6,492.50$12.25
Ref #2 202E32000 CURB REMOVED, (25 FT)
Awd $337.50$13.50
2 $968.75$38.75
Ref #3 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (22.14 MILE)
Awd $21,033.00$950.00
2 $15,498.00$700.00
Ref #4 608E10000 4" CONCRETE WALK, (330 SF)
Awd $2,310.00$7.00
2 $5,362.50$16.25
Ref #5 608E52000 CURB RAMP, (200 SF)
Awd $3,000.00$15.00
2 $4,800.00$24.00
Ref #6 608E53020 DETECTABLE WARNING, (64 SF)
Awd $1,408.00$22.00
2 $2,464.00$38.50
Section 1 - ROADWAY - Totals
Awd $30,473.50
2 $35,585.75
Ref #7 253E02000 PAVEMENT REPAIR, (750 CY)
Awd $187,500.00$250.00
2 $262,500.00$350.00
Ref #8 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (158057 SY)
Awd $189,668.40$1.20
2 $197,571.25$1.25
Ref #9 254E01600 PATCHING PLANED SURFACE, (50 SY)
Awd $2,500.00$50.00
2 $1,050.00$21.00
Ref #10 407E10000 TACK COAT, (13108 GAL)
Awd $26,216.00$2.00
2 $26,216.00$2.00
Ref #11 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (7972 CY)
Awd $1,116,080.00$140.00
2 $1,434,960.00$180.00
Ref #12 617E10100 COMPACTED AGGREGATE, (1087 CY)
Awd $47,828.00$44.00
2 $54,350.00$50.00
Section 2 - PAVEMENT - Totals
Awd $1,569,792.40
2 $1,976,647.25
Ref #13 621E00100 RPM, (1317 EACH)
Awd $23,706.00$18.00
2 $29,632.50$22.50
150016 - Page 153
Ref #14 621E54000 RAISED PAVEMENT MARKER REMOVED, (1317 EACH)
Awd $6,585.00$5.00
2 $7,902.00$6.00
Ref #15 642E00090 EDGE LINE, 4", (22.14 MILE)
Awd $9,741.60$440.00
2 $9,298.80$420.00
Ref #16 642E00190 LANE LINE, 4", (0.43 MILE)
Awd $279.50$650.00
2 $268.75$625.00
Ref #17 642E00290 CENTER LINE, (11.54 MILE)
Awd $9,232.00$800.00
2 $9,001.20$780.00
Ref #18 644E00500 STOP LINE, (384 FT)
Awd $4,224.00$11.00
2 $4,224.00$11.00
Ref #100 644E00400 CHANNELIZING LINE, 8", (120 FT)
Awd $840.00$7.00
2 $840.00$7.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $54,608.10
2 $61,167.25
Ref #19 614E12460 WORK ZONE MARKING SIGN, (82 EACH)
Awd $4,100.00$50.00
2 $8,610.00$105.00
Ref #20 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (0.86 MILE)
Awd $731.00$850.00
2 $860.00$1,000.00
Ref #21 614E20500 WORK ZONE LANE LINE, CLASS II, 642 PAINT, (0.86 MILE)
Awd $731.00$850.00
2 $1,032.00$1,200.00
Ref #22 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (21.35 MILE)
Awd $18,147.50$850.00
2 $25,620.00$1,200.00
Ref #23 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (21.35 MILE)
Awd $12,810.00$600.00
2 $12,810.00$600.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $36,519.50
2 $48,932.00
Ref #24 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,250.00$4,250.00
2 $10,000.00$10,000.00
Ref #25 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $28,000.00$28,000.00
2 $75,000.00$75,000.00
150016 - Page 154
Ref #26 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,000.00$3,000.00
Ref #27 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $100,000.00$100,000.00
Section 5 - INCIDENTALS - Totals
Awd $43,250.00
2 $188,000.00
150016 - Page 155
Project No. 150017
PID 94598
MOE-SR 800-5.97
Federal
Type: SLIDE REPAIR
Completion Date: 10/31/2015
Award Amount: $725,541.13
Contract Awarded To: R F SCURLOCK CO
Letting Date: 1/15/2015
Engineer's Estimate: $706,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
R F SCURLOCK CO
3220 FIFTH STREET P O BOX 308
TRINWAY, OH 43842-0335
Bidder 1
Bid $725,541.13
TRUCCO CONSTRUCTION CO INC
3531 AIRPORT RD
DELAWARE, OH 43015
Delaware
Bidder 2
Bid $1,067,556.08
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $1,115,035.05
TRITON CONSTRUCTION INC
P O BOX 908
NITRO, WV 25143
Bidder 4
Bid $1,192,000.00
150017 - Page 156
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $18,250.00$18,250.00
3 $136,500.00$136,500.00
4 $159,371.94$159,371.94
Ref #2 202E75000 FENCE REMOVED, (669 FT)
Awd $976.74$1.46
2 $1,070.40$1.60
3 $1,471.80$2.20
4 $1,070.40$1.60
Ref #3 202E98200 REMOVAL MISC.: EXISTING GAS LINE, (727 FT)
Awd $974.18$1.34
2 $3,998.50$5.50
3 $4,725.50$6.50
4 $3,635.00$5.00
Ref #4 203E10000 EXCAVATION, (23640 CY)
Awd $301,173.60$12.74
2 $673,740.00$28.50
3 $567,360.00$24.00
4 $591,000.00$25.00
Ref #5 203E20000 EMBANKMENT, (24 CY)
Awd $319.68$13.32
2 $3,960.00$165.00
3 $864.00$36.00
4 $120.00$5.00
Ref #6 208E10000 PRE-BLAST CONDITION SURVEY, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $2,200.00$2,200.00
3 $2,500.00$2,500.00
4 $2,235.00$2,235.00
Ref #7 208E12000 BLASTING CONSULTANT, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $2,500.00$2,500.00
3 $5,500.00$5,500.00
4 $600.00$600.00
Ref #8 208E13000 AIR BLAST AND NOISE CONTROL, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $750.00$750.00
3 $3,200.00$3,200.00
4 $1,200.00$1,200.00
Ref #9 208E14000 VIBRATION CONTROL AND MONITORING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $750.00$750.00
3 $3,200.00$3,200.00
4 $1,200.00$1,200.00
Ref #10 208E15000 PRESPLITTING, (970 SY)
Awd $29,526.80$30.44
2 $15,520.00$16.00
3 $33,950.00$35.00
4 $29,100.00$30.00
150017 - Page 157
Ref #11 208E16000 HYDROLOGIST, (LUMP SUM)
Awd $16,000.00$16,000.00
2 $11,000.00$11,000.00
3 $20,000.00$20,000.00
4 $11,000.00$11,000.00
Ref #12 607E15000 FENCE, TYPE 47, (1006 FT)
Awd $17,091.94$16.99
2 $16,699.60$16.60
3 $8,048.00$8.00
4 $16,699.60$16.60
Ref #100 623E12000 PRIMARY PROJECT CONTROL MONUMENT, TYPE A, (6 EACH)
Awd $1,200.00$200.00
2 $2,100.00$350.00
3 $4,800.00$800.00
4 $816.36$136.06
Section 1 - ROADWAY - Totals
Awd $407,762.94
2 $752,538.50
3 $792,119.30
4 $818,048.30
Ref #13 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (109 CY)
Awd $7,013.06$64.34
2 $13,625.00$125.00
3 $5,450.00$50.00
4 $15,478.00$142.00
Ref #14 659E10001 SEEDING AND MULCHING, AS PER PLAN, (13533 SY)
Awd $10,149.75$0.75
2 $9,879.09$0.73
3 $10,149.75$0.75
4 $6,766.50$0.50
Ref #15 659E20000 COMMERCIAL FERTILIZER, (1.8 TON)
Awd $990.00$550.00
2 $585.00$325.00
3 $1,008.00$560.00
4 $1,710.00$950.00
Ref #16 659E31000 LIME, (2.8 ACRE)
Awd $434.00$155.00
2 $84.00$30.00
3 $448.00$160.00
4 $1,708.00$610.00
Ref #17 659E35000 WATER, (73 MGAL)
Awd $73.00$1.00
2 $73.00$1.00
3 $73.00$1.00
4 $1,095.00$15.00
Ref #18 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $6,275.00$6,275.00
2 $7,500.00$7,500.00
3 $4,000.00$4,000.00
4 $10,000.00$10,000.00
150017 - Page 158
Ref #19 832E30000 EROSION CONTROL, (9000 EACH)
Awd $9,000.00$1.00
2 $9,000.00$1.00
3 $9,000.00$1.00
4 $9,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $33,934.81
2 $40,746.09
3 $30,128.75
4 $45,757.50
Ref #20 407E10000 TACK COAT, (468 GAL)
Awd $1,170.00$2.50
2 $1,170.00$2.50
3 $1,170.00$2.50
4 $1,170.00$2.50
Ref #21 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (278 CY)
Awd $68,944.00$248.00
2 $54,210.00$195.00
3 $54,210.00$195.00
4 $54,210.00$195.00
Ref #22 617E10100 COMPACTED AGGREGATE, (51 CY)
Awd $5,543.19$108.69
2 $7,650.00$150.00
3 $3,825.00$75.00
4 $6,120.00$120.00
Section 3 - PAVEMENT - Totals
Awd $75,657.19
2 $63,030.00
3 $59,205.00
4 $61,500.00
Ref #23 621E00100 RPM, (69 EACH)
Awd $2,853.15$41.35
2 $2,853.15$41.35
3 $1,725.00$25.00
4 $3,864.00$56.00
Ref #24 621E54000 RAISED PAVEMENT MARKER REMOVED, (69 EACH)
Awd $486.45$7.05
2 $1,725.00$25.00
3 $552.00$8.00
4 $1,725.00$25.00
Ref #25 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $50.00$50.00
2 $50.00$50.00
3 $200.00$200.00
4 $245.00$245.00
150017 - Page 159
Ref #26 642E00090 EDGE LINE, 4", (1.1 MILE)
Awd $852.50$775.00
2 $852.50$775.00
3 $770.00$700.00
4 $3,520.00$3,200.00
Ref #27 642E00290 CENTER LINE, (0.54 MILE)
Awd $1,080.00$2,000.00
2 $1,080.00$2,000.00
3 $756.00$1,400.00
4 $2,700.00$5,000.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $5,322.10
2 $6,560.65
3 $4,003.00
4 $12,054.00
Ref #28 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (6 EACH)
Awd $11,400.00$1,900.00
2 $11,400.00$1,900.00
3 $12,000.00$2,000.00
4 $10,950.00$1,825.00
Ref #29 614E12740 WORK ZONE LIGHTING SYSTEM, (3 EACH)
Awd $20,000.01$6,666.67
2 $40,500.00$13,500.00
3 $60,000.00$20,000.00
4 $30,000.00$10,000.00
Ref #30 614E13302 BARRIER REFLECTOR, TYPE B2, (33 EACH)
Awd $181.50$5.50
2 $181.50$5.50
3 $330.00$10.00
4 $264.00$8.00
Ref #31 614E13360 OBJECT MARKER, TWO WAY, (33 EACH)
Awd $396.00$12.00
2 $396.00$12.00
3 $429.00$13.00
4 $495.00$15.00
Ref #32 614E22000 WORK ZONE EDGE LINE, CLASS I, (0.24 MILE)
Awd $7,200.00$30,000.00
2 $7,200.00$30,000.00
3 $1,680.00$7,000.00
4 $4,064.40$16,935.00
Ref #33 614E22001 WORK ZONE EDGE LINE, CLASS I, AS PER PLAN, (0.11 MILE)
Awd $550.00$5,000.00
2 $550.00$5,000.00
3 $660.00$6,000.00
4 $646.80$5,880.00
Ref #34 614E26000 WORK ZONE STOP LINE, CLASS I, (72 FT)
Awd $432.00$6.00
2 $432.00$6.00
3 $1,080.00$15.00
4 $720.00$10.00
150017 - Page 160
Ref #35 622E41000 PORTABLE BARRIER, 32", (1600 FT)
Awd $31,664.00$19.79
2 $41,616.00$26.01
3 $22,400.00$14.00
4 $40,000.00$25.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $71,823.51
2 $102,275.50
3 $98,579.00
4 $87,140.20
Ref #36 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $14,804.58$14,804.58
2 $7,405.34$7,405.34
3 $6,000.00$6,000.00
4 $12,500.00$12,500.00
Ref #37 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $35,000.00$35,000.00
3 $60,000.00$60,000.00
4 $80,000.00$80,000.00
Ref #38 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $12,200.00$12,200.00
2 $20,000.00$20,000.00
3 $25,000.00$25,000.00
4 $35,000.00$35,000.00
Ref #39 624E10000 MOBILIZATION, (LUMP SUM)
Awd $96,036.00$96,036.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $40,000.00$40,000.00
Section 6 - INCIDENTALS - Totals
Awd $131,040.58
2 $102,405.34
3 $131,000.00
4 $167,500.00
150017 - Page 161
Project No. 150018
PID 84333
MRG-SR 78-30.62
Federal
Type: TWO LANE RESURFACING
Completion Date: 8/1/2015
Award Amount: $735,836.60
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/15/2015
Engineer's Estimate: $862,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $735,836.60
THE LASH PAVING COMPANY
70700 SWINGLE RD
BRIDGEPORT, OH 43912
Belmont
Bidder 2
Bid $960,812.00
150018 - Page 162
Ref #1 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (12.42 MILE)
Awd $9,315.00$750.00
2 $7,452.00$600.00
Section 1 - ROADWAY - Totals
Awd $9,315.00
2 $7,452.00
Ref #2 253E02000 PAVEMENT REPAIR, (100 CY)
Awd $27,500.00$275.00
2 $35,000.00$350.00
Ref #3 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (84494 SY)
Awd $76,044.60$0.90
2 $92,943.40$1.10
Ref #4 254E01600 PATCHING PLANED SURFACE, (50 SY)
Awd $100.00$2.00
2 $1,250.00$25.00
Ref #5 407E10000 TACK COAT, (6075 GAL)
Awd $12,757.50$2.10
2 $12,150.00$2.00
Ref #6 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (3707 CY)
Awd $481,910.00$130.00
2 $667,260.00$180.00
Ref #7 617E10100 COMPACTED AGGREGATE, (607 CY)
Awd $36,420.00$60.00
2 $30,350.00$50.00
Section 2 - PAVEMENT - Totals
Awd $634,732.10
2 $838,953.40
Ref #8 621E00100 RPM, (765 EACH)
Awd $14,535.00$19.00
2 $16,447.50$21.50
Ref #9 621E54000 RAISED PAVEMENT MARKER REMOVED, (765 EACH)
Awd $4,590.00$6.00
2 $3,825.00$5.00
Ref #10 642E00090 EDGE LINE, 4", (12.42 MILE)
Awd $5,899.50$475.00
2 $5,775.30$465.00
Ref #11 642E00290 CENTER LINE, (6.21 MILE)
Awd $5,402.70$870.00
2 $5,775.30$930.00
Ref #12 644E00500 STOP LINE, (84 FT)
Awd $672.00$8.00
2 $546.00$6.50
150018 - Page 163
Section 3 - TRAFFIC CONTROL - Totals
Awd $31,099.20
2 $32,369.10
Ref #13 614E12460 WORK ZONE MARKING SIGN, (22 EACH)
Awd $2,750.00$125.00
2 $2,750.00$125.00
Ref #14 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (12.42 MILE)
Awd $12,916.80$1,040.00
2 $16,456.50$1,325.00
Ref #15 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (12.42 MILE)
Awd $2,173.50$175.00
2 $6,831.00$550.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $17,840.30
2 $26,037.50
Ref #16 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,950.00$2,950.00
2 $4,000.00$4,000.00
Ref #17 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $28,000.00$28,000.00
2 $29,500.00$29,500.00
Ref #18 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $1,900.00$1,900.00
2 $2,500.00$2,500.00
Ref #19 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $20,000.00$20,000.00
Section 5 - INCIDENTALS - Totals
Awd $42,850.00
2 $56,000.00
150018 - Page 164
Project No. 150019
PID 86294
MRW-US 42-21.23
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 10/1/2015
Award Amount: $689,494.78
Contract Awarded To: R & I CONSTRUCTION INC
Letting Date: 1/15/2015
Engineer's Estimate: $709,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
R & I CONSTRUCTION INC
2931 STATE ROUTE 67 SOUTH
TIFFIN, OH 44883
Seneca
Bidder 1
Bid $689,494.78
EAGLE BRIDGE CO
800 S VAN DEMARK RD
SIDNEY, OH 45365
Shelby
Bidder 2
Bid $696,214.64
ARMSTRONG STEEL ERECTORS INC
50 SOUTH FOURTH ST P O BOX 577
NEWARK, OH 43058
Licking
Bidder 3
Bid $726,171.98
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 4
Bid $765,710.75
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 5
Bid $769,880.42
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 6
Bid $824,417.50
150019 - Page 165
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,500.00$2,500.00
3 $5,500.00$5,500.00
4 $2,900.00$2,900.00
5 $4,000.00$4,000.00
6 $10,000.00$10,000.00
Ref #2 202E23001 PAVEMENT REMOVED, AS PER PLAN, (1048 SY)
Awd $7,336.00$7.00
2 $14,672.00$14.00
3 $10,480.00$10.00
4 $18,340.00$17.50
5 $8,384.00$8.00
6 $9,432.00$9.00
Ref #3 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (467.5 FT)
Awd $467.50$1.00
2 $935.00$2.00
3 $701.25$1.50
4 $1,402.50$3.00
5 $935.00$2.00
6 $561.00$1.20
Ref #4 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN, (3 EACH)
Awd $150.00$50.00
2 $751.74$250.58
3 $600.00$200.00
4 $990.00$330.00
5 $699.00$233.00
6 $600.00$200.00
Ref #5 202E42041 ANCHOR ASSEMBLY REMOVED, TYPE T, AS PER PLAN, (1 EACH)
Awd $50.00$50.00
2 $250.58$250.58
3 $100.00$100.00
4 $350.00$350.00
5 $90.00$90.00
6 $65.00$65.00
Ref #6 202E47001 BRIDGE TERMINAL ASSEMBLY REMOVED, AS PER PLAN, (4 EACH)
Awd $200.00$50.00
2 $400.92$100.23
3 $300.00$75.00
4 $580.00$145.00
5 $320.00$80.00
6 $220.00$55.00
Ref #7 203E10000 EXCAVATION, (114 CY)
Awd $1,140.00$10.00
2 $3,420.00$30.00
3 $1,254.00$11.00
4 $3,078.00$27.00
5 $1,710.00$15.00
6 $3,420.00$30.00
150019 - Page 166
Ref #8 203E20000 EMBANKMENT, (363 CY)
Awd $4,356.00$12.00
2 $5,445.00$15.00
3 $5,989.50$16.50
4 $4,537.50$12.50
5 $2,904.00$8.00
6 $7,260.00$20.00
Ref #9 204E10000 SUBGRADE COMPACTION, (1446 SY)
Awd $1,446.00$1.00
2 $2,892.00$2.00
3 $5,784.00$4.00
4 $1,446.00$1.00
5 $5,784.00$4.00
6 $4,338.00$3.00
Ref #10 204E45000 PROOF ROLLING, (1 HOUR)
Awd $25.00$25.00
2 $150.00$150.00
3 $1,500.00$1,500.00
4 $300.00$300.00
5 $190.00$190.00
6 $225.00$225.00
Ref #11 606E15050 GUARDRAIL, TYPE MGS, (317.5 FT)
Awd $4,651.38$14.65
2 $4,660.90$14.68
3 $4,651.38$14.65
4 $4,921.25$15.50
5 $4,921.25$15.50
6 $5,080.00$16.00
Ref #12 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (3 EACH)
Awd $5,520.00$1,840.00
2 $5,532.69$1,844.23
3 $5,520.00$1,840.00
4 $5,907.00$1,969.00
5 $6,000.00$2,000.00
6 $5,505.00$1,835.00
Ref #13 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (1 EACH)
Awd $625.00$625.00
2 $626.44$626.44
3 $625.00$625.00
4 $669.00$669.00
5 $660.00$660.00
6 $785.00$785.00
Ref #14 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $7,360.00$1,840.00
2 $7,376.92$1,844.23
3 $7,360.00$1,840.00
4 $7,876.00$1,969.00
5 $7,800.00$1,950.00
6 $7,780.00$1,945.00
150019 - Page 167
Section 1 - ROADWAY - Totals
Awd $34,326.88
2 $49,614.19
3 $50,365.13
4 $53,297.25
5 $44,397.25
6 $55,271.00
Ref #15 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (1 CY)
Awd $60.00$60.00
2 $100.00$100.00
3 $150.00$150.00
4 $300.00$300.00
5 $165.00$165.00
6 $200.00$200.00
Ref #16 659E00300 TOPSOIL, (278 CY)
Awd $2,780.00$10.00
2 $2,780.00$10.00
3 $6,255.00$22.50
4 $7,784.00$28.00
5 $4,170.00$15.00
6 $5,560.00$20.00
Ref #17 659E10000 SEEDING AND MULCHING, (2472 SY)
Awd $3,090.00$1.25
2 $4,944.00$2.00
3 $4,078.80$1.65
4 $4,326.00$1.75
5 $2,101.20$0.85
6 $3,460.80$1.40
Ref #18 659E14000 REPAIR SEEDING AND MULCHING, (124 SY)
Awd $12.40$0.10
2 $31.00$0.25
3 $49.60$0.40
4 $217.00$1.75
5 $31.00$0.25
6 $49.60$0.40
Ref #19 659E15000 INTER-SEEDING, (124 SY)
Awd $12.40$0.10
2 $31.00$0.25
3 $12.40$0.10
4 $21,700.00$175.00
5 $31.00$0.25
6 $12.40$0.10
Ref #20 659E20000 COMMERCIAL FERTILIZER, (0.33 TON)
Awd $198.00$600.00
2 $247.50$750.00
3 $105.60$320.00
4 $214.50$650.00
5 $181.50$550.00
6 $105.60$320.00
150019 - Page 168
Ref #21 659E31000 LIME, (0.51 ACRE)
Awd $5.10$10.00
2 $5.10$10.00
3 $30.60$60.00
4 $51.00$100.00
5 $82.62$162.00
6 $30.60$60.00
Ref #22 659E35000 WATER, (13 MGAL)
Awd $13.00$1.00
2 $13.00$1.00
3 $13.00$1.00
4 $208.00$16.00
5 $13.00$1.00
6 $13.00$1.00
Ref #23 832E30000 EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
4 $5,000.00$1.00
5 $5,000.00$1.00
6 $5,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $11,170.90
2 $13,151.60
3 $15,695.00
4 $39,800.50
5 $11,775.32
6 $14,432.00
Ref #24 605E31100 AGGREGATE DRAINS, (150 FT)
Awd $1,200.00$8.00
2 $1,200.00$8.00
3 $1,875.00$12.50
4 $1,950.00$13.00
5 $1,950.00$13.00
6 $3,000.00$20.00
Ref #25 611E00100 4" CONDUIT, TYPE B, (45 FT)
Awd $360.00$8.00
2 $270.00$6.00
3 $675.00$15.00
4 $450.00$10.00
5 $810.00$18.00
6 $180.00$4.00
Ref #26 611E01100 6" CONDUIT, TYPE C, (25 FT)
Awd $200.00$8.00
2 $175.00$7.00
3 $325.00$13.00
4 $250.00$10.00
5 $350.00$14.00
6 $150.00$6.00
150019 - Page 169
Ref #27 611E01400 6" CONDUIT, TYPE E, (20 FT)
Awd $160.00$8.00
2 $140.00$7.00
3 $140.00$7.00
4 $200.00$10.00
5 $340.00$17.00
6 $120.00$6.00
Ref #28 611E02500 8" CONDUIT, TYPE E, (25 FT)
Awd $250.00$10.00
2 $200.00$8.00
3 $200.00$8.00
4 $250.00$10.00
5 $375.00$15.00
6 $200.00$8.00
Ref #29 611E02600 8" CONDUIT, TYPE F, (20 FT)
Awd $200.00$10.00
2 $160.00$8.00
3 $240.00$12.00
4 $200.00$10.00
5 $360.00$18.00
6 $160.00$8.00
Ref #30 611E05200 12" CONDUIT, TYPE F, (25 FT)
Awd $500.00$20.00
2 $375.00$15.00
3 $1,125.00$45.00
4 $500.00$20.00
5 $1,425.00$57.00
6 $300.00$12.00
Section 3 - DRAINAGE - Totals
Awd $2,870.00
2 $2,520.00
3 $4,580.00
4 $3,800.00
5 $5,610.00
6 $4,110.00
Ref #31 252E01500 FULL DEPTH PAVEMENT SAWING, (56 FT)
Awd $560.00$10.00
2 $168.00$3.00
3 $560.00$10.00
4 $896.00$16.00
5 $336.00$6.00
6 $2,800.00$50.00
Ref #32 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (312 SY)
Awd $3,120.00$10.00
2 $2,808.00$9.00
3 $3,120.00$10.00
4 $2,808.00$9.00
5 $2,808.00$9.00
6 $3,120.00$10.00
150019 - Page 170
Ref #33 301E46000 ASPHALT CONCRETE BASE, PG64-22, (236 CY)
Awd $33,040.00$140.00
2 $35,954.60$152.35
3 $33,040.00$140.00
4 $38,468.00$163.00
5 $40,120.00$170.00
6 $40,120.00$170.00
Ref #34 304E20000 AGGREGATE BASE, (242 CY)
Awd $10,648.00$44.00
2 $12,584.00$52.00
3 $13,915.00$57.50
4 $11,132.00$46.00
5 $14,520.00$60.00
6 $14,520.00$60.00
Ref #35 407E10000 TACK COAT, (114 GAL)
Awd $228.00$2.00
2 $400.14$3.51
3 $228.00$2.00
4 $427.50$3.75
5 $256.50$2.25
6 $114.00$1.00
Ref #36 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (60 GAL)
Awd $120.00$2.00
2 $210.60$3.51
3 $120.00$2.00
4 $225.00$3.75
5 $135.00$2.25
6 $60.00$1.00
Ref #37 408E10000 PRIME COAT, (498 GAL)
Awd $2,490.00$5.00
2 $2,494.98$5.01
3 $2,490.00$5.00
4 $2,739.00$5.50
5 $1,992.00$4.00
6 $498.00$1.00
Ref #38 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (112 CY)
Awd $22,400.00$200.00
2 $19,083.68$170.39
3 $22,400.00$200.00
4 $20,384.00$182.00
5 $24,640.00$220.00
6 $22,400.00$200.00
Ref #39 617E10100 COMPACTED AGGREGATE, (17 CY)
Awd $765.00$45.00
2 $1,530.00$90.00
3 $1,360.00$80.00
4 $1,139.00$67.00
5 $2,380.00$140.00
6 $1,275.00$75.00
150019 - Page 171
Section 4 - PAVEMENT - Totals
Awd $73,371.00
2 $75,234.00
3 $77,233.00
4 $78,218.50
5 $87,187.50
6 $84,907.00
Ref #40 621E00100 RPM, (7 EACH)
Awd $2,100.00$300.00
2 $1,368.15$195.45
3 $1,655.85$236.55
4 $1,568.00$224.00
5 $2,660.00$380.00
6 $1,365.00$195.00
Ref #41 621E54000 RAISED PAVEMENT MARKER REMOVED, (7 EACH)
Awd $7.00$1.00
2 $49.00$7.00
3 $140.00$20.00
4 $315.00$45.00
5 $91.00$13.00
6 $175.00$25.00
Ref #42 626E00100 BARRIER REFLECTOR, (17 EACH)
Awd $136.00$8.00
2 $136.34$8.02
3 $136.00$8.00
4 $144.50$8.50
5 $153.00$9.00
6 $102.00$6.00
Ref #43 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7 FT)
Awd $80.50$11.50
2 $80.71$11.53
3 $80.50$11.50
4 $87.50$12.50
5 $84.00$12.00
6 $105.00$15.00
Ref #44 630E80101 SIGN, FLAT SHEET, AS PER PLAN, (1 SF)
Awd $70.00$70.00
2 $70.16$70.16
3 $70.00$70.00
4 $75.00$75.00
5 $70.00$70.00
6 $45.00$45.00
Ref #45 642E00094 EDGE LINE, 6", (0.2 MILE)
Awd $1,500.00$7,500.00
2 $805.85$4,029.25
3 $804.00$4,020.00
4 $1,020.00$5,100.00
5 $110.00$550.00
6 $804.00$4,020.00
150019 - Page 172
Ref #46 642E00290 CENTER LINE, (0.1 MILE)
Awd $750.00$7,500.00
2 $370.85$3,708.50
3 $370.00$3,700.00
4 $1,020.00$10,200.00
5 $100.00$1,000.00
6 $370.00$3,700.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $4,643.50
2 $2,881.06
3 $3,256.35
4 $4,230.00
5 $3,268.00
6 $2,966.00
Ref #47 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $8,000.00$8,000.00
3 $9,500.00$9,500.00
4 $7,863.00$7,863.00
5 $8,000.00$8,000.00
6 $9,100.00$9,100.00
Ref #48 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (25 CY)
Awd $4,500.00$180.00
2 $5,625.00$225.00
3 $5,000.00$200.00
4 $4,550.00$182.00
5 $5,000.00$200.00
6 $5,000.00$200.00
Ref #49 616E10000 WATER, (2 MGAL)
Awd $2.00$1.00
2 $2.00$1.00
3 $600.00$300.00
4 $32.00$16.00
5 $80.00$40.00
6 $200.00$100.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $8,502.00
2 $13,627.00
3 $15,100.00
4 $12,445.00
5 $13,080.00
6 $14,300.00
Ref #50 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $20,000.00$20,000.00
3 $40,000.00$40,000.00
4 $31,704.00$31,704.00
5 $19,800.00$19,800.00
6 $40,000.00$40,000.00
150019 - Page 173
Ref #51 202E22900 APPROACH SLAB REMOVED, (107 SY)
Awd $1,605.00$15.00
2 $3,210.00$30.00
3 $4,012.50$37.50
4 $3,745.00$35.00
5 $2,675.00$25.00
6 $2,140.00$20.00
Ref #52 202E23500 WEARING COURSE REMOVED, (107 SY)
Awd $535.00$5.00
2 $1,070.00$10.00
3 $1,070.00$10.00
4 $642.00$6.00
5 $1,070.00$10.00
6 $2,140.00$20.00
Ref #53 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $10,000.00$10,000.00
3 $18,000.00$18,000.00
4 $11,800.00$11,800.00
5 $15,000.00$15,000.00
6 $45,000.00$45,000.00
Ref #54 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $32,250.00$32,250.00
3 $25,000.00$25,000.00
4 $34,476.00$34,476.00
5 $16,000.00$16,000.00
6 $30,000.00$30,000.00
Ref #55 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $12,500.00$12,500.00
3 $16,500.00$16,500.00
4 $9,560.00$9,560.00
5 $15,000.00$15,000.00
6 $10,000.00$10,000.00
Ref #56 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE, (990 FT)
Awd $6,930.00$7.00
2 $6,930.00$7.00
3 $12,375.00$12.50
4 $13,167.00$13.30
5 $23,760.00$24.00
6 $28,215.00$28.50
Ref #57 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI, (1100 FT)
Awd $77,000.00$70.00
2 $77,000.00$70.00
3 $53,900.00$49.00
4 $70,400.00$64.00
5 $57,200.00$52.00
6 $55,000.00$50.00
150019 - Page 174
Ref #58 509E10000 EPOXY COATED REINFORCING STEEL, (39400 LB)
Awd $49,250.00$1.25
2 $35,460.00$0.90
3 $33,884.00$0.86
4 $33,490.00$0.85
5 $31,520.00$0.80
6 $35,460.00$0.90
Ref #59 511E33414 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE(SING, (161 CY)
Awd $104,650.00$650.00
2 $100,625.00$625.00
3 $104,650.00$650.00
4 $109,480.00$680.00
5 $120,750.00$750.00
6 $99,820.00$620.00
Ref #60 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (135 CY)
Awd $60,750.00$450.00
2 $63,450.00$470.00
3 $70,875.00$525.00
4 $46,575.00$345.00
5 $97,200.00$720.00
6 $104,625.00$775.00
Ref #61 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (171 SY)
Awd $4,275.00$25.00
2 $3,856.05$22.55
3 $3,847.50$22.50
4 $5,130.00$30.00
5 $3,420.00$20.00
6 $3,847.50$22.50
Ref #62 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (81 SF)
Awd $243.00$3.00
2 $405.00$5.00
3 $324.00$4.00
4 $526.50$6.50
5 $352.35$4.35
6 $810.00$10.00
Ref #63 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (110 SF)
Awd $440.00$4.00
2 $660.00$6.00
3 $550.00$5.00
4 $770.00$7.00
5 $660.00$6.00
6 $1,650.00$15.00
Ref #64 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (136 FT)
Awd $2,720.00$20.00
2 $3,400.00$25.00
3 $3,740.00$27.50
4 $4,488.00$33.00
5 $5,440.00$40.00
6 $3,400.00$25.00
150019 - Page 175
Ref #65 517E70000 RAILING (TWIN STEEL TUBE), (86 FT)
Awd $12,620.50$146.75
2 $12,649.74$147.09
3 $12,900.00$150.00
4 $13,502.00$157.00
5 $13,330.00$155.00
6 $12,857.00$149.50
Ref #66 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (61 CY)
Awd $3,660.00$60.00
2 $4,575.00$75.00
3 $5,490.00$90.00
4 $3,721.00$61.00
5 $6,100.00$100.00
6 $6,039.00$99.00
Ref #67 518E22300 SPECIAL - STEEL DRIP STRIP, (90 FT)
Awd $720.00$8.00
2 $990.00$11.00
3 $1,575.00$17.50
4 $1,170.00$13.00
5 $1,530.00$17.00
6 $1,350.00$15.00
Ref #68 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (157 FT)
Awd $1,099.00$7.00
2 $1,256.00$8.00
3 $1,334.50$8.50
4 $1,413.00$9.00
5 $785.00$5.00
6 $1,570.00$10.00
Ref #69 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (34 FT)
Awd $238.00$7.00
2 $340.00$10.00
3 $425.00$12.50
4 $476.00$14.00
5 $170.00$5.00
6 $408.00$12.00
Ref #70 523E20000 DYNAMIC LOAD TESTING, (1 EACH)
Awd $3,125.00$3,125.00
2 $3,250.00$3,250.00
3 $3,750.00$3,750.00
4 $3,345.00$3,345.00
5 $3,500.00$3,500.00
6 $7,500.00$7,500.00
Ref #71 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13"), (196 SY)
Awd $43,120.00$220.00
2 $39,200.00$200.00
3 $44,100.00$225.00
4 $34,496.00$176.00
5 $44,100.00$225.00
6 $39,200.00$200.00
150019 - Page 176
Ref #72 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (94 CY)
Awd $6,580.00$70.00
2 $6,110.00$65.00
3 $5,640.00$60.00
4 $7,238.00$77.00
5 $9,400.00$100.00
6 $9,400.00$100.00
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-42- - Totals
Awd $429,560.50
2 $439,186.79
3 $463,942.50
4 $441,314.50
5 $488,762.35
6 $540,431.50
Ref #73 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $7,200.00$7,200.00
2 $5,000.00$5,000.00
3 $8,500.00$8,500.00
4 $7,100.00$7,100.00
5 $4,000.00$4,000.00
6 $7,500.00$7,500.00
Ref #74 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $1,500.00$1,500.00
3 $3,500.00$3,500.00
4 $1,100.00$1,100.00
5 $1,200.00$1,200.00
6 $7,500.00$7,500.00
Ref #75 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $3,500.00$3,500.00
3 $4,000.00$4,000.00
4 $3,200.00$3,200.00
5 $15,600.00$15,600.00
6 $3,000.00$3,000.00
Ref #76 624E10000 MOBILIZATION, (LUMP SUM)
Awd $42,350.00$42,350.00
2 $17,000.00$17,000.00
3 $20,000.00$20,000.00
4 $36,205.00$36,205.00
5 $20,000.00$20,000.00
6 $20,000.00$20,000.00
Section 8 - INCIDENTALS - Totals
Awd $55,050.00
2 $27,000.00
3 $36,000.00
4 $47,605.00
5 $40,800.00
6 $38,000.00
150019 - Page 177
Ref #77 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI, (1000 DLR)
Awd $70,000.00$70.00
2 $73,000.00$73.00
3 $60,000.00$60.00
4 $85,000.00$85.00
5 $75,000.00$75.00
6 $70,000.00$70.00
Section 9 - PART B - Totals
Awd $70,000.00
2 $73,000.00
3 $60,000.00
4 $85,000.00
5 $75,000.00
6 $70,000.00
150019 - Page 178
Project No. 150020
PID 88514
SEN-SR 18-30.53 Resurf
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/1/2015
Award Amount: $1,144,187.25
Contract Awarded To: M & B ASPHALT CO INC
Letting Date: 1/15/2015
Engineer's Estimate: $1,399,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
M & B ASPHALT CO INC
1525 WEST COUNTY RD #42
TIFFIN, OH 44883
Seneca
Bidder 1
Bid $1,144,187.25
ERIE BLACKTOP INC
4507 TIFFIN AVE
SANDUSKY, OH 44870
Erie
Bidder 2
Bid $1,147,413.45
GERKEN PAVING INC
9072 CO RD 424
NAPOLEON, OH 43545
Henry
Bidder 3
Bid $1,154,784.35
150020 - Page 179
Ref #1 209E60500 LINEAR GRADING, (9 MILE)
Awd $7,200.00$800.00
2 $7,650.00$850.00
3 $11,925.00$1,325.00
Ref #2 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (8.5 MILE)
Awd $7,650.00$900.00
2 $7,225.00$850.00
3 $11,262.50$1,325.00
Section 1 - ROADWAY - Totals
Awd $14,850.00
2 $14,875.00
3 $23,187.50
Ref #3 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #4 253E02000 PAVEMENT REPAIR, (1122 CY)
Awd $154,275.00$137.50
2 $153,714.00$137.00
3 $154,836.00$138.00
Ref #5 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, - 3 1/4", (67373 SY)
Awd $84,216.25$1.25
2 $64,004.35$0.95
3 $97,690.85$1.45
Ref #6 407E10000 TACK COAT, (5063 GAL)
Awd $10,126.00$2.00
2 $11,391.75$2.25
3 $10,126.00$2.00
Ref #7 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (2695 GAL)
Awd $5,390.00$2.00
2 $6,063.75$2.25
3 $5,390.00$2.00
Ref #8 409E98010 SEALING, MISC.:LONGITUDINAL JOINT SEALER, (5601 LB)
Awd $8,401.50$1.50
2 $8,401.50$1.50
3 $10,081.80$1.80
Ref #9 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (2888 CY)
Awd $361,000.00$125.00
2 $375,440.00$130.00
3 $361,000.00$125.00
150020 - Page 180
Ref #10 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (3306 CY)
Awd $371,925.00$112.50
2 $363,660.00$110.00
3 $363,660.00$110.00
Ref #11 617E10100 COMPACTED AGGREGATE, (899 CY)
Awd $35,960.00$40.00
2 $43,152.00$48.00
3 $34,162.00$38.00
Ref #12 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE), (8.5 MILE)
Awd $9,775.00$1,150.00
2 $9,137.50$1,075.00
3 $8,542.50$1,005.00
Section 3 - PAVEMENT - Totals
Awd $1,041,068.75
2 $1,034,964.85
3 $1,045,489.15
Ref #13 621E00100 RPM, (281 EACH)
Awd $6,182.00$22.00
2 $6,744.00$24.00
3 $6,519.20$23.20
Ref #14 621E54000 RAISED PAVEMENT MARKER REMOVED, (223 EACH)
Awd $1,784.00$8.00
2 $1,494.10$6.70
3 $1,561.00$7.00
Ref #15 642E00090 EDGE LINE, 4", (8.5 MILE)
Awd $4,037.50$475.00
2 $4,250.00$500.00
3 $4,037.50$475.00
Ref #16 642E00290 CENTER LINE, (4.25 MILE)
Awd $2,125.00$500.00
2 $2,231.25$525.00
3 $2,125.00$500.00
Ref #17 644E40010 SPECIAL - AIR SPEED ZONE MARKING, (30 SF)
Awd $2,250.00$75.00
2 $2,295.00$76.50
3 $1,200.00$40.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $16,378.50
2 $17,014.35
3 $15,442.70
Ref #18 614E12460 WORK ZONE MARKING SIGN, (22 EACH)
Awd $2,640.00$120.00
2 $1,848.00$84.00
3 $2,200.00$100.00
150020 - Page 181
Ref #19 614E12500 REPLACEMENT SIGN, (5 EACH)
Awd $250.00$50.00
2 $525.00$105.00
3 $650.00$130.00
Ref #20 614E12600 REPLACEMENT DRUM, (5 EACH)
Awd $250.00$50.00
2 $236.25$47.25
3 $250.00$50.00
Ref #21 614E21400 WORK ZONE CENTER LINE, CLASS II, (13 MILE)
Awd $4,550.00$350.00
2 $5,850.00$450.00
3 $1,365.00$105.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $7,690.00
2 $8,459.25
3 $4,465.00
Ref #22 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,200.00$5,200.00
2 $4,300.00$4,300.00
3 $5,700.00$5,700.00
Ref #23 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $25,000.00$25,000.00
3 $26,500.00$26,500.00
Ref #24 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,800.00$1,800.00
3 $3,000.00$3,000.00
Ref #25 624E10000 MOBILIZATION, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $40,000.00$40,000.00
3 $30,000.00$30,000.00
Section 6 - INCIDENTALS - Totals
Awd $63,200.00
2 $71,100.00
3 $65,200.00
150020 - Page 182
Project No. 150021
PID 88523
SEN-SR 67-0.00 Resurf
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/30/2015
Award Amount: $641,541.19
Contract Awarded To: SHELLY COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $782,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $641,541.19
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 2
Bid $642,105.26
M & B ASPHALT CO INC
1525 WEST COUNTY RD #42
TIFFIN, OH 44883
Seneca
Bidder 3
Bid $647,017.20
GERKEN PAVING INC
9072 CO RD 424
NAPOLEON, OH 43545
Henry
Bidder 4
Bid $655,650.93
150021 - Page 183
Ref #1 202E38000 GUARDRAIL REMOVED, (350 FT)
Awd $420.00$1.20
2 $420.00$1.20
3 $420.00$1.20
4 $420.00$1.20
Ref #2 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (4 EACH)
Awd $540.00$135.00
2 $540.00$135.00
3 $540.00$135.00
4 $540.00$135.00
Ref #3 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $220.00$55.00
2 $220.00$55.00
3 $220.00$55.00
4 $220.00$55.00
Ref #4 209E15000 RESHAPING UNDER GUARDRAIL, (4 STA)
Awd $140.00$35.00
2 $140.00$35.00
3 $140.00$35.00
4 $140.00$35.00
Ref #5 606E15050 GUARDRAIL, TYPE MGS, (50 FT)
Awd $980.00$19.60
2 $980.00$19.60
3 $980.00$19.60
4 $980.00$19.60
Ref #6 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (4 EACH)
Awd $7,400.00$1,850.00
2 $7,400.00$1,850.00
3 $7,400.00$1,850.00
4 $7,400.00$1,850.00
Ref #7 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $3,760.00$940.00
2 $3,760.00$940.00
3 $3,760.00$940.00
4 $3,760.00$940.00
Ref #8 626E00100 BARRIER REFLECTOR, (12 EACH)
Awd $76.80$6.40
2 $76.80$6.40
3 $84.00$7.00
4 $76.80$6.40
Ref #9 659E10000 SEEDING AND MULCHING, (116 SY)
Awd $1,276.00$11.00
2 $1,276.00$11.00
3 $1,276.00$11.00
4 $1,276.00$11.00
Ref #10 659E20000 COMMERCIAL FERTILIZER, (0.02 TON)
Awd $11.00$550.00
2 $11.00$550.00
3 $11.00$550.00
4 $11.00$550.00
150021 - Page 184
Ref #11 659E35000 WATER, (2 MGAL)
Awd $2.00$1.00
2 $2.00$1.00
3 $2.00$1.00
4 $2.00$1.00
Section 1 - ROADWAY - Totals
Awd $14,825.80
2 $14,825.80
3 $14,833.00
4 $14,825.80
Ref #12 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
3 $2,000.00$1.00
4 $2,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $2,000.00
2 $2,000.00
3 $2,000.00
4 $2,000.00
Ref #13 209E60500 LINEAR GRADING, (5 MILE)
Awd $4,000.00$800.00
2 $5,500.00$1,100.00
3 $3,750.00$750.00
4 $5,000.00$1,000.00
Ref #14 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (4.65 MILE)
Awd $8,835.00$1,900.00
2 $697.50$150.00
3 $4,185.00$900.00
4 $4,650.00$1,000.00
Ref #15 253E01000 PAVEMENT REPAIR, (6300 SY)
Awd $182,700.00$29.00
2 $182,700.00$29.00
3 $184,275.00$29.25
4 $182,700.00$29.00
Ref #16 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (30855 SY)
Awd $18,513.00$0.60
2 $23,141.25$0.75
3 $30,855.00$1.00
4 $37,951.65$1.23
Ref #17 407E10000 TACK COAT, (2314 GAL)
Awd $4,628.00$2.00
2 $4,628.00$2.00
3 $4,628.00$2.00
4 $4,628.00$2.00
150021 - Page 185
Ref #18 409E98010 SEALING, MISC.:LONGITUDINAL JOINT SEALER, (3069 LB)
Awd $3,069.00$1.00
2 $3,069.00$1.00
3 $4,603.50$1.50
4 $5,524.20$1.80
Ref #19 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (1320 CY)
Awd $184,800.00$140.00
2 $183,480.00$139.00
3 $167,640.00$127.00
4 $178,200.00$135.00
Ref #20 617E10100 COMPACTED AGGREGATELONGITUDINAL JOINT SEALER, (222 CY)
Awd $8,880.00$40.00
2 $12,210.00$55.00
3 $12,210.00$55.00
4 $9,990.00$45.00
Section 3 - PAVEMENT - Totals
Awd $415,425.00
2 $415,425.75
3 $412,146.50
4 $428,643.85
Ref #21 621E00100 RPM, (187 EACH)
Awd $5,142.50$27.50
2 $5,037.78$26.94
3 $5,049.00$27.00
4 $5,037.78$26.94
Ref #22 621E54000 RAISED PAVEMENT MARKER REMOVED, (101 EACH)
Awd $707.00$7.00
2 $707.00$7.00
3 $808.00$8.00
4 $707.00$7.00
Ref #23 642E00090 EDGE LINE, 4", (4.72 MILE)
Awd $2,242.00$475.00
2 $2,336.40$495.00
3 $2,242.00$475.00
4 $2,336.40$495.00
Ref #24 642E00290 CENTER LINE, (2.35 MILE)
Awd $1,233.75$525.00
2 $1,833.00$780.00
3 $1,292.50$550.00
4 $1,833.00$780.00
Ref #25 647E18060 STOP LINE, TYPE B90, (26 FT)
Awd $780.00$30.00
2 $208.00$8.00
3 $780.00$30.00
4 $390.00$15.00
150021 - Page 186
Section 4 - TRAFFIC CONTROL - Totals
Awd $10,105.25
2 $10,122.18
3 $10,171.50
4 $10,304.18
Ref #26 614E12460 WORK ZONE MARKING SIGN, (12 EACH)
Awd $1,440.00$120.00
2 $1,500.00$125.00
3 $1,620.00$135.00
4 $1,500.00$125.00
Ref #27 614E12500 REPLACEMENT SIGN, (5 EACH)
Awd $475.00$95.00
2 $750.00$150.00
3 $250.00$50.00
4 $750.00$150.00
Ref #28 614E12600 REPLACEMENT DRUM, (5 EACH)
Awd $150.00$30.00
2 $200.00$40.00
3 $250.00$50.00
4 $250.00$50.00
Ref #29 614E21400 WORK ZONE CENTER LINE, CLASS II, (4.6 MILE)
Awd $1,150.00$250.00
2 $1,840.00$400.00
3 $1,840.00$400.00
4 $506.00$110.00
Ref #30 614E26000 WORK ZONE STOP LINE, CLASS I, (52 FT)
Awd $312.00$6.00
2 $156.00$3.00
3 $936.00$18.00
4 $286.00$5.50
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,527.00
2 $4,446.00
3 $4,896.00
4 $3,292.00
Ref #31 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $30,399.00$30,399.00
2 $30,399.00$30,399.00
3 $30,400.00$30,400.00
4 $30,399.00$30,399.00
Ref #32 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN202, (40 CY)
Awd $2,600.00$65.00
2 $2,600.00$65.00
3 $2,600.00$65.00
4 $2,600.00$65.00
150021 - Page 187
Ref #33 509E10000 EPOXY COATED REINFORCING STEEL, (4902 LB)
Awd $8,431.44$1.72
2 $8,431.44$1.72
3 $8,431.44$1.72
4 $8,431.44$1.72
Ref #34 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $172.00$1.72
2 $172.00$1.72
3 $172.00$1.72
4 $172.00$1.72
Ref #35 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (284 EACH)
Awd $2,402.64$8.46
2 $2,402.64$8.46
3 $2,402.64$8.46
4 $2,402.64$8.46
Ref #36 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (16 CY)
Awd $18,288.00$1,143.00
2 $18,288.00$1,143.00
3 $18,288.00$1,143.00
4 $18,288.00$1,143.00
Ref #37 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT, (10 CY)
Awd $12,410.00$1,241.00
2 $12,410.00$1,241.00
3 $12,410.00$1,241.00
4 $12,410.00$1,241.00
Ref #38 511E60000 SPECIAL - BRIDGE DECK GROOVING, (180 SY)
Awd $3,400.20$18.89
2 $3,400.20$18.89
3 $3,400.20$18.89
4 $3,400.20$18.89
Ref #39 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (51 SY)
Awd $559.98$10.98
2 $559.98$10.98
3 $559.98$10.98
4 $559.98$10.98
Ref #40 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (9 SF)
Awd $92.97$10.33
2 $92.97$10.33
3 $92.97$10.33
4 $92.97$10.33
Ref #41 516E31000 JOINT SEALER, (74 FT)
Awd $1,175.86$15.89
2 $1,175.86$15.89
3 $1,175.86$15.89
4 $1,175.86$15.89
Ref #42 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (65 FT)
Awd $1,175.85$18.09
2 $1,175.85$18.09
3 $1,175.85$18.09
4 $1,175.85$18.09
150021 - Page 188
Ref #43 517E70000 RAILING (TWIN STEEL TUBE), (121.38 FT)
Awd $16,993.20$140.00
2 $17,357.34$143.00
3 $16,993.20$140.00
4 $16,993.20$140.00
Ref #44 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (10 CY)
Awd $816.00$81.60
2 $816.00$81.60
3 $816.00$81.60
4 $816.00$81.60
Ref #45 518E22300 SPECIAL - STEEL DRIP STRIP, (132 FT)
Awd $1,293.60$9.80
2 $1,293.60$9.80
3 $1,293.60$9.80
4 $1,293.60$9.80
Ref #46 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (53 FT)
Awd $664.62$12.54
2 $664.62$12.54
3 $664.62$12.54
4 $664.62$12.54
Ref #47 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (16 FT)
Awd $200.64$12.54
2 $200.64$12.54
3 $200.64$12.54
4 $200.64$12.54
Ref #48 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (30 SF)
Awd $3,299.70$109.99
2 $3,299.70$109.99
3 $3,300.00$110.00
4 $3,299.70$109.99
Ref #49 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION, (6 SY)
Awd $600.00$100.00
2 $600.00$100.00
3 $600.00$100.00
4 $600.00$100.00
Ref #50 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (191 SY)
Awd $12,988.00$68.00
2 $12,988.00$68.00
3 $12,988.00$68.00
4 $12,988.00$68.00
Ref #51 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (191 SY)
Awd $25,212.00$132.00
2 $25,212.00$132.00
3 $25,212.00$132.00
4 $25,212.00$132.00
Ref #52 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $476.00$238.00
2 $476.00$238.00
3 $476.00$238.00
4 $476.00$238.00
150021 - Page 189
Ref #53 848E50000 HAND CHIPPING, (10 SY)
Awd $1,460.00$146.00
2 $1,460.00$146.00
3 $1,460.00$146.00
4 $1,460.00$146.00
Ref #54 848E50100 TEST SLAB, (LUMP SUM)
Awd $762.00$762.00
2 $762.00$762.00
3 $762.00$762.00
4 $762.00$762.00
Ref #55 848E50300 WEARING COURSE REMOVED, ASPHALT, (602 SY)
Awd $6,032.04$10.02
2 $4,816.00$8.00
3 $4,214.00$7.00
4 $6,020.00$10.00
Section 6 - STRUCTURE REPAIR (SEN-67-0046) - Totals
Awd $151,905.74
2 $151,053.84
3 $150,089.00
4 $151,893.70
Ref #56 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (152 SY)
Awd $91.20$0.60
2 $91.20$0.60
3 $1,520.00$10.00
4 $205.20$1.35
Ref #57 407E10000 TACK COAT, (7 GAL)
Awd $14.00$2.00
2 $14.00$2.00
3 $14.00$2.00
4 $14.00$2.00
Ref #58 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (7 CY)
Awd $980.00$140.00
2 $980.00$140.00
3 $1,400.00$200.00
4 $1,225.00$175.00
Ref #59 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (80 FT)
Awd $1,447.20$18.09
2 $1,447.20$18.09
3 $1,447.20$18.09
4 $1,447.20$18.09
Section 7 - STRUCTURE REPAIR (SEN-67-0117) - Totals
Awd $2,532.40
2 $2,532.40
3 $4,381.20
4 $2,891.40
150021 - Page 190
Ref #60 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $5,000.00$5,000.00
3 $3,000.00$3,000.00
4 $3,300.00$3,300.00
Ref #61 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $17,000.00$17,000.00
2 $15,499.29$15,499.29
3 $23,000.00$23,000.00
4 $19,500.00$19,500.00
Ref #62 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $2,220.00$2,220.00
2 $1,200.00$1,200.00
3 $2,500.00$2,500.00
4 $3,000.00$3,000.00
Ref #63 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
3 $20,000.00$20,000.00
4 $16,000.00$16,000.00
Section 8 - INCIDENTALS - Totals
Awd $41,220.00
2 $41,699.29
3 $48,500.00
4 $41,800.00
150021 - Page 191
Project No. 150022
PID 86996
SUM-SR 18-13.02
Federal
Type: BRIDGE REPAIR
Completion Date: 10/15/2015
Award Amount: $1,677,790.81
Contract Awarded To: SUBURBAN MAINTENANCE & CONSTRUCTION INC
Letting Date: 1/15/2015
Engineer's Estimate: $1,610,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SUBURBAN MAINTENANCE & CONSTRUCTION INC
16330 YORK RD
NORTH ROYALTON, OH 44133
Cuyahoga
Bidder 1
Bid $1,677,790.81
BLACK HORSE BRIDGE CONSTRUCTION INC
5185 WOOSTER ROAD WEST
NORTON, OH 44203
Summit
Bidder 2
Bid $1,691,852.10
J D WILLIAMSON CONSTRUCTION CO INC
441 GENEVA AVE, PO BOX 113
TALLMADGE, OH 44278
Summit
Bidder 3
Bid $1,704,123.70
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $1,952,608.55
KENMORE CONSTRUCTION CO INC
700 HOME AVE
AKRON, OH 44310
Summit
Bidder 5
Bid $2,216,653.45
150022 - Page 192
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $15,000.00$15,000.00
4 $12,000.00$12,000.00
5 $5,000.00$5,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (1297 SY)
Awd $19,455.00$15.00
2 $19,455.00$15.00
3 $14,267.00$11.00
4 $15,564.00$12.00
5 $25,940.00$20.00
Ref #3 202E30000 WALK REMOVED, (2994 SF)
Awd $4,491.00$1.50
2 $1,497.00$0.50
3 $2,994.00$1.00
4 $2,994.00$1.00
5 $5,988.00$2.00
Ref #4 202E30700 CONCRETE BARRIER REMOVED, (20 FT)
Awd $1,000.00$50.00
2 $620.00$31.00
3 $500.00$25.00
4 $860.00$43.00
5 $480.00$24.00
Ref #5 202E32000 CURB REMOVED, (1001 FT)
Awd $2,502.50$2.50
2 $2,502.50$2.50
3 $7,007.00$7.00
4 $2,002.00$2.00
5 $3,003.00$3.00
Ref #6 202E35100 PIPE REMOVED, 24" AND UNDER, (266 FT)
Awd $1,330.00$5.00
2 $7,980.00$30.00
3 $2,926.00$11.00
4 $5,586.00$21.00
5 $5,320.00$20.00
Ref #7 202E35200 PIPE REMOVED, OVER 24", (14 FT)
Awd $350.00$25.00
2 $700.00$50.00
3 $451.50$32.25
4 $616.00$44.00
5 $350.00$25.00
Ref #8 202E38000 GUARDRAIL REMOVED, (272 FT)
Awd $489.60$1.80
2 $489.60$1.80
3 $516.80$1.90
4 $272.00$1.00
5 $544.00$2.00
150022 - Page 193
Ref #9 202E58200 INLET REMOVED, (2 EACH)
Awd $2,000.00$1,000.00
2 $700.00$350.00
3 $430.00$215.00
4 $400.00$200.00
5 $400.00$200.00
Ref #10 202E58701 MANHOLE ABANDONED, AS PER PLAN, (1 EACH)
Awd $1,000.00$1,000.00
2 $2,500.00$2,500.00
3 $560.00$560.00
4 $1,900.00$1,900.00
5 $5,000.00$5,000.00
Ref #11 202E60010 MONUMENT ASSEMBLY REMOVED, (1 EACH)
Awd $50.00$50.00
2 $100.00$100.00
3 $150.00$150.00
4 $414.00$414.00
5 $150.00$150.00
Ref #12 202E75000 FENCE REMOVED, (173 FT)
Awd $415.20$2.40
2 $415.20$2.40
3 $432.50$2.50
4 $346.00$2.00
5 $519.00$3.00
Ref #13 202E75610 VALVE BOX REMOVED, (1 EACH)
Awd $250.00$250.00
2 $100.00$100.00
3 $100.00$100.00
4 $300.00$300.00
5 $50.00$50.00
Ref #14 202E98100 REMOVAL MISC.: WATER METER, (1 EACH)
Awd $200.00$200.00
2 $100.00$100.00
3 $700.00$700.00
4 $750.00$750.00
5 $250.00$250.00
Ref #15 202E98200 REMOVAL MISC.: LANDSCAPE TIES, (43 FT)
Awd $215.00$5.00
2 $107.50$2.50
3 $1,225.50$28.50
4 $903.00$21.00
5 $1,290.00$30.00
Ref #16 203E10000 EXCAVATION, (156 CY)
Awd $2,808.00$18.00
2 $1,872.00$12.00
3 $2,223.00$14.25
4 $4,524.00$29.00
5 $7,800.00$50.00
150022 - Page 194
Ref #17 203E20000 EMBANKMENT, (109 CY)
Awd $2,180.00$20.00
2 $1,526.00$14.00
3 $1,689.50$15.50
4 $2,943.00$27.00
5 $6,540.00$60.00
Ref #18 204E10000 SUBGRADE COMPACTION, (1852 SY)
Awd $4,630.00$2.50
2 $6,019.00$3.25
3 $5,278.20$2.85
4 $3,704.00$2.00
5 $3,704.00$2.00
Ref #19 204E13000 EXCAVATION OF SUBGRADE, (195 CY)
Awd $3,510.00$18.00
2 $2,203.50$11.30
3 $3,090.75$15.85
4 $3,900.00$20.00
5 $5,850.00$30.00
Ref #20 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN, (195 CY)
Awd $11,700.00$60.00
2 $9,750.00$50.00
3 $10,042.50$51.50
4 $9,555.00$49.00
5 $11,700.00$60.00
Ref #21 204E45000 PROOF ROLLING, (1 HOUR)
Awd $250.00$250.00
2 $150.00$150.00
3 $145.00$145.00
4 $188.00$188.00
5 $100.00$100.00
Ref #22 204E50000 GEOTEXTILE FABRIC, (401 SY)
Awd $1,503.75$3.75
2 $401.00$1.00
3 $902.25$2.25
4 $1,203.00$3.00
5 $1,203.00$3.00
Ref #23 606E15050 GUARDRAIL, TYPE MGS, (131 FT)
Awd $3,327.40$25.40
2 $3,327.40$25.40
3 $3,537.00$27.00
4 $3,537.00$27.00
5 $3,406.00$26.00
Ref #24 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (12.5 FT)
Awd $370.00$29.60
2 $370.00$29.60
3 $387.50$31.00
4 $387.50$31.00
5 $375.00$30.00
150022 - Page 195
Ref #25 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (1 EACH)
Awd $2,325.00$2,325.00
2 $2,325.00$2,325.00
3 $2,500.00$2,500.00
4 $2,500.00$2,500.00
5 $2,300.00$2,300.00
Ref #26 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (6 EACH)
Awd $17,040.00$2,840.00
2 $17,040.00$2,840.00
3 $18,000.00$3,000.00
4 $18,000.00$3,000.00
5 $17,400.00$2,900.00
Ref #27 607E23000 FENCE, TYPE CLT, (142 FT)
Awd $2,811.60$19.80
2 $2,811.60$19.80
3 $2,982.00$21.00
4 $2,982.00$21.00
5 $2,840.00$20.00
Ref #28 607E98000 FENCE, MISC.: TEMPORARY CONSTRUCTION FENCE, (130 FT)
Awd $676.00$5.20
2 $260.00$2.00
3 $715.00$5.50
4 $910.00$7.00
5 $780.00$6.00
Ref #29 608E13000 6" CONCRETE WALK, (2417 SF)
Awd $9,668.00$4.00
2 $13,051.80$5.40
3 $14,502.00$6.00
4 $14,502.00$6.00
5 $16,919.00$7.00
Ref #30 622E10200 BARRIER TRANSITION, (1 EACH)
Awd $1,800.00$1,800.00
2 $3,000.00$3,000.00
3 $5,350.00$5,350.00
4 $3,800.00$3,800.00
5 $6,000.00$6,000.00
Ref #31 623E38501 MONUMENT ASSEMBLY, AS PER PLAN, (1 EACH)
Awd $500.00$500.00
2 $500.00$500.00
3 $450.00$450.00
4 $1,400.00$1,400.00
5 $700.00$700.00
Ref #32 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (1 EACH)
Awd $150.00$150.00
2 $185.00$185.00
3 $150.00$150.00
4 $195.00$195.00
5 $150.00$150.00
150022 - Page 196
Ref #33 690E98000 SPECIAL - MISC.: VERTICAL CLEARANCE, (2 EACH)
Awd $5,000.00$2,500.00
2 $1,000.00$500.00
3 $1,550.00$775.00
4 $1,000.00$500.00
5 $3,000.00$1,500.00
Ref #34 861E10000 GEOGRID FOR SUBGRADE STABILIZATION, (401 SY)
Awd $1,042.60$2.60
2 $601.50$1.50
3 $902.25$2.25
4 $1,403.50$3.50
5 $1,604.00$4.00
Section 1 - ROADWAY - Totals
Awd $110,040.65
2 $108,660.60
3 $121,657.25
4 $121,541.00
5 $146,655.00
Ref #35 659E00300 TOPSOIL, (43 CY)
Awd $2,795.00$65.00
2 $1,290.00$30.00
3 $1,720.00$40.00
4 $3,741.00$87.00
5 $2,580.00$60.00
Ref #36 659E10000 SEEDING AND MULCHING, (386 SY)
Awd $1,158.00$3.00
2 $1,930.00$5.00
3 $2,644.10$6.85
4 $1,930.00$5.00
5 $772.00$2.00
Ref #37 659E14000 REPAIR SEEDING AND MULCHING, (19 SY)
Awd $38.00$2.00
2 $190.00$10.00
3 $9.50$0.50
4 $38.00$2.00
5 $38.00$2.00
Ref #38 659E20000 COMMERCIAL FERTILIZER, (0.05 TON)
Awd $15.00$300.00
2 $25.00$500.00
3 $22.50$450.00
4 $29.10$582.00
5 $25.00$500.00
Ref #39 659E31000 LIME, (0.08 ACRE)
Awd $12.00$150.00
2 $16.00$200.00
3 $8.80$110.00
4 $8.40$105.00
5 $2.40$30.00
150022 - Page 197
Ref #40 659E35000 WATER, (2 MGAL)
Awd $2.00$1.00
2 $20.00$10.00
3 $2.00$1.00
4 $2.00$1.00
5 $2.00$1.00
Ref #41 661E00500 MULCH, (1 CY)
Awd $40.00$40.00
2 $50.00$50.00
3 $35.00$35.00
4 $52.00$52.00
5 $50.00$50.00
Ref #42 832E30000 EROSION CONTROL, (5247 EACH)
Awd $5,247.00$1.00
2 $5,247.00$1.00
3 $5,247.00$1.00
4 $5,247.00$1.00
5 $5,247.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $9,307.00
2 $8,768.00
3 $9,688.90
4 $11,047.50
5 $8,716.40
Ref #43 605E05110 4" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, (199 FT)
Awd $1,990.00$10.00
2 $2,487.50$12.50
3 $2,189.00$11.00
4 $1,791.00$9.00
5 $2,985.00$15.00
Ref #44 605E05210 4" UNCLASSIFIED PIPE UNDERDRAIN WITH FABRIC WRAP, (97 FT)
Awd $970.00$10.00
2 $1,212.50$12.50
3 $1,067.00$11.00
4 $873.00$9.00
5 $1,552.00$16.00
Ref #45 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, 707., (37 FT)
Awd $425.50$11.50
2 $1,110.00$30.00
3 $499.50$13.50
4 $592.00$16.00
5 $666.00$18.00
Ref #46 605E12210 6" DEEP PIPE UNDERDRAINS WITH FABRIC WRAP, 707.31, (31 FT)
Awd $542.50$17.50
2 $1,085.00$35.00
3 $465.00$15.00
4 $434.00$14.00
5 $620.00$20.00
150022 - Page 198
Ref #47 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP,, (20 FT)
Awd $350.00$17.50
2 $400.00$20.00
3 $260.00$13.00
4 $400.00$20.00
5 $400.00$20.00
Ref #48 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET, (40 FT)
Awd $320.00$8.00
2 $1,000.00$25.00
3 $480.00$12.00
4 $440.00$11.00
5 $600.00$15.00
Ref #49 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (20 FT)
Awd $200.00$10.00
2 $600.00$30.00
3 $330.00$16.50
4 $400.00$20.00
5 $320.00$16.00
Ref #50 611E04400 12" CONDUIT, TYPE B, 706.02, (39 FT)
Awd $2,769.00$71.00
2 $3,900.00$100.00
3 $3,315.00$85.00
4 $6,240.00$160.00
5 $3,705.00$95.00
Ref #51 611E13400 30" CONDUIT, TYPE B, 706.02, (10 FT)
Awd $1,000.00$100.00
2 $2,350.00$235.00
3 $2,250.00$225.00
4 $3,800.00$380.00
5 $4,000.00$400.00
Ref #52 611E97400 CONDUIT, MISC.: 3" HOUSE DRAIN, (128 FT)
Awd $1,280.00$10.00
2 $1,920.00$15.00
3 $1,792.00$14.00
4 $4,224.00$33.00
5 $1,280.00$10.00
Ref #53 611E99500 INLET, MISC.: DOUBLE NO. 2 INLET, (2 EACH)
Awd $3,060.00$1,530.00
2 $5,400.00$2,700.00
3 $5,050.00$2,525.00
4 $5,000.00$2,500.00
5 $6,000.00$3,000.00
Ref #54 611E99654 MANHOLE ADJUSTED TO GRADE, (2 EACH)
Awd $1,000.00$500.00
2 $200.00$100.00
3 $750.00$375.00
4 $1,504.00$752.00
5 $1,000.00$500.00
150022 - Page 199
Ref #55 611E99690 MANHOLE, MISC.: BRICK MANHOLE, 72", (1 EACH)
Awd $3,530.00$3,530.00
2 $10,600.00$10,600.00
3 $3,000.00$3,000.00
4 $11,000.00$11,000.00
5 $6,500.00$6,500.00
Ref #56 611E99700 GAS VALVE BOX ADJUSTED TO GRADE, (4 EACH)
Awd $600.00$150.00
2 $400.00$100.00
3 $540.00$135.00
4 $1,200.00$300.00
5 $600.00$150.00
Section 3 - DRAINAGE - Totals
Awd $18,037.00
2 $32,665.00
3 $21,987.50
4 $37,898.00
5 $30,228.00
Ref #57 304E20001 AGGREGATE BASE, AS PER PLAN, (325 CY)
Awd $19,500.00$60.00
2 $19,500.00$60.00
3 $15,600.00$48.00
4 $22,750.00$70.00
5 $17,875.00$55.00
Ref #58 451E13010 8" REINFORCED CONCRETE PAVEMENT, CLASS QC1, (259 SY)
Awd $15,281.00$59.00
2 $15,216.25$58.75
3 $19,166.00$74.00
4 $18,130.00$70.00
5 $23,310.00$90.00
Ref #59 451E14010 9" REINFORCED CONCRETE PAVEMENT, CLASS QC1, (1149 SY)
Awd $74,685.00$65.00
2 $73,823.25$64.25
3 $90,196.50$78.50
4 $86,175.00$75.00
5 $97,665.00$85.00
Ref #60 452E11050 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, (96 SY)
Awd $5,760.00$60.00
2 $4,656.00$48.50
3 $5,952.00$62.00
4 $7,680.00$80.00
5 $8,640.00$90.00
Ref #61 609E14001 CURB, TYPE 2-A, AS PER PLAN, (574 FT)
Awd $7,462.00$13.00
2 $3,702.30$6.45
3 $4,018.00$7.00
4 $17,220.00$30.00
5 $4,592.00$8.00
150022 - Page 200
Ref #62 609E26000 CURB, TYPE 6, (24 FT)
Awd $960.00$40.00
2 $672.00$28.00
3 $852.00$35.50
4 $600.00$25.00
5 $840.00$35.00
Section 4 - PAVEMENT - Totals
Awd $123,648.00
2 $117,569.80
3 $135,784.50
4 $152,555.00
5 $152,922.00
Ref #63 638E10700 FIRE HYDRANT REMOVED AND DISPOSED OF, (1 EACH)
Awd $1,000.00$1,000.00
2 $550.00$550.00
3 $800.00$800.00
4 $1,000.00$1,000.00
5 $800.00$800.00
Ref #64 638E50000 SPECIAL - 6" WATER MAIN DUCTILE IRON PIPE ANSI CLA, (85 FT)
Awd $8,500.00$100.00
2 $11,900.00$140.00
3 $8,967.50$105.50
4 $21,250.00$250.00
5 $12,750.00$150.00
Ref #65 638E51090 SPECIAL - 6" GATE VALVE WITH VALVE BOX, COMPLETE, (1 EACH)
Awd $3,500.00$3,500.00
2 $1,000.00$1,000.00
3 $1,400.00$1,400.00
4 $1,275.00$1,275.00
5 $1,000.00$1,000.00
Ref #66 638E51400 SPECIAL - FURNISHING AND SETTING 6" HYDRANT, COMPL, (1 EACH)
Awd $5,000.00$5,000.00
2 $3,600.00$3,600.00
3 $3,500.00$3,500.00
4 $4,000.00$4,000.00
5 $3,500.00$3,500.00
Ref #67 638E53500 VALVE BOX ADJUSTED TO GRADE, (2 EACH)
Awd $400.00$200.00
2 $300.00$150.00
3 $270.00$135.00
4 $858.00$429.00
5 $300.00$150.00
Ref #68 638E98000 WATER WORK, MISC.: 4" DUCTILE IRON TRANSITION COUP, (1 EACH)
Awd $650.00$650.00
2 $150.00$150.00
3 $460.00$460.00
4 $100.00$100.00
5 $300.00$300.00
150022 - Page 201
Ref #69 638E98000 WATER WORK, MISC.: 6"x4" REDUCER, (1 EACH)
Awd $750.00$750.00
2 $150.00$150.00
3 $445.00$445.00
4 $185.00$185.00
5 $300.00$300.00
Ref #70 638E98600 WATER WORK, MISC.: TRENCH, (13 FT)
Awd $260.00$20.00
2 $2,600.00$200.00
3 $1,690.00$130.00
4 $1,430.00$110.00
5 $650.00$50.00
Section 5 - WATER WORK - Totals
Awd $20,060.00
2 $20,250.00
3 $17,532.50
4 $30,098.00
5 $19,600.00
Ref #71 611E99654 MANHOLE ADJUSTED TO GRADE (FOR SANITARY), (1 EACH)
Awd $500.00$500.00
2 $250.00$250.00
3 $375.00$375.00
4 $1,100.00$1,100.00
5 $550.00$550.00
Section 6 - SANITARY SEWER - Totals
Awd $500.00
2 $250.00
3 $375.00
4 $1,100.00
5 $550.00
Ref #72 625E00450 CONNECTION, FUSED PULL APART, (8 EACH)
Awd $674.48$84.31
2 $674.48$84.31
3 $708.00$88.50
4 $672.00$84.00
5 $680.00$85.00
Ref #73 625E00480 CONNECTION, UNFUSED PERMANENT, (2 EACH)
Awd $154.82$77.41
2 $154.82$77.41
3 $163.00$81.50
4 $168.00$84.00
5 $150.00$75.00
Ref #74 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, A6B30, (1 EACH)
Awd $2,185.90$2,185.90
2 $2,185.90$2,185.90
3 $2,300.00$2,300.00
4 $3,000.00$3,000.00
5 $2,200.00$2,200.00
150022 - Page 202
Ref #75 625E10500 LIGHT POLE, MISC.: PEDESTRIAN, (3 EACH)
Awd $4,568.70$1,522.90
2 $4,568.70$1,522.90
3 $4,800.00$1,600.00
4 $6,600.00$2,200.00
5 $4,500.00$1,500.00
Ref #76 625E10614 LIGHT POLE ANCHOR BOLTS ON STRUCTURE, (7 EACH)
Awd $460.60$65.80
2 $460.60$65.80
3 $490.00$70.00
4 $518.00$74.00
5 $455.00$65.00
Ref #77 625E14501 LIGHT POLE FOUNDATION, AS PER PLAN, (2 EACH)
Awd $2,955.00$1,477.50
2 $2,955.00$1,477.50
3 $3,100.00$1,550.00
4 $3,800.00$1,900.00
5 $3,000.00$1,500.00
Ref #78 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE, (1062 FT)
Awd $2,219.58$2.09
2 $2,219.58$2.09
3 $2,389.50$2.25
4 $2,389.50$2.25
5 $2,124.00$2.00
Ref #79 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, (246 FT)
Awd $597.78$2.43
2 $597.78$2.43
3 $639.60$2.60
4 $590.40$2.40
5 $615.00$2.50
Ref #80 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE, (90 FT)
Awd $463.50$5.15
2 $463.50$5.15
3 $495.00$5.50
4 $270.00$3.00
5 $450.00$5.00
Ref #81 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE, (30 FT)
Awd $232.80$7.76
2 $232.80$7.76
3 $247.50$8.25
4 $60.00$2.00
5 $240.00$8.00
Ref #82 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (240 FT)
Awd $434.40$1.81
2 $434.40$1.81
3 $480.00$2.00
4 $300.00$1.25
5 $480.00$2.00
150022 - Page 203
Ref #83 625E25400 CONDUIT, 2", 725.04, (80 FT)
Awd $786.40$9.83
2 $786.40$9.83
3 $820.00$10.25
4 $1,760.00$22.00
5 $800.00$10.00
Ref #84 625E25401 CONDUIT, 2", 725.04, AS PER PLAN, (183 FT)
Awd $4,212.66$23.02
2 $4,212.66$23.02
3 $4,437.75$24.25
4 $2,196.00$12.00
5 $4,209.00$23.00
Ref #85 625E25409 CONDUIT, 2", 725.051, AS PER PLAN, (194 FT)
Awd $4,467.82$23.03
2 $4,467.82$23.03
3 $4,704.50$24.25
4 $3,880.00$20.00
5 $4,462.00$23.00
Ref #86 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, TYPE II, 200, (1 EACH)
Awd $431.30$431.30
2 $431.30$431.30
3 $450.00$450.00
4 $315.00$315.00
5 $430.00$430.00
Ref #87 625E27600 LUMINAIRE, MISC.: PEDESTRIAN, CONVENTIONAL, TYPE I, (3 EACH)
Awd $3,214.50$1,071.50
2 $3,214.50$1,071.50
3 $3,375.00$1,125.00
4 $3,000.00$1,000.00
5 $3,000.00$1,000.00
Ref #88 625E27600 LUMINAIRE, MISC.: PEDESTRIAN, WALL MOUNTED UNDERPA, (5 EACH)
Awd $4,005.00$801.00
2 $4,005.00$801.00
3 $4,250.00$850.00
4 $3,500.00$700.00
5 $4,000.00$800.00
Ref #89 625E29100 TRENCH, 36" DEEP, (113 FT)
Awd $1,227.18$10.86
2 $1,227.18$10.86
3 $1,299.50$11.50
4 $1,808.00$16.00
5 $1,356.00$12.00
Ref #90 625E29900 JUNCTION BOX, (3 EACH)
Awd $2,601.00$867.00
2 $2,601.00$867.00
3 $2,745.00$915.00
4 $1,050.00$350.00
5 $2,700.00$900.00
150022 - Page 204
Ref #91 625E30700 PULL BOX, 725.08, 18", (2 EACH)
Awd $1,193.50$596.75
2 $1,193.50$596.75
3 $1,260.00$630.00
4 $1,200.00$600.00
5 $1,200.00$600.00
Ref #92 625E31420 PULL BOX, 725.06, 17"X30", (2 EACH)
Awd $1,159.00$579.50
2 $1,159.00$579.50
3 $1,220.00$610.00
4 $1,600.00$800.00
5 $1,200.00$600.00
Ref #93 625E32000 GROUND ROD, (4 EACH)
Awd $403.00$100.75
2 $403.00$100.75
3 $420.00$105.00
4 $720.00$180.00
5 $400.00$100.00
Ref #94 625E33000 STRUCTURE GROUNDING SYSTEM, (2 EACH)
Awd $2,614.50$1,307.25
2 $2,614.50$1,307.25
3 $2,750.00$1,375.00
4 $6,400.00$3,200.00
5 $2,600.00$1,300.00
Ref #95 625E34001 POWER SERVICE, AS PER PLAN, (1 EACH)
Awd $1,709.75$1,709.75
2 $1,709.75$1,709.75
3 $1,800.00$1,800.00
4 $2,000.00$2,000.00
5 $1,700.00$1,700.00
Ref #96 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)
Awd $2,196.00$2,196.00
2 $2,196.00$2,196.00
3 $2,300.00$2,300.00
4 $400.00$400.00
5 $2,200.00$2,200.00
Ref #97 625E75400 LIGHT POLE REMOVED, (1 EACH)
Awd $384.00$384.00
2 $384.00$384.00
3 $405.00$405.00
4 $100.00$100.00
5 $380.00$380.00
Ref #98 625E75506 LUMINAIRE REMOVED, (1 EACH)
Awd $64.25$64.25
2 $64.25$64.25
3 $67.50$67.50
4 $42.00$42.00
5 $65.00$65.00
150022 - Page 205
Ref #99 625E75801 DISCONNECT CIRCUIT, AS PER PLAN, (1 EACH)
Awd $192.00$192.00
2 $192.00$192.00
3 $200.00$200.00
4 $190.00$190.00
5 $200.00$200.00
Ref #100 625E98000 LIGHTING, MISC.: FOUNDATION TEST HOLES, (2 EACH)
Awd $1,508.00$754.00
2 $1,508.50$754.25
3 $1,580.00$790.00
4 $136.00$68.00
5 $1,600.00$800.00
Ref #101 625E98000 LIGHTING, MISC.: POWER PEDESTAL INCLUDING WORK PAD, (1 EACH)
Awd $5,485.50$5,485.50
2 $5,485.50$5,485.50
3 $5,800.00$5,800.00
4 $9,500.00$9,500.00
5 $5,500.00$5,500.00
Section 7 - LIGHTING - Totals
Awd $52,802.92
2 $52,803.42
3 $55,696.85
4 $58,164.90
5 $52,896.00
Ref #102 626E00100 BARRIER REFLECTOR, (22 EACH)
Awd $110.00$5.00
2 $143.00$6.50
3 $121.00$5.50
4 $154.00$7.00
5 $154.00$7.00
Ref #103 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (53 FT)
Awd $246.45$4.65
2 $265.00$5.00
3 $291.50$5.50
4 $424.00$8.00
5 $265.00$5.00
Ref #104 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (30 FT)
Awd $178.50$5.95
2 $180.00$6.00
3 $195.00$6.50
4 $270.00$9.00
5 $180.00$6.00
Ref #105 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST, (19.5 FT)
Awd $97.50$5.00
2 $136.50$7.00
3 $146.25$7.50
4 $292.50$15.00
5 $292.50$15.00
150022 - Page 206
Ref #106 630E80100 SIGN, FLAT SHEET, (23.2 SF)
Awd $393.24$16.95
2 $324.80$14.00
3 $348.00$15.00
4 $719.20$31.00
5 $394.40$17.00
Ref #107 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $49.50$24.75
2 $40.00$20.00
3 $40.00$20.00
4 $30.00$15.00
5 $50.00$25.00
Ref #108 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)
Awd $100.00$50.00
2 $110.00$55.00
3 $116.00$58.00
4 $90.00$45.00
5 $100.00$50.00
Ref #109 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS , (1 EACH)
Awd $1,500.00$1,500.00
2 $1,800.00$1,800.00
3 $1,900.00$1,900.00
4 $45.00$45.00
5 $1,200.00$1,200.00
Ref #110 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)
Awd $99.00$33.00
2 $75.00$25.00
3 $79.50$26.50
4 $225.00$75.00
5 $150.00$50.00
Ref #111 630E86272 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND DISPOSA, (1 EACH)
Awd $50.00$50.00
2 $50.00$50.00
3 $53.00$53.00
4 $75.00$75.00
5 $70.00$70.00
Ref #112 630E86321 REMOVAL OF STRUCTURE MOUNTED SIGN AND REERECTION, , (2 EACH)
Awd $145.50$72.75
2 $190.00$95.00
3 $200.00$100.00
4 $600.00$300.00
5 $140.00$70.00
Ref #113 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $49.50$16.50
2 $45.00$15.00
3 $48.00$16.00
4 $204.00$68.00
5 $51.00$17.00
150022 - Page 207
Ref #114 631E84000 SIGN SERVICE, (1 EACH)
Awd $800.00$800.00
2 $800.00$800.00
3 $1,800.00$1,800.00
4 $2,500.00$2,500.00
5 $1,700.00$1,700.00
Ref #115 631E94470 REMOVAL OF SIGN SERVICE, (1 EACH)
Awd $300.00$300.00
2 $300.00$300.00
3 $368.00$368.00
4 $27.00$27.00
5 $350.00$350.00
Ref #116 642E00100 EDGE LINE, 4", TYPE 1, (0.14 MILE)
Awd $398.30$2,845.00
2 $1,330.00$9,500.00
3 $420.00$3,000.00
4 $1,050.00$7,500.00
5 $406.00$2,900.00
Ref #117 642E00300 CENTER LINE, TYPE 1, (0.09 MILE)
Awd $512.10$5,690.00
2 $405.00$4,500.00
3 $540.00$6,000.00
4 $720.00$8,000.00
5 $540.00$6,000.00
Ref #118 642E01300 LANE ARROW, TYPE 1, (2 EACH)
Awd $110.00$55.00
2 $150.00$75.00
3 $120.00$60.00
4 $320.00$160.00
5 $110.00$55.00
Section 8 - TRAFFIC CONTROL - Totals
Awd $5,139.59
2 $6,344.30
3 $6,786.25
4 $7,745.70
5 $6,152.90
Ref #119 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (25 CY)
Awd $1,500.00$60.00
2 $1,250.00$50.00
3 $1,625.00$65.00
4 $2,500.00$100.00
5 $750.00$30.00
Ref #120 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (75 HOUR)
Awd $5,250.00$70.00
2 $5,625.00$75.00
3 $3,375.00$45.00
4 $6,000.00$80.00
5 $4,875.00$65.00
150022 - Page 208
Ref #121 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $10,000.00$10,000.00
3 $6,000.00$6,000.00
4 $8,000.00$8,000.00
5 $7,000.00$7,000.00
Ref #122 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (0.22 MILE)
Awd $1,489.40$6,770.00
2 $1,650.00$7,500.00
3 $1,562.00$7,100.00
4 $1,100.00$5,000.00
5 $1,540.00$7,000.00
Ref #123 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (0.38 MILE)
Awd $1,286.30$3,385.00
2 $1,710.00$4,500.00
3 $1,368.00$3,600.00
4 $1,900.00$5,000.00
5 $1,330.00$3,500.00
Ref #124 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT, (136 FT)
Awd $408.00$3.00
2 $408.00$3.00
3 $292.40$2.15
4 $217.60$1.60
5 $408.00$3.00
Ref #125 616E10000 WATER, (51 MGAL)
Awd $51.00$1.00
2 $51.00$1.00
3 $255.00$5.00
4 $1,479.00$29.00
5 $51.00$1.00
Section 9 - MAINTENANCE OF TRAFFIC - Totals
Awd $16,484.70
2 $20,694.00
3 $14,477.40
4 $21,196.60
5 $15,954.00
Ref #126 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $80,000.00$80,000.00
3 $25,000.00$25,000.00
4 $75,000.00$75,000.00
5 $40,000.00$40,000.00
Ref #127 509E10000 EPOXY COATED REINFORCING STEEL, (15015 LB)
Awd $14,264.25$0.95
2 $14,264.25$0.95
3 $15,015.00$1.00
4 $15,015.00$1.00
5 $18,768.75$1.25
150022 - Page 209
Ref #128 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (488 EACH)
Awd $12,200.00$25.00
2 $7,320.00$15.00
3 $8,296.00$17.00
4 $9,760.00$20.00
5 $1,464.00$3.00
Ref #129 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (65 SY)
Awd $910.00$14.00
2 $633.75$9.75
3 $650.00$10.00
4 $780.00$12.00
5 $1,950.00$30.00
Ref #130 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (940 SY)
Awd $15,040.00$16.00
2 $12,690.00$13.50
3 $10,340.00$11.00
4 $15,040.00$16.00
5 $23,500.00$25.00
Ref #131 512E10600 CONCRETE REPAIR BY EPOXY INJECTION, (88 FT)
Awd $6,160.00$70.00
2 $8,800.00$100.00
3 $4,400.00$50.00
4 $8,800.00$100.00
5 $7,040.00$80.00
Ref #132 517E73200 RAILING (DEFLECTOR PARAPET TYPE), (492 FT)
Awd $66,420.00$135.00
2 $59,040.00$120.00
3 $81,426.00$165.50
4 $34,440.00$70.00
5 $159,900.00$325.00
Ref #133 517E73501 RAILING, PIPE, AS PER PLAN, (60 FT)
Awd $5,730.00$95.50
2 $11,145.00$185.75
3 $11,700.00$195.00
4 $9,900.00$165.00
5 $11,100.00$185.00
Ref #134 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF)
Awd $8,000.00$80.00
2 $6,500.00$65.00
3 $6,300.00$63.00
4 $8,500.00$85.00
5 $9,500.00$95.00
Section 10 - RETAINING WALLS - Totals
Awd $168,724.25
2 $200,393.00
3 $163,127.00
4 $177,235.00
5 $273,222.75
150022 - Page 210
Ref #135 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $95,000.00$95,000.00
2 $90,000.00$90,000.00
3 $105,000.00$105,000.00
4 $75,000.00$75,000.00
5 $150,000.00$150,000.00
Ref #136 202E22901 APPROACH SLAB REMOVED, AS PER PLAN, (191 SY)
Awd $3,438.00$18.00
2 $3,820.00$20.00
3 $4,393.00$23.00
4 $3,820.00$20.00
5 $6,685.00$35.00
Ref #137 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN, (LUMP SUM)
Awd $500.00$500.00
2 $15,000.00$15,000.00
3 $7,000.00$7,000.00
4 $13,000.00$13,000.00
5 $7,000.00$7,000.00
Ref #138 509E10000 EPOXY COATED REINFORCING STEEL, (29488 LB)
Awd $29,488.00$1.00
2 $28,013.60$0.95
3 $29,488.00$1.00
4 $29,488.00$1.00
5 $35,385.60$1.20
Ref #139 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (122 EACH)
Awd $3,050.00$25.00
2 $1,830.00$15.00
3 $2,074.00$17.00
4 $2,440.00$20.00
5 $366.00$3.00
Ref #140 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (65 CY)
Awd $52,000.00$800.00
2 $60,125.00$925.00
3 $49,725.00$765.00
4 $78,000.00$1,200.00
5 $58,500.00$900.00
Ref #141 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET), (21 CY)
Awd $8,400.00$400.00
2 $12,600.00$600.00
3 $18,270.00$870.00
4 $9,975.00$475.00
5 $17,850.00$850.00
Ref #142 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING, (67 CY)
Awd $120,600.00$1,800.00
2 $35,175.00$525.00
3 $28,475.00$425.00
4 $46,900.00$700.00
5 $40,200.00$600.00
150022 - Page 211
Ref #143 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (413 SY)
Awd $5,782.00$14.00
2 $5,575.50$13.50
3 $5,369.00$13.00
4 $6,608.00$16.00
5 $10,325.00$25.00
Ref #144 512E10600 CONCRETE REPAIR BY EPOXY INJECTION, (27 FT)
Awd $1,890.00$70.00
2 $2,835.00$105.00
3 $1,485.00$55.00
4 $2,430.00$90.00
5 $2,160.00$80.00
Ref #145 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN, (60836 LB)
Awd $152,090.00$2.50
2 $105,246.28$1.73
3 $103,421.20$1.70
4 $128,363.96$2.11
5 $115,588.40$1.90
Ref #146 513E20000 WELDED STUD SHEAR CONNECTORS, (816 EACH)
Awd $3,264.00$4.00
2 $3,264.00$4.00
3 $2,937.60$3.60
4 $2,448.00$3.00
5 $2,856.00$3.50
Ref #148 514E27700 FIELD PAINTING, MISC.:URETHANE TOP COAT FOR GALVAN, (665 SF)
Awd $19,950.00$30.00
2 $7,980.00$12.00
3 $21,280.00$32.00
4 $8,645.00$13.00
5 $19,950.00$30.00
Ref #149 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (73 FT)
Awd $29,200.00$400.00
2 $29,200.00$400.00
3 $31,390.00$430.00
4 $36,500.00$500.00
5 $32,850.00$450.00
Ref #150 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (85 SF)
Awd $850.00$10.00
2 $340.00$4.00
3 $510.00$6.00
4 $765.00$9.00
5 $1,700.00$20.00
Ref #151 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (5 EACH)
Awd $4,400.00$880.00
2 $2,850.00$570.00
3 $3,225.00$645.00
4 $3,000.00$600.00
5 $3,500.00$700.00
150022 - Page 212
Ref #152 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (5 EACH)
Awd $3,115.00$623.00
2 $1,565.00$313.00
3 $3,225.00$645.00
4 $3,000.00$600.00
5 $2,500.00$500.00
Ref #153 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $3,500.00$3,500.00
3 $4,500.00$4,500.00
4 $3,500.00$3,500.00
5 $5,000.00$5,000.00
Ref #154 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (247 SF)
Awd $7,410.00$30.00
2 $16,055.00$65.00
3 $15,561.00$63.00
4 $20,501.00$83.00
5 $17,290.00$70.00
Ref #155 519E11600 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.:REFAC, (940 SF)
Awd $28,200.00$30.00
2 $32,900.00$35.00
3 $36,190.00$38.50
4 $45,120.00$48.00
5 $75,200.00$80.00
Ref #156 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER, (150 SY)
Awd $26,250.00$175.00
2 $27,000.00$180.00
3 $30,000.00$200.00
4 $52,500.00$350.00
5 $39,750.00$265.00
Ref #157 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (128 FT)
Awd $9,574.40$74.80
2 $9,574.40$74.80
3 $11,264.00$88.00
4 $10,112.00$79.00
5 $9,600.00$75.00
Ref #200 514E27700 FIELD PAINTING, MISC.:BRUSH-OFF BLASTING GALVANIZE, (665 SF)
Awd $9,941.75$14.95
2 $19,950.00$30.00
3 $21,280.00$32.00
4 $21,280.00$32.00
5 $9,975.00$15.00
Ref #201 514E27700 FIELD PAINTING, MISC.:EPOXY INTERMEDIATE COAT FOR , (665 SF)
Awd $9,941.75$14.95
2 $7,980.00$12.00
3 $21,280.00$32.00
4 $7,980.00$12.00
5 $9,975.00$15.00
150022 - Page 213
Section 11 - STRUCTURE REPAIR (SUM-18-1302) - Totals
Awd $626,834.90
2 $522,378.78
3 $557,342.80
4 $611,375.96
5 $674,206.00
Ref #158 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $80,000.00$80,000.00
2 $110,000.00$110,000.00
3 $105,000.00$105,000.00
4 $85,000.00$85,000.00
5 $125,000.00$125,000.00
Ref #159 202E22901 APPROACH SLAB REMOVED, AS PER PLAN, (209 SY)
Awd $3,762.00$18.00
2 $5,225.00$25.00
3 $4,389.00$21.00
4 $5,176.93$24.77
5 $7,315.00$35.00
Ref #160 202E23500 WEARING COURSE REMOVED, (137 SY)
Awd $2,055.00$15.00
2 $411.00$3.00
3 $1,746.75$12.75
4 $685.00$5.00
5 $2,740.00$20.00
Ref #161 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN, (LUMP SUM)
Awd $500.00$500.00
2 $15,000.00$15,000.00
3 $5,000.00$5,000.00
4 $9,000.00$9,000.00
5 $4,500.00$4,500.00
Ref #162 509E10000 EPOXY COATED REINFORCING STEEL, (18012 LB)
Awd $18,012.00$1.00
2 $17,111.40$0.95
3 $18,012.00$1.00
4 $19,452.96$1.08
5 $21,614.40$1.20
Ref #163 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (120 EACH)
Awd $3,000.00$25.00
2 $1,800.00$15.00
3 $2,040.00$17.00
4 $2,400.00$20.00
5 $360.00$3.00
Ref #164 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (35 CY)
Awd $31,500.00$900.00
2 $38,500.00$1,100.00
3 $26,775.00$765.00
4 $55,125.00$1,575.00
5 $35,000.00$1,000.00
150022 - Page 214
Ref #165 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET), (12 CY)
Awd $10,200.00$850.00
2 $7,800.00$650.00
3 $9,180.00$765.00
4 $7,800.00$650.00
5 $12,000.00$1,000.00
Ref #166 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE, (25 CY)
Awd $45,000.00$1,800.00
2 $15,625.00$625.00
3 $15,500.00$620.00
4 $31,250.00$1,250.00
5 $27,500.00$1,100.00
Ref #167 511E51510 CLASS QC2 CONCRETE, SIDEWALK, (16 CY)
Awd $8,000.00$500.00
2 $5,600.00$350.00
3 $9,600.00$600.00
4 $8,960.00$560.00
5 $12,800.00$800.00
Ref #168 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (118 SY)
Awd $1,652.00$14.00
2 $1,150.50$9.75
3 $1,180.00$10.00
4 $1,416.00$12.00
5 $2,950.00$25.00
Ref #169 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (287 SY)
Awd $4,018.00$14.00
2 $3,874.50$13.50
3 $4,879.00$17.00
4 $4,592.00$16.00
5 $7,175.00$25.00
Ref #170 512E10600 CONCRETE REPAIR BY EPOXY INJECTION, (30 FT)
Awd $2,100.00$70.00
2 $2,100.00$70.00
3 $1,605.00$53.50
4 $2,700.00$90.00
5 $2,400.00$80.00
Ref #171 515E12020 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM, (2 EACH)
Awd $18,600.00$9,300.00
2 $19,200.00$9,600.00
3 $18,000.00$9,000.00
4 $16,000.00$8,000.00
5 $34,000.00$17,000.00
Ref #172 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM, (8 EACH)
Awd $74,400.00$9,300.00
2 $60,800.00$7,600.00
3 $72,000.00$9,000.00
4 $64,000.00$8,000.00
5 $104,000.00$13,000.00
150022 - Page 215
Ref #173 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (76 FT)
Awd $3,040.00$40.00
2 $1,520.00$20.00
3 $3,572.00$47.00
4 $3,040.00$40.00
5 $3,040.00$40.00
Ref #174 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (40 EACH)
Awd $5,400.00$135.00
2 $5,200.00$130.00
3 $8,200.00$205.00
4 $6,320.00$158.00
5 $10,000.00$250.00
Ref #175 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $3,150.00$3,150.00
3 $3,500.00$3,500.00
4 $3,500.00$3,500.00
5 $5,000.00$5,000.00
Ref #176 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (926 SF)
Awd $27,780.00$30.00
2 $60,190.00$65.00
3 $56,949.00$61.50
4 $75,932.00$82.00
5 $64,820.00$70.00
Ref #177 519E11600 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.:REFAC, (635 SF)
Awd $19,050.00$30.00
2 $22,225.00$35.00
3 $24,130.00$38.00
4 $29,845.00$47.00
5 $50,800.00$80.00
Ref #178 519E11600 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.:VOID , (70 SF)
Awd $4,900.00$70.00
2 $7,000.00$100.00
3 $4,900.00$70.00
4 $12,250.00$175.00
5 $6,650.00$95.00
Ref #179 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER, (186 SY)
Awd $32,550.00$175.00
2 $29,760.00$160.00
3 $38,130.00$205.00
4 $46,500.00$250.00
5 $47,430.00$255.00
Ref #180 607E39910 VANDAL PROTECTION FENCE, 8' STRAIGHT, COATED FABRI, (108 FT)
Awd $9,892.80$91.60
2 $9,892.80$91.60
3 $11,340.00$105.00
4 $10,476.00$97.00
5 $9,936.00$92.00
150022 - Page 216
Ref #181 690E98000 SPECIAL - MISC.:DUCT BANK SUPPORTS, (18 EACH)
Awd $5,040.00$280.00
2 $8,100.00$450.00
3 $8,190.00$455.00
4 $11,430.00$635.00
5 $4,320.00$240.00
Ref #182 690E98000 SPECIAL - MISC.:STEEL PIPE ROLLERS AND ROLLER SUPP, (8 EACH)
Awd $3,360.00$420.00
2 $5,840.00$730.00
3 $6,000.00$750.00
4 $10,400.00$1,300.00
5 $7,200.00$900.00
Ref #183 690E98100 SPECIAL - MISC.:10" PIPE ENCASEMENT, 748.06, (100 FT)
Awd $6,000.00$60.00
2 $8,000.00$80.00
3 $2,550.00$25.50
4 $8,400.00$84.00
5 $5,000.00$50.00
Ref #184 690E98400 SPECIAL - MISC.:TEMPORARY SUPPORT OF EXISTING DUCT, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $8,000.00$8,000.00
3 $4,000.00$4,000.00
4 $45,000.00$45,000.00
5 $15,000.00$15,000.00
Section 12 - STRUCTURE 20 FOOT SPAN AND OVER (SUM-BRI - Totals
Awd $427,311.80
2 $473,075.20
3 $466,367.75
4 $576,650.89
5 $628,550.40
Ref #185 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $10,000.00$10,000.00
2 $20,000.00$20,000.00
3 $7,500.00$7,500.00
4 $15,000.00$15,000.00
5 $12,000.00$12,000.00
Ref #186 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $20,000.00$20,000.00
3 $20,000.00$20,000.00
4 $15,000.00$15,000.00
5 $25,000.00$25,000.00
Ref #187 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
3 $35,000.00$35,000.00
4 $20,000.00$20,000.00
5 $50,000.00$50,000.00
150022 - Page 217
Ref #188 619E16010 FIELD OFFICE, TYPE B, (12 MNTH)
Awd $14,400.00$1,200.00
2 $18,000.00$1,500.00
3 $19,800.00$1,650.00
4 $30,000.00$2,500.00
5 $30,000.00$2,500.00
Ref #189 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $10,000.00$10,000.00
3 $11,000.00$11,000.00
4 $26,000.00$26,000.00
5 $20,000.00$20,000.00
Ref #190 624E10000 MOBILIZATION, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $40,000.00$40,000.00
5 $70,000.00$70,000.00
Section 13 - INCIDENTALS - Totals
Awd $98,900.00
2 $128,000.00
3 $133,300.00
4 $146,000.00
5 $207,000.00
150022 - Page 218
Project No. 150023
PID 81656
SUM-SR 82-04.65
Federal
Type: MAJOR WIDENING
Completion Date: 9/30/2016
Award Amount: $4,577,016.05
Contract Awarded To: KARVO PAVING COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $3,977,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
KARVO PAVING COMPANY
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 1
Bid $4,577,016.05
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $4,790,038.42
FABRIZI TRUCKING & PAVING CO INC
389 COLUMBIA RD
VALLEY CITY, OH 44280
Medina
Bidder 3
Bid $5,200,000.00
S E T INC
235 EAST WATER ST
LOWELLVILLE, OH 44436
Mahoning
Bidder 4
Bid $5,299,445.39
150023 - Page 219
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $25,000.00$25,000.00
3 $32,380.00$32,380.00
4 $36,690.00$36,690.00
Ref #2 202E20010 HEADWALL REMOVED, (3 EACH)
Awd $1,725.00$575.00
2 $900.00$300.00
3 $1,050.00$350.00
4 $1,971.00$657.00
Ref #3 202E23000 PAVEMENT REMOVED, (11498 SY)
Awd $119,579.20$10.40
2 $137,976.00$12.00
3 $195,466.00$17.00
4 $137,976.00$12.00
Ref #4 202E23010 PAVEMENT REMOVED, ASPHALT, (2005 SY)
Awd $10,125.25$5.05
2 $24,060.00$12.00
3 $32,080.00$16.00
4 $16,040.00$8.00
Ref #5 202E30000 WALK REMOVED, (2420 SF)
Awd $4,235.00$1.75
2 $1,936.00$0.80
3 $2,420.00$1.00
4 $4,840.00$2.00
Ref #6 202E32000 CURB REMOVED, (273 FT)
Awd $1,365.00$5.00
2 $819.00$3.00
3 $2,184.00$8.00
4 $1,911.00$7.00
Ref #7 202E32500 CURB AND GUTTER REMOVED, (362 FT)
Awd $1,991.00$5.50
2 $1,086.00$3.00
3 $3,620.00$10.00
4 $6,154.00$17.00
Ref #8 202E35100 PIPE REMOVED, 24" AND UNDER, (2682 FT)
Awd $75,096.00$28.00
2 $40,230.00$15.00
3 $59,004.00$22.00
4 $53,640.00$20.00
Ref #9 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN, (1500 FT)
Awd $18,000.00$12.00
2 $16,500.00$11.00
3 $39,000.00$26.00
4 $22,500.00$15.00
Ref #10 202E35200 PIPE REMOVED, OVER 24", (84 FT)
Awd $3,528.00$42.00
2 $924.00$11.00
3 $2,940.00$35.00
4 $1,512.00$18.00
150023 - Page 220
Ref #11 202E38000 GUARDRAIL REMOVED, (737.5 FT)
Awd $1,180.00$1.60
2 $1,253.75$1.70
3 $4,425.00$6.00
4 $737.50$1.00
Ref #12 202E58000 MANHOLE REMOVED, (2 EACH)
Awd $1,200.00$600.00
2 $1,000.00$500.00
3 $1,300.00$650.00
4 $1,846.00$923.00
Ref #13 202E58100 CATCH BASIN REMOVED, (21 EACH)
Awd $7,875.00$375.00
2 $10,500.00$500.00
3 $7,350.00$350.00
4 $6,573.00$313.00
Ref #14 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (659 FT)
Awd $5,272.00$8.00
2 $11,862.00$18.00
3 $11,203.00$17.00
4 $3,295.00$5.00
Ref #15 202E70100 SPECIAL - PIPE CLEANOUT, (200 FT)
Awd $7,400.00$37.00
2 $5,600.00$28.00
3 $5,000.00$25.00
4 $6,000.00$30.00
Ref #16 203E10000 EXCAVATION, (9854 CY)
Awd $108,394.00$11.00
2 $172,445.00$17.50
3 $142,883.00$14.50
4 $177,372.00$18.00
Ref #17 203E20000 EMBANKMENT, (3616 CY)
Awd $31,640.00$8.75
2 $21,696.00$6.00
3 $23,504.00$6.50
4 $32,544.00$9.00
Ref #18 204E10000 SUBGRADE COMPACTION, (15789 SY)
Awd $18,946.80$1.20
2 $23,683.50$1.50
3 $27,630.75$1.75
4 $31,578.00$2.00
Ref #19 204E13000 EXCAVATION OF SUBGRADE, (5081 CY)
Awd $40,648.00$8.00
2 $106,701.00$21.00
3 $71,134.00$14.00
4 $91,458.00$18.00
Ref #20 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN, (5081 CY)
Awd $152,430.00$30.00
2 $223,564.00$44.00
3 $243,888.00$48.00
4 $264,212.00$52.00
150023 - Page 221
Ref #21 204E45000 PROOF ROLLING, (8 HOUR)
Awd $1,200.00$150.00
2 $2,600.00$325.00
3 $1,200.00$150.00
4 $1,088.00$136.00
Ref #22 204E50000 GEOTEXTILE FABRIC, (1507 SY)
Awd $1,507.00$1.00
2 $1,808.40$1.20
3 $3,014.00$2.00
4 $1,507.00$1.00
Ref #23 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (57 STA)
Awd $2,166.00$38.00
2 $3,705.00$65.00
3 $14,535.00$255.00
4 $10,659.00$187.00
Ref #24 606E15050 GUARDRAIL, TYPE MGS, (443.75 FT)
Awd $7,455.00$16.80
2 $7,987.50$18.00
3 $9,762.50$22.00
4 $10,206.25$23.00
Ref #25 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (5 EACH)
Awd $9,225.00$1,845.00
2 $9,750.00$1,950.00
3 $11,075.00$2,215.00
4 $10,065.00$2,013.00
Ref #26 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (5 EACH)
Awd $3,675.00$735.00
2 $3,900.00$780.00
3 $4,250.00$850.00
4 $4,800.00$960.00
Ref #27 608E10001 4" CONCRETE WALK, AS PER PLAN, (9256 SF)
Awd $38,875.20$4.20
2 $41,652.00$4.50
3 $49,519.60$5.35
4 $46,280.00$5.00
Ref #28 608E13001 6" CONCRETE WALK, AS PER PLAN, (390 SF)
Awd $2,340.00$6.00
2 $2,340.00$6.00
3 $2,223.00$5.70
4 $2,730.00$7.00
Ref #29 608E15001 8" CONCRETE WALK, AS PER PLAN, (267 SF)
Awd $1,775.55$6.65
2 $2,136.00$8.00
3 $1,735.50$6.50
4 $2,136.00$8.00
Ref #30 608E52021 CURB RAMP, TYPE A2, AS PER PLAN, (450 SF)
Awd $5,625.00$12.50
2 $6,750.00$15.00
3 $5,850.00$13.00
4 $6,300.00$14.00
150023 - Page 222
Ref #31 608E52031 CURB RAMP, TYPE B1, AS PER PLAN, (72 SF)
Awd $1,008.00$14.00
2 $1,152.00$16.00
3 $1,296.00$18.00
4 $1,008.00$14.00
Ref #32 608E52045 CURB RAMP, TYPE B3, AS PER PLAN, (118 SF)
Awd $1,416.00$12.00
2 $1,180.00$10.00
3 $1,652.00$14.00
4 $1,652.00$14.00
Ref #33 608E52051 CURB RAMP, TYPE C1, AS PER PLAN, (180 SF)
Awd $2,160.00$12.00
2 $1,440.00$8.00
3 $2,520.00$14.00
4 $2,520.00$14.00
Ref #34 623E38500 MONUMENT ASSEMBLY, (7 EACH)
Awd $6,650.00$950.00
2 $8,400.00$1,200.00
3 $7,350.00$1,050.00
4 $7,910.00$1,130.00
Ref #35 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (19 EACH)
Awd $2,185.00$115.00
2 $2,375.00$125.00
3 $4,085.00$215.00
4 $2,128.00$112.00
Ref #36 861E10000 GEOGRID FOR SUBGRADE STABILIZATION, (12254 SY)
Awd $25,978.48$2.12
2 $42,889.00$3.50
3 $42,889.00$3.50
4 $49,016.00$4.00
Ref #300 690E98000 SPECIAL - MISC.:CONDUIT RISER ASSEMBLY, (3 EACH)
Awd $7,500.00$2,500.00
2 $6,900.00$2,300.00
3 $1,050.00$350.00
4 $8,280.00$2,760.00
Section 1 - ROADWAY - Totals
Awd $766,371.48
2 $974,701.15
3 $1,072,468.35
4 $1,067,134.75
Ref #37 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (10 SY)
Awd $800.00$80.00
2 $1,100.00$110.00
3 $650.00$65.00
4 $1,160.00$116.00
Ref #38 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (8.3 CY)
Awd $1,743.00$210.00
2 $1,328.00$160.00
3 $996.00$120.00
4 $1,294.80$156.00
150023 - Page 223
Ref #39 616E10000 WATER, (10 MGAL)
Awd $100.00$10.00
2 $500.00$50.00
3 $100.00$10.00
4 $350.00$35.00
Ref #40 616E20000 CALCIUM CHLORIDE, (1 TON)
Awd $45.00$45.00
2 $400.00$400.00
3 $400.00$400.00
4 $2,847.00$2,847.00
Ref #41 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $400.00$200.00
2 $60.00$30.00
3 $160.00$80.00
4 $82.00$41.00
Ref #42 659E00300 TOPSOIL, (2122 CY)
Awd $44,562.00$21.00
2 $59,416.00$28.00
3 $101,856.00$48.00
4 $91,246.00$43.00
Ref #43 659E10000 SEEDING AND MULCHING, (19101 SY)
Awd $12,033.63$0.63
2 $16,235.85$0.85
3 $57,303.00$3.00
4 $19,101.00$1.00
Ref #44 659E14000 REPAIR SEEDING AND MULCHING, (955 SY)
Awd $955.00$1.00
2 $811.75$0.85
3 $955.00$1.00
4 $955.00$1.00
Ref #45 659E15000 INTER-SEEDING, (955 SY)
Awd $9.55$0.01
2 $9.55$0.01
3 $955.00$1.00
4 $955.00$1.00
Ref #46 659E20000 COMMERCIAL FERTILIZER, (2.66 TON)
Awd $1,862.00$700.00
2 $771.40$290.00
3 $2,394.00$900.00
4 $1,529.50$575.00
Ref #47 659E31000 LIME, (3.95 ACRE)
Awd $395.00$100.00
2 $102.70$26.00
3 $237.00$60.00
4 $138.25$35.00
Ref #48 659E35000 WATER, (106 MGAL)
Awd $2,120.00$20.00
2 $106.00$1.00
3 $1,060.00$10.00
4 $106.00$1.00
150023 - Page 224
Ref #49 670E00710 DITCH EROSION PROTECTION MAT, TYPE A, (784 SY)
Awd $1,764.00$2.25
2 $1,450.40$1.85
3 $1,568.00$2.00
4 $1,568.00$2.00
Ref #50 670E00730 DITCH EROSION PROTECTION MAT, TYPE C, (770 SY)
Awd $2,310.00$3.00
2 $1,848.00$2.40
3 $1,540.00$2.00
4 $1,540.00$2.00
Ref #51 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $20,000.00$20,000.00
3 $10,000.00$10,000.00
4 $19,320.00$19,320.00
Ref #52 832E30000 EROSION CONTROL, (65225 EACH)
Awd $65,225.00$1.00
2 $65,225.00$1.00
3 $65,225.00$1.00
4 $65,225.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $149,324.18
2 $169,364.65
3 $245,399.00
4 $207,417.55
Ref #53 602E20000 CONCRETE MASONRY, (6.63 CY)
Awd $17,901.00$2,700.00
2 $12,928.50$1,950.00
3 $8,950.50$1,350.00
4 $7,186.92$1,084.00
Ref #54 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, 707., (7755 FT)
Awd $77,550.00$10.00
2 $100,815.00$13.00
3 $77,550.00$10.00
4 $100,815.00$13.00
Ref #55 605E12210 6" DEEP PIPE UNDERDRAINS WITH FABRIC WRAP, 707.31, (954 FT)
Awd $15,264.00$16.00
2 $15,264.00$16.00
3 $15,264.00$16.00
4 $11,448.00$12.00
Ref #56 605E13402 6" UNCLASSIFIED PIPE UNDERDRAINS FOR SPRINGS, (100 FT)
Awd $1,200.00$12.00
2 $1,150.00$11.50
3 $1,400.00$14.00
4 $1,300.00$13.00
Ref #57 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP,, (320 FT)
Awd $3,520.00$11.00
2 $4,160.00$13.00
3 $4,480.00$14.00
4 $3,200.00$10.00
150023 - Page 225
Ref #58 605E32200 AGGREGATE DRAINS FOR SPRINGS, (100 FT)
Awd $1,000.00$10.00
2 $750.00$7.50
3 $1,800.00$18.00
4 $2,400.00$24.00
Ref #59 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (465 FT)
Awd $5,812.50$12.50
2 $8,835.00$19.00
3 $5,580.00$12.00
4 $5,580.00$12.00
Ref #60 611E00900 6" CONDUIT, TYPE B, (151 FT)
Awd $4,530.00$30.00
2 $3,473.00$23.00
3 $6,795.00$45.00
4 $2,114.00$14.00
Ref #61 611E01400 6" CONDUIT, TYPE E, (100 FT)
Awd $1,100.00$11.00
2 $1,775.00$17.75
3 $1,500.00$15.00
4 $800.00$8.00
Ref #62 611E01500 6" CONDUIT, TYPE F, (100 FT)
Awd $1,100.00$11.00
2 $1,775.00$17.75
3 $1,200.00$12.00
4 $800.00$8.00
Ref #63 611E04400 12" CONDUIT, TYPE B, (1073 FT)
Awd $82,621.00$77.00
2 $74,037.00$69.00
3 $66,526.00$62.00
4 $78,329.00$73.00
Ref #64 611E04400 12" CONDUIT, TYPE B, 706.02, (21 FT)
Awd $3,150.00$150.00
2 $2,352.00$112.00
3 $1,365.00$65.00
4 $1,428.00$68.00
Ref #65 611E04600 12" CONDUIT, TYPE C, (1316 FT)
Awd $61,852.00$47.00
2 $81,592.00$62.00
3 $71,064.00$54.00
4 $77,644.00$59.00
Ref #66 611E04600 12" CONDUIT, TYPE C, 706.02, (10 FT)
Awd $1,200.00$120.00
2 $1,240.00$124.00
3 $690.00$69.00
4 $530.00$53.00
Ref #67 611E04900 12" CONDUIT, TYPE D, (17 FT)
Awd $1,037.00$61.00
2 $918.00$54.00
3 $833.00$49.00
4 $714.00$42.00
150023 - Page 226
Ref #68 611E05100 12" CONDUIT, TYPE E, (200 FT)
Awd $5,200.00$26.00
2 $10,800.00$54.00
3 $9,000.00$45.00
4 $6,800.00$34.00
Ref #69 611E05200 12" CONDUIT, TYPE F, (200 FT)
Awd $5,600.00$28.00
2 $10,800.00$54.00
3 $7,600.00$38.00
4 $6,800.00$34.00
Ref #70 611E05900 15" CONDUIT, TYPE B, (84 FT)
Awd $6,804.00$81.00
2 $9,072.00$108.00
3 $5,460.00$65.00
4 $5,460.00$65.00
Ref #71 611E06100 15" CONDUIT, TYPE C, (149 FT)
Awd $7,003.00$47.00
2 $8,940.00$60.00
3 $7,599.00$51.00
4 $8,046.00$54.00
Ref #72 611E07400 18" CONDUIT, TYPE B, (660 FT)
Awd $62,040.00$94.00
2 $52,140.00$79.00
3 $46,200.00$70.00
4 $54,780.00$83.00
Ref #73 611E07600 18" CONDUIT, TYPE C, (21 FT)
Awd $2,289.00$109.00
2 $1,932.00$92.00
3 $1,239.00$59.00
4 $1,428.00$68.00
Ref #74 611E08900 21" CONDUIT, TYPE B, (299 FT)
Awd $37,076.00$124.00
2 $33,787.00$113.00
3 $29,003.00$97.00
4 $25,714.00$86.00
Ref #75 611E09100 21" CONDUIT, TYPE C, (361 FT)
Awd $28,880.00$80.00
2 $28,158.00$78.00
3 $28,158.00$78.00
4 $27,797.00$77.00
Ref #76 611E10400 24" CONDUIT, TYPE B, (293 FT)
Awd $33,695.00$115.00
2 $37,797.00$129.00
3 $24,905.00$85.00
4 $27,542.00$94.00
Ref #77 611E10600 24" CONDUIT, TYPE C, (238 FT)
Awd $18,088.00$76.00
2 $23,086.00$97.00
3 $17,136.00$72.00
4 $20,944.00$88.00
150023 - Page 227
Ref #78 611E10900 24" CONDUIT, TYPE D, (32 FT)
Awd $2,208.00$69.00
2 $2,688.00$84.00
3 $2,080.00$65.00
4 $2,816.00$88.00
Ref #79 611E13600 30" CONDUIT, TYPE C, (81 FT)
Awd $7,533.00$93.00
2 $9,072.00$112.00
3 $7,452.00$92.00
4 $8,262.00$102.00
Ref #80 611E16400 36" CONDUIT, TYPE B, (487 FT)
Awd $70,128.00$144.00
2 $61,849.00$127.00
3 $48,213.00$99.00
4 $55,518.00$114.00
Ref #81 611E98150 CATCH BASIN, NO. 3, (4 EACH)
Awd $13,800.00$3,450.00
2 $11,600.00$2,900.00
3 $11,200.00$2,800.00
4 $11,124.00$2,781.00
Ref #82 611E98151 CATCH BASIN, NO. 3, AS PER PLAN, (1 EACH)
Awd $4,300.00$4,300.00
2 $2,900.00$2,900.00
3 $3,150.00$3,150.00
4 $3,509.00$3,509.00
Ref #83 611E98180 CATCH BASIN, NO. 3A, (28 EACH)
Awd $61,600.00$2,200.00
2 $84,000.00$3,000.00
3 $67,200.00$2,400.00
4 $58,100.00$2,075.00
Ref #84 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN, (2 EACH)
Awd $5,600.00$2,800.00
2 $5,200.00$2,600.00
3 $5,300.00$2,650.00
4 $5,054.00$2,527.00
Ref #85 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN A, (1 EACH)
Awd $2,800.00$2,800.00
2 $5,800.00$5,800.00
3 $2,600.00$2,600.00
4 $2,059.00$2,059.00
Ref #86 611E98450 CATCH BASIN, NO. 2-2A, (1 EACH)
Awd $1,150.00$1,150.00
2 $2,300.00$2,300.00
3 $1,450.00$1,450.00
4 $1,779.00$1,779.00
Ref #87 611E98470 CATCH BASIN, NO. 2-2B, (9 EACH)
Awd $10,800.00$1,200.00
2 $18,900.00$2,100.00
3 $13,950.00$1,550.00
4 $9,243.00$1,027.00
150023 - Page 228
Ref #88 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)
Awd $1,500.00$1,500.00
2 $2,200.00$2,200.00
3 $1,650.00$1,650.00
4 $1,209.00$1,209.00
Ref #89 611E98540 CATCH BASIN, NO. 2-4, (1 EACH)
Awd $1,700.00$1,700.00
2 $2,300.00$2,300.00
3 $1,950.00$1,950.00
4 $1,379.00$1,379.00
Ref #90 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (1 EACH)
Awd $1,350.00$1,350.00
2 $1,400.00$1,400.00
3 $750.00$750.00
4 $999.00$999.00
Ref #91 611E99574 MANHOLE, NO. 3, (10 EACH)
Awd $27,000.00$2,700.00
2 $40,000.00$4,000.00
3 $27,500.00$2,750.00
4 $27,290.00$2,729.00
Ref #92 611E99575 MANHOLE, NO. 3, AS PER PLAN A, (1 EACH)
Awd $3,400.00$3,400.00
2 $4,000.00$4,000.00
3 $2,650.00$2,650.00
4 $2,809.00$2,809.00
Ref #93 611E99575 MANHOLE, NO. 3, AS PER PLAN B, (1 EACH)
Awd $4,200.00$4,200.00
2 $4,000.00$4,000.00
3 $3,150.00$3,150.00
4 $4,198.00$4,198.00
Ref #94 611E99575 MANHOLE, NO. 3, AS PER PLAN C, (1 EACH)
Awd $2,600.00$2,600.00
2 $4,000.00$4,000.00
3 $2,800.00$2,800.00
4 $2,699.00$2,699.00
Ref #95 611E99584 MANHOLE, NO. 3 WITH 96" BASE I.D. AND 9" WEIR, (1 EACH)
Awd $8,800.00$8,800.00
2 $6,700.00$6,700.00
3 $7,750.00$7,750.00
4 $7,495.00$7,495.00
Ref #96 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (1 EACH)
Awd $900.00$900.00
2 $1,850.00$1,850.00
3 $950.00$950.00
4 $977.00$977.00
Ref #97 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (6 EACH)
Awd $1,500.00$250.00
2 $1,800.00$300.00
3 $750.00$125.00
4 $1,908.00$318.00
150023 - Page 229
Ref #98 611E99820 SPECIAL - MISCELLANEOUS METAL, (2500 LB)
Awd $2,500.00$1.00
2 $2,500.00$1.00
3 $3,125.00$1.25
4 $2,500.00$1.00
Ref #99 895E10030 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 3, (1 EACH)
Awd $20,000.00$20,000.00
2 $25,000.00$25,000.00
3 $18,500.00$18,500.00
4 $28,493.00$28,493.00
Section 3 - DRAINAGE - Totals
Awd $740,881.50
2 $827,635.50
3 $675,417.50
4 $719,019.92
Ref #100 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (2400 SY)
Awd $52,800.00$22.00
2 $60,000.00$25.00
3 $81,600.00$34.00
4 $84,000.00$35.00
Ref #101 252E01500 FULL DEPTH PAVEMENT SAWING, (8640 FT)
Awd $8,640.00$1.00
2 $15,552.00$1.80
3 $17,280.00$2.00
4 $17,280.00$2.00
Ref #102 253E01000 PAVEMENT REPAIR, (2400 SY)
Awd $115,200.00$48.00
2 $156,000.00$65.00
3 $192,000.00$80.00
4 $139,200.00$58.00
Ref #103 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25"), (10832 SY)
Awd $14,081.60$1.30
2 $16,248.00$1.50
3 $30,329.60$2.80
4 $32,496.00$3.00
Ref #104 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3"), (12583 SY)
Awd $30,828.35$2.45
2 $31,457.50$2.50
3 $42,782.20$3.40
4 $50,332.00$4.00
Ref #105 301E46000 ASPHALT CONCRETE BASE, PG64-22, (3841 CY)
Awd $464,761.00$121.00
2 $499,330.00$130.00
3 $507,012.00$132.00
4 $518,535.00$135.00
Ref #106 304E20001 AGGREGATE BASE, AS PER PLAN, (3372 CY)
Awd $168,600.00$50.00
2 $198,948.00$59.00
3 $161,856.00$48.00
4 $195,576.00$58.00
150023 - Page 230
Ref #107 305E12010 8" CONCRETE BASE, CLASS QC1, (18 SY)
Awd $1,260.00$70.00
2 $1,224.00$68.00
3 $1,710.00$95.00
4 $1,044.00$58.00
Ref #108 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (11 GAL)
Awd $22.00$2.00
2 $38.50$3.50
3 $126.50$11.50
4 $132.00$12.00
Ref #109 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (2431 GAL)
Awd $8,508.50$3.50
2 $8,508.50$3.50
3 $11,547.25$4.75
4 $12,155.00$5.00
Ref #110 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (1369 GAL)
Awd $4,791.50$3.50
2 $4,791.50$3.50
3 $6,502.75$4.75
4 $6,845.00$5.00
Ref #111 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (1369 CY)
Awd $216,302.00$158.00
2 $225,885.00$165.00
3 $260,110.00$190.00
4 $265,586.00$194.00
Ref #112 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (1356 CY)
Awd $193,908.00$143.00
2 $199,332.00$147.00
3 $254,928.00$188.00
4 $261,708.00$193.00
Ref #113 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (13 CY)
Awd $2,990.00$230.00
2 $4,940.00$380.00
3 $3,796.00$292.00
4 $3,887.00$299.00
Ref #114 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, (244 SY)
Awd $11,224.00$46.00
2 $18,056.00$74.00
3 $15,372.00$63.00
4 $11,956.00$49.00
Ref #115 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, (603 SY)
Awd $29,547.00$49.00
2 $36,180.00$60.00
3 $45,828.00$76.00
4 $34,974.00$58.00
Ref #116 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN, (22 FT)
Awd $858.00$39.00
2 $726.00$33.00
3 $880.00$40.00
4 $616.00$28.00
150023 - Page 231
Ref #117 609E20000 CURB, TYPE 3-A, (35 FT)
Awd $1,190.00$34.00
2 $1,155.00$33.00
3 $875.00$25.00
4 $980.00$28.00
Ref #118 609E26000 CURB, TYPE 6, (8572 FT)
Awd $90,006.00$10.50
2 $102,864.00$12.00
3 $132,866.00$15.50
4 $102,864.00$12.00
Ref #119 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (74 CY)
Awd $7,400.00$100.00
2 $5,032.00$68.00
3 $16,280.00$220.00
4 $11,100.00$150.00
Section 4 - PAVEMENT - Totals
Awd $1,422,917.95
2 $1,586,268.00
3 $1,783,681.30
4 $1,751,266.00
Ref #120 202E35100 PIPE REMOVED, 24" AND UNDER, (399 FT)
Awd $9,975.00$25.00
2 $5,187.00$13.00
3 $1,197.00$3.00
4 $7,980.00$20.00
Ref #121 638E04900 1" COPPER SERVICE BRANCH, (100 FT)
Awd $3,200.00$32.00
2 $5,000.00$50.00
3 $4,500.00$45.00
4 $2,100.00$21.00
Ref #122 638E05000 1-1/2" COPPER SERVICE BRANCH, (100 FT)
Awd $3,300.00$33.00
2 $5,500.00$55.00
3 $5,200.00$52.00
4 $2,500.00$25.00
Ref #123 638E05100 2" COPPER SERVICE BRANCH, (100 FT)
Awd $4,200.00$42.00
2 $6,000.00$60.00
3 $5,500.00$55.00
4 $4,200.00$42.00
Ref #124 638E10480 FIRE HYDRANT REMOVED, (1 EACH)
Awd $700.00$700.00
2 $950.00$950.00
3 $275.00$275.00
4 $666.00$666.00
Ref #125 638E10500 FIRE HYDRANT REMOVED AND RESET, (1 EACH)
Awd $1,890.00$1,890.00
2 $4,500.00$4,500.00
3 $2,500.00$2,500.00
4 $1,516.00$1,516.00
150023 - Page 232
Ref #126 638E10800 VALVE BOX ADJUSTED TO GRADE, (18 EACH)
Awd $2,250.00$125.00
2 $6,300.00$350.00
3 $3,150.00$175.00
4 $4,140.00$230.00
Ref #127 638E11100 METER AND CHAMBER REMOVED AND RESET, (2 EACH)
Awd $1,490.00$745.00
2 $5,200.00$2,600.00
3 $5,700.00$2,850.00
4 $3,328.00$1,664.00
Ref #128 638E20102 SPECIAL - 6" WATER MAIN DUCTILE IRON PIPE WITH PUS, (50 FT)
Awd $8,000.00$160.00
2 $6,850.00$137.00
3 $3,750.00$75.00
4 $4,050.00$81.00
Ref #129 638E20306 SPECIAL - 8" WATER MAIN DUCTILE IRON PIPE WITH PUS, (50 FT)
Awd $8,200.00$164.00
2 $7,100.00$142.00
3 $10,500.00$210.00
4 $4,400.00$88.00
Ref #130 638E20906 SPECIAL - 12" WATER MAIN DUCTILE IRON PIPE WITH PU, (585 FT)
Awd $122,850.00$210.00
2 $101,790.00$174.00
3 $104,130.00$178.00
4 $108,810.00$186.00
Ref #131 638E22706 SPECIAL - TEMPORARY BY-PASS CONNECTION, COMPLETE W, (800 FT)
Awd $12,000.00$15.00
2 $11,200.00$14.00
3 $12,400.00$15.50
4 $20,800.00$26.00
Ref #132 638E24600 SPECIAL - FURNISHING AND SETTING 6" HYDRANT, COMPL, (1 EACH)
Awd $9,750.00$9,750.00
2 $7,000.00$7,000.00
3 $4,750.00$4,750.00
4 $6,307.00$6,307.00
Ref #133 638E24700 SPECIAL - EXTEND AND ADJUST HYDRANT TO GRADE, TYPE, (7 EACH)
Awd $39,200.00$5,600.00
2 $32,900.00$4,700.00
3 $19,950.00$2,850.00
4 $7,448.00$1,064.00
Ref #134 638E24806 SPECIAL - HYDRANT ADJUSTED TO GRADE, (2 EACH)
Awd $1,910.00$955.00
2 $2,200.00$1,100.00
3 $1,300.00$650.00
4 $2,100.00$1,050.00
Ref #135 638E26600 SPECIAL - RETAP AND RECONNECT 1" WATER SERVICE CON, (5 EACH)
Awd $6,000.00$1,200.00
2 $6,500.00$1,300.00
3 $18,750.00$3,750.00
4 $3,645.00$729.00
150023 - Page 233
Ref #136 638E26606 SPECIAL - RETAP AND RECONNECT 1-1/2" WATER SERVICE, (5 EACH)
Awd $10,000.00$2,000.00
2 $9,000.00$1,800.00
3 $19,750.00$3,950.00
4 $8,925.00$1,785.00
Ref #137 638E26702 SPECIAL - RETAP AND RECONNECT 2" WATER SERVICE CON, (5 EACH)
Awd $14,000.00$2,800.00
2 $10,000.00$2,000.00
3 $21,375.00$4,275.00
4 $10,560.00$2,112.00
Ref #138 638E30200 SPECIAL - TEMPORARY SERVICE CONNECTION, (10 EACH)
Awd $2,500.00$250.00
2 $2,600.00$260.00
3 $3,000.00$300.00
4 $5,010.00$501.00
Ref #139 638E98100 WATER WORK, MISC.: CITY OF CLEVELAND WATER DEPARTM, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
3 $7,500.00$7,500.00
4 $69,000.00$69,000.00
Ref #140 690E98400 SPECIAL - MISC.: AS-BUILT WATERLINE DRAWINGS, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $4,000.00$4,000.00
3 $1,500.00$1,500.00
4 $6,900.00$6,900.00
Section 5 - WATER WORK - Totals
Awd $283,915.00
2 $259,777.00
3 $256,677.00
4 $284,385.00
Ref #141 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (10 EACH)
Awd $5,000.00$500.00
2 $11,000.00$1,100.00
3 $10,500.00$1,050.00
4 $6,140.00$614.00
Ref #142 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (6 EACH)
Awd $5,790.00$965.00
2 $18,000.00$3,000.00
3 $9,300.00$1,550.00
4 $5,394.00$899.00
Section 6 - SANITARY SEWER - Totals
Awd $10,790.00
2 $29,000.00
3 $19,800.00
4 $11,534.00
150023 - Page 234
Ref #143 626E00100 BARRIER REFLECTOR, (20 EACH)
Awd $130.00$6.50
2 $140.00$7.00
3 $400.00$20.00
4 $140.00$7.00
Ref #144 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (495.3 FT)
Awd $3,120.39$6.30
2 $3,714.75$7.50
3 $2,228.85$4.50
4 $3,467.10$7.00
Ref #145 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (423.3 FT)
Awd $2,963.10$7.00
2 $3,598.05$8.50
3 $2,370.48$5.60
4 $3,386.40$8.00
Ref #146 630E08501 STREET NAME SIGN SUPPORT, AS PER PLAN, (3 EACH)
Awd $255.00$85.00
2 $780.00$260.00
3 $1,008.00$336.00
4 $294.00$98.00
Ref #147 630E08600 SIGN POST REFLECTOR, (5 EACH)
Awd $150.00$30.00
2 $185.00$37.00
3 $225.00$45.00
4 $175.00$35.00
Ref #148 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (6 EACH)
Awd $1,050.00$175.00
2 $1,710.00$285.00
3 $1,920.00$320.00
4 $1,206.00$201.00
Ref #149 630E80100 SIGN, FLAT SHEET, (455.7 SF)
Awd $6,835.50$15.00
2 $7,291.20$16.00
3 $7,291.20$16.00
4 $7,746.90$17.00
Ref #150 630E80500 SIGN, DOUBLE FACED, STREET NAME, (4 EACH)
Awd $160.00$40.00
2 $400.00$100.00
3 $784.00$196.00
4 $184.00$46.00
Ref #151 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (62 EACH)
Awd $620.00$10.00
2 $682.00$11.00
3 $1,302.00$21.00
4 $744.00$12.00
Ref #152 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (10 EACH)
Awd $100.00$10.00
2 $370.00$37.00
3 $620.00$62.00
4 $120.00$12.00
150023 - Page 235
Ref #153 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (56 EACH)
Awd $280.00$5.00
2 $784.00$14.00
3 $1,288.00$23.00
4 $336.00$6.00
Ref #154 646E10000 EDGE LINE, 4", (2.46 MILE)
Awd $5,289.00$2,150.00
2 $7,626.00$3,100.00
3 $5,923.68$2,408.00
4 $8,287.74$3,369.00
Ref #155 646E10100 LANE LINE, 4", (0.54 MILE)
Awd $594.00$1,100.00
2 $1,269.00$2,350.00
3 $665.28$1,232.00
4 $1,396.98$2,587.00
Ref #156 646E10200 CENTER LINE, (2.18 MILE)
Awd $8,284.00$3,800.00
2 $10,464.00$4,800.00
3 $9,278.08$4,256.00
4 $11,368.70$5,215.00
Ref #157 646E10300 CHANNELIZING LINE, 8", (813 FT)
Awd $1,300.80$1.60
2 $1,056.90$1.30
3 $1,463.40$1.80
4 $813.00$1.00
Ref #158 646E10400 STOP LINE, (309 FT)
Awd $2,781.00$9.00
2 $2,935.50$9.50
3 $3,244.50$10.50
4 $3,399.00$11.00
Ref #159 646E10500 CROSSWALK LINE, (368 FT)
Awd $1,656.00$4.50
2 $2,060.80$5.60
3 $1,840.00$5.00
4 $2,208.00$6.00
Ref #160 646E10600 TRANSVERSE/DIAGONAL LINE, (182 FT)
Awd $1,092.00$6.00
2 $1,383.20$7.60
3 $1,228.50$6.75
4 $1,456.00$8.00
Ref #161 646E10800 ISLAND MARKING, (57 SF)
Awd $171.00$3.00
2 $250.80$4.40
3 $199.50$3.50
4 $285.00$5.00
Ref #162 646E20300 LANE ARROW, (32 EACH)
Awd $4,640.00$145.00
2 $5,056.00$158.00
3 $5,216.00$163.00
4 $5,536.00$173.00
150023 - Page 236
Ref #163 646E20502 DOTTED LINE, 4", (775 FT)
Awd $3,100.00$4.00
2 $1,007.50$1.30
3 $3,487.50$4.50
4 $775.00$1.00
Ref #164 646E20600 BIKE LANE SYMBOL MARKING, (24 EACH)
Awd $3,960.00$165.00
2 $4,440.00$185.00
3 $4,440.00$185.00
4 $4,824.00$201.00
Section 7 - TRAFFIC CONTROL - Totals
Awd $48,531.79
2 $57,204.70
3 $56,423.97
4 $58,148.82
Ref #165 625E25500 CONDUIT, 3", 725.04, (85 FT)
Awd $2,065.50$24.30
2 $1,615.00$19.00
3 $1,428.00$16.80
4 $1,700.00$20.00
Ref #166 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, (255 FT)
Awd $7,140.00$28.00
2 $10,710.00$42.00
3 $13,005.00$51.00
4 $11,730.00$46.00
Ref #167 625E29000 TRENCH, (52 FT)
Awd $1,560.00$30.00
2 $442.00$8.50
3 $416.00$8.00
4 $312.00$6.00
Ref #168 625E30700 PULL BOX, 725.08, 18", (3 EACH)
Awd $1,470.00$490.00
2 $1,980.00$660.00
3 $2,352.00$784.00
4 $2,238.00$746.00
Ref #169 625E30706 PULL BOX, 725.08, 24", (1 EACH)
Awd $575.00$575.00
2 $820.00$820.00
3 $896.00$896.00
4 $962.00$962.00
Ref #170 625E32000 GROUND ROD, (5 EACH)
Awd $620.00$124.00
2 $975.00$195.00
3 $760.00$152.00
4 $585.00$117.00
Ref #171 625E36000 PLASTIC CAUTION TAPE, (52 FT)
Awd $52.00$1.00
2 $15.60$0.30
3 $52.00$1.00
4 $23.87$0.46
150023 - Page 237
Ref #172 632E05007 VEHICULAR SIGNAL HEAD, (LED), BLACK, 3-SECTION, 12, (7 EACH)
Awd $4,536.00$648.00
2 $6,650.00$950.00
3 $4,655.00$665.00
4 $5,005.00$715.00
Ref #173 632E05087 VEHICULAR SIGNAL HEAD, (LED), BLACK, 5-SECTION, 12, (2 EACH)
Awd $2,080.00$1,040.00
2 $2,750.00$1,375.00
3 $2,130.00$1,065.00
4 $2,586.00$1,293.00
Ref #174 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (819 FT)
Awd $1,744.47$2.13
2 $1,965.60$2.40
3 $1,638.00$2.00
4 $1,638.00$2.00
Ref #175 632E64010 SIGNAL SUPPORT FOUNDATION, (4 EACH)
Awd $6,400.00$1,600.00
2 $14,000.00$3,500.00
3 $14,336.00$3,584.00
4 $6,580.00$1,645.00
Ref #176 632E70001 POWER SERVICE, AS PER PLAN, (1 EACH)
Awd $1,780.00$1,780.00
2 $2,600.00$2,600.00
3 $3,136.00$3,136.00
4 $1,997.00$1,997.00
Ref #177 632E80303 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3, AS PER PL, (2 EACH)
Awd $8,100.00$4,050.00
2 $7,600.00$3,800.00
3 $8,624.00$4,312.00
4 $10,996.00$5,498.00
Ref #178 632E80603 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 12, AS PER P, (2 EACH)
Awd $14,100.00$7,050.00
2 $16,400.00$8,200.00
3 $14,784.00$7,392.00
4 $18,246.00$9,123.00
Ref #179 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (1 EACH)
Awd $6,920.00$6,920.00
2 $900.00$900.00
3 $2,352.00$2,352.00
4 $6,429.00$6,429.00
Ref #180 632E90400 SIGNALIZATION, MISC.: TEST HOLE PERFORMED, (2 EACH)
Awd $260.00$130.00
2 $232.00$116.00
3 $1,100.00$550.00
4 $2,088.00$1,044.00
Ref #181 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH)
Awd $12,500.00$12,500.00
2 $13,000.00$13,000.00
3 $14,000.00$14,000.00
4 $16,513.00$16,513.00
150023 - Page 238
Ref #182 633E67000 CABINET RISER, (2 EACH)
Awd $908.00$454.00
2 $1,036.00$518.00
3 $1,300.00$650.00
4 $1,106.00$553.00
Ref #183 633E67101 CABINET FOUNDATION, AS PER PLAN, (1 EACH)
Awd $712.00$712.00
2 $2,500.00$2,500.00
3 $2,050.00$2,050.00
4 $1,345.00$1,345.00
Ref #184 633E67201 CONTROLLER WORK PAD, AS PER PLAN, (1 EACH)
Awd $590.00$590.00
2 $185.00$185.00
3 $675.00$675.00
4 $404.00$404.00
Ref #186 633E67400 PREEMPTION CONFIRMATION LIGHT, (4 EACH)
Awd $1,120.00$280.00
2 $1,692.00$423.00
3 $1,600.00$400.00
4 $1,748.00$437.00
Ref #187 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS , (1 EACH)
Awd $4,212.00$4,212.00
2 $4,870.00$4,870.00
3 $4,750.00$4,750.00
4 $5,131.00$5,131.00
Ref #188 816E30000 VIDEO DETECTION SYSTEM, (1 EACH)
Awd $17,200.00$17,200.00
2 $19,000.00$19,000.00
3 $19,600.00$19,600.00
4 $22,161.00$22,161.00
Section 8 - TRAFFIC SIGNALS - Totals
Awd $96,644.97
2 $111,938.20
3 $115,639.00
4 $121,523.87
Ref #190 AA2 633E67301 PREEMPTION, AS PER PLAN, SONEM 2000 SYSTEM, (1 EACH)
Awd $1,187.00$1,187.00
2 $1,270.00$1,270.00
3 $2,352.00$2,352.00
4 $1,841.00$1,841.00
Ref #192 AB2 633E67310 PREEMPTION RECEIVING UNIT, SONEM 2000 SYSTEM RECEI, (4 EACH)
Awd $1,924.00$481.00
2 $2,328.00$582.00
3 $2,240.00$560.00
4 $2,992.00$748.00
Ref #194 AC2 633E67320 PREEMPTION DETECTOR CABLE, SONEM 2000 SYSTEM CABLE, (733 FT)
Awd $630.38$0.86
2 $1,246.10$1.70
3 $1,282.75$1.75
4 $733.00$1.00
150023 - Page 239
Ref #301 AD2 633E67350 PREEMPTION PHASE SELECTOR, SONEM 2000 SYSTEM PHASE, (1 EACH)
Awd $1,511.00$1,511.00
2 $1,666.00$1,666.00
3 $1,800.00$1,800.00
4 $2,117.00$2,117.00
Section 9 - TRAFFIC SIGNALS ALTERNATES - Totals
Awd $5,252.38
2 $6,510.10
3 $7,674.75
4 $7,683.00
Ref #195 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (450 CY)
Awd $18,000.00$40.00
2 $28,350.00$63.00
3 $36,000.00$80.00
4 $31,500.00$70.00
Ref #196 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $5,200.00$65.00
2 $5,920.00$74.00
3 $4,400.00$55.00
4 $5,520.00$69.00
Ref #197 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL, (1 EACH)
Awd $7,400.00$7,400.00
2 $10,000.00$10,000.00
3 $26,880.00$26,880.00
4 $31,232.00$31,232.00
Ref #198 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (8 EACH)
Awd $15,200.00$1,900.00
2 $16,000.00$2,000.00
3 $22,800.00$2,850.00
4 $17,480.00$2,185.00
Ref #199 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $11,950.00$11,950.00
2 $6,700.00$6,700.00
3 $14,000.00$14,000.00
4 $7,279.00$7,279.00
Ref #200 614E12460 WORK ZONE MARKING SIGN, (6 EACH)
Awd $570.00$95.00
2 $756.00$126.00
3 $660.00$110.00
4 $828.00$138.00
Ref #201 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (100 CY)
Awd $22,000.00$220.00
2 $25,000.00$250.00
3 $25,000.00$250.00
4 $23,500.00$235.00
Ref #202 614E13302 BARRIER REFLECTOR, TYPE B2, (37 EACH)
Awd $296.00$8.00
2 $222.00$6.00
3 $370.00$10.00
4 $259.00$7.00
150023 - Page 240
Ref #203 614E13360 OBJECT MARKER, TWO WAY, (37 EACH)
Awd $925.00$25.00
2 $481.00$13.00
3 $1,110.00$30.00
4 $518.00$14.00
Ref #204 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (180 DAY)
Awd $6,300.00$35.00
2 $6,480.00$36.00
3 $7,200.00$40.00
4 $6,300.00$35.00
Ref #205 614E20000 WORK ZONE LANE LINE, CLASS I, (0.56 MILE)
Awd $280.00$500.00
2 $355.04$634.00
3 $313.60$560.00
4 $386.40$690.00
Ref #206 614E21000 WORK ZONE CENTER LINE, CLASS I, (4.01 MILE)
Awd $4,812.00$1,200.00
2 $3,649.10$910.00
3 $5,614.00$1,400.00
4 $3,965.89$989.00
Ref #207 614E22000 WORK ZONE EDGE LINE, CLASS I, (5.48 MILE)
Awd $3,288.00$600.00
2 $4,142.88$756.00
3 $3,699.00$675.00
4 $4,504.56$822.00
Ref #208 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (813 FT)
Awd $487.80$0.60
2 $487.80$0.60
3 $609.75$0.75
4 $1.63$0.00
Ref #209 614E24000 WORK ZONE DOTTED LINE, CLASS I, (775 FT)
Awd $775.00$1.00
2 $387.50$0.50
3 $968.75$1.25
4 $775.00$1.00
Ref #210 614E26000 WORK ZONE STOP LINE, CLASS I, (399 FT)
Awd $798.00$2.00
2 $1,077.30$2.70
3 $897.75$2.25
4 $1,197.00$3.00
Ref #211 614E27000 WORK ZONE CROSSWALK LINE, CLASS I, (368 FT)
Awd $368.00$1.00
2 $883.20$2.40
3 $460.00$1.25
4 $1,104.00$3.00
Ref #212 614E30000 WORK ZONE ARROW, CLASS I, (32 EACH)
Awd $1,600.00$50.00
2 $1,504.00$47.00
3 $1,792.00$56.00
4 $1,664.00$52.00
150023 - Page 241
Ref #213 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN, (7 EACH)
Awd $2,800.00$400.00
2 $1,484.00$212.00
3 $3,150.00$450.00
4 $1,610.00$230.00
Ref #214 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $37,000.00$37,000.00
3 $51,000.00$51,000.00
4 $11,500.00$11,500.00
Ref #215 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (1937 SY)
Awd $67,795.00$35.00
2 $77,480.00$40.00
3 $73,606.00$38.00
4 $92,976.00$48.00
Ref #216 616E10000 WATER, (110 MGAL)
Awd $1,100.00$10.00
2 $1,100.00$10.00
3 $1,100.00$10.00
4 $3,850.00$35.00
Ref #217 622E41000 PORTABLE BARRIER, 32", (1580 FT)
Awd $20,540.00$13.00
2 $15,800.00$10.00
3 $63,200.00$40.00
4 $39,500.00$25.00
Section 10 - MAINTENANCE OF TRAFFIC - Totals
Awd $227,484.80
2 $245,259.82
3 $344,830.85
4 $287,450.48
Ref #218 202E11200 PORTIONS OF STRUCTURE REMOVED, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $978.00$978.00
3 $3,500.00$3,500.00
4 $7,967.00$7,967.00
Ref #219 202E35200 PIPE REMOVED, OVER 24", (12 FT)
Awd $4,440.00$370.00
2 $2,556.00$213.00
3 $600.00$50.00
4 $216.00$18.00
Ref #220 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $7,800.00$7,800.00
2 $4,500.00$4,500.00
3 $1,500.00$1,500.00
4 $9,181.00$9,181.00
Ref #221 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $4,400.00$4,400.00
2 $930.00$930.00
3 $4,500.00$4,500.00
4 $9,848.00$9,848.00
150023 - Page 242
Ref #222 509E10000 EPOXY COATED REINFORCING STEEL, (3227 LB)
Awd $6,454.00$2.00
2 $2,097.55$0.65
3 $8,067.50$2.50
4 $6,454.00$2.00
Ref #223 511E46010 CLASS QC1 CONCRETE, (11 CY)
Awd $9,900.00$900.00
2 $17,600.00$1,600.00
3 $11,000.00$1,000.00
4 $11,385.00$1,035.00
Ref #224 511E46510 CLASS QC1 CONCRETE, FOOTING, (23 CY)
Awd $13,800.00$600.00
2 $17,710.00$770.00
3 $16,100.00$700.00
4 $15,870.00$690.00
Ref #225 511E46610 CLASS QC1 CONCRETE, HEADWALL, (2 CY)
Awd $1,800.00$900.00
2 $1,146.00$573.00
3 $2,000.00$1,000.00
4 $2,070.00$1,035.00
Ref #226 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (46 SY)
Awd $1,380.00$30.00
2 $1,932.00$42.00
3 $1,610.00$35.00
4 $1,610.00$35.00
Ref #227 512E33000 TYPE 2 WATERPROOFING, (68 SY)
Awd $1,360.00$20.00
2 $3,060.00$45.00
3 $1,360.00$20.00
4 $1,428.00$21.00
Ref #228 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (32 SF)
Awd $320.00$10.00
2 $176.00$5.50
3 $480.00$15.00
4 $448.00$14.00
Ref #229 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (22 CY)
Awd $3,410.00$155.00
2 $2,310.00$105.00
3 $1,056.00$48.00
4 $924.00$42.00
Ref #230 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH FABRIC FILTER, (21 CY)
Awd $2,583.00$123.00
2 $2,520.00$120.00
3 $1,995.00$95.00
4 $2,289.00$109.00
Ref #231 611E93011 5' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN, (26 FT)
Awd $28,600.00$1,100.00
2 $17,550.00$675.00
3 $22,750.00$875.00
4 $45,916.00$1,766.00
150023 - Page 243
Section 11 - STRUCTURE REPAIR (STA. 253+38.32) - Totals
Awd $101,247.00
2 $75,065.55
3 $76,518.50
4 $115,606.00
Ref #232 202E11200 PORTIONS OF STRUCTURE REMOVED, (LUMP SUM)
Awd $14,500.00$14,500.00
2 $1,000.00$1,000.00
3 $3,500.00$3,500.00
4 $6,304.00$6,304.00
Ref #233 202E35200 PIPE REMOVED, OVER 24", (23 FT)
Awd $4,462.00$194.00
2 $3,542.00$154.00
3 $575.00$25.00
4 $414.00$18.00
Ref #234 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $7,800.00$7,800.00
2 $4,500.00$4,500.00
3 $1,500.00$1,500.00
4 $9,181.00$9,181.00
Ref #235 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $4,400.00$4,400.00
2 $930.00$930.00
3 $4,500.00$4,500.00
4 $8,863.00$8,863.00
Ref #236 509E10000 EPOXY COATED REINFORCING STEEL, (1815 LB)
Awd $3,630.00$2.00
2 $1,179.75$0.65
3 $4,537.50$2.50
4 $3,630.00$2.00
Ref #237 511E46010 CLASS QC1 CONCRETE, (5 CY)
Awd $4,500.00$900.00
2 $10,500.00$2,100.00
3 $5,000.00$1,000.00
4 $5,175.00$1,035.00
Ref #238 511E46510 CLASS QC1 CONCRETE, FOOTING, (14 CY)
Awd $8,400.00$600.00
2 $15,400.00$1,100.00
3 $9,800.00$700.00
4 $9,660.00$690.00
Ref #239 511E46610 CLASS QC1 CONCRETE, HEADWALL, (1 CY)
Awd $900.00$900.00
2 $1,100.00$1,100.00
3 $1,000.00$1,000.00
4 $1,035.00$1,035.00
Ref #240 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (30 SY)
Awd $900.00$30.00
2 $1,260.00$42.00
3 $1,050.00$35.00
4 $120.00$4.00
150023 - Page 244
Ref #241 512E33000 TYPE 2 WATERPROOFING, (63 SY)
Awd $1,260.00$20.00
2 $2,835.00$45.00
3 $1,260.00$20.00
4 $1,323.00$21.00
Ref #242 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (21 SF)
Awd $210.00$10.00
2 $147.00$7.00
3 $315.00$15.00
4 $294.00$14.00
Ref #243 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (7 CY)
Awd $1,120.00$160.00
2 $770.00$110.00
3 $336.00$48.00
4 $357.00$51.00
Ref #244 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (3 SY)
Awd $900.00$300.00
2 $1,170.00$390.00
3 $285.00$95.00
4 $372.00$124.00
Ref #245 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH FABRIC FILTER, (21 CY)
Awd $2,583.00$123.00
2 $2,520.00$120.00
3 $1,995.00$95.00
4 $2,289.00$109.00
Ref #246 611E93001 5' X 3' CONDUIT, TYPE A, 706.05, AS PER PLAN, (28 FT)
Awd $28,840.00$1,030.00
2 $22,260.00$795.00
3 $23,800.00$850.00
4 $38,864.00$1,388.00
Section 12 - STRUCTURE REPAIR (STA. 275+94.54) - Totals
Awd $84,405.00
2 $69,113.75
3 $59,453.50
4 $87,881.00
Ref #247 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $80,000.00$80,000.00
2 $20,000.00$20,000.00
3 $65,000.00$65,000.00
4 $40,000.00$40,000.00
Ref #248 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $380,500.00$380,500.00
2 $167,000.00$167,000.00
3 $72,000.00$72,000.00
4 $178,000.00$178,000.00
Ref #249 619E16020 FIELD OFFICE, TYPE C, (21 MNTH)
Awd $36,750.00$1,750.00
2 $46,200.00$2,200.00
3 $63,000.00$3,000.00
4 $62,895.00$2,995.00
150023 - Page 245
Ref #250 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $42,000.00$42,000.00
2 $45,000.00$45,000.00
3 $42,000.00$42,000.00
4 $34,500.00$34,500.00
Ref #251 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $244,016.28$244,016.28
4 $265,000.00$265,000.00
Section 13 - INCIDENTALS - Totals
Awd $639,250.00
2 $378,200.00
3 $486,016.28
4 $580,395.00
150023 - Page 246
Project No. 150024
PID 87160
TUS-SR 212-10.70
Federal
Type: SLIDE REPAIR
Completion Date: 7/15/2015
Award Amount: $287,506.60
Contract Awarded To: TUCSON INC
Letting Date: 1/15/2015
Engineer's Estimate: $257,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
TUCSON INC
3497 UNIVERSITY DR NE
NEW PHILADELPHIA, OH 44663
Tuscarawas
Bidder 1
Bid $287,506.60
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 2
Bid $292,297.90
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 3
Bid $306,248.50
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $325,219.00
CROSS ROADS CONSTRUCTION INC
3155 HARDING LANE
CAMBRIDGE, OH 43725
Guernsey
Bidder 5
Bid $340,034.44
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 6
Bid $349,007.50
150024 - Page 247
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $7,500.00$7,500.00
2 $4,000.00$4,000.00
3 $5,233.00$5,233.00
4 $5,800.00$5,800.00
5 $11,000.00$11,000.00
6 $14,000.00$14,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (98 SY)
Awd $1,274.00$13.00
2 $980.00$10.00
3 $3,488.80$35.60
4 $1,078.00$11.00
5 $2,450.00$25.00
6 $490.00$5.00
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (6 FT)
Awd $258.00$43.00
2 $150.00$25.00
3 $60.00$10.00
4 $174.00$29.00
5 $450.00$75.00
6 $30.00$5.00
Ref #4 202E38000 GUARDRAIL REMOVED, (425 FT)
Awd $765.00$1.80
2 $850.00$2.00
3 $850.00$2.00
4 $850.00$2.00
5 $1,997.50$4.70
6 $850.00$2.00
Ref #5 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (100 FT)
Awd $1,500.00$15.00
2 $5,000.00$50.00
3 $3,900.00$39.00
4 $2,200.00$22.00
5 $3,200.00$32.00
6 $1,000.00$10.00
Ref #6 203E10000 EXCAVATION, (763 CY)
Awd $6,104.00$8.00
2 $11,445.00$15.00
3 $6,867.00$9.00
4 $11,063.50$14.50
5 $13,734.00$18.00
6 $9,156.00$12.00
Ref #7 203E20000 EMBANKMENT, (2832 CY)
Awd $48,144.00$17.00
2 $42,480.00$15.00
3 $57,206.40$20.20
4 $59,472.00$21.00
5 $60,888.00$21.50
6 $42,480.00$15.00
150024 - Page 248
Ref #8 204E10000 SUBGRADE COMPACTION, (783 SY)
Awd $783.00$1.00
2 $2,349.00$3.00
3 $783.00$1.00
4 $3,680.10$4.70
5 $3,132.00$4.00
6 $783.00$1.00
Ref #9 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (187.5 FT)
Awd $5,437.50$29.00
2 $4,312.50$23.00
3 $3,750.00$20.00
4 $3,562.50$19.00
5 $3,375.00$18.00
6 $4,312.50$23.00
Ref #10 606E25550 ANCHOR ASSEMBLY, MGS TYPE A, (1 EACH)
Awd $1,185.00$1,185.00
2 $1,000.00$1,000.00
3 $1,444.00$1,444.00
4 $1,400.00$1,400.00
5 $1,300.00$1,300.00
6 $960.00$960.00
Ref #11 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (1 EACH)
Awd $900.00$900.00
2 $800.00$800.00
3 $833.00$833.00
4 $800.00$800.00
5 $750.00$750.00
6 $670.00$670.00
Section 1 - ROADWAY - Totals
Awd $73,850.50
2 $73,366.50
3 $84,415.20
4 $90,080.10
5 $102,276.50
6 $74,731.50
Ref #12 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $115.00$57.50
2 $30.00$15.00
3 $150.00$75.00
4 $106.00$53.00
5 $200.00$100.00
6 $400.00$200.00
Ref #13 659E00300 TOPSOIL, (303 CY)
Awd $3,030.00$10.00
2 $3,030.00$10.00
3 $6,859.92$22.64
4 $12,423.00$41.00
5 $11,211.00$37.00
6 $11,211.00$37.00
150024 - Page 249
Ref #14 659E10000 SEEDING AND MULCHING, (2728 SY)
Awd $2,728.00$1.00
2 $2,182.40$0.80
3 $4,092.00$1.50
4 $2,728.00$1.00
5 $1,991.44$0.73
6 $2,046.00$0.75
Ref #15 659E20000 COMMERCIAL FERTILIZER, (0.37 TON)
Awd $647.50$1,750.00
2 $259.00$700.00
3 $185.00$500.00
4 $240.50$650.00
5 $259.00$700.00
6 $259.00$700.00
Ref #16 659E31000 LIME, (0.56 ACRE)
Awd $196.00$350.00
2 $168.00$300.00
3 $56.00$100.00
4 $89.60$160.00
5 $28.00$50.00
6 $280.00$500.00
Ref #17 659E35000 WATER, (15 MGAL)
Awd $15.00$1.00
2 $15.00$1.00
3 $15.00$1.00
4 $15.00$1.00
5 $7.50$0.50
6 $600.00$40.00
Ref #18 832E30000 EROSION CONTROL, (12000 EACH)
Awd $12,000.00$1.00
2 $12,000.00$1.00
3 $12,000.00$1.00
4 $12,000.00$1.00
5 $12,000.00$1.00
6 $12,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $18,731.50
2 $17,684.40
3 $23,357.92
4 $27,602.10
5 $25,696.94
6 $26,796.00
Ref #19 602E20000 CONCRETE MASONRY, (0.6 CY)
Awd $1,170.00$1,950.00
2 $900.00$1,500.00
3 $724.80$1,208.00
4 $1,020.00$1,700.00
5 $900.00$1,500.00
6 $600.00$1,000.00
150024 - Page 250
Ref #20 605E31100 AGGREGATE DRAINS, (96 FT)
Awd $1,824.00$19.00
2 $1,440.00$15.00
3 $3,043.20$31.70
4 $2,016.00$21.00
5 $1,440.00$15.00
6 $960.00$10.00
Ref #21 611E05900 15" CONDUIT, TYPE B, (6 FT)
Awd $762.00$127.00
2 $1,200.00$200.00
3 $282.00$47.00
4 $768.00$128.00
5 $1,200.00$200.00
6 $420.00$70.00
Ref #22 611E96600 CONDUIT, BORED OR JACKED: 30" CONDUIT, TYPE B, (122 FT)
Awd $54,290.00$445.00
2 $56,730.00$465.00
3 $41,297.00$338.50
4 $59,780.00$490.00
5 $57,950.00$475.00
6 $103,334.00$847.00
Ref #23 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)
Awd $1,800.00$1,800.00
2 $1,500.00$1,500.00
3 $2,809.00$2,809.00
4 $2,000.00$2,000.00
5 $2,750.00$2,750.00
6 $1,400.00$1,400.00
Section 3 - DRAINAGE - Totals
Awd $59,846.00
2 $61,770.00
3 $48,156.00
4 $65,584.00
5 $64,240.00
6 $106,714.00
Ref #24 252E01500 FULL DEPTH PAVEMENT SAWING, (448 FT)
Awd $896.00$2.00
2 $1,120.00$2.50
3 $448.00$1.00
4 $896.00$2.00
5 $2,688.00$6.00
6 $896.00$2.00
Ref #25 301E46000 ASPHALT CONCRETE BASE, PG64-22, (47 CY)
Awd $16,920.00$360.00
2 $18,330.00$390.00
3 $18,800.00$400.00
4 $30,550.00$650.00
5 $14,241.00$303.00
6 $8,225.00$175.00
150024 - Page 251
Ref #26 304E20000 AGGREGATE BASE, (131 CY)
Awd $10,349.00$79.00
2 $9,825.00$75.00
3 $11,462.50$87.50
4 $9,170.00$70.00
5 $10,480.00$80.00
6 $4,585.00$35.00
Ref #27 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (8 GAL)
Awd $24.00$3.00
2 $80.00$10.00
3 $32.00$4.00
4 $16.80$2.10
5 $20.00$2.50
6 $24.00$3.00
Ref #28 408E10001 PRIME COAT, AS PER PLAN, (212 GAL)
Awd $1,908.00$9.00
2 $2,120.00$10.00
3 $2,120.00$10.00
4 $1,696.00$8.00
5 $1,060.00$5.00
6 $1,060.00$5.00
Ref #29 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS, (16 CY)
Awd $9,600.00$600.00
2 $8,000.00$500.00
3 $10,672.00$667.00
4 $16,000.00$1,000.00
5 $12,800.00$800.00
6 $4,800.00$300.00
Section 4 - PAVEMENT - Totals
Awd $39,697.00
2 $39,475.00
3 $43,534.50
4 $58,328.80
5 $41,289.00
6 $19,590.00
Ref #30 626E00100 BARRIER REFLECTOR, (4 EACH)
Awd $28.80$7.20
2 $28.00$7.00
3 $40.00$10.00
4 $36.00$9.00
5 $36.00$9.00
6 $26.00$6.50
Ref #31 642E00100 EDGE LINE, 4", TYPE 1, (0.08 MILE)
Awd $533.60$6,670.00
2 $640.00$8,000.00
3 $471.52$5,894.00
4 $488.00$6,100.00
5 $464.00$5,800.00
6 $424.00$5,300.00
150024 - Page 252
Ref #32 642E00300 CENTER LINE, TYPE 1, (0.04 MILE)
Awd $533.60$13,340.00
2 $400.00$10,000.00
3 $471.56$11,789.00
4 $480.00$12,000.00
5 $464.00$11,600.00
6 $440.00$11,000.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $1,096.00
2 $1,068.00
3 $983.08
4 $1,004.00
5 $964.00
6 $890.00
Ref #33 614E11630 INCREASED BARRIER DELINEATION, (830 FT)
Awd $1,452.50$1.75
2 $1,660.00$2.00
3 $1,377.80$1.66
4 $830.00$1.00
5 $1,245.00$1.50
6 $1,245.00$1.50
Ref #34 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (4 EACH)
Awd $9,000.00$2,250.00
2 $7,200.00$1,800.00
3 $6,444.00$1,611.00
4 $8,400.00$2,100.00
5 $10,600.00$2,650.00
6 $8,800.00$2,200.00
Ref #35 614E12740 WORK ZONE LIGHTING SYSTEM, (2 EACH)
Awd $23,000.00$11,500.00
2 $38,000.00$19,000.00
3 $200.00$100.00
4 $22,000.00$11,000.00
5 $12,000.00$6,000.00
6 $18,000.00$9,000.00
Ref #36 614E13302 BARRIER REFLECTOR, TYPE B2, (19 EACH)
Awd $152.00$8.00
2 $133.00$7.00
3 $147.82$7.78
4 $171.00$9.00
5 $95.00$5.00
6 $133.00$7.00
Ref #37 614E13360 OBJECT MARKER, TWO WAY, (19 EACH)
Awd $418.00$22.00
2 $285.00$15.00
3 $253.46$13.34
4 $247.00$13.00
5 $228.00$12.00
6 $228.00$12.00
150024 - Page 253
Ref #38 614E21000 WORK ZONE CENTER LINE, CLASS I, (0.18 MILE)
Awd $1,138.50$6,325.00
2 $1,800.00$10,000.00
3 $2,048.94$11,383.00
4 $1,044.00$5,800.00
5 $990.00$5,500.00
6 $1,854.00$10,300.00
Ref #39 614E22000 WORK ZONE EDGE LINE, CLASS I, (0.32 MILE)
Awd $1,120.00$3,500.00
2 $1,600.00$5,000.00
3 $1,822.08$5,694.00
4 $1,024.00$3,200.00
5 $992.00$3,100.00
6 $1,664.00$5,200.00
Ref #40 614E26000 WORK ZONE STOP LINE, CLASS I, (22 FT)
Awd $138.60$6.30
2 $330.00$15.00
3 $143.00$6.50
4 $132.00$6.00
5 $132.00$6.00
6 $132.00$6.00
Ref #41 616E10000 WATER, (36 MGAL)
Awd $36.00$1.00
2 $36.00$1.00
3 $36.00$1.00
4 $1,152.00$32.00
5 $36.00$1.00
6 $1,080.00$30.00
Ref #42 622E41000 PORTABLE BARRIER, 32", (830 FT)
Awd $21,580.00$26.00
2 $10,790.00$13.00
3 $17,670.70$21.29
4 $11,620.00$14.00
5 $20,750.00$25.00
6 $20,750.00$25.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $58,035.60
2 $61,834.00
3 $30,143.80
4 $46,620.00
5 $47,068.00
6 $53,886.00
Ref #43 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $2,500.00$2,500.00
2 $5,000.00$5,000.00
3 $5,000.00$5,000.00
4 $2,000.00$2,000.00
5 $7,500.00$7,500.00
6 $9,000.00$9,000.00
150024 - Page 254
Ref #44 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,225.00$4,225.00
2 $5,000.00$5,000.00
3 $4,500.00$4,500.00
4 $1,800.00$1,800.00
5 $12,500.00$12,500.00
6 $7,500.00$7,500.00
Ref #45 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $10,525.00$10,525.00
2 $4,000.00$4,000.00
3 $44,283.00$44,283.00
4 $4,000.00$4,000.00
5 $18,000.00$18,000.00
6 $29,000.00$29,000.00
Ref #46 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $4,500.00$1,500.00
2 $600.00$200.00
3 $6,498.00$2,166.00
4 $7,500.00$2,500.00
5 $1,500.00$500.00
6 $900.00$300.00
Ref #47 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $4,500.00$4,500.00
3 $9,111.00$9,111.00
4 $10,700.00$10,700.00
5 $4,000.00$4,000.00
6 $12,000.00$12,000.00
Ref #48 624E10000 MOBILIZATION, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $18,000.00$18,000.00
3 $6,266.00$6,266.00
4 $10,000.00$10,000.00
5 $15,000.00$15,000.00
6 $8,000.00$8,000.00
Section 7 - INCIDENTALS - Totals
Awd $36,250.00
2 $37,100.00
3 $75,658.00
4 $36,000.00
5 $58,500.00
6 $66,400.00
150024 - Page 255
Project No. 150025
PID 94902
WAY-US 250-07.10
Federal
Type: CULVERT REPLACEMENT
Completion Date: 8/31/2015
Award Amount: $109,226.79
Contract Awarded To: STANLEY MILLER CONSTRUCTION COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $146,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 1
Bid $109,226.79
BCC OHIO INC
P O BOX 229
NEW LONDON, OH 44851
Huron
Bidder 2
Bid $119,389.22
BLACK HORSE BRIDGE CONSTRUCTION INC
5185 WOOSTER ROAD WEST
NORTON, OH 44203
Summit
Bidder 3
Bid $140,273.10
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 4
Bid $145,604.11
TURN-KEY TUNNELING INC
1247 STIMMEL RD
COLUMBUS, OH 43223
Franklin
Bidder 5
Bid $153,803.90
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 6
Bid $172,339.50
R W ROBINSON INC
87 EAST STATE
BELLVILLE, OH 44813
Richland
Bidder 7
Bid $221,973.11
BURTON SCOT CONTRACTORS LLC
11330 KINSMAN RD
NEWBURY, OH 44065
Geauga
Bidder 8
Bid $248,910.00
150025 - Page 256
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $7,867.00$7,867.00
2 $6,202.50$6,202.50
3 $12,000.00$12,000.00
4 $12,000.00$12,000.00
5 $7,500.00$7,500.00
6 $2,000.00$2,000.00
7 $19,000.00$19,000.00
8 $10,000.00$10,000.00
Ref #2 202E20010 HEADWALL REMOVED, (1 EACH)
Awd $983.00$983.00
2 $2,107.50$2,107.50
3 $380.00$380.00
4 $650.00$650.00
5 $3,500.00$3,500.00
6 $100.00$100.00
7 $1,000.00$1,000.00
8 $5,000.00$5,000.00
Ref #3 202E35201 PIPE REMOVED, OVER 24", AS PER PLAN, (10 FT)
Awd $980.00$98.00
2 $1,620.00$162.00
3 $2,220.00$222.00
4 $950.00$95.00
5 $1,600.00$160.00
6 $100.00$10.00
7 $1,000.00$100.00
8 $7,500.00$750.00
Ref #4 202E75000 FENCE REMOVED, (170 FT)
Awd $170.00$1.00
2 $238.00$1.40
3 $1,360.00$8.00
4 $340.00$2.00
5 $1,360.00$8.00
6 $170.00$1.00
7 $408.00$2.40
8 $408.00$2.40
Ref #5 203E20000 EMBANKMENT, (3 CY)
Awd $150.00$50.00
2 $238.50$79.50
3 $840.00$280.00
4 $300.00$100.00
5 $750.00$250.00
6 $300.00$100.00
7 $300.00$100.00
8 $1,800.00$600.00
Ref #6 607E15000 FENCE, TYPE 47, (240 FT)
Awd $5,335.20$22.23
2 $3,477.60$14.49
3 $4,800.00$20.00
4 $4,320.00$18.00
5 $8,400.00$35.00
6 $3,360.00$14.00
7 $6,312.00$26.30
8 $6,312.00$26.30
150025 - Page 257
Section 1 - ROADWAY - Totals
Awd $15,485.20
2 $13,884.10
3 $21,600.00
4 $18,560.00
5 $23,110.00
6 $6,030.00
7 $28,020.00
8 $31,020.00
Ref #7 601E26000 DUMPED ROCK FILL, TYPE B, (14 CY)
Awd $2,730.00$195.00
2 $2,002.56$143.04
3 $8,540.00$610.00
4 $1,680.00$120.00
5 $2,100.00$150.00
6 $1,260.00$90.00
7 $2,240.00$160.00
8 $4,200.00$300.00
Ref #8 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN, (32 CY)
Awd $7,840.00$245.00
2 $4,579.52$143.11
3 $6,400.00$200.00
4 $3,840.00$120.00
5 $7,840.00$245.00
6 $2,880.00$90.00
7 $5,120.00$160.00
8 $8,000.00$250.00
Ref #9 659E10000 SEEDING AND MULCHING, (200 SY)
Awd $1,046.00$5.23
2 $972.00$4.86
3 $1,000.00$5.00
4 $400.00$2.00
5 $2,400.00$12.00
6 $400.00$2.00
7 $1,000.00$5.00
8 $1,590.00$7.95
Ref #10 659E20000 COMMERCIAL FERTILIZER, (0.03 TON)
Awd $18.60$620.00
2 $10.50$350.00
3 $15.00$500.00
4 $15.00$500.00
5 $11.25$375.00
6 $24.00$800.00
7 $15.00$500.00
8 $9.90$330.00
150025 - Page 258
Ref #11 659E31000 LIME, (0.04 ACRE)
Awd $7.08$177.00
2 $4.20$105.00
3 $10.00$250.00
4 $8.00$200.00
5 $6.00$150.00
6 $20.00$500.00
7 $2.00$50.00
8 $4.00$100.00
Ref #12 659E35000 WATER, (1.11 MGAL)
Awd $1.11$1.00
2 $12.60$11.35
3 $11.10$10.00
4 $1.11$1.00
5 $16.65$15.00
6 $55.50$50.00
7 $1.11$1.00
8 $11.10$10.00
Ref #13 832E30000 EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
5 $1,500.00$1.00
6 $1,500.00$1.00
7 $1,500.00$1.00
8 $1,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $13,142.79
2 $9,081.38
3 $17,476.10
4 $7,444.11
5 $13,873.90
6 $6,139.50
7 $9,878.11
8 $15,315.00
Ref #14 611E28000 84" CONDUIT, TYPE A, (10 FT)
Awd $8,090.00$809.00
2 $12,102.00$1,210.20
3 $7,400.00$740.00
4 $10,000.00$1,000.00
5 $6,800.00$680.00
6 $5,000.00$500.00
7 $8,000.00$800.00
8 $23,000.00$2,300.00
150025 - Page 259
Ref #15 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (84" CM, (335 FT)
Awd $21,775.00$65.00
2 $35,778.00$106.80
3 $29,145.00$87.00
4 $33,500.00$100.00
5 $40,200.00$120.00
6 $60,300.00$180.00
7 $58,625.00$175.00
8 $41,875.00$125.00
Ref #16 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (64" CM, (274 FT)
Awd $15,070.00$55.00
2 $25,131.28$91.72
3 $26,852.00$98.00
4 $27,400.00$100.00
5 $31,510.00$115.00
6 $41,100.00$150.00
7 $47,950.00$175.00
8 $34,250.00$125.00
Section 3 - DRAINAGE - Totals
Awd $44,935.00
2 $73,011.28
3 $63,397.00
4 $70,900.00
5 $78,510.00
6 $106,400.00
7 $114,575.00
8 $99,125.00
Ref #17 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (30 HOUR)
Awd $1,950.00$65.00
2 $976.50$32.55
3 $1,770.00$59.00
4 $1,950.00$65.00
5 $2,250.00$75.00
6 $1,800.00$60.00
7 $1,500.00$50.00
8 $1,950.00$65.00
Ref #18 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (2 SNMT)
Awd $3,332.00$1,666.00
2 $1,881.76$940.88
3 $1,800.00$900.00
4 $1,800.00$900.00
5 $2,400.00$1,200.00
6 $6,000.00$3,000.00
7 $1,000.00$500.00
8 $1,800.00$900.00
150025 - Page 260
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $5,282.00
2 $2,858.26
3 $3,570.00
4 $3,750.00
5 $4,650.00
6 $7,800.00
7 $2,500.00
8 $3,750.00
Ref #19 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $9,840.00$9,840.00
2 $4,860.00$4,860.00
3 $15,000.00$15,000.00
4 $12,000.00$12,000.00
5 $9,000.00$9,000.00
6 $10,000.00$10,000.00
7 $20,000.00$20,000.00
8 $22,500.00$22,500.00
Ref #20 511E46611 CLASS QC1 CONCRETE, HEADWALL, AS PER PLAN, (3.3 CY)
Awd $4,309.80$1,306.00
2 $3,990.00$1,209.09
3 $3,630.00$1,100.00
4 $4,950.00$1,500.00
5 $3,960.00$1,200.00
6 $2,970.00$900.00
7 $33,000.00$10,000.00
8 $13,200.00$4,000.00
Section 5 - STRUCTURE REPAIR (WAY-250-(7.10)(13.17)) - Totals
Awd $14,149.80
2 $8,850.00
3 $18,630.00
4 $16,950.00
5 $12,960.00
6 $12,970.00
7 $53,000.00
8 $35,700.00
Ref #21 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,600.00$1,600.00
2 $1,473.00$1,473.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
5 $3,500.00$3,500.00
6 $5,500.00$5,500.00
7 $2,500.00$2,500.00
8 $4,000.00$4,000.00
150025 - Page 261
Ref #22 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $9,944.00$9,944.00
2 $5,460.00$5,460.00
3 $4,600.00$4,600.00
4 $5,000.00$5,000.00
5 $8,500.00$8,500.00
6 $19,000.00$19,000.00
7 $6,500.00$6,500.00
8 $34,000.00$34,000.00
Ref #23 624E10000 MOBILIZATION, (LUMP SUM)
Awd $4,688.00$4,688.00
2 $4,771.20$4,771.20
3 $8,000.00$8,000.00
4 $20,000.00$20,000.00
5 $8,700.00$8,700.00
6 $8,500.00$8,500.00
7 $5,000.00$5,000.00
8 $26,000.00$26,000.00
Section 6 - INCIDENTALS - Totals
Awd $16,232.00
2 $11,704.20
3 $15,600.00
4 $28,000.00
5 $20,700.00
6 $33,000.00
7 $14,000.00
8 $64,000.00
150025 - Page 262
Project No. 150026
PID 91938
ADA-Guardrail Project 2015
Non-Federal
Type: GUARDRAIL REBUILDING
Completion Date: 7/31/2015
Award Amount: $1,028,525.00
Contract Awarded To: LAKE ERIE CONSTRUCTION COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $1,083,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
LAKE ERIE CONSTRUCTION COMPANY
25 NORWALD ROAD
NORWALK, OH 44857
Huron
Bidder 1
Bid $1,028,525.00
PDK CONSTRUCTION INC
34070 CREW RD P O BOX 683
POMEROY, OH 45769
Meigs
Bidder 2
Bid $1,126,286.26
M P DORY CO
2001 INTEGRITY DR SOUTH
COLUMBUS, OH 43209
Franklin
Bidder 3
Bid $1,155,914.10
150026 - Page 263
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,400.00$3,400.00
2 $1,000.00$1,000.00
3 $2,500.00$2,500.00
Ref #2 202E38000 GUARDRAIL REMOVED, (8575 FT)
Awd $10,290.00$1.20
2 $11,147.50$1.30
3 $21,437.50$2.50
Ref #3 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (100 FT)
Awd $160.00$1.60
2 $300.00$3.00
3 $100.00$1.00
Ref #4 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN, (21362.5 FT)
Awd $34,180.00$1.60
2 $42,725.00$2.00
3 $53,406.25$2.50
Ref #5 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (157 EACH)
Awd $30,615.00$195.00
2 $28,260.00$180.00
3 $31,400.00$200.00
Ref #6 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (4 EACH)
Awd $700.00$175.00
2 $600.00$150.00
3 $800.00$200.00
Ref #7 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (22 EACH)
Awd $1,760.00$80.00
2 $1,980.00$90.00
3 $1,760.00$80.00
Ref #8 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (27 EACH)
Awd $2,025.00$75.00
2 $2,160.00$80.00
3 $2,160.00$80.00
Ref #9 209E60201 LINEAR GRADING, AS PER PLAN, (364 STA)
Awd $9,100.00$25.00
2 $10,920.00$30.00
3 $36,400.00$100.00
Ref #10 209E70000 BORROW, (2920 CY)
Awd $132,860.00$45.50
2 $87,600.00$30.00
3 $131,400.00$45.00
Ref #11 606E13000 GUARDRAIL, TYPE 5, (19044.25 FT)
Awd $236,148.70$12.40
2 $248,337.02$13.04
3 $243,766.40$12.80
Ref #12 606E13001 GUARDRAIL, TYPE 5, AS PER PLAN, (100 FT)
Awd $980.00$9.80
2 $1,000.00$10.00
3 $1,000.00$10.00
150026 - Page 264
Ref #13 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS, (2787.5 FT)
Awd $40,140.00$14.40
2 $40,140.00$14.40
3 $41,255.00$14.80
Ref #14 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN, (587.5 FT)
Awd $11,515.00$19.60
2 $9,693.75$16.50
3 $10,868.75$18.50
Ref #15 606E17300 GUARDRAIL, TYPE 5, 25' LONG-SPAN, (100 FT)
Awd $1,960.00$19.60
2 $2,100.00$21.00
3 $2,250.00$22.50
Ref #16 606E25000 ANCHOR ASSEMBLY, TYPE A, (6 EACH)
Awd $4,950.00$825.00
2 $4,680.00$780.00
3 $5,400.00$900.00
Ref #17 606E26000 ANCHOR ASSEMBLY, TYPE B, (1 EACH)
Awd $1,640.00$1,640.00
2 $1,450.00$1,450.00
3 $1,450.00$1,450.00
Ref #18 606E26100 ANCHOR ASSEMBLY, TYPE E, (152 EACH)
Awd $262,200.00$1,725.00
2 $266,000.00$1,750.00
3 $281,200.00$1,850.00
Ref #19 606E26500 ANCHOR ASSEMBLY, TYPE T, (33 EACH)
Awd $18,480.00$560.00
2 $18,150.00$550.00
3 $19,800.00$600.00
Ref #20 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $4,000.00$1,000.00
2 $3,600.00$900.00
3 $4,800.00$1,200.00
Ref #21 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (33 EACH)
Awd $18,150.00$550.00
2 $17,325.00$525.00
3 $19,800.00$600.00
Ref #22 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (8 EACH)
Awd $640.00$80.00
2 $640.00$80.00
3 $760.00$95.00
Ref #23 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE, (1 EACH)
Awd $130.00$130.00
2 $125.00$125.00
3 $140.00$140.00
Section 1 - ROADWAY - Totals
Awd $826,023.70
2 $799,933.27
3 $913,853.90
150026 - Page 265
Ref #24 659E10000 SEEDING AND MULCHING, (30333 SY)
Awd $18,199.80$0.60
2 $18,199.80$0.60
3 $27,299.70$0.90
Ref #25 659E14000 REPAIR SEEDING AND MULCHING, (1517 SY)
Awd $303.40$0.20
2 $333.74$0.22
3 $758.50$0.50
Ref #26 659E20000 COMMERCIAL FERTILIZER, (4.09 TON)
Awd $1,145.20$280.00
2 $2,045.00$500.00
3 $2,658.50$650.00
Ref #27 659E31000 LIME, (6.3 ACRE)
Awd $630.00$100.00
2 $1,260.00$200.00
3 $1,008.00$160.00
Ref #28 659E35000 WATER, (81.9 MGAL)
Awd $81.90$1.00
2 $81.90$1.00
3 $819.00$10.00
Section 2 - EROSION CONTROL - Totals
Awd $20,360.30
2 $21,920.44
3 $32,543.70
Ref #29 626E00100 BARRIER REFLECTOR, (416 EACH)
Awd $2,496.00$6.00
2 $2,412.80$5.80
3 $2,704.00$6.50
Ref #30 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (100 FT)
Awd $800.00$8.00
2 $800.00$8.00
3 $1,000.00$10.00
Ref #31 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (50 EACH)
Awd $750.00$15.00
2 $750.00$15.00
3 $1,250.00$25.00
Ref #32 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT, (50 EACH)
Awd $500.00$10.00
2 $500.00$10.00
3 $4,000.00$80.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $4,546.00
2 $4,462.80
3 $8,954.00
150026 - Page 266
Ref #33 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING, (1368.75 FT)
Awd $125,925.00$92.00
2 $132,768.75$97.00
3 $150,562.50$110.00
Section 4 - MISCELLANEOUS STRUCTURE - Totals
Awd $125,925.00
2 $132,768.75
3 $150,562.50
Ref #34 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,920.00$6,920.00
2 $7,400.00$7,400.00
3 $7,500.00$7,500.00
Ref #35 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $18,700.00$18,700.00
2 $82,800.00$82,800.00
3 $20,000.00$20,000.00
Ref #36 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,650.00$3,650.00
2 $1.00$1.00
3 $2,500.00$2,500.00
Ref #37 624E10000 MOBILIZATION, (LUMP SUM)
Awd $22,400.00$22,400.00
2 $77,000.00$77,000.00
3 $20,000.00$20,000.00
Section 5 - INCIDENTALS - Totals
Awd $51,670.00
2 $167,201.00
3 $50,000.00
150026 - Page 267
Project No. 150027
PID 91726
GRE-IR 675-8.45N
Non-Federal
Type: BRIDGE REPAIR
Completion Date: 11/1/2015
Award Amount: $3,494,213.02
Contract Awarded To: JOHN R JURGENSEN COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $2,945,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 1
Bid $3,494,213.02
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 2
Bid $3,645,613.00
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45005
Warren
Bidder 3
Bid $3,820,420.18
150027 - Page 268
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $14,940.73$14,940.73
2 $20,000.00$20,000.00
3 $10,000.00$10,000.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (1399 SY)
Awd $8,645.82$6.18
2 $20,985.00$15.00
3 $11,192.00$8.00
Ref #3 202E23900 CONCRETE BASE REMOVED, (31 SY)
Awd $2,838.05$91.55
2 $1,240.00$40.00
3 $1,085.00$35.00
Ref #4 202E35100 PIPE REMOVED, 24" AND UNDER, (193 FT)
Awd $3,352.41$17.37
2 $4,825.00$25.00
3 $4,246.00$22.00
Ref #5 202E35200 PIPE REMOVED, OVER 24", (83 FT)
Awd $2,393.72$28.84
2 $2,490.00$30.00
3 $3,735.00$45.00
Ref #6 202E38000 GUARDRAIL REMOVED, (5700 FT)
Awd $5,700.00$1.00
2 $5,700.00$1.00
3 $5,700.00$1.00
Ref #7 202E42206 ANCHOR ASSEMBLY REMOVED, (20 EACH)
Awd $3,900.00$195.00
2 $3,900.00$195.00
3 $3,900.00$195.00
Ref #8 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (8 EACH)
Awd $480.00$60.00
2 $480.00$60.00
3 $480.00$60.00
Ref #9 202E58100 CATCH BASIN REMOVED, (2 EACH)
Awd $2,515.88$1,257.94
2 $1,500.00$750.00
3 $1,100.00$550.00
Ref #10 202E58200 INLET REMOVED, (1 EACH)
Awd $1,257.17$1,257.17
2 $1,500.00$1,500.00
3 $900.00$900.00
Ref #11 202E70100 SPECIAL - PIPE CLEANOUT, (378 FT)
Awd $23,814.00$63.00
2 $5,670.00$15.00
3 $7,560.00$20.00
Ref #12 203E10000 EXCAVATION, (424 CY)
Awd $5,194.00$12.25
2 $8,480.00$20.00
3 $7,632.00$18.00
150027 - Page 269
Ref #13 203E20000 EMBANKMENT, (829 CY)
Awd $15,543.75$18.75
2 $16,580.00$20.00
3 $20,725.00$25.00
Ref #14 204E10000 SUBGRADE COMPACTION, (1399 SY)
Awd $3,175.73$2.27
2 $5,596.00$4.00
3 $3,497.50$2.50
Ref #15 204E13000 EXCAVATION OF SUBGRADE, (428 CY)
Awd $3,210.00$7.50
2 $12,840.00$30.00
3 $12,840.00$30.00
Ref #16 606E15050 GUARDRAIL, TYPE MGS, (5600 FT)
Awd $71,680.00$12.80
2 $71,680.00$12.80
3 $71,680.00$12.80
Ref #17 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (6 EACH)
Awd $9,390.00$1,565.00
2 $9,390.00$1,565.00
3 $9,390.00$1,565.00
Ref #18 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (6 EACH)
Awd $10,920.00$1,820.00
2 $10,920.00$1,820.00
3 $10,920.00$1,820.00
Ref #19 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (8 EACH)
Awd $5,920.00$740.00
2 $5,920.00$740.00
3 $5,920.00$740.00
Ref #20 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (6 EACH)
Awd $11,610.00$1,935.00
2 $11,610.00$1,935.00
3 $11,610.00$1,935.00
Ref #21 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH)
Awd $750.00$375.00
2 $750.00$375.00
3 $750.00$375.00
Ref #22 622E23401 CONCRETE BARRIER, TYPE B, AS PER PLAN, (100 FT)
Awd $22,195.00$221.95
2 $30,000.00$300.00
3 $35,000.00$350.00
Section 1 - ROADWAY - Totals
Awd $229,426.26
2 $252,056.00
3 $239,862.50
Ref #23 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (461 SY)
Awd $13,830.00$30.00
2 $23,050.00$50.00
3 $12,908.00$28.00
150027 - Page 270
Ref #24 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (136 CY)
Awd $14,013.44$103.04
2 $14,960.00$110.00
3 $13,600.00$100.00
Ref #25 601E40050 PAVED GUTTER, MISC.:, (20 SY)
Awd $800.00$40.00
2 $5,500.00$275.00
3 $3,800.00$190.00
Ref #26 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $202.46$101.23
2 $130.00$65.00
3 $100.00$50.00
Ref #27 659E00300 TOPSOIL, (196 CY)
Awd $3,682.84$18.79
2 $4,900.00$25.00
3 $9,408.00$48.00
Ref #28 659E10000 SEEDING AND MULCHING, (1762 SY)
Awd $3,347.80$1.90
2 $2,202.50$1.25
3 $3,347.80$1.90
Ref #29 659E14000 REPAIR SEEDING AND MULCHING, (88 SY)
Awd $44.00$0.50
2 $132.00$1.50
3 $44.00$0.50
Ref #30 659E20000 COMMERCIAL FERTILIZER, (0.24 TON)
Awd $94.80$395.00
2 $120.00$500.00
3 $94.80$395.00
Ref #31 659E31000 LIME, (0.36 ACRE)
Awd $36.00$100.00
2 $72.00$200.00
3 $36.00$100.00
Ref #32 659E35000 WATER, (10 MGAL)
Awd $10.00$1.00
2 $120.00$12.00
3 $10.00$1.00
Ref #33 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $46,061.34
2 $61,186.50
3 $53,348.60
Ref #34 605E14000 6" BASE PIPE UNDERDRAINS, (380 FT)
Awd $8,781.80$23.11
2 $7,220.00$19.00
3 $6,840.00$18.00
150027 - Page 271
Ref #35 611E05900 15" CONDUIT, TYPE B, (60 FT)
Awd $5,922.60$98.71
2 $9,900.00$165.00
3 $7,800.00$130.00
Ref #36 611E06100 15" CONDUIT, TYPE C, (6 FT)
Awd $829.50$138.25
2 $480.00$80.00
3 $805.02$134.17
Ref #37 611E07600 18" CONDUIT, TYPE C, (129 FT)
Awd $11,331.36$87.84
2 $9,675.00$75.00
3 $12,642.00$98.00
Ref #38 611E19904 42" CONDUIT, TYPE F, (71 FT)
Awd $11,980.54$168.74
2 $9,940.00$140.00
3 $12,070.00$170.00
Ref #39 611E21100 48" CONDUIT, TYPE C, (12 FT)
Awd $8,290.08$690.84
2 $3,900.00$325.00
3 $4,944.00$412.00
Ref #40 611E98300 CATCH BASIN, NO. 5, (1 EACH)
Awd $5,082.20$5,082.20
2 $5,000.00$5,000.00
3 $3,800.00$3,800.00
Ref #41 611E98341 CATCH BASIN, NO. 5A, (1 EACH)
Awd $7,137.98$7,137.98
2 $14,000.00$14,000.00
3 $6,300.00$6,300.00
Ref #42 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (3 EACH)
Awd $3,952.95$1,317.65
2 $4,200.00$1,400.00
3 $4,500.00$1,500.00
Ref #43 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (1 EACH)
Awd $4,410.19$4,410.19
2 $2,500.00$2,500.00
3 $2,500.00$2,500.00
Ref #44 611E98645 CATCH BASIN GRATE, AS PER PLAN, (1 EACH)
Awd $687.00$687.00
2 $600.00$600.00
3 $580.00$580.00
Ref #45 611E98690 CATCH BASIN, MISC.: CLEANOUT, (4 EACH)
Awd $10,917.48$2,729.37
2 $1,000.00$250.00
3 $880.00$220.00
Ref #46 611E98800 INLET, NO. 3B, (1 EACH)
Awd $5,617.39$5,617.39
2 $11,000.00$11,000.00
3 $7,200.00$7,200.00
150027 - Page 272
Ref #47 611E99574 MANHOLE, NO. 3, (1 EACH)
Awd $6,247.48$6,247.48
2 $11,000.00$11,000.00
3 $8,000.00$8,000.00
Section 3 - DRAINAGE - Totals
Awd $91,188.55
2 $90,415.00
3 $78,861.02
Ref #48 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP, (1700 SY)
Awd $172,567.00$101.51
2 $115,600.00$68.00
3 $374,000.00$220.00
Ref #49 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (56707 SY)
Awd $101,505.53$1.79
2 $113,414.00$2.00
3 $113,414.00$2.00
Ref #50 255E20000 FULL DEPTH PAVEMENT SAWING, (100 FT)
Awd $250.00$2.50
2 $2,500.00$25.00
3 $300.00$3.00
Ref #51 301E46000 ASPHALT CONCRETE BASE, PG64-22, (7 CY)
Awd $2,541.49$363.07
2 $3,500.00$500.00
3 $1,400.00$200.00
Ref #52 304E20000 AGGREGATE BASE, (10 CY)
Awd $2,492.60$249.26
2 $1,250.00$125.00
3 $1,000.00$100.00
Ref #53 407E10000 TACK COAT, (4253 GAL)
Awd $10,632.50$2.50
2 $9,781.90$2.30
3 $9,781.90$2.30
Ref #54 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (2269 GAL)
Awd $5,672.50$2.50
2 $5,218.70$2.30
3 $5,218.70$2.30
Ref #55 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (2403 CY)
Awd $460,558.98$191.66
2 $446,958.00$186.00
3 $468,585.00$195.00
Ref #56 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (2757 CY)
Awd $396,484.17$143.81
2 $454,905.00$165.00
3 $471,447.00$171.00
Ref #57 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (31 SY)
Awd $5,217.61$168.31
2 $12,400.00$400.00
3 $4,340.00$140.00
150027 - Page 273
Ref #58 609E24510 CURB, TYPE 4-C, (108 FT)
Awd $5,940.00$55.00
2 $8,640.00$80.00
3 $4,644.00$43.00
Ref #59 609E72001 CONCRETE MEDIAN, AS PER PLAN, (100 SY)
Awd $15,611.00$156.11
2 $15,000.00$150.00
3 $14,000.00$140.00
Ref #60 618E40101 RUMBLE STRIPS, (ASPHALT CONCRETE), AS PER PLAN, (255 FT)
Awd $471.75$1.85
2 $3,825.00$15.00
3 $20,400.00$80.00
Ref #61 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (37.92 MILE)
Awd $17,249.81$454.90
2 $21,235.20$560.00
3 $22,752.00$600.00
Section 4 - PAVEMENT - Totals
Awd $1,197,194.94
2 $1,214,227.80
3 $1,511,282.60
Ref #62 621E00100 RPM, (556 EACH)
Awd $10,769.72$19.37
2 $10,480.60$18.85
3 $10,480.60$18.85
Ref #63 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN, (1 EACH)
Awd $475.00$475.00
2 $2,000.00$2,000.00
3 $475.00$475.00
Ref #64 626E00100 BARRIER REFLECTOR, (92 EACH)
Awd $575.00$6.25
2 $575.00$6.25
3 $575.00$6.25
Ref #65 644E00100 EDGE LINE, 4", (0.4 MILE)
Awd $810.00$2,025.00
2 $810.00$2,025.00
3 $810.00$2,025.00
Ref #66 644E00104 EDGE LINE, 6", (5.09 MILE)
Awd $14,353.80$2,820.00
2 $14,353.80$2,820.00
3 $14,353.80$2,820.00
Ref #67 644E00200 LANE LINE, 4", (0.54 MILE)
Awd $429.30$795.00
2 $429.30$795.00
3 $429.30$795.00
Ref #68 644E00204 LANE LINE, 6", (1.83 MILE)
Awd $1,839.15$1,005.00
2 $1,839.15$1,005.00
3 $1,839.15$1,005.00
150027 - Page 274
Ref #69 644E00300 CENTER LINE, (0.48 MILE)
Awd $1,562.40$3,255.00
2 $1,562.40$3,255.00
3 $1,562.40$3,255.00
Ref #70 644E00400 CHANNELIZING LINE, 8", (361 FT)
Awd $415.15$1.15
2 $415.15$1.15
3 $415.15$1.15
Ref #71 644E00404 CHANNELIZING LINE, 12", (2579 FT)
Awd $3,481.65$1.35
2 $3,481.65$1.35
3 $3,481.65$1.35
Ref #72 644E00500 STOP LINE, (177 FT)
Awd $752.25$4.25
2 $752.25$4.25
3 $752.25$4.25
Ref #73 644E00700 TRANSVERSE/DIAGONAL LINE, (534 FT)
Awd $2,189.40$4.10
2 $2,189.40$4.10
3 $2,189.40$4.10
Ref #74 644E01300 LANE ARROW, (19 EACH)
Awd $1,425.00$75.00
2 $1,425.00$75.00
3 $1,425.00$75.00
Ref #75 644E01400 WORD ON PAVEMENT, 72", (5 EACH)
Awd $475.00$95.00
2 $475.00$95.00
3 $475.00$95.00
Ref #76 646E10000 EDGE LINE, 4", (0.12 MILE)
Awd $818.40$6,820.00
2 $818.40$6,820.00
3 $818.40$6,820.00
Ref #77 646E10010 EDGE LINE, 6", (0.4 MILE)
Awd $2,808.00$7,020.00
2 $2,808.00$7,020.00
3 $2,808.00$7,020.00
Ref #78 646E10100 LANE LINE, 4", (0.17 MILE)
Awd $972.40$5,720.00
2 $972.40$5,720.00
3 $972.40$5,720.00
Ref #79 646E10110 LANE LINE, 6", (0.1 MILE)
Awd $597.50$5,975.00
2 $597.50$5,975.00
3 $597.50$5,975.00
Ref #80 646E10200 CENTER LINE, (0.06 MILE)
Awd $464.70$7,745.00
2 $464.70$7,745.00
3 $464.70$7,745.00
150027 - Page 275
Ref #81 646E10300 CHANNELIZING LINE, 8", (15 FT)
Awd $75.00$5.00
2 $75.00$5.00
3 $75.00$5.00
Ref #82 646E20300 LANE ARROW, (1 EACH)
Awd $250.00$250.00
2 $250.00$250.00
3 $250.00$250.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $45,538.82
2 $46,774.70
3 $45,249.70
Ref #83 633E69100 STOP BAR DETECTION RADAR, (4 EACH)
Awd $27,940.00$6,985.00
2 $32,000.00$8,000.00
3 $27,500.00$6,875.00
Section 6 - TRAFFIC SIGNALS - Totals
Awd $27,940.00
2 $32,000.00
3 $27,500.00
Ref #84 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR)
Awd $14,466.00$72.33
2 $16,000.00$80.00
3 $12,400.00$62.00
Ref #85 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (5 EACH)
Awd $10,233.25$2,046.65
2 $10,500.00$2,100.00
3 $9,825.00$1,965.00
Ref #86 614E13300 BARRIER REFLECTOR, TYPE B, (60 EACH)
Awd $582.60$9.71
2 $360.00$6.00
3 $360.00$6.00
Ref #87 614E13350 OBJECT MARKER, ONE WAY, (60 EACH)
Awd $938.40$15.64
2 $660.00$11.00
3 $660.00$11.00
Ref #88 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (6 SNMT)
Awd $5,556.12$926.02
2 $5,100.00$850.00
3 $6,000.00$1,000.00
Ref #89 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (2.64 MILE)
Awd $884.40$335.00
2 $1,003.20$380.00
3 $884.40$335.00
150027 - Page 276
Ref #90 614E20200 WORK ZONE LANE LINE, CLASS I, 740.06, TYPE I, (1.24 MILE)
Awd $4,340.00$3,500.00
2 $5,034.81$4,060.33
3 $4,340.00$3,500.00
Ref #91 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (0.54 MILE)
Awd $321.30$595.00
2 $372.74$690.26
3 $321.30$595.00
Ref #92 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, (1.09 MILE)
Awd $11,990.00$11,000.00
2 $13,909.54$12,761.05
3 $11,990.00$11,000.00
Ref #93 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (6.01 MILE)
Awd $2,734.55$455.00
2 $3,172.32$527.84
3 $2,734.55$455.00
Ref #94 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (1.63 MILE)
Awd $9,897.36$6,072.00
2 $11,481.88$7,044.10
3 $9,897.36$6,072.00
Ref #95 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (2937 FT)
Awd $1,615.35$0.55
2 $1,879.68$0.64
3 $1,615.35$0.55
Ref #96 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 740.06, TYPE, (3654 FT)
Awd $6,577.20$1.80
2 $7,636.86$2.09
3 $6,577.20$1.80
Ref #97 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I, (2915 FT)
Awd $4,372.50$1.50
2 $5,072.10$1.74
3 $4,372.50$1.50
Ref #98 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (177 FT)
Awd $442.50$2.50
2 $513.30$2.90
3 $442.50$2.50
Ref #99 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (237 FT)
Awd $1,422.00$6.00
2 $1,649.52$6.96
3 $1,422.00$6.00
Ref #100 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I, (15 EACH)
Awd $2,250.00$150.00
2 $2,610.15$174.01
3 $2,250.00$150.00
Ref #101 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $40,000.00$40,000.00
3 $20,000.00$20,000.00
150027 - Page 277
Ref #102 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER , (1399 SY)
Awd $72,552.14$51.86
2 $76,945.00$55.00
3 $81,142.00$58.00
Ref #103 616E10000 WATER, (2 MGAL)
Awd $51.96$25.98
2 $120.00$60.00
3 $200.00$100.00
Ref #104 622E41000 PORTABLE BARRIER, 32", (2635 FT)
Awd $60,684.05$23.03
2 $26,350.00$10.00
3 $26,350.00$10.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $215,411.68
2 $230,371.10
3 $203,784.16
Ref #105 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $1,500.00$1,500.00
2 $20,000.00$20,000.00
3 $1,500.00$1,500.00
Ref #106 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (46 LB)
Awd $92.00$2.00
2 $230.00$5.00
3 $92.00$2.00
Ref #107 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (1 CY)
Awd $3,000.00$3,000.00
2 $8,500.00$8,500.00
3 $3,000.00$3,000.00
Ref #108 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (269 SY)
Awd $4,519.20$16.80
2 $4,035.00$15.00
3 $4,707.50$17.50
Ref #109 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1690 SY)
Awd $22,815.00$13.50
2 $25,350.00$15.00
3 $22,815.00$13.50
Ref #110 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN, (8 EACH)
Awd $12,000.00$1,500.00
2 $12,000.00$1,500.00
3 $12,000.00$1,500.00
Ref #111 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,200.00$2,200.00
3 $2,000.00$2,000.00
Ref #112 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (81 SF)
Awd $8,100.00$100.00
2 $7,290.00$90.00
3 $8,100.00$100.00
150027 - Page 278
Section 8 - STRUCTURE 20 FOOT SPAN AND OVER (GRE-675 - Totals
Awd $54,026.20
2 $79,605.00
3 $54,214.50
Ref #113 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $1,500.00$1,500.00
2 $25,000.00$25,000.00
3 $1,500.00$1,500.00
Ref #114 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (68 LB)
Awd $136.00$2.00
2 $476.00$7.00
3 $136.00$2.00
Ref #115 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (1 CY)
Awd $3,000.00$3,000.00
2 $8,500.00$8,500.00
3 $3,000.00$3,000.00
Ref #116 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (269 SY)
Awd $4,519.20$16.80
2 $4,035.00$15.00
3 $4,707.50$17.50
Ref #117 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (2366 SY)
Awd $27,209.00$11.50
2 $35,490.00$15.00
3 $27,209.00$11.50
Ref #118 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN, (10 EACH)
Awd $15,000.00$1,500.00
2 $15,000.00$1,500.00
3 $15,000.00$1,500.00
Ref #119 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $2,200.00$2,200.00
3 $2,500.00$2,500.00
Ref #120 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (217 SF)
Awd $19,530.00$90.00
2 $19,530.00$90.00
3 $19,530.00$90.00
Section 9 - STRUCTURE 20 FOOT SPAN AND OVER (GRE-675 - Totals
Awd $73,394.20
2 $110,231.00
3 $73,582.50
Ref #121 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $115,000.00$115,000.00
2 $130,000.00$130,000.00
3 $115,000.00$115,000.00
150027 - Page 279
Ref #122 509E10000 EPOXY COATED REINFORCING STEEL, (12921 LB)
Awd $16,151.25$1.25
2 $16,151.25$1.25
3 $16,151.25$1.25
Ref #123 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (2573 LB)
Awd $3,216.25$1.25
2 $7,719.00$3.00
3 $3,216.25$1.25
Ref #124 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (1218 EACH)
Awd $13,398.00$11.00
2 $24,360.00$20.00
3 $13,398.00$11.00
Ref #125 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (21 CY)
Awd $31,500.00$1,500.00
2 $52,500.00$2,500.00
3 $31,500.00$1,500.00
Ref #126 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET), (67 CY)
Awd $43,550.00$650.00
2 $67,000.00$1,000.00
3 $43,550.00$650.00
Ref #127 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING, (15 CY)
Awd $25,500.00$1,700.00
2 $37,500.00$2,500.00
3 $25,500.00$1,700.00
Ref #128 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1530 SY)
Awd $25,704.00$16.80
2 $22,950.00$15.00
3 $26,775.00$17.50
Ref #129 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (3543 LB)
Awd $24,801.00$7.00
2 $31,887.00$9.00
3 $24,801.00$7.00
Ref #130 513E21000 TRIMMING OF BEAM END, (5 EACH)
Awd $2,500.00$500.00
2 $1,750.00$350.00
3 $2,500.00$500.00
Ref #131 513E95020 STRUCTURAL STEEL, MISC.: REPLACE PORTIONS OF EXIST, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $20,000.00$20,000.00
3 $25,000.00$25,000.00
Ref #132 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (27946 SF)
Awd $208,197.70$7.45
2 $172,985.74$6.19
3 $167,676.00$6.00
Ref #133 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (27946 SF)
Awd $55,892.00$2.00
2 $53,376.86$1.91
3 $51,700.10$1.85
150027 - Page 280
Ref #134 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (28409 SF)
Awd $56,818.00$2.00
2 $58,522.54$2.06
3 $56,818.00$2.00
Ref #135 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (28409 SF)
Awd $42,613.50$1.50
2 $58,522.54$2.06
3 $56,818.00$2.00
Ref #136 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (43 MNHR)
Awd $3,440.00$80.00
2 $5,319.53$123.71
3 $5,160.00$120.00
Ref #137 514E10000 FINAL INSPECTION REPAIR, (28 EACH)
Awd $7,000.00$250.00
2 $7,216.44$257.73
3 $7,000.00$250.00
Ref #138 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (173 FT)
Awd $90,825.00$525.00
2 $82,175.00$475.00
3 $90,825.00$525.00
Ref #139 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (20 EACH)
Awd $22,000.00$1,100.00
2 $22,400.00$1,120.00
3 $22,000.00$1,100.00
Ref #140 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $15,000.00$15,000.00
3 $5,000.00$5,000.00
Ref #141 518E12800 SCUPPER MODIFICATION, (13 EACH)
Awd $6,500.00$500.00
2 $26,000.00$2,000.00
3 $6,500.00$500.00
Ref #142 518E63300 STRUCTURE DRAINAGE, MISC.: CLEANOUT OF BRIDGE COLL, (LUMP SUM)
Awd $7,500.00$7,500.00
2 $15,000.00$15,000.00
3 $7,500.00$7,500.00
Ref #143 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (112 SF)
Awd $10,640.00$95.00
2 $15,680.00$140.00
3 $10,640.00$95.00
Ref #144 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (500 FT)
Awd $31,500.00$63.00
2 $31,500.00$63.00
3 $31,500.00$63.00
Ref #145 690E98400 SPECIAL - MISC.:CONSULTANT FOR CONCRETE QUALITY CO, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $5,000.00$5,000.00
150027 - Page 281
Ref #146 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (2544 SY)
Awd $101,760.00$40.00
2 $101,760.00$40.00
3 $101,760.00$40.00
Ref #147 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (2544 SY)
Awd $139,920.00$55.00
2 $132,288.00$52.00
3 $139,920.00$55.00
Ref #148 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (178 CY)
Awd $30,260.00$170.00
2 $27,590.00$155.00
3 $30,260.00$170.00
Ref #149 848E50000 HAND CHIPPING, (255 SY)
Awd $11,475.00$45.00
2 $16,575.00$65.00
3 $11,475.00$45.00
Ref #150 848E50100 TEST SLAB, (LUMP SUM)
Awd $500.00$500.00
2 $5,000.00$5,000.00
3 $500.00$500.00
Ref #151 848E50300 WEARING COURSE REMOVED, ASPHALT, (2613 SY)
Awd $18,291.00$7.00
2 $23,517.00$9.00
3 $18,291.00$7.00
Section 10 - STRUCTURE 20 FOOT SPAN AND OVER (GRE-675 - Totals
Awd $1,181,452.70
2 $1,287,245.90
3 $1,153,734.60
Ref #152 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $31,271.03$31,271.03
2 $26,500.00$26,500.00
3 $35,000.00$35,000.00
Ref #153 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $167,935.08$167,935.08
2 $90,000.00$90,000.00
3 $209,000.00$209,000.00
Ref #154 619E16010 FIELD OFFICE, TYPE B, (6 MNTH)
Awd $6,613.92$1,102.32
2 $12,000.00$2,000.00
3 $15,000.00$2,500.00
Ref #155 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $26,758.30$26,758.30
2 $13,000.00$13,000.00
3 $30,000.00$30,000.00
Ref #156 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $90,000.00$90,000.00
150027 - Page 282
Section 11 - INCIDENTALS - Totals
Awd $332,578.33
2 $241,500.00
3 $379,000.00
150027 - Page 283
Project No. 150028
PID 96980
MAH-US 62-7.60
Non-Federal
Type: SIGNALIZATION
Completion Date: 8/21/2015
Award Amount: $69,656.25
Contract Awarded To: PERRAM ELECTRIC INC
Letting Date: 1/15/2015
Engineer's Estimate: $107,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
PERRAM ELECTRIC INC
6882 RIDGE RD
WADSWORTH, OH 44281
Medina
Bidder 1
Bid $69,656.25
CORNERSTONE ELECTRIC INC
14375 WEST CALLA RD
SALEM, OH 44460
Columbiana
Bidder 2
Bid $72,729.00
GREENWICH ELECTRIC INC
1050 LAFAYETTE RD
MEDINA, OH 44256-3549
Bidder 3
Bid $75,517.75
THOMPSON ELECTRIC INC
49 NORTHMORELAND AVE
MUNROE FALLS, OH 44262
Summit
Bidder 4
Bid $79,466.21
S E T INC
235 EAST WATER ST
LOWELLVILLE, OH 44436
Mahoning
Bidder 5
Bid $85,701.08
DAVIS H ELLIOT CONSTRUCTION COMPANY INC
673 BLUE SKY PARKWAY
LEXINGTON, KY 40509
Bidder 6
Bid $116,840.00
150028 - Page 284
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $100.00$100.00
2 $500.00$500.00
3 $250.00$250.00
4 $250.00$250.00
5 $2,051.00$2,051.00
6 $1,000.00$1,000.00
Section 1 - ROADWAY - Totals
Awd $100.00
2 $500.00
3 $250.00
4 $250.00
5 $2,051.00
6 $1,000.00
Ref #2 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
6 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
6 $1,000.00
Ref #3 625E25300 CONDUIT, 1-1/2", 725.04, (603 FT)
Awd $6,120.45$10.15
2 $4,221.00$7.00
3 $5,125.50$8.50
4 $3,895.38$6.46
5 $3,618.00$6.00
6 $1,809.00$3.00
Ref #4 625E25500 CONDUIT, 3", 725.04, (4 FT)
Awd $232.00$58.00
2 $60.00$15.00
3 $80.00$20.00
4 $332.00$83.00
5 $80.00$20.00
6 $32.00$8.00
Ref #5 625E29000 TRENCH, (556 FT)
Awd $3,808.60$6.85
2 $2,780.00$5.00
3 $3,336.00$6.00
4 $2,924.56$5.26
5 $3,336.00$6.00
6 $2,780.00$5.00
150028 - Page 285
Ref #6 625E29400 TRENCH IN PAVED AREA, (51 FT)
Awd $1,326.00$26.00
2 $1,785.00$35.00
3 $1,606.50$31.50
4 $3,085.50$60.50
5 $765.00$15.00
6 $1,530.00$30.00
Ref #7 625E30700 PULL BOX, 725.08, 18", (7 EACH)
Awd $6,545.00$935.00
2 $5,250.00$750.00
3 $4,935.00$705.00
4 $4,480.00$640.00
5 $5,173.00$739.00
6 $8,400.00$1,200.00
Ref #8 625E30706 PULL BOX, 725.08, 24", (1 EACH)
Awd $1,080.00$1,080.00
2 $850.00$850.00
3 $855.00$855.00
4 $760.00$760.00
5 $948.00$948.00
6 $2,000.00$2,000.00
Ref #9 625E31510 PULL BOX REMOVED, (7 EACH)
Awd $532.00$76.00
2 $1,750.00$250.00
3 $1,120.00$160.00
4 $2,338.00$334.00
5 $861.00$123.00
6 $3,500.00$500.00
Ref #10 625E32000 GROUND ROD, (2 EACH)
Awd $396.00$198.00
2 $250.00$125.00
3 $270.00$135.00
4 $242.00$121.00
5 $224.00$112.00
6 $400.00$200.00
Ref #11 625E36000 PLASTIC CAUTION TAPE, (607 FT)
Awd $91.05$0.15
2 $607.00$1.00
3 $151.75$0.25
4 $163.89$0.27
5 $267.08$0.44
6 $151.75$0.25
Ref #12 632E05007 VEHICULAR SIGNAL HEAD, (LED), BLACK, 3-SECTION, 12, (8 EACH)
Awd $4,720.00$590.00
2 $6,400.00$800.00
3 $4,640.00$580.00
4 $6,956.00$869.50
5 $5,480.00$685.00
6 $7,200.00$900.00
150028 - Page 286
Ref #13 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (8 EACH)
Awd $80.00$10.00
2 $160.00$20.00
3 $120.00$15.00
4 $340.00$42.50
5 $344.00$43.00
6 $400.00$50.00
Ref #14 632E26500 DETECTOR LOOP, (4 EACH)
Awd $4,360.00$1,090.00
2 $6,000.00$1,500.00
3 $4,400.00$1,100.00
4 $4,720.00$1,180.00
5 $2,372.00$593.00
6 $8,000.00$2,000.00
Ref #15 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES, (88 FT)
Awd $704.00$8.00
2 $616.00$7.00
3 $792.00$9.00
4 $2,201.76$25.02
5 $1,056.00$12.00
6 $440.00$5.00
Ref #16 632E30600 TETHER WIRE, WITH ACCESSORIES, (88 FT)
Awd $862.40$9.80
2 $1,320.00$15.00
3 $1,320.00$15.00
4 $2,523.84$28.68
5 $704.00$8.00
6 $440.00$5.00
Ref #17 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (407 FT)
Awd $875.05$2.15
2 $1,017.50$2.50
3 $814.00$2.00
4 $862.84$2.12
5 $814.00$2.00
6 $407.00$1.00
Ref #18 632E64000 STRAIN POLE FOUNDATION, (2 EACH)
Awd $6,940.00$3,470.00
2 $5,500.00$2,750.00
3 $7,000.00$3,500.00
4 $3,664.00$1,832.00
5 $4,458.00$2,229.00
6 $11,000.00$5,500.00
Ref #19 632E65200 LOOP DETECTOR LEAD-IN CABLE, (983 FT)
Awd $1,376.20$1.40
2 $2,457.50$2.50
3 $1,474.50$1.50
4 $1,848.04$1.88
5 $983.00$1.00
6 $983.00$1.00
150028 - Page 287
Ref #20 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG, (30 FT)
Awd $201.00$6.70
2 $150.00$5.00
3 $157.50$5.25
4 $151.80$5.06
5 $60.00$2.00
6 $60.00$2.00
Ref #21 632E70001 POWER SERVICE, AS PER PLAN, (1 EACH)
Awd $1,315.00$1,315.00
2 $1,500.00$1,500.00
3 $1,600.00$1,600.00
4 $1,896.00$1,896.00
5 $1,352.00$1,352.00
6 $3,500.00$3,500.00
Ref #22 632E83200 STRAIN POLE, TYPE TC-81.10, DESIGN 12, (2 EACH)
Awd $11,880.00$5,940.00
2 $12,400.00$6,200.00
3 $12,820.00$6,410.00
4 $13,070.00$6,535.00
5 $15,438.00$7,719.00
6 $25,000.00$12,500.00
Ref #23 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, (1 EACH)
Awd $750.00$750.00
2 $1,500.00$1,500.00
3 $1,500.00$1,500.00
4 $2,228.00$2,228.00
5 $2,656.00$2,656.00
6 $5,747.25$5,747.25
Ref #24 632E90400 SIGNALIZATION, MISC.: REMOVE AND REINSTALL RADAR , (2 EACH)
Awd $1,030.00$515.00
2 $600.00$300.00
3 $1,600.00$800.00
4 $2,180.00$1,090.00
5 $1,842.00$921.00
6 $5,000.00$2,500.00
Ref #25 632E90500 SIGNALIZATION, MISC.: DIGITAL RADAR DETECTION CAB, (130 FT)
Awd $396.50$3.05
2 $325.00$2.50
3 $260.00$2.00
4 $353.60$2.72
5 $390.00$3.00
6 $260.00$2.00
Ref #26 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH)
Awd $8,675.00$8,675.00
2 $9,000.00$9,000.00
3 $9,000.00$9,000.00
4 $9,687.00$9,687.00
5 $11,960.00$11,960.00
6 $12,500.00$12,500.00
150028 - Page 288
Ref #27 633E67200 CONTROLLER WORK PAD, (1 EACH)
Awd $185.00$185.00
2 $350.00$350.00
3 $250.00$250.00
4 $1,034.00$1,034.00
5 $387.00$387.00
6 $1,000.00$1,000.00
Section 3 - TRAFFIC SIGNALS - Totals
Awd $64,481.25
2 $66,849.00
3 $65,227.75
4 $71,938.21
5 $65,568.08
6 $102,540.00
Ref #28 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (16 HOUR)
Awd $960.00$60.00
2 $880.00$55.00
3 $1,040.00$65.00
4 $1,248.00$78.00
5 $1,056.00$66.00
6 $800.00$50.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $960.00
2 $880.00
3 $1,040.00
4 $1,248.00
5 $1,056.00
6 $800.00
Ref #29 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $815.00$815.00
2 $1,000.00$1,000.00
3 $3,200.00$3,200.00
4 $490.00$490.00
5 $1,000.00$1,000.00
6 $500.00$500.00
Ref #30 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $100.00$100.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
4 $1,352.00$1,352.00
5 $4,923.00$4,923.00
6 $3,500.00$3,500.00
Ref #31 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $200.00$200.00
2 $1,000.00$1,000.00
3 $1,300.00$1,300.00
4 $1,252.00$1,252.00
5 $2,300.00$2,300.00
6 $2,000.00$2,000.00
150028 - Page 289
Ref #32 624E10000 MOBILIZATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $500.00$500.00
3 $2,500.00$2,500.00
4 $1,936.00$1,936.00
5 $7,803.00$7,803.00
6 $5,500.00$5,500.00
Section 5 - INCIDENTALS - Totals
Awd $3,115.00
2 $3,500.00
3 $8,000.00
4 $5,030.00
5 $16,026.00
6 $11,500.00
150028 - Page 290
Project No. 151000
PID 98166
LAW-US 52-11.30
Non-Federal
Type: MISCELLANOUS
Completion Date: 8/31/2015
Award Amount: $149,374.25
Contract Awarded To: D G M INC
Letting Date: 1/15/2015
Engineer's Estimate: $278,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
D G M INC
1881 ADAMS RD
BEAVER, OH 45613
Pike
Bidder 1
Bid $149,374.25
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 2
Bid $181,299.50
ALLARD EXCAVATION LLC
8336 BENNETT SCHOOL HOUSE RD
SOUTH WEBSTER, OH 45682
Scioto
Bidder 3
Bid $194,658.70
151000 - Page 291
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $2,000.00$2,000.00
3 $5,443.75$5,443.75
Ref #2 203E10001 EXCAVATION, AS PER PLAN, (8991 CY)
Awd $62,937.00$7.00
2 $141,608.25$15.75
3 $129,919.95$14.45
Ref #3 209E60501 LINEAR GRADING, AS PER PLAN, (0.24 MILE)
Awd $1,200.00$5,000.00
2 $3,600.00$15,000.00
3 $5,050.00$21,041.67
Section 1 - ROADWAY - Totals
Awd $79,137.00
2 $147,208.25
3 $140,413.70
Ref #4 659E10000 SEEDING AND MULCHING, (2900 SY)
Awd $14,500.00$5.00
2 $2,175.00$0.75
3 $5,800.00$2.00
Ref #5 659E14000 REPAIR SEEDING AND MULCHING, (145 SY)
Awd $7.25$0.05
2 $36.25$0.25
3 $2,175.00$15.00
Ref #6 659E20000 COMMERCIAL FERTILIZER, (1 TON)
Awd $300.00$300.00
2 $500.00$500.00
3 $100.00$100.00
Ref #7 659E31000 LIME, (1 ACRE)
Awd $100.00$100.00
2 $150.00$150.00
3 $50.00$50.00
Ref #8 659E35000 WATER, (10 MGAL)
Awd $10.00$1.00
2 $10.00$1.00
3 $100.00$10.00
Ref #9 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
3 $2,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $16,917.25
2 $4,871.25
3 $10,225.00
151000 - Page 292
Ref #10 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $4,800.00$60.00
2 $5,200.00$65.00
3 $6,000.00$75.00
Ref #11 616E10000 WATER, (20 MGAL)
Awd $20.00$1.00
2 $20.00$1.00
3 $20.00$1.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $4,820.00
2 $5,220.00
3 $6,020.00
Ref #12 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $3,500.00$3,500.00
3 $4,500.00$4,500.00
Ref #13 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $16,000.00$16,000.00
2 $2,500.00$2,500.00
3 $8,500.00$8,500.00
Ref #14 624E10000 MOBILIZATION, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $18,000.00$18,000.00
3 $25,000.00$25,000.00
Section 4 - INCIDENTALS - Totals
Awd $48,500.00
2 $24,000.00
3 $38,000.00
151000 - Page 293
Project No. 151003
PID 97587
LIC-CR 128/539 00.83/07.46
Non-Federal
Type: MISCELLANEOUS
Completion Date: 5/1/2015
Award Amount: $212,602.38
Contract Awarded To: R F SCURLOCK CO
Letting Date: 1/15/2015
Engineer's Estimate: $277,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
R F SCURLOCK CO
3220 FIFTH STREET P O BOX 308
TRINWAY, OH 43842-0335
Bidder 1
Bid $212,602.38
BAUMANN ENTERPRISES INC
4801 CHAINCRAFT RD
GARFIELD HTS, OH 44125
Cuyahoga
Bidder 2
Bid $188,819.00
B & B WRECKING AND EXCAVATING INC
4510 E 71ST ST, SUITE 6
CLEVELAND, OH 44105
Cuyahoga
Bidder 3
Bid $253,481.50
COMPLETE CLEARING INC
510 INDUSTRIAL WAY
MARENGO, OH 43334-9537
Bidder 4
Bid $322,551.50
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 5
Bid $328,109.50
151003 - Page 294
Ref #1 201E11001 CLEARING AND GRUBBING, AS PER PLAN, (LUMP SUM)
Awd $76,076.06$76,076.06
2 $1,500.00$1,500.00
3 $2,500.00$2,500.00
4 $149,700.00$149,700.00
5 $210,000.00$210,000.00
Ref #2 202E62700 SEPTIC TANK REMOVED, (2 EACH)
Awd $2,134.52$1,067.26
2 $2,000.00$1,000.00
3 $4,000.00$2,000.00
4 $2,400.00$1,200.00
5 $2,000.00$1,000.00
Ref #3 202E66000 SPECIAL - DRILLED WATER WELL ABANDONED, (1 EACH)
Awd $400.00$400.00
2 $1,500.00$1,500.00
3 $2,000.00$2,000.00
4 $1,200.00$1,200.00
5 $2,000.00$2,000.00
Section 1 - ROADWAY - Totals
Awd $78,610.58
2 $5,000.00
3 $8,500.00
4 $153,300.00
5 $214,000.00
Ref #4 653E10000 TOPSOIL FURNISHED AND PLACED, (200 CY)
Awd $4,694.00$23.47
2 $5,000.00$25.00
3 $6,000.00$30.00
4 $4,400.00$22.00
5 $1,600.00$8.00
Ref #5 659E00500 SEEDING AND MULCHING, CLASS 1, (2420 SY)
Awd $1,573.00$0.65
2 $2,904.00$1.20
3 $2,299.00$0.95
4 $2,904.00$1.20
5 $1,573.00$0.65
Ref #6 659E00510 SEEDING AND MULCHING, CLASS 2, (98750 SY)
Awd $49,375.00$0.50
2 $108,625.00$1.10
3 $93,812.50$0.95
4 $64,187.50$0.65
5 $50,362.50$0.51
Ref #7 659E20000 COMMERCIAL FERTILIZER, (14 TON)
Awd $6,300.00$450.00
2 $3,150.00$225.00
3 $28,000.00$2,000.00
4 $6,300.00$450.00
5 $7,000.00$500.00
151003 - Page 295
Ref #8 659E31000 LIME, (22 ACRE)
Awd $3,300.00$150.00
2 $11,000.00$500.00
3 $55,000.00$2,500.00
4 $2,750.00$125.00
5 $3,300.00$150.00
Ref #9 659E35000 WATER, (274 MGAL)
Awd $274.00$1.00
2 $2,740.00$10.00
3 $1,370.00$5.00
4 $4,110.00$15.00
5 $274.00$1.00
Ref #10 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $2,860.00$2,860.00
2 $7,500.00$7,500.00
3 $5,000.00$5,000.00
4 $3,250.00$3,250.00
5 $10,000.00$10,000.00
Ref #11 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $69,376.00
2 $141,919.00
3 $192,481.50
4 $88,901.50
5 $75,109.50
Ref #12 202E56001 BUILDING DEMOLISHED, AS PER PLAN 1508 CHERRY VALLE, (LUMP SUM)
Awd $11,398.27$11,398.27
2 $14,000.00$14,000.00
3 $13,000.00$13,000.00
4 $16,650.00$16,650.00
5 $8,000.00$8,000.00
Ref #13 202E56001 BUILDING DEMOLISHED, AS PER PLAN 2665 NEWARK GRANV, (LUMP SUM)
Awd $13,950.27$13,950.27
2 $14,000.00$14,000.00
3 $18,000.00$18,000.00
4 $22,500.00$22,500.00
5 $8,000.00$8,000.00
Ref #14 690E71000 SPECIAL - ASBESTOS ABATEMENT: 2665 NEWARK GRANVIL, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $15,000.00$15,000.00
4 $3,200.00$3,200.00
5 $3,000.00$3,000.00
151003 - Page 296
Section 3 - BUILDING DEMOLITION - Totals
Awd $28,348.54
2 $31,000.00
3 $46,000.00
4 $42,350.00
5 $19,000.00
Ref #15 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,552.48$2,552.48
2 $6,400.00$6,400.00
3 $2,500.00$2,500.00
4 $11,000.00$11,000.00
5 $5,000.00$5,000.00
Ref #16 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,446.88$3,446.88
2 $500.00$500.00
3 $500.00$500.00
4 $12,500.00$12,500.00
5 $10,000.00$10,000.00
Ref #17 624E10000 MOBILIZATION, (LUMP SUM)
Awd $30,267.90$30,267.90
2 $4,000.00$4,000.00
3 $3,500.00$3,500.00
4 $14,500.00$14,500.00
5 $5,000.00$5,000.00
Section 4 - INCIDENTALS - Totals
Awd $36,267.26
2 $10,900.00
3 $6,500.00
4 $38,000.00
5 $20,000.00
151003 - Page 297
Project No. 153000
PID 98061
SUM-IR 76/IR 77-7.58 / 9.59
Federal
Type: BRIDGE REPAIR
Completion Date: 9/15/2016
Award Amount: $2,839,025.00
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/15/2015
Engineer's Estimate: $2,321,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $2,839,025.00
KENMORE CONSTRUCTION CO INC
700 HOME AVE
AKRON, OH 44310
Summit
Bidder 2
Bid $3,147,350.00
J D WILLIAMSON CONSTRUCTION CO INC
441 GENEVA AVE, PO BOX 113
TALLMADGE, OH 44278
Summit
Bidder 3
Bid $3,199,640.35
MARUCCI & GAFFNEY EXCAVATING CO
18 HOGUE ST
YOUNGSTOWN, OH 44502
Mahoning
Bidder 4
Bid $3,594,300.00
153000 - Page 298
Ref #1 201E99000 SPECIAL - CLEARING AND GRUBBING, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $8,500.00$8,500.00
3 $15,000.00$15,000.00
4 $178,000.00$178,000.00
Ref #2 203E10000 EXCAVATION (FOR PAVEMENT REPAIR), (20 CY)
Awd $300.00$15.00
2 $1,200.00$60.00
3 $1,160.00$58.00
4 $900.00$45.00
Ref #3 203E99000 SPECIAL - EARTHWORK, (LUMP SUM)
Awd $140,000.00$140,000.00
2 $210,000.00$210,000.00
3 $230,746.00$230,746.00
4 $410,000.00$410,000.00
Ref #4 606E99000 SPECIAL - GUARDRAIL, (LUMP SUM)
Awd $90,000.00$90,000.00
2 $63,000.00$63,000.00
3 $67,625.50$67,625.50
4 $147,000.00$147,000.00
Section 1 - ROADWAY - Totals
Awd $245,300.00
2 $282,700.00
3 $314,531.50
4 $735,900.00
Ref #5 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $39,000.00$39,000.00
3 $35,194.40$35,194.40
4 $37,000.00$37,000.00
Ref #6 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (25000 EACH)
Awd $25,000.00$1.00
2 $25,000.00$1.00
3 $25,000.00$1.00
4 $25,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $43,000.00
2 $64,000.00
3 $60,194.40
4 $62,000.00
Ref #7 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $32,000.00$32,000.00
3 $28,439.25$28,439.25
4 $47,000.00$47,000.00
153000 - Page 299
Section 3 - DRAINAGE - Totals
Awd $50,000.00
2 $32,000.00
3 $28,439.25
4 $47,000.00
Ref #8 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (100 SY)
Awd $15,000.00$150.00
2 $15,000.00$150.00
3 $9,000.00$90.00
4 $17,500.00$175.00
Ref #9 255E20000 FULL DEPTH PAVEMENT SAWING, (150 FT)
Awd $525.00$3.50
2 $450.00$3.00
3 $750.00$5.00
4 $1,500.00$10.00
Ref #10 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR), (20 CY)
Awd $1,200.00$60.00
2 $1,200.00$60.00
3 $2,800.00$140.00
4 $1,300.00$65.00
Ref #11 304E99000 SPECIAL - AGGREGATE BASE, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $30,000.00$30,000.00
3 $40,500.00$40,500.00
4 $39,000.00$39,000.00
Ref #12 442E99000 SPECIAL - FLEXIBLE PAVEMENT, (LUMP SUM)
Awd $315,000.00$315,000.00
2 $325,000.00$325,000.00
3 $368,830.00$368,830.00
4 $326,000.00$326,000.00
Section 4 - PAVEMENT - Totals
Awd $381,725.00
2 $371,650.00
3 $421,880.00
4 $385,300.00
Ref #13 625E99000 SPECIAL - LIGHTING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $23,000.00$23,000.00
3 $12,495.00$12,495.00
4 $500.00$500.00
Section 5 - LIGHTING - Totals
Awd $1,000.00
2 $23,000.00
3 $12,495.00
4 $500.00
153000 - Page 300
Ref #14 626E99000 SPECIAL - BARRIER REFLECTORS, (LUMP SUM)
Awd $500.00$500.00
2 $500.00$500.00
3 $585.00$585.00
4 $500.00$500.00
Ref #15 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $5,000.00$5,000.00
3 $3,355.00$3,355.00
4 $2,500.00$2,500.00
Ref #16 642E99000 SPECIAL - PAVEMENT MARKING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $4,500.00$4,500.00
3 $10,000.00$10,000.00
4 $5,000.00$5,000.00
Section 6 - TRAFFIC CONTROL - Totals
Awd $13,500.00
2 $10,000.00
3 $13,940.00
4 $8,000.00
Ref #17 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $255,000.00$255,000.00
3 $74,800.00$74,800.00
4 $236,000.00$236,000.00
Ref #18 616E99000 SPECIAL - DUST CONTROL, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $500.00$500.00
3 $125.00$125.00
4 $500.00$500.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $51,500.00
2 $255,500.00
3 $74,925.00
4 $236,500.00
Ref #19 202E99010 SPECIAL - PORTIONS OF STRUCTURE REMOVED, (LUMP SUM)
Awd $65,000.00$65,000.00
2 $32,000.00$32,000.00
3 $75,000.00$75,000.00
4 $75,000.00$75,000.00
Ref #20 512E99000 SPECIAL - SEALING OF CONCRETE, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $12,000.00$12,000.00
3 $6,847.50$6,847.50
4 $10,000.00$10,000.00
153000 - Page 301
Ref #21 514E99000 SPECIAL - BRIDGE PAINTING, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $96,000.00$96,000.00
3 $126,260.00$126,260.00
4 $90,000.00$90,000.00
Ref #22 519E11100 PATCHING CONCRETE STRUCTURE, (100 SF)
Awd $9,000.00$90.00
2 $8,500.00$85.00
3 $8,000.00$80.00
4 $5,000.00$50.00
Ref #23 530E99030 SPECIAL - STRUCTURE REHABILITATION, (LUMP SUM)
Awd $200,000.00$200,000.00
2 $160,000.00$160,000.00
3 $153,470.70$153,470.70
4 $160,000.00$160,000.00
Section 8 - STRUCTURE REPAIR (SUM-76-0758) - Totals
Awd $382,000.00
2 $308,500.00
3 $369,578.20
4 $340,000.00
Ref #24 202E99010 SPECIAL - PORTIONS OF STRUCTURE REMOVED, (LUMP SUM)
Awd $90,000.00$90,000.00
2 $84,000.00$84,000.00
3 $253,149.00$253,149.00
4 $150,000.00$150,000.00
Ref #25 512E99000 SPECIAL - SEALING OF CONCRETE, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $28,000.00$28,000.00
3 $32,180.00$32,180.00
4 $20,000.00$20,000.00
Ref #26 514E99000 SPECIAL - BRIDGE PAINTING, (LUMP SUM)
Awd $187,000.00$187,000.00
2 $194,000.00$194,000.00
3 $212,400.00$212,400.00
4 $150,000.00$150,000.00
Ref #27 519E11100 PATCHING CONCRETE STRUCTURE, (200 SF)
Awd $18,000.00$90.00
2 $14,000.00$70.00
3 $16,000.00$80.00
4 $14,000.00$70.00
Ref #28 526E99000 SPECIAL - REINFORCED CONCRETE APPROACH SLABS, AS P, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $62,000.00$62,000.00
3 $59,800.00$59,800.00
4 $66,000.00$66,000.00
Ref #29 530E99030 SPECIAL - STRUCTURE REHABILITATION, (LUMP SUM)
Awd $833,000.00$833,000.00
2 $1,050,000.00$1,050,000.00
3 $945,028.00$945,028.00
4 $934,500.00$934,500.00
153000 - Page 302
Section 9 - STRUCTURE REPAIR (SUM-77-0959) - Totals
Awd $1,208,000.00
2 $1,432,000.00
3 $1,518,557.00
4 $1,334,500.00
Ref #30 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $2,000.00$2,000.00
3 $4,000.00$4,000.00
4 $1,200.00$1,200.00
Ref #31 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $9,500.00$9,500.00
2 $9,000.00$9,000.00
3 $8,000.00$8,000.00
4 $2,200.00$2,200.00
Ref #32 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $20,000.00$20,000.00
3 $15,000.00$15,000.00
4 $15,000.00$15,000.00
Ref #33 690E20040 SPECIAL - PRELIMINARY DESIGN, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $57,000.00$57,000.00
3 $96,000.00$96,000.00
4 $132,400.00$132,400.00
Ref #34 690E20050 SPECIAL - FINAL DESIGN, (LUMP SUM)
Awd $125,000.00$125,000.00
2 $94,000.00$94,000.00
3 $85,000.00$85,000.00
4 $36,800.00$36,800.00
Ref #35 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $28,000.00$28,000.00
3 $32,000.00$32,000.00
4 $40,000.00$40,000.00
Section 10 - ENGINEERING & SURVEYING SERVICES - Totals
Awd $290,500.00
2 $210,000.00
3 $240,000.00
4 $227,600.00
Ref #36 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,000.00$1,000.00
3 $100.00$100.00
4 $30,000.00$30,000.00
153000 - Page 303
Ref #38 108E99000 SPECIAL - CPM PROGRESS SCHEDULE, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $2,000.00$2,000.00
3 $3,000.00$3,000.00
4 $10,000.00$10,000.00
Ref #39 619E99000 SPECIAL - FIELD OFFICE, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $35,000.00$35,000.00
3 $22,000.00$22,000.00
4 $42,000.00$42,000.00
Ref #40 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $20,000.00$20,000.00
3 $20,000.00$20,000.00
4 $35,000.00$35,000.00
Ref #41 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
4 $100,000.00$100,000.00
Section 11 - INCIDENTALS - Totals
Awd $172,500.00
2 $158,000.00
3 $145,100.00
4 $217,000.00
153000 - Page 304
Project No. 153002
PID 97569
CLE-/CLE TR 8/960 Des-Build (PART 1/PART 2)
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 9/30/2015
Award Amount: $967,865.26
Contract Awarded To: JOHN R JURGENSEN COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $986,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 1
Bid $967,865.26
OHIO BRIDGE CORPORATION
P O BOX 757
CAMBRIDGE, OH 43725
Guernsey
Bidder 2
Bid $969,550.00
EAGLE BRIDGE CO
800 S VAN DEMARK RD
SIDNEY, OH 45365
Shelby
Bidder 3
Bid $1,087,050.00
RACK & BALLAUER EXCAVATING CO INC
11321 PADDY'S RUN RD
HAMILTON, OH 45013
Butler
Bidder 4
Bid $1,115,550.00
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 5
Bid $1,192,790.00
SUNESIS CONSTRUCTION CO
2610 CRESCENTVILLE RD
WEST CHESTER, OH 45069
Butler
Bidder 6
Bid $1,436,713.03
153002 - Page 305
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $19,060.12$19,060.12
2 $25,000.00$25,000.00
3 $32,500.00$32,500.00
4 $40,000.00$40,000.00
5 $38,000.00$38,000.00
6 $55,102.87$55,102.87
Section 1 - ROADWAY (PART 1) - Totals
Awd $19,060.12
2 $25,000.00
3 $32,500.00
4 $40,000.00
5 $38,000.00
6 $55,102.87
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $5,200.00$5,200.00
2 $7,500.00$7,500.00
3 $10,000.00$10,000.00
4 $8,500.00$8,500.00
5 $9,000.00$9,000.00
6 $15,941.41$15,941.41
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (10600 EACH)
Awd $10,600.00$1.00
2 $10,600.00$1.00
3 $10,600.00$1.00
4 $10,600.00$1.00
5 $10,600.00$1.00
6 $10,600.00$1.00
Section 2 - EROSION CONTROL (PART 1) - Totals
Awd $15,800.00
2 $18,100.00
3 $20,600.00
4 $19,100.00
5 $19,600.00
6 $26,541.41
Ref #4 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $500.00$500.00
2 $300.00$300.00
3 $2,500.00$2,500.00
4 $2,500.00$2,500.00
5 $18,000.00$18,000.00
6 $2,299.73$2,299.73
153002 - Page 306
Section 3 - DRAINAGE (PART 1) - Totals
Awd $500.00
2 $300.00
3 $2,500.00
4 $2,500.00
5 $18,000.00
6 $2,299.73
Ref #5 690E20080 SPECIAL - SUBSURFACE INVESTIGATIONS, (LUMP SUM)
Awd $500.00$500.00
2 $1,000.00$1,000.00
3 $2,600.00$2,600.00
4 $5,000.00$5,000.00
5 $5,000.00$5,000.00
6 $15,000.00$15,000.00
Ref #6 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $28,217.09$28,217.09
2 $23,000.00$23,000.00
3 $30,000.00$30,000.00
4 $30,000.00$30,000.00
5 $42,000.00$42,000.00
6 $47,892.91$47,892.91
Section 4 - PAVEMENT (PART 1) - Totals
Awd $28,717.09
2 $24,000.00
3 $32,600.00
4 $35,000.00
5 $47,000.00
6 $62,892.91
Ref #7 626E99000 SPECIAL - BARRIER REFLECTORS, (LUMP SUM)
Awd $28.00$28.00
2 $200.00$200.00
3 $150.00$150.00
4 $100.00$100.00
5 $120.00$120.00
6 $137.94$137.94
Ref #8 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $500.00$500.00
2 $500.00$500.00
3 $350.00$350.00
4 $1,000.00$1,000.00
5 $500.00$500.00
6 $1,760.00$1,760.00
Ref #9 642E99000 SPECIAL - PAVEMENT MARKING, (LUMP SUM)
Awd $1,140.00$1,140.00
2 $1,000.00$1,000.00
3 $2,000.00$2,000.00
4 $1,200.00$1,200.00
5 $1,200.00$1,200.00
6 $8,260.00$8,260.00
153002 - Page 307
Section 5 - TRAFFIC CONTROL (PART 1) - Totals
Awd $1,668.00
2 $1,700.00
3 $2,500.00
4 $2,300.00
5 $1,820.00
6 $10,157.94
Ref #10 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $6,469.81$6,469.81
2 $3,000.00$3,000.00
3 $4,000.00$4,000.00
4 $6,500.00$6,500.00
5 $4,000.00$4,000.00
6 $4,760.75$4,760.75
Section 6 - MAINTENANCE OF TRAFFIC (PART 1) - Totals
Awd $6,469.81
2 $3,000.00
3 $4,000.00
4 $6,500.00
5 $4,000.00
6 $4,760.75
Ref #11 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $378,259.24$378,259.24
2 $369,000.00$369,000.00
3 $430,000.00$430,000.00
4 $485,000.00$485,000.00
5 $430,000.00$430,000.00
6 $522,466.54$522,466.54
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (BUT-TR8 - Totals
Awd $378,259.24
2 $369,000.00
3 $430,000.00
4 $485,000.00
5 $430,000.00
6 $522,466.54
Ref #12 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $3,500.00$3,500.00
3 $500.00$500.00
4 $2,000.00$2,000.00
5 $5,000.00$5,000.00
6 $712.86$712.86
153002 - Page 308
Ref #13 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $3,675.00$3,675.00
2 $5,600.00$5,600.00
3 $1,000.00$1,000.00
4 $2,000.00$2,000.00
5 $5,000.00$5,000.00
6 $1,000.01$1,000.01
Ref #14 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $3,410.00$3,410.00
2 $8,000.00$8,000.00
3 $1,000.00$1,000.00
4 $4,000.00$4,000.00
5 $5,000.00$5,000.00
6 $7,400.00$7,400.00
Ref #15 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $29,400.00$29,400.00
2 $10,000.00$10,000.00
3 $22,000.00$22,000.00
4 $42,000.00$42,000.00
5 $20,000.00$20,000.00
6 $39,700.01$39,700.01
Ref #16 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $36,990.00$36,990.00
2 $27,000.00$27,000.00
3 $20,000.00$20,000.00
4 $23,000.00$23,000.00
5 $20,000.00$20,000.00
6 $20,000.00$20,000.00
Section 8 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $75,975.00
2 $54,100.00
3 $44,500.00
4 $73,000.00
5 $55,000.00
6 $68,812.88
Ref #17 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $19,119.72$19,119.72
2 $9,000.00$9,000.00
3 $32,500.00$32,500.00
4 $30,000.00$30,000.00
5 $25,000.00$25,000.00
6 $45,151.49$45,151.49
Section 9 - ROADWAY (PART 2) - Totals
Awd $19,119.72
2 $9,000.00
3 $32,500.00
4 $30,000.00
5 $25,000.00
6 $45,151.49
153002 - Page 309
Ref #18 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $5,200.00$5,200.00
2 $6,000.00$6,000.00
3 $7,500.00$7,500.00
4 $5,700.00$5,700.00
5 $6,000.00$6,000.00
6 $23,373.36$23,373.36
Ref #19 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (2650 EACH)
Awd $2,650.00$1.00
2 $2,650.00$1.00
3 $2,650.00$1.00
4 $2,650.00$1.00
5 $2,650.00$1.00
6 $2,650.00$1.00
Section 10 - EROSION CONTROL (PART 2) - Totals
Awd $7,850.00
2 $8,650.00
3 $10,150.00
4 $8,350.00
5 $8,650.00
6 $26,023.36
Ref #20 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $500.00$500.00
2 $100.00$100.00
3 $2,000.00$2,000.00
4 $500.00$500.00
5 $13,000.00$13,000.00
6 $527.30$527.30
Section 11 - DRAINAGE (PART 2) - Totals
Awd $500.00
2 $100.00
3 $2,000.00
4 $500.00
5 $13,000.00
6 $527.30
Ref #21 690E20080 SPECIAL - SUBSURFACE INVESTIGATIONS, (LUMP SUM)
Awd $9,825.63$9,825.63
2 $1,000.00$1,000.00
3 $2,500.00$2,500.00
4 $5,000.00$5,000.00
5 $5,000.00$5,000.00
6 $15,000.00$15,000.00
Ref #22 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $22,114.11$22,114.11
2 $14,000.00$14,000.00
3 $28,000.00$28,000.00
4 $26,000.00$26,000.00
5 $35,000.00$35,000.00
6 $16,321.50$16,321.50
153002 - Page 310
Section 12 - PAVEMENT (PART 2) - Totals
Awd $31,939.74
2 $15,000.00
3 $30,500.00
4 $31,000.00
5 $40,000.00
6 $31,321.50
Ref #23 626E99000 SPECIAL - BARRIER REFLECTORS, (LUMP SUM)
Awd $70.00$70.00
2 $200.00$200.00
3 $200.00$200.00
4 $100.00$100.00
5 $120.00$120.00
6 $91.75$91.75
Ref #24 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $500.00$500.00
3 $1,250.00$1,250.00
4 $500.00$500.00
5 $500.00$500.00
6 $660.00$660.00
Ref #25 642E99000 SPECIAL - PAVEMENT MARKING, (LUMP SUM)
Awd $1,045.00$1,045.00
2 $1,000.00$1,000.00
3 $1,250.00$1,250.00
4 $1,100.00$1,100.00
5 $1,100.00$1,100.00
6 $1,045.07$1,045.07
Section 13 - TRAFFIC CONTROL (PART 2) - Totals
Awd $2,115.00
2 $1,700.00
3 $2,700.00
4 $1,700.00
5 $1,720.00
6 $1,796.82
Ref #26 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $4,276.13$4,276.13
2 $3,000.00$3,000.00
3 $5,000.00$5,000.00
4 $6,500.00$6,500.00
5 $5,000.00$5,000.00
6 $5,595.75$5,595.75
153002 - Page 311
Section 14 - MAINTENANCE OF TRAFFIC (PART 2) - Totals
Awd $4,276.13
2 $3,000.00
3 $5,000.00
4 $6,500.00
5 $5,000.00
6 $5,595.75
Ref #27 530E99050 SPECIAL - RETAINING WALL, (LUMP SUM)
Awd $500.00$500.00
2 $100.00$100.00
3 $41,500.00$41,500.00
4 $100.00$100.00
5 $5,000.00$5,000.00
6 $54,664.94$54,664.94
Section 15 - RETAINING WALLS (PART 2) - Totals
Awd $500.00
2 $100.00
3 $41,500.00
4 $100.00
5 $5,000.00
6 $54,664.94
Ref #28 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $251,321.99$251,321.99
2 $319,000.00$319,000.00
3 $300,000.00$300,000.00
4 $272,000.00$272,000.00
5 $352,000.00$352,000.00
6 $370,782.58$370,782.58
Section 16 - STRUCTURE 20 FOOT SPAN AND OVER (CLE-T09 - Totals
Awd $251,321.99
2 $319,000.00
3 $300,000.00
4 $272,000.00
5 $352,000.00
6 $370,782.58
Ref #29 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $4,000.00$4,000.00
3 $500.00$500.00
4 $2,000.00$2,000.00
5 $4,500.00$4,500.00
6 $712.86$712.86
153002 - Page 312
Ref #30 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $3,780.00$3,780.00
2 $5,600.00$5,600.00
3 $1,000.00$1,000.00
4 $2,000.00$2,000.00
5 $5,000.00$5,000.00
6 $1,000.01$1,000.01
Ref #31 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $3,410.00$3,410.00
2 $10,000.00$10,000.00
3 $1,000.00$1,000.00
4 $4,000.00$4,000.00
5 $5,000.00$5,000.00
6 $7,900.00$7,900.00
Ref #32 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $30,250.00$30,250.00
2 $12,000.00$12,000.00
3 $15,500.00$15,500.00
4 $24,000.00$24,000.00
5 $20,000.00$20,000.00
6 $40,700.01$40,700.01
Ref #33 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $38,145.00$38,145.00
2 $23,200.00$23,200.00
3 $14,000.00$14,000.00
4 $16,000.00$16,000.00
5 $20,000.00$20,000.00
6 $20,000.00$20,000.00
Section 17 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $78,085.00
2 $54,800.00
3 $32,000.00
4 $48,000.00
5 $54,500.00
6 $70,312.88
Ref #34 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE(PART 1 , (LUMP SUM)
Awd $750.00$750.00
2 $20,000.00$20,000.00
3 $1,000.00$1,000.00
4 $8,000.00$8,000.00
5 $500.00$500.00
6 $500.00$500.00
Ref #35 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $4,605.42$4,605.42
2 $15,000.00$15,000.00
3 $10,000.00$10,000.00
4 $10,000.00$10,000.00
5 $11,000.00$11,000.00
6 $9,390.65$9,390.65
153002 - Page 313
Ref #36 619E99000 SPECIAL - FIELD OFFICE(PART 1 AND PART 2), (LUMP SUM)
Awd $5,109.51$5,109.51
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
5 $8,000.00$8,000.00
6 $10,471.98$10,471.98
Ref #37 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $15,243.49$15,243.49
2 $5,000.00$5,000.00
3 $7,500.00$7,500.00
4 $6,000.00$6,000.00
5 $15,000.00$15,000.00
6 $17,104.49$17,104.49
Ref #38 624E99000 SPECIAL - MOBILIZATION(PART 1 AND PART 2), (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
3 $40,000.00$40,000.00
4 $27,000.00$27,000.00
5 $40,000.00$40,000.00
6 $40,034.26$40,034.26
Section 18 - INCIDENTALS - Totals
Awd $45,708.42
2 $63,000.00
3 $61,500.00
4 $54,000.00
5 $74,500.00
6 $77,501.38
153002 - Page 314
Project No. 153003
PID 97575
CLE-SR 45-3.26
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 6/30/2015
Award Amount: $406,850.00
Contract Awarded To: OHIO BRIDGE CORPORATION
Letting Date: 1/15/2015
Engineer's Estimate: $382,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
OHIO BRIDGE CORPORATION
P O BOX 757
CAMBRIDGE, OH 43725
Guernsey
Bidder 1
Bid $406,850.00
PRUS CONSTRUCTION COMPANY
5325 WOOSTER RD
CINCINNATI, OH 45226
Hamilton
Bidder 2
Bid $471,480.00
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 3
Bid $517,171.29
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 4
Bid $583,830.00
SUNESIS CONSTRUCTION CO
2610 CRESCENTVILLE RD
WEST CHESTER, OH 45069
Butler
Bidder 5
Bid $617,976.28
153003 - Page 315
Ref #1 626E99000 SPECIAL - BARRIER REFLECTORS, (LUMP SUM)
Awd $200.00$200.00
2 $36,000.00$36,000.00
3 $70.00$70.00
4 $80.00$80.00
5 $58.00$58.00
Ref #2 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $2,000.00$2,000.00
3 $28,942.05$28,942.05
4 $25,000.00$25,000.00
5 $40,140.76$40,140.76
Section 1 - ROADWAY - Totals
Awd $24,200.00
2 $38,000.00
3 $29,012.05
4 $25,080.00
5 $40,198.76
Ref #3 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $8,500.00$8,500.00
3 $8,319.00$8,319.00
4 $6,000.00$6,000.00
5 $4,316.49$4,316.49
Ref #4 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (6500 EACH)
Awd $6,500.00$1.00
2 $6,500.00$1.00
3 $6,500.00$1.00
4 $6,500.00$1.00
5 $6,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $14,500.00
2 $15,000.00
3 $14,819.00
4 $12,500.00
5 $10,816.49
Ref #5 690E20080 SPECIAL - SUBSURFACE INVESTIGATIONS, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $4,000.00$4,000.00
3 $500.00$500.00
4 $5,000.00$5,000.00
5 $15,000.00$15,000.00
Ref #6 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $19,000.00$19,000.00
2 $27,825.00$27,825.00
3 $52,030.12$52,030.12
4 $36,000.00$36,000.00
5 $40,185.14$40,185.14
153003 - Page 316
Ref #7 690E21000 SPECIAL - MISC.: SUBGRADE TREATMENT, (LUMP SUM)
Awd $500.00$500.00
2 $10,500.00$10,500.00
3 $11,124.80$11,124.80
4 $5,500.00$5,500.00
5 $1,947.59$1,947.59
Section 3 - PAVEMENT - Totals
Awd $20,500.00
2 $42,325.00
3 $63,654.92
4 $46,500.00
5 $57,132.73
Ref #8 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $500.00$500.00
2 $375.00$375.00
3 $2,500.00$2,500.00
4 $250.00$250.00
5 $1,350.00$1,350.00
Ref #9 642E99000 SPECIAL - PAVEMENT MARKING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,155.00$1,155.00
3 $1,085.00$1,085.00
4 $4,500.00$4,500.00
5 $1,085.04$1,085.04
Section 4 - TRAFFIC CONTROL - Totals
Awd $1,500.00
2 $1,530.00
3 $3,585.00
4 $4,750.00
5 $2,435.04
Ref #10 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $13,000.00$13,000.00
3 $12,499.56$12,499.56
4 $6,000.00$6,000.00
5 $10,995.90$10,995.90
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,000.00
2 $13,000.00
3 $12,499.56
4 $6,000.00
5 $10,995.90
153003 - Page 317
Ref #11 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $252,000.00$252,000.00
2 $250,000.00$250,000.00
3 $273,975.60$273,975.60
4 $390,000.00$390,000.00
5 $377,558.19$377,558.19
Section 6 - STRUCTURE 20 FOOT SPAN AND OVER (CLE-CR4 - Totals
Awd $252,000.00
2 $250,000.00
3 $273,975.60
4 $390,000.00
5 $377,558.19
Ref #12 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $35,000.00$35,000.00
3 $2,500.00$2,500.00
4 $4,500.00$4,500.00
5 $1,005.20$1,005.20
Ref #13 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $5,600.00$5,600.00
2 $3,000.00$3,000.00
3 $4,125.00$4,125.00
4 $5,000.00$5,000.00
5 $1,000.00$1,000.00
Ref #14 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $2,625.00$2,625.00
3 $3,520.00$3,520.00
4 $5,000.00$5,000.00
5 $8,900.00$8,900.00
Ref #15 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $40,000.00$40,000.00
3 $32,975.00$32,975.00
4 $20,000.00$20,000.00
5 $41,000.01$41,000.01
Ref #16 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $27,550.00$27,550.00
2 $9,000.00$9,000.00
3 $41,825.00$41,825.00
4 $20,000.00$20,000.00
5 $20,000.00$20,000.00
Section 7 - ENGINEERING AND SURVEYING SERVICES - Totals
Awd $54,150.00
2 $89,625.00
3 $84,945.00
4 $54,500.00
5 $71,905.21
153003 - Page 318
Ref #17 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $500.00$500.00
3 $500.00$500.00
4 $500.00$500.00
5 $500.00$500.00
Ref #18 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $4,500.00$4,500.00
3 $2,729.33$2,729.33
4 $7,000.00$7,000.00
5 $4,722.47$4,722.47
Ref #19 619E99000 SPECIAL - FIELD OFFICE, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $2,500.00$2,500.00
3 $3,491.70$3,491.70
4 $12,000.00$12,000.00
5 $5,820.22$5,820.22
Ref #20 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $4,500.00$4,500.00
3 $7,959.13$7,959.13
4 $5,000.00$5,000.00
5 $9,687.39$9,687.39
Ref #21 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $10,000.00$10,000.00
3 $20,000.00$20,000.00
4 $20,000.00$20,000.00
5 $26,203.88$26,203.88
Section 8 - INCIDENTALS - Totals
Awd $37,000.00
2 $22,000.00
3 $34,680.16
4 $44,500.00
5 $46,933.96
153003 - Page 319
Project No. 153004
PID 97539
CRA-TR 50-6.10
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 8/31/2015
Award Amount: $427,340.00
Contract Awarded To: R & I CONSTRUCTION INC
Letting Date: 1/15/2015
Engineer's Estimate: $435,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
R & I CONSTRUCTION INC
2931 STATE ROUTE 67 SOUTH
TIFFIN, OH 44883
Seneca
Bidder 1
Bid $427,340.00
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 2
Bid $434,358.00
OHIO BRIDGE CORPORATION
P O BOX 757
CAMBRIDGE, OH 43725
Guernsey
Bidder 3
Bid $449,709.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $562,350.00
153004 - Page 320
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $22,840.00$22,840.00
2 $37,900.00$37,900.00
3 $18,000.00$18,000.00
4 $57,000.00$57,000.00
Section 1 - ROADWAY - Totals
Awd $22,840.00
2 $37,900.00
3 $18,000.00
4 $57,000.00
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $17,000.00$17,000.00
2 $14,100.00$14,100.00
3 $12,000.00$12,000.00
4 $31,000.00$31,000.00
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
4 $5,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $22,000.00
2 $19,100.00
3 $17,000.00
4 $36,000.00
Ref #4 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $43,000.00$43,000.00
2 $27,650.00$27,650.00
3 $25,000.00$25,000.00
4 $55,000.00$55,000.00
Section 3 - PAVEMENT - Totals
Awd $43,000.00
2 $27,650.00
3 $25,000.00
4 $55,000.00
Ref #5 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $100.00$100.00
2 $636.00$636.00
3 $500.00$500.00
4 $700.00$700.00
Ref #6 642E99000 SPECIAL - PAVEMENT MARKING, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $910.00$910.00
3 $1,000.00$1,000.00
4 $2,000.00$2,000.00
153004 - Page 321
Section 4 - TRAFFIC CONTROL - Totals
Awd $1,300.00
2 $1,546.00
3 $1,500.00
4 $2,700.00
Ref #7 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $4,670.00$4,670.00
3 $3,000.00$3,000.00
4 $8,000.00$8,000.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,500.00
2 $4,670.00
3 $3,000.00
4 $8,000.00
Ref #8 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $262,299.00$262,299.00
2 $274,000.00$274,000.00
3 $318,000.00$318,000.00
4 $320,400.00$320,400.00
Section 6 - STRUCTURE 20 FOOT SPAN AND OVER (CRA-TR5 - Totals
Awd $262,299.00
2 $274,000.00
3 $318,000.00
4 $320,400.00
Ref #9 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,561.00$1,561.00
3 $2,500.00$2,500.00
4 $750.00$750.00
Ref #10 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $885.00$885.00
3 $767.00$767.00
4 $3,300.00$3,300.00
Ref #11 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $3,940.00$3,940.00
3 $7,500.00$7,500.00
4 $2,200.00$2,200.00
Ref #12 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $18,552.00$18,552.00
3 $12,000.00$12,000.00
4 $10,000.00$10,000.00
153004 - Page 322
Ref #13 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $9,276.00$9,276.00
3 $7,369.00$7,369.00
4 $17,000.00$17,000.00
Ref #14 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,093.00$3,093.00
3 $1,073.00$1,073.00
4 $8,000.00$8,000.00
Section 7 - ENGINEERING AND SURVEYING SERVICES - Totals
Awd $32,200.00
2 $37,307.00
3 $31,209.00
4 $41,250.00
Ref #15 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $1.00$1.00
2 $550.00$550.00
3 $15,000.00$15,000.00
4 $500.00$500.00
Ref #16 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $5,700.00$5,700.00
3 $10,000.00$10,000.00
4 $4,000.00$4,000.00
Ref #17 619E99000 SPECIAL - FIELD OFFICE, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $4,775.00$4,775.00
3 $2,000.00$2,000.00
4 $6,000.00$6,000.00
Ref #18 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $2,960.00$2,960.00
3 $5,000.00$5,000.00
4 $11,500.00$11,500.00
Ref #19 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $18,200.00$18,200.00
3 $4,000.00$4,000.00
4 $20,000.00$20,000.00
Section 8 - INCIDENTALS - Totals
Awd $40,201.00
2 $32,185.00
3 $36,000.00
4 $42,000.00
153004 - Page 323
Project No. 153005
PID 97548
HUR-OBPP-1C HUR
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 8/31/2015
Award Amount: $623,800.00
Contract Awarded To: MOSSER CONSTRUCTION INC
Letting Date: 1/15/2015
Engineer's Estimate: $783,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
MOSSER CONSTRUCTION INC
122 S WILSON AVE
FREMONT, OH 43420
Sandusky
Bidder 1
Bid $623,800.00
R & I CONSTRUCTION INC
2931 STATE ROUTE 67 SOUTH
TIFFIN, OH 44883
Seneca
Bidder 2
Bid $665,940.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $696,900.00
OHIO BRIDGE CORPORATION
P O BOX 757
CAMBRIDGE, OH 43725
Guernsey
Bidder 4
Bid $829,719.00
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 5
Bid $844,613.00
153005 - Page 324
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $34,000.00$34,000.00
2 $50,350.00$50,350.00
3 $37,000.00$37,000.00
4 $15,000.00$15,000.00
5 $35,956.00$35,956.00
Section 1 - ROADWAY - Totals
Awd $34,000.00
2 $50,350.00
3 $37,000.00
4 $15,000.00
5 $35,956.00
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
3 $5,000.00$5,000.00
4 $3,000.00$3,000.00
5 $13,860.00$13,860.00
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (7500 EACH)
Awd $7,500.00$1.00
2 $7,500.00$1.00
3 $7,500.00$1.00
4 $7,500.00$1.00
5 $7,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $9,500.00
2 $9,500.00
3 $12,500.00
4 $10,500.00
5 $21,360.00
Ref #4 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $500.00$500.00
2 $500.00$500.00
3 $2,500.00$2,500.00
4 $200.00$200.00
5 $2,000.00$2,000.00
Section 3 - DRAINAGE - Totals
Awd $500.00
2 $500.00
3 $2,500.00
4 $200.00
5 $2,000.00
153005 - Page 325
Ref #5 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $27,000.00$27,000.00
2 $38,000.00$38,000.00
3 $20,000.00$20,000.00
4 $15,000.00$15,000.00
5 $22,619.00$22,619.00
Section 4 - PAVEMENT - Totals
Awd $27,000.00
2 $38,000.00
3 $20,000.00
4 $15,000.00
5 $22,619.00
Ref #6 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $500.00$500.00
2 $100.00$100.00
3 $1,400.00$1,400.00
4 $1,000.00$1,000.00
5 $660.00$660.00
Ref #7 642E99000 SPECIAL - PAVEMENT MARKING, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,200.00$1,200.00
3 $2,000.00$2,000.00
4 $1,000.00$1,000.00
5 $1,728.00$1,728.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $3,000.00
2 $1,300.00
3 $3,400.00
4 $2,000.00
5 $2,388.00
Ref #8 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,800.00$3,800.00
2 $4,000.00$4,000.00
3 $4,000.00$4,000.00
4 $5,000.00$5,000.00
5 $4,165.00$4,165.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,800.00
2 $4,000.00
3 $4,000.00
4 $5,000.00
5 $4,165.00
153005 - Page 326
Ref #9 202E99000 SPECIAL - STRUCTURE REMOVED, (LUMP SUM)
Awd $65,000.00$65,000.00
2 $60,000.00$60,000.00
3 $65,000.00$65,000.00
4 $58,000.00$58,000.00
5 $73,690.00$73,690.00
Ref #10 530E99010 SPECIAL - SUBSTRUCTURE, (LUMP SUM)
Awd $175,000.00$175,000.00
2 $180,000.00$180,000.00
3 $325,000.00$325,000.00
4 $150,000.00$150,000.00
5 $156,238.00$156,238.00
Ref #11 530E99020 SPECIAL - SUPERSTRUCTURE, (LUMP SUM)
Awd $198,000.00$198,000.00
2 $222,089.00$222,089.00
3 $120,000.00$120,000.00
4 $475,000.00$475,000.00
5 $415,410.00$415,410.00
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (HUR-CR4 - Totals
Awd $438,000.00
2 $462,089.00
3 $510,000.00
4 $683,000.00
5 $645,338.00
Ref #12 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $800.00$800.00
2 $1,500.00$1,500.00
3 $3,500.00$3,500.00
4 $3,500.00$3,500.00
5 $2,465.00$2,465.00
Ref #13 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $2,200.00$2,200.00
2 $1,200.00$1,200.00
3 $8,000.00$8,000.00
4 $767.00$767.00
5 $886.00$886.00
Ref #14 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $1,500.00$1,500.00
3 $5,500.00$5,500.00
4 $10,000.00$10,000.00
5 $3,831.00$3,831.00
Ref #15 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $48,600.00$48,600.00
2 $26,000.00$26,000.00
3 $16,000.00$16,000.00
4 $12,000.00$12,000.00
5 $30,889.00$30,889.00
153005 - Page 327
Ref #16 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $14,400.00$14,400.00
2 $16,000.00$16,000.00
3 $8,000.00$8,000.00
4 $7,496.00$7,496.00
5 $10,296.00$10,296.00
Section 8 - ENGINEERING AND SURVEYING SERVICES - Totals
Awd $70,500.00
2 $46,200.00
3 $41,000.00
4 $33,763.00
5 $48,367.00
Ref #17 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1.00$1.00
3 $16,000.00$16,000.00
4 $20,000.00$20,000.00
5 $500.00$500.00
Ref #18 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $8,500.00$8,500.00
3 $4,500.00$4,500.00
4 $15,000.00$15,000.00
5 $9,300.00$9,300.00
Ref #19 619E99000 SPECIAL - FIELD OFFICE, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $3,500.00$3,500.00
3 $9,000.00$9,000.00
4 $3,000.00$3,000.00
5 $5,800.00$5,800.00
Ref #20 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $2,000.00$2,000.00
3 $17,000.00$17,000.00
4 $7,256.00$7,256.00
5 $3,507.00$3,507.00
Ref #21 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $40,000.00$40,000.00
3 $20,000.00$20,000.00
4 $20,000.00$20,000.00
5 $43,313.00$43,313.00
Section 9 - INCIDENTALS - Totals
Awd $37,500.00
2 $54,001.00
3 $66,500.00
4 $65,256.00
5 $62,420.00
153005 - Page 328
Project No. 153006
PID 97648
LUC-TAYLOR ROAD-21.23
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 8/1/2015
Award Amount: $363,310.00
Contract Awarded To: VERNON NAGEL INC
Letting Date: 1/15/2015
Engineer's Estimate: $235,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
VERNON NAGEL INC
O-154 CO RD 11-C
NAPOLEON, OH 43545
Henry
Bidder 1
Bid $363,310.00
MILLER BROS CONST INC
1613 S DEFIANCE ST P O BOX 30
ARCHBOLD, OH 43502
Fulton
Bidder 2
Bid $433,000.00
153006 - Page 329
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $20,000.00$20,000.00
Section 1 - ROADWAY - Totals
Awd $30,000.00
2 $20,000.00
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $9,500.00$9,500.00
2 $1,500.00$1,500.00
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (6500 EACH)
Awd $6,500.00$1.00
2 $6,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $16,000.00
2 $8,000.00
Ref #4 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $2,000.00$2,000.00
Section 3 - DRAINAGE - Totals
Awd $1,500.00
2 $2,000.00
Ref #5 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $25,000.00$25,000.00
Section 4 - PAVEMENT - Totals
Awd $25,000.00
2 $25,000.00
Ref #6 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $296.00$296.00
2 $500.00$500.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $296.00
2 $500.00
Ref #7 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,800.00$3,800.00
2 $4,000.00$4,000.00
153006 - Page 330
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,800.00
2 $4,000.00
Ref #8 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $240,000.00$240,000.00
2 $300,000.00$300,000.00
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (TAYLOR - Totals
Awd $240,000.00
2 $300,000.00
Ref #9 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
Ref #10 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $714.00$714.00
2 $2,000.00$2,000.00
Ref #11 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
Ref #12 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $30,000.00$30,000.00
Ref #13 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $12,000.00$12,000.00
Section 8 - ENGINEERING & SURVEYING SERVICES - Totals
Awd $20,714.00
2 $49,000.00
Ref #14 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,000.00$3,000.00
Ref #15 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $3,000.00$3,000.00
Ref #16 619E99000 SPECIAL - FIELD OFFICE, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $6,000.00$6,000.00
Ref #17 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $2,500.00$2,500.00
Ref #18 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $10,000.00$10,000.00
153006 - Page 331
Section 9 - INCIDENTALS - Totals
Awd $26,000.00
2 $24,500.00
153006 - Page 332
Project No. 157000
PID 91295
WAS-SR 821-3.680
Federal
Type: SLIDE REPAIR
Completion Date: 10/16/2016
Award Amount: $5,914,365.91
Contract Awarded To: RUHLIN COMPANY
Letting Date: 1/15/2015
Engineer's Estimate: $6,150,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
RUHLIN COMPANY
P O BOX 190
SHARON CENTER, OH 44274
Medina
Bidder 1
Bid $5,914,365.91
TRUCCO CONSTRUCTION CO INC
3531 AIRPORT RD
DELAWARE, OH 43015
Delaware
Bidder 2
Bid $6,725,891.18
MOUNTAINEER CONTRACTORS INC
ROUTE 26 SOUTH
KINGWOOD, WV 26537
Bidder 3
Bid $6,783,465.47
BEAVER EXCAVATING COMPANY
P O BOX 6059
CANTON, OH 44706
Stark
Bidder 4
Bid $6,960,702.49
E S WAGNER COMPANY
840 PATCHEN RD
OREGON, OH 43616
Lucas
Bidder 5
Bid $7,259,163.01
R F SCURLOCK CO
3220 FIFTH STREET P O BOX 308
TRINWAY, OH 43842-0335
Bidder 6
Bid $7,632,961.95
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 7
Bid $7,649,013.93
KANAWHA STONE COMPANY INCORPORATED
409 JACOBSON DR
POCA, WV 25159
Bidder 8
Bid $8,188,976.64
157000 - Page 333
Ref #1 201E11001 CLEARING AND GRUBBING, AS PER PLAN, (LUMP SUM)
Awd $166,500.00$166,500.00
2 $207,000.00$207,000.00
3 $304,000.00$304,000.00
4 $150,000.00$150,000.00
5 $243,694.00$243,694.00
6 $173,199.00$173,199.00
7 $350,000.00$350,000.00
8 $1,337,999.79$1,337,999.79
Ref #2 202E20010 HEADWALL REMOVED, (4 EACH)
Awd $400.00$100.00
2 $760.00$190.00
3 $4,000.00$1,000.00
4 $1,000.00$250.00
5 $2,000.00$500.00
6 $530.04$132.51
7 $600.00$150.00
8 $562.52$140.63
Ref #3 202E23000 PAVEMENT REMOVED, (5587 SY)
Awd $27,935.00$5.00
2 $27,935.00$5.00
3 $44,975.35$8.05
4 $44,696.00$8.00
5 $11,174.00$2.00
6 $45,142.96$8.08
7 $27,935.00$5.00
8 $9,050.94$1.62
Ref #4 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (13 SY)
Awd $87.75$6.75
2 $195.00$15.00
3 $1,378.00$106.00
4 $325.00$25.00
5 $975.00$75.00
6 $850.07$65.39
7 $182.00$14.00
8 $229.06$17.62
Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (80 FT)
Awd $1,760.00$22.00
2 $800.00$10.00
3 $11,280.00$141.00
4 $1,600.00$20.00
5 $4,880.00$61.00
6 $876.00$10.95
7 $1,120.00$14.00
8 $1,723.20$21.54
Ref #6 202E38000 GUARDRAIL REMOVED, (4120 FT)
Awd $4,944.00$1.20
2 $4,944.00$1.20
3 $4,944.00$1.20
4 $4,944.00$1.20
5 $4,944.00$1.20
6 $5,356.00$1.30
7 $5,768.00$1.40
8 $5,232.40$1.27
157000 - Page 334
Ref #7 202E38200 GUARDRAIL REMOVED FOR REUSE, (25 FT)
Awd $62.50$2.50
2 $62.50$2.50
3 $62.50$2.50
4 $62.50$2.50
5 $62.50$2.50
6 $25.00$1.00
7 $25.00$1.00
8 $66.25$2.65
Ref #8 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (233 FT)
Awd $5,592.00$24.00
2 $4,660.00$20.00
3 $11,067.50$47.50
4 $10,485.00$45.00
5 $6,990.00$30.00
6 $3,851.49$16.53
7 $6,990.00$30.00
8 $8,632.65$37.05
Ref #9 203E10000 EXCAVATION, (604080 CY)
Awd $3,098,930.40$5.13
2 $3,841,948.80$6.36
3 $3,020,400.00$5.00
4 $4,125,866.40$6.83
5 $4,143,988.80$6.86
6 $4,325,212.80$7.16
7 $3,775,500.00$6.25
8 $3,757,377.60$6.22
Ref #10 203E20000 EMBANKMENT, (12039 CY)
Awd $22,874.10$1.90
2 $4,815.60$0.40
3 $65,973.72$5.48
4 $60,195.00$5.00
5 $12,039.00$1.00
6 $16,373.04$1.36
7 $66,214.50$5.50
8 $17,215.77$1.43
Ref #11 203E22000 EMBANKMENT, USING NATURAL SOILS, 703.16.A, (164 CY)
Awd $9,676.00$59.00
2 $8,200.00$50.00
3 $3,977.00$24.25
4 $8,200.00$50.00
5 $10,004.00$61.00
6 $8,247.56$50.29
7 $9,020.00$55.00
8 $13,730.08$83.72
Ref #12 203E80000 SPECIAL - BIORETENTION CELL, (LUMP SUM)
Awd $6,600.00$6,600.00
2 $2,400.00$2,400.00
3 $5,700.00$5,700.00
4 $5,000.00$5,000.00
5 $12,400.00$12,400.00
6 $14,311.21$14,311.21
7 $24,500.00$24,500.00
8 $9,712.51$9,712.51
157000 - Page 335
Ref #13 204E10000 SUBGRADE COMPACTION, (13720 SY)
Awd $19,894.00$1.45
2 $20,580.00$1.50
3 $8,232.00$0.60
4 $27,440.00$2.00
5 $13,720.00$1.00
6 $20,991.60$1.53
7 $24,010.00$1.75
8 $10,290.00$0.75
Ref #14 204E13000 EXCAVATION OF SUBGRADE, (261 CY)
Awd $3,132.00$12.00
2 $5,220.00$20.00
3 $8,874.00$34.00
4 $3,132.00$12.00
5 $3,132.00$12.00
6 $1,320.66$5.06
7 $2,740.50$10.50
8 $3,194.64$12.24
Ref #15 204E20000 EMBANKMENT, (100 CY)
Awd $2,000.00$20.00
2 $2,000.00$20.00
3 $2,500.00$25.00
4 $1,500.00$15.00
5 $1,200.00$12.00
6 $895.00$8.95
7 $1,700.00$17.00
8 $611.00$6.11
Ref #16 204E30010 GRANULAR MATERIAL, TYPE B, (3940 CY)
Awd $271,860.00$69.00
2 $267,920.00$68.00
3 $328,990.00$83.50
4 $256,100.00$65.00
5 $244,280.00$62.00
6 $233,799.60$59.34
7 $256,100.00$65.00
8 $236,400.00$60.00
Ref #17 204E45000 PROOF ROLLING, (5 HOUR)
Awd $1,500.00$300.00
2 $900.00$180.00
3 $790.00$158.00
4 $1,250.00$250.00
5 $1,000.00$200.00
6 $981.20$196.24
7 $1,500.00$300.00
8 $1,000.00$200.00
Ref #18 204E50000 GEOTEXTILE FABRIC, (5146 SY)
Awd $5,660.60$1.10
2 $7,719.00$1.50
3 $5,660.60$1.10
4 $5,146.00$1.00
5 $8,542.36$1.66
6 $3,550.74$0.69
7 $5,146.00$1.00
8 $11,372.66$2.21
157000 - Page 336
Ref #19 208E10000 PRE-BLAST CONDITION SURVEY, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $13,000.00$13,000.00
3 $11,907.00$11,907.00
4 $7,000.00$7,000.00
5 $11,500.00$11,500.00
6 $13,000.00$13,000.00
7 $20,000.00$20,000.00
8 $7,937.25$7,937.25
Ref #20 208E12000 BLASTING CONSULTANT, (LUMP SUM)
Awd $14,560.00$14,560.00
2 $15,000.00$15,000.00
3 $12,168.00$12,168.00
4 $1,500.00$1,500.00
5 $15,600.00$15,600.00
6 $16,000.00$16,000.00
7 $25,000.00$25,000.00
8 $15,874.49$15,874.49
Ref #21 208E13000 AIR BLAST AND NOISE CONTROL, (LUMP SUM)
Awd $4,880.00$4,880.00
2 $8,000.00$8,000.00
3 $9,778.00$9,778.00
4 $2,500.00$2,500.00
5 $5,250.00$5,250.00
6 $13,000.00$13,000.00
7 $11,000.00$11,000.00
8 $5,185.67$5,185.67
Ref #22 208E14000 VIBRATION CONTROL AND MONITORING, (LUMP SUM)
Awd $4,880.00$4,880.00
2 $8,000.00$8,000.00
3 $9,778.00$9,778.00
4 $5,000.00$5,000.00
5 $5,250.00$5,250.00
6 $13,000.00$13,000.00
7 $10,000.00$10,000.00
8 $5,185.67$5,185.67
Ref #23 208E15000 PRESPLITTING, (6713 SY)
Awd $94,988.95$14.15
2 $90,625.50$13.50
3 $91,632.45$13.65
4 $100,695.00$15.00
5 $121,505.30$18.10
6 $150,035.55$22.35
7 $134,260.00$20.00
8 $87,067.61$12.97
Ref #24 606E13000 GUARDRAIL, TYPE 5, (750 FT)
Awd $9,750.00$13.00
2 $9,750.00$13.00
3 $9,750.00$13.00
4 $9,750.00$13.00
5 $9,750.00$13.00
6 $9,750.00$13.00
7 $9,750.00$13.00
8 $10,320.00$13.76
157000 - Page 337
Ref #25 606E16500 GUARDRAIL REBUILT, TYPE 5, (25 FT)
Awd $237.50$9.50
2 $237.50$9.50
3 $237.50$9.50
4 $237.50$9.50
5 $237.50$9.50
6 $217.50$8.70
7 $225.00$9.00
8 $251.25$10.05
Ref #26 606E25000 ANCHOR ASSEMBLY, TYPE A, (1 EACH)
Awd $900.00$900.00
2 $900.00$900.00
3 $900.00$900.00
4 $900.00$900.00
5 $900.00$900.00
6 $950.00$950.00
7 $1,000.00$1,000.00
8 $952.47$952.47
Ref #27 606E26000 ANCHOR ASSEMBLY, TYPE B, (1 EACH)
Awd $1,450.00$1,450.00
2 $1,450.00$1,450.00
3 $1,450.00$1,450.00
4 $1,450.00$1,450.00
5 $1,450.00$1,450.00
6 $1,570.00$1,570.00
7 $1,600.00$1,600.00
8 $1,534.53$1,534.53
Ref #28 623E40500 REFERENCE MONUMENT, (17 EACH)
Awd $6,800.00$400.00
2 $5,100.00$300.00
3 $2,601.00$153.00
4 $4,250.00$250.00
5 $3,400.00$200.00
6 $4,250.00$250.00
7 $10,200.00$600.00
8 $5,560.70$327.10
Section 1 - ROADWAY - Totals
Awd $3,794,354.80
2 $4,560,122.90
3 $3,983,006.62
4 $4,840,224.40
5 $4,899,868.46
6 $5,077,287.02
7 $4,782,086.00
8 $5,564,270.71
157000 - Page 338
Ref #29 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (82 SY)
Awd $7,298.00$89.00
2 $5,740.00$70.00
3 $5,904.00$72.00
4 $11,070.00$135.00
5 $5,904.00$72.00
6 $10,856.80$132.40
7 $41,000.00$500.00
8 $6,142.62$74.91
Ref #30 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH FABRIC FILTER, (249 CY)
Awd $22,410.00$90.00
2 $18,675.00$75.00
3 $26,643.00$107.00
4 $23,655.00$95.00
5 $19,920.00$80.00
6 $17,574.42$70.58
7 $20,012.13$80.37
8 $20,627.16$82.84
Ref #31 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (121 CY)
Awd $10,648.00$88.00
2 $10,890.00$90.00
3 $13,794.00$114.00
4 $11,495.00$95.00
5 $11,374.00$94.00
6 $9,356.93$77.33
7 $9,680.00$80.00
8 $10,245.07$84.67
Ref #32 601E40050 PAVED GUTTER, MISC.:TYPE 4 MODIFIED, (256 SY)
Awd $23,040.00$90.00
2 $25,088.00$98.00
3 $24,704.00$96.50
4 $25,600.00$100.00
5 $25,088.00$98.00
6 $30,832.64$120.44
7 $38,400.00$150.00
8 $27,609.60$107.85
Ref #33 659E10001 SEEDING AND MULCHING, AS PER PLAN, (103557 SY)
Awd $43,493.94$0.42
2 $51,778.50$0.50
3 $45,565.08$0.44
4 $41,422.80$0.40
5 $43,493.94$0.42
6 $69,383.19$0.67
7 $77,667.75$0.75
8 $54,885.21$0.53
Ref #34 659E14000 REPAIR SEEDING AND MULCHING, (5178 SY)
Awd $1,035.60$0.20
2 $2,589.00$0.50
3 $2,278.32$0.44
4 $1,035.60$0.20
5 $8,647.26$1.67
6 $3,624.60$0.70
7 $3,624.60$0.70
8 $2,744.34$0.53
157000 - Page 339
Ref #35 659E20000 COMMERCIAL FERTILIZER, (9.51 TON)
Awd $4,755.00$500.00
2 $4,090.54$430.13
3 $5,706.00$600.00
4 $4,755.00$500.00
5 $4,755.00$500.00
6 $6,657.00$700.00
7 $6,181.50$650.00
8 $4,529.04$476.24
Ref #36 659E31000 LIME, (21.84 ACRE)
Awd $4,368.00$200.00
2 $1,092.00$50.00
3 $5,460.00$250.00
4 $4,368.00$200.00
5 $4,368.00$200.00
6 $21.84$1.00
7 $3,494.40$160.00
8 $1,155.55$52.91
Ref #37 659E35000 WATER, (114 MGAL)
Awd $114.00$1.00
2 $114.00$1.00
3 $114.00$1.00
4 $114.00$1.00
5 $114.00$1.00
6 $114.00$1.00
7 $114.00$1.00
8 $120.84$1.06
Ref #38 661E00500 MULCH, (25 CY)
Awd $1,500.00$60.00
2 $2,500.00$100.00
3 $1,375.00$55.00
4 $1,500.00$60.00
5 $1,500.00$60.00
6 $1,250.00$50.00
7 $875.00$35.00
8 $2,645.75$105.83
Ref #39 661E20020 DECIDUOUS SHRUB, 18" HEIGHT, BUTTONBUSH-CEPHALANTH, (140 EACH)
Awd $7,560.00$54.00
2 $14,000.00$100.00
3 $10,640.00$76.00
4 $7,560.00$54.00
5 $7,560.00$54.00
6 $9,660.00$69.00
7 $4,900.00$35.00
8 $14,816.20$105.83
Ref #40 661E31000 LANDSCAPE WATERING, (3600 GAL)
Awd $540.00$0.15
2 $360.00$0.10
3 $360.00$0.10
4 $540.00$0.15
5 $540.00$0.15
6 $360.00$0.10
7 $900.00$0.25
8 $396.00$0.11
157000 - Page 340
Ref #41 661E40020 DECIDUOUS TREE, 6' HEIGHT, RIVER BIRCH-BETULA NIGR, (10 EACH)
Awd $1,100.00$110.00
2 $2,250.00$225.00
3 $2,580.00$258.00
4 $1,100.00$110.00
5 $1,100.00$110.00
6 $2,340.00$234.00
7 $2,500.00$250.00
8 $2,381.20$238.12
Ref #42 670E00500 SLOPE EROSION PROTECTION, (5000 SY)
Awd $9,750.00$1.95
2 $7,000.00$1.40
3 $9,250.00$1.85
4 $9,750.00$1.95
5 $9,750.00$1.95
6 $8,250.00$1.65
7 $10,000.00$2.00
8 $7,400.00$1.48
Ref #43 670E00700 DITCH EROSION PROTECTION, (2161 SY)
Awd $4,213.95$1.95
2 $3,241.50$1.50
3 $3,997.85$1.85
4 $4,213.95$1.95
5 $4,213.95$1.95
6 $3,760.14$1.74
7 $4,322.00$2.00
8 $3,435.99$1.59
Ref #44 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $22,790.00$22,790.00
2 $10,000.00$10,000.00
3 $20,800.00$20,800.00
4 $10,000.00$10,000.00
5 $2,500.00$2,500.00
6 $20,000.00$20,000.00
7 $50,000.00$50,000.00
8 $17,356.11$17,356.11
Ref #45 832E30000 EROSION CONTROL, (190000 EACH)
Awd $190,000.00$1.00
2 $190,000.00$1.00
3 $190,000.00$1.00
4 $190,000.00$1.00
5 $190,000.00$1.00
6 $190,000.00$1.00
7 $190,000.00$1.00
8 $190,000.00$1.00
157000 - Page 341
Section 2 - EROSION CONTROL - Totals
Awd $354,616.49
2 $349,408.54
3 $369,171.25
4 $348,179.35
5 $340,828.15
6 $384,041.56
7 $463,671.38
8 $366,490.68
Ref #46 602E20000 CONCRETE MASONRY, (9 CY)
Awd $8,100.00$900.00
2 $9,900.00$1,100.00
3 $9,450.00$1,050.00
4 $10,800.00$1,200.00
5 $11,340.00$1,260.00
6 $10,188.45$1,132.05
7 $14,400.00$1,600.00
8 $7,089.57$787.73
Ref #47 605E11000 6" CONSTRUCTION UNDERDRAINS, (558 FT)
Awd $9,486.00$17.00
2 $6,696.00$12.00
3 $19,530.00$35.00
4 $8,370.00$15.00
5 $11,160.00$20.00
6 $14,887.44$26.68
7 $10,044.00$18.00
8 $11,093.04$19.88
Ref #48 605E13402 6" UNCLASSIFIED PIPE UNDERDRAINS FOR SPRINGS, (75 FT)
Awd $825.00$11.00
2 $1,650.00$22.00
3 $4,500.00$60.00
4 $1,050.00$14.00
5 $2,025.00$27.00
6 $2,118.00$28.24
7 $1,875.00$25.00
8 $1,446.75$19.29
Ref #49 605E31100 AGGREGATE DRAINS, (1801 FT)
Awd $10,265.70$5.70
2 $16,209.00$9.00
3 $45,025.00$25.00
4 $18,010.00$10.00
5 $22,872.70$12.70
6 $57,595.98$31.98
7 $32,418.00$18.00
8 $26,186.54$14.54
157000 - Page 342
Ref #50 605E32200 AGGREGATE DRAINS FOR SPRINGS, (10 FT)
Awd $190.00$19.00
2 $140.00$14.00
3 $1,000.00$100.00
4 $200.00$20.00
5 $500.00$50.00
6 $498.10$49.81
7 $100.00$10.00
8 $705.80$70.58
Ref #51 611E05900 15" CONDUIT, TYPE B, (43 FT)
Awd $6,880.00$160.00
2 $3,053.00$71.00
3 $7,052.00$164.00
4 $3,440.00$80.00
5 $5,375.00$125.00
6 $4,309.89$100.23
7 $6,020.00$140.00
8 $6,354.54$147.78
Ref #52 611E06100 15" CONDUIT, TYPE C, (195 FT)
Awd $9,750.00$50.00
2 $11,505.00$59.00
3 $7,995.00$41.00
4 $8,775.00$45.00
5 $15,990.00$82.00
6 $16,748.55$85.89
7 $21,450.00$110.00
8 $15,746.25$80.75
Ref #53 611E07600 18" CONDUIT, TYPE C, (233 FT)
Awd $15,378.00$66.00
2 $16,543.00$71.00
3 $11,417.00$49.00
4 $12,815.00$55.00
5 $19,572.00$84.00
6 $20,720.69$88.93
7 $29,125.00$125.00
8 $21,682.98$93.06
Ref #54 611E09100 21" CONDUIT, TYPE C, (668 FT)
Awd $34,736.00$52.00
2 $54,776.00$82.00
3 $40,748.00$61.00
4 $40,080.00$60.00
5 $60,120.00$90.00
6 $69,478.68$104.01
7 $83,500.00$125.00
8 $71,542.80$107.10
Ref #55 611E10400 24" CONDUIT, TYPE B, (79 FT)
Awd $10,665.00$135.00
2 $4,819.00$61.00
3 $12,640.00$160.00
4 $5,135.00$65.00
5 $9,085.00$115.00
6 $8,424.56$106.64
7 $28,440.00$360.00
8 $6,778.20$85.80
157000 - Page 343
Ref #56 611E10600 24" CONDUIT, TYPE C, (647 FT)
Awd $41,408.00$64.00
2 $53,054.00$82.00
3 $41,408.00$64.00
4 $42,055.00$65.00
5 $62,759.00$97.00
6 $69,694.84$107.72
7 $80,875.00$125.00
8 $70,917.67$109.61
Ref #57 611E11200 24" CONDUIT, TYPE F, (50 FT)
Awd $5,650.00$113.00
2 $5,650.00$113.00
3 $4,100.00$82.00
4 $3,500.00$70.00
5 $4,750.00$95.00
6 $3,053.50$61.07
7 $6,750.00$135.00
8 $6,825.00$136.50
Ref #58 611E13600 30" CONDUIT, TYPE C, (737 FT)
Awd $58,223.00$79.00
2 $70,752.00$96.00
3 $53,064.00$72.00
4 $58,960.00$80.00
5 $87,703.00$119.00
6 $93,510.56$126.88
7 $106,865.00$145.00
8 $92,265.03$125.19
Ref #59 611E16600 36" CONDUIT, TYPE C, (640 FT)
Awd $61,440.00$96.00
2 $66,560.00$104.00
3 $53,120.00$83.00
4 $64,000.00$100.00
5 $78,720.00$123.00
6 $86,137.60$134.59
7 $102,400.00$160.00
8 $97,843.20$152.88
Ref #60 611E21100 48" CONDUIT, TYPE C, (47 FT)
Awd $7,943.00$169.00
2 $6,674.00$142.00
3 $6,956.00$148.00
4 $6,956.00$148.00
5 $9,400.00$200.00
6 $8,987.34$191.22
7 $14,100.00$300.00
8 $10,501.68$223.44
Ref #61 611E98230 CATCH BASIN, NO. 4, (2 EACH)
Awd $6,800.00$3,400.00
2 $6,000.00$3,000.00
3 $5,500.00$2,750.00
4 $6,800.00$3,400.00
5 $5,100.00$2,550.00
6 $13,991.22$6,995.61
7 $9,000.00$4,500.00
8 $5,207.10$2,603.55
157000 - Page 344
Ref #62 611E98341 CATCH BASIN, NO. 5A, (1 EACH)
Awd $3,300.00$3,300.00
2 $2,800.00$2,800.00
3 $2,750.00$2,750.00
4 $3,500.00$3,500.00
5 $2,700.00$2,700.00
6 $6,465.61$6,465.61
7 $3,800.00$3,800.00
8 $2,829.57$2,829.57
Ref #63 611E98410 CATCH BASIN, NO. 8, (14 EACH)
Awd $43,400.00$3,100.00
2 $32,200.00$2,300.00
3 $32,900.00$2,350.00
4 $35,000.00$2,500.00
5 $35,980.00$2,570.00
6 $56,774.20$4,055.30
7 $53,200.00$3,800.00
8 $32,938.08$2,352.72
Ref #64 611E98434 CATCH BASIN, NO. 8A, (1 EACH)
Awd $3,300.00$3,300.00
2 $2,400.00$2,400.00
3 $2,600.00$2,600.00
4 $2,900.00$2,900.00
5 $2,860.00$2,860.00
6 $5,995.61$5,995.61
7 $3,800.00$3,800.00
8 $2,676.53$2,676.53
Ref #65 611E99574 MANHOLE, NO. 3, (6 EACH)
Awd $24,600.00$4,100.00
2 $24,000.00$4,000.00
3 $30,300.00$5,050.00
4 $18,000.00$3,000.00
5 $19,140.00$3,190.00
6 $21,061.20$3,510.20
7 $27,000.00$4,500.00
8 $22,939.80$3,823.30
Ref #66 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)
Awd $550.00$275.00
2 $400.00$200.00
3 $1,320.00$660.00
4 $550.00$275.00
5 $800.00$400.00
6 $325.10$162.55
7 $500.00$250.00
8 $852.78$426.39
Ref #67 613E41200 LOW STRENGTH MORTAR BACKFILL, (37 CY)
Awd $6,660.00$180.00
2 $3,330.00$90.00
3 $13,505.00$365.00
4 $6,475.00$175.00
5 $5,735.00$155.00
6 $4,010.80$108.40
7 $4,625.00$125.00
8 $9,221.51$249.23
157000 - Page 345
Section 3 - DRAINAGE - Totals
Awd $369,549.70
2 $399,111.00
3 $406,880.00
4 $357,371.00
5 $473,686.70
6 $574,977.92
7 $640,287.00
8 $523,644.42
Ref #68 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (299 SY)
Awd $2,347.15$7.85
2 $2,347.15$7.85
3 $10,166.00$34.00
4 $2,347.15$7.85
5 $2,347.15$7.85
6 $6,781.32$22.68
7 $2,347.15$7.85
8 $1,913.60$6.40
Ref #69 301E46000 ASPHALT CONCRETE BASE, PG64-22, (1842 CY)
Awd $285,510.00$155.00
2 $285,510.00$155.00
3 $285,510.00$155.00
4 $285,510.00$155.00
5 $285,510.00$155.00
6 $300,246.00$163.00
7 $285,510.00$155.00
8 $285,510.00$155.00
Ref #70 301E48000 ASPHALT CONCRETE BASE, PG64-22 (DRIVEWAYS), (10 CY)
Awd $1,550.00$155.00
2 $1,550.00$155.00
3 $1,550.00$155.00
4 $1,550.00$155.00
5 $1,550.00$155.00
6 $1,630.00$163.00
7 $1,550.00$155.00
8 $1,550.00$155.00
Ref #71 304E20000 AGGREGATE BASE, (2173 CY)
Awd $154,283.00$71.00
2 $169,494.00$78.00
3 $191,224.00$88.00
4 $158,629.00$73.00
5 $147,764.00$68.00
6 $146,851.34$67.58
7 $162,975.00$75.00
8 $179,076.93$82.41
157000 - Page 346
Ref #72 407E10000 TACK COAT, (139 GAL)
Awd $347.50$2.50
2 $347.50$2.50
3 $347.50$2.50
4 $347.50$2.50
5 $347.50$2.50
6 $368.35$2.65
7 $347.50$2.50
8 $347.50$2.50
Ref #73 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (549 GAL)
Awd $1,372.50$2.50
2 $1,372.50$2.50
3 $1,372.50$2.50
4 $1,372.50$2.50
5 $1,372.50$2.50
6 $1,454.85$2.65
7 $1,372.50$2.50
8 $1,372.50$2.50
Ref #74 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (483 CY)
Awd $80,178.00$166.00
2 $80,178.00$166.00
3 $80,178.00$166.00
4 $80,178.00$166.00
5 $80,178.00$166.00
6 $84,525.00$175.00
7 $80,178.00$166.00
8 $80,178.00$166.00
Ref #75 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (660 CY)
Awd $104,940.00$159.00
2 $104,940.00$159.00
3 $104,940.00$159.00
4 $104,940.00$159.00
5 $104,940.00$159.00
6 $110,220.00$167.00
7 $104,940.00$159.00
8 $104,940.00$159.00
Ref #76 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (3 CY)
Awd $498.00$166.00
2 $498.00$166.00
3 $498.00$166.00
4 $498.00$166.00
5 $498.00$166.00
6 $525.00$175.00
7 $498.00$166.00
8 $498.00$166.00
157000 - Page 347
Section 4 - PAVEMENT - Totals
Awd $631,026.15
2 $646,237.15
3 $675,786.00
4 $635,372.15
5 $624,507.15
6 $652,601.86
7 $639,718.15
8 $655,386.53
Ref #77 621E10000 RPM, LOW PROFILE, YELLOW/YELLOW, (93 EACH)
Awd $3,299.64$35.48
2 $3,299.64$35.48
3 $3,299.64$35.48
4 $3,299.64$35.48
5 $3,299.64$35.48
6 $1,395.00$15.00
7 $5,208.00$56.00
8 $1,968.81$21.17
Ref #78 621E54000 RAISED PAVEMENT MARKER REMOVED, (176 EACH)
Awd $1,760.00$10.00
2 $1,408.00$8.00
3 $1,936.00$11.00
4 $2,288.00$13.00
5 $1,136.96$6.46
6 $1,050.72$5.97
7 $1,408.00$8.00
8 $1,210.88$6.88
Ref #79 626E00100 BARRIER REFLECTOR, (8 EACH)
Awd $52.00$6.50
2 $52.00$6.50
3 $52.00$6.50
4 $52.00$6.50
5 $52.00$6.50
6 $48.00$6.00
7 $56.00$7.00
8 $169.36$21.17
Ref #80 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $168.00$8.00
2 $168.00$8.00
3 $168.00$8.00
4 $168.00$8.00
5 $168.00$8.00
6 $168.00$8.00
7 $178.50$8.50
8 $177.87$8.47
157000 - Page 348
Ref #81 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (82 FT)
Awd $697.00$8.50
2 $697.00$8.50
3 $697.00$8.50
4 $697.00$8.50
5 $697.00$8.50
6 $738.00$9.00
7 $779.00$9.50
8 $738.00$9.00
Ref #82 630E08600 SIGN POST REFLECTOR, (1 EACH)
Awd $35.00$35.00
2 $35.00$35.00
3 $35.00$35.00
4 $35.00$35.00
5 $35.00$35.00
6 $22.00$22.00
7 $30.00$30.00
8 $37.04$37.04
Ref #83 630E80100 SIGN, FLAT SHEET, (56.8 SF)
Awd $1,050.80$18.50
2 $1,050.80$18.50
3 $1,050.80$18.50
4 $1,050.80$18.50
5 $1,050.80$18.50
6 $1,079.20$19.00
7 $1,079.20$19.00
8 $1,112.14$19.58
Ref #84 630E80600 SIGN, DOUBLE FACED, MILE MARKER, (1 EACH)
Awd $50.00$50.00
2 $50.00$50.00
3 $50.00$50.00
4 $50.00$50.00
5 $50.00$50.00
6 $40.00$40.00
7 $105.00$105.00
8 $52.91$52.91
Ref #85 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (22 EACH)
Awd $264.00$12.00
2 $264.00$12.00
3 $264.00$12.00
4 $264.00$12.00
5 $264.00$12.00
6 $220.00$10.00
7 $220.00$10.00
8 $279.40$12.70
Ref #86 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (20 EACH)
Awd $240.00$12.00
2 $240.00$12.00
3 $240.00$12.00
4 $240.00$12.00
5 $240.00$12.00
6 $200.00$10.00
7 $200.00$10.00
8 $254.00$12.70
157000 - Page 349
Ref #87 642E00090 EDGE LINE, 4", (1.7 MILE)
Awd $1,190.00$700.00
2 $1,190.00$700.00
3 $1,190.00$700.00
4 $1,190.00$700.00
5 $1,190.00$700.00
6 $1,164.50$685.00
7 $1,275.00$750.00
8 $1,259.38$740.81
Ref #88 642E00290 CENTER LINE, (0.85 MILE)
Awd $1,190.00$1,400.00
2 $1,190.00$1,400.00
3 $1,190.00$1,400.00
4 $1,190.00$1,400.00
5 $1,190.00$1,400.00
6 $1,232.50$1,450.00
7 $1,275.00$1,500.00
8 $1,259.38$1,481.62
Ref #89 642E00490 STOP LINE, (37 FT)
Awd $259.00$7.00
2 $259.00$7.00
3 $259.00$7.00
4 $259.00$7.00
5 $259.00$7.00
6 $120.25$3.25
7 $277.50$7.50
8 $274.17$7.41
Section 5 - TRAFFIC CONTROL - Totals
Awd $10,255.44
2 $9,903.44
3 $10,431.44
4 $10,783.44
5 $9,632.40
6 $7,478.17
7 $12,091.20
8 $8,793.34
Ref #90 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (75 CY)
Awd $7,125.00$95.00
2 $6,750.00$90.00
3 $7,125.00$95.00
4 $3,750.00$50.00
5 $3,600.00$48.00
6 $5,373.00$71.64
7 $9,375.00$125.00
8 $5,995.50$79.94
157000 - Page 350
Ref #91 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (10 EACH)
Awd $18,000.00$1,800.00
2 $18,000.00$1,800.00
3 $18,000.00$1,800.00
4 $20,000.00$2,000.00
5 $18,000.00$1,800.00
6 $21,000.00$2,100.00
7 $25,000.00$2,500.00
8 $22,224.30$2,222.43
Ref #92 614E12460 WORK ZONE MARKING SIGN, (8 EACH)
Awd $800.00$100.00
2 $800.00$100.00
3 $800.00$100.00
4 $800.00$100.00
5 $800.00$100.00
6 $640.00$80.00
7 $680.00$85.00
8 $846.64$105.83
Ref #93 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $4,500.00$225.00
2 $3,400.00$170.00
3 $3,400.00$170.00
4 $4,000.00$200.00
5 $3,400.00$170.00
6 $4,128.80$206.44
7 $3,400.00$170.00
8 $3,598.20$179.91
Ref #94 614E13302 BARRIER REFLECTOR, TYPE B2, (109 EACH)
Awd $1,907.50$17.50
2 $1,907.50$17.50
3 $1,907.50$17.50
4 $763.00$7.00
5 $1,907.50$17.50
6 $599.50$5.50
7 $981.00$9.00
8 $923.23$8.47
Ref #95 614E13360 OBJECT MARKER, TWO WAY, (109 EACH)
Awd $1,907.50$17.50
2 $1,907.50$17.50
3 $1,907.50$17.50
4 $1,308.00$12.00
5 $1,907.50$17.50
6 $1,308.00$12.00
7 $1,090.00$10.00
8 $2,018.68$18.52
Ref #96 614E21000 WORK ZONE CENTER LINE, CLASS I, (0.79 MILE)
Awd $1,129.70$1,430.00
2 $1,129.70$1,430.00
3 $1,129.70$1,430.00
4 $1,129.70$1,430.00
5 $1,129.70$1,430.00
6 $5,925.00$7,500.00
7 $1,185.00$1,500.00
8 $1,195.57$1,513.38
157000 - Page 351
Ref #97 614E21400 WORK ZONE CENTER LINE, CLASS II, (0.7 MILE)
Awd $1,172.50$1,675.00
2 $1,172.50$1,675.00
3 $1,172.50$1,675.00
4 $1,172.50$1,675.00
5 $1,172.50$1,675.00
6 $1,050.00$1,500.00
7 $1,190.00$1,700.00
8 $1,240.86$1,772.66
Ref #98 614E22000 WORK ZONE EDGE LINE, CLASS I, (1.86 MILE)
Awd $1,525.20$820.00
2 $1,525.20$820.00
3 $1,525.20$820.00
4 $1,525.20$820.00
5 $1,525.20$820.00
6 $1,860.00$1,000.00
7 $1,525.20$820.00
8 $1,614.13$867.81
Ref #99 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.13 MILE)
Awd $789.75$6,075.00
2 $789.75$6,075.00
3 $789.75$6,075.00
4 $789.75$6,075.00
5 $789.75$6,075.00
6 $1,300.00$10,000.00
7 $832.00$6,400.00
8 $835.79$6,429.15
Ref #100 614E26000 WORK ZONE STOP LINE, CLASS I, (70 FT)
Awd $280.00$4.00
2 $280.00$4.00
3 $280.00$4.00
4 $280.00$4.00
5 $280.00$4.00
6 $245.00$3.50
7 $280.00$4.00
8 $296.10$4.23
Ref #101 616E10000 WATER, (2418 MGAL)
Awd $71,355.18$29.51
2 $48,360.00$20.00
3 $96,720.00$40.00
4 $79,794.00$33.00
5 $96,720.00$40.00
6 $87,918.48$36.36
7 $91,884.00$38.00
8 $76,021.92$31.44
Ref #102 622E41000 PORTABLE BARRIER, 32", (5200 FT)
Awd $57,200.00$11.00
2 $59,800.00$11.50
3 $260,000.00$50.00
4 $62,400.00$12.00
5 $66,040.00$12.70
6 $89,596.00$17.23
7 $62,400.00$12.00
8 $85,020.00$16.35
157000 - Page 352
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $167,692.33
2 $145,822.15
3 $394,757.15
4 $177,712.15
5 $197,272.15
6 $220,943.78
7 $199,822.20
8 $201,830.92
Ref #103 202E11200 PORTIONS OF STRUCTURE REMOVED, (LUMP SUM)
Awd $14,000.00$14,000.00
2 $5,000.00$5,000.00
3 $2,100.00$2,100.00
4 $20,000.00$20,000.00
5 $4,800.00$4,800.00
6 $5,287.69$5,287.69
7 $10,000.00$10,000.00
8 $8,401.34$8,401.34
Ref #104 507E00400 STEEL PILES, MISC.: HP12X53 SOLDIER PILES, (1278 FT)
Awd $67,734.00$53.00
2 $54,954.00$43.00
3 $70,290.00$55.00
4 $63,900.00$50.00
5 $57,510.00$45.00
6 $51,120.00$40.00
7 $63,900.00$50.00
8 $60,858.36$47.62
Ref #105 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (205 CY)
Awd $18,245.00$89.00
2 $22,550.00$110.00
3 $31,775.00$155.00
4 $20,500.00$100.00
5 $31,775.00$155.00
6 $31,775.00$155.00
7 $24,600.00$120.00
8 $33,628.20$164.04
Ref #106 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (368 FT)
Awd $2,944.00$8.00
2 $2,576.00$7.00
3 $3,680.00$10.00
4 $3,680.00$10.00
5 $3,680.00$10.00
6 $3,680.00$10.00
7 $368.00$1.00
8 $3,893.44$10.58
157000 - Page 353
Ref #107 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (26 FT)
Awd $650.00$25.00
2 $286.00$11.00
3 $390.00$15.00
4 $390.00$15.00
5 $390.00$15.00
6 $390.00$15.00
7 $650.00$25.00
8 $412.62$15.87
Ref #108 524E94601 DRILLED SHAFTS, 30" DIAMETER, AS PER PLAN, (854 FT)
Awd $71,736.00$84.00
2 $119,560.00$140.00
3 $81,130.00$95.00
4 $76,860.00$90.00
5 $134,932.00$158.00
6 $68,320.00$80.00
7 $76,860.00$90.00
8 $92,590.68$108.42
Ref #109 530E00400 SPECIAL - STRUCTURE, MISC.: PRECAST CONCRETE LAGGI, (138 EACH)
Awd $55,062.00$399.00
2 $64,860.00$470.00
3 $101,568.00$736.00
4 $46,230.00$335.00
5 $101,568.00$736.00
6 $179,767.08$1,302.66
7 $57,960.00$420.00
8 $107,489.58$778.91
Section 7 - RETAINING WALLS - Totals
Awd $230,371.00
2 $269,786.00
3 $290,933.00
4 $231,560.00
5 $334,655.00
6 $340,339.77
7 $234,338.00
8 $307,274.22
Ref #110 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $51,000.00$51,000.00
2 $63,000.00$63,000.00
3 $0.01$0.01
4 $26,000.00$26,000.00
5 $34,000.00$34,000.00
6 $105,856.51$105,856.51
7 $35,000.00$35,000.00
8 $47,815.47$47,815.47
157000 - Page 354
Ref #111 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $53,000.00$53,000.00
2 $30,000.00$30,000.00
3 $210,000.00$210,000.00
4 $40,000.00$40,000.00
5 $44,788.00$44,788.00
6 $18,101.97$18,101.97
7 $150,000.00$150,000.00
8 $134,426.80$134,426.80
Ref #112 619E16010 FIELD OFFICE, TYPE B, (15 MNTH)
Awd $25,500.00$1,700.00
2 $22,500.00$1,500.00
3 $52,500.00$3,500.00
4 $43,500.00$2,900.00
5 $74,925.00$4,995.00
6 $36,750.00$2,450.00
7 $42,000.00$2,800.00
8 $56,543.55$3,769.57
Ref #113 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $27,000.00$27,000.00
2 $30,000.00$30,000.00
3 $54,000.00$54,000.00
4 $50,000.00$50,000.00
5 $25,000.00$25,000.00
6 $72,160.00$72,160.00
7 $250,000.00$250,000.00
8 $122,500.00$122,500.00
Ref #114 624E10000 MOBILIZATION, (LUMP SUM)
Awd $200,000.00$200,000.00
2 $200,000.00$200,000.00
3 $336,000.00$336,000.00
4 $200,000.00$200,000.00
5 $200,000.00$200,000.00
6 $142,423.39$142,423.39
7 $200,000.00$200,000.00
8 $200,000.00$200,000.00
Section 8 - INCIDENTALS - Totals
Awd $356,500.00
2 $345,500.00
3 $652,500.01
4 $359,500.00
5 $378,713.00
6 $375,291.87
7 $677,000.00
8 $561,285.82
157000 - Page 355
Project No. 157001
PID 98823
MOT-IR 675-6.47
Non-Federal
Type: BRIDGE REPAIR
Completion Date: 7/1/2015
Award Amount: $243,546.80
Contract Awarded To: ARMSTRONG STEEL ERECTORS INC
Letting Date: 1/15/2015
Engineer's Estimate: $227,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
ARMSTRONG STEEL ERECTORS INC
50 SOUTH FOURTH ST P O BOX 577
NEWARK, OH 43058
Licking
Bidder 1
Bid $243,546.80
EVERS WELDING CO INC
4849 BLUE ROCK RD
CINCINNATI, OH 45247
Hamilton
Bidder 2
Bid $258,826.00
CIVIL CONSTRUCTION INC
10310 STATE ROUTE 161
PLAIN CITY, OH 43064
Madison
Bidder 3
Bid $277,280.19
157001 - Page 356
Ref #1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (120 HOUR)
Awd $10,200.00$85.00
2 $7,800.00$65.00
3 $9,396.00$78.30
Ref #2 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) 24" W, (2 EACH)
Awd $4,400.00$2,200.00
2 $4,000.00$2,000.00
3 $4,840.00$2,420.00
Ref #3 614E12500 REPLACEMENT SIGN, (4 EACH)
Awd $500.00$125.00
2 $800.00$200.00
3 $550.00$137.50
Ref #4 614E12600 REPLACEMENT DRUM, (10 EACH)
Awd $500.00$50.00
2 $600.00$60.00
3 $550.00$55.00
Ref #5 614E13300 BARRIER REFLECTOR, TYPE B, (26 EACH)
Awd $156.00$6.00
2 $156.00$6.00
3 $171.60$6.60
Ref #6 614E13350 OBJECT MARKER, ONE WAY, (26 EACH)
Awd $286.00$11.00
2 $260.00$10.00
3 $314.60$12.10
Ref #7 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (1 SNMT)
Awd $900.00$900.00
2 $800.00$800.00
3 $990.00$990.00
Ref #8 622E41000 PORTABLE BARRIER, 32", (860 FT)
Awd $12,470.00$14.50
2 $12,900.00$15.00
3 $13,717.00$15.95
Section 1 - MAINTENANCE OF TRAFFIC - Totals
Awd $29,412.00
2 $27,316.00
3 $30,529.20
Ref #9 202E11401 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SECOND, (1389 LB)
Awd $4,167.00$3.00
2 $19,446.00$14.00
3 $6,597.75$4.75
Ref #10 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (1389 LB)
Awd $20,487.75$14.75
2 $20,835.00$15.00
3 $29,016.21$20.89
Ref #11 514E20001 FIELD PAINTING OF DAMAGED STRUCTURAL STEEL, AS PER, (1399 SF)
Awd $69,880.05$49.95
2 $85,339.00$61.00
3 $61,556.00$44.00
157001 - Page 357
Ref #12 849E10000 DAMAGE ASSESSMENT, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $1,200.00$1,200.00
3 $603.19$603.19
Ref #13 849E10500 SURFACE PREPARATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $850.00$850.00
3 $8,880.84$8,880.84
Ref #14 849E10600 REPAIRING DAMAGED MEMBERS BY GRINDING, (8 HOUR)
Awd $1,600.00$200.00
2 $840.00$105.00
3 $1,206.40$150.80
Ref #15 849E10700 STRAIGHTENING DAMAGED MEMBERS, (LUMP SUM)
Awd $65,000.00$65,000.00
2 $32,000.00$32,000.00
3 $47,947.81$47,947.81
Section 2 - STRUCTURE REPAIR (SFN 5711436) - Totals
Awd $165,134.80
2 $160,510.00
3 $155,808.20
Ref #16 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $7,000.00$7,000.00
3 $3,106.00$3,106.00
Ref #17 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $86,630.41$86,630.41
Ref #18 624E10000 MOBILIZATION, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $24,000.00$24,000.00
3 $1,206.38$1,206.38
Section 3 - INCIDENTALS - Totals
Awd $49,000.00
2 $71,000.00
3 $90,942.79
157001 - Page 358