OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

9
OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL

Transcript of OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

Page 1: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

OGSA-WG charter discussion

Dec. 3, 2003

F2F meeting at ANL

Page 2: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

We need re-charter• Current formal WG charter

– Approved September 24, 2002 and posted on GridForge– Very obsolete

• Assuming WG charter– Agreed at 2nd interim meeting 2003/2 (?)– OGSA document Chapter 2– Need some update and add milestones

• Revised charter for GFSG submission– Proposal: Make out and agreed at this meeting

• Next step– Formal re-charter approval process

Page 3: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

Current formal WG charter: Purpose

• The purpose of the OGSA Working Group is to achieve an integrated approach to future OGSA service development via the documentation of requirements, functionalites, priorities, and interrelationships for OGSA services. Topic areas that we expect to scope and discretize early are common resource model and service domain mechanisms, but the precise set to be addressed will be determined in early discussions.

• The output of this WG will be an OGSA architecture roadmap document that defines, scopes, and outlines requirements for key services. It is expected that the development of detailed specifications for specific services will occur in other WGs (existing or new). When this document is produced, the WG will consult internally and with the GFSG to determine whether to close or, alternatively, to work to produce a second edition.

Page 4: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

Current formal WG charter: Milestones

• GGF5 (July 2002): – BOF to propose working group

• GGF6 (October 2002): – First draft of OGSA architecture document

• GGF7 (March 2003): – Second draft of OGSA architecture document.

• GGF8 (June 2003): – Final draft OGSA architecture document

GGF9

GGF10?

GGF11?

Page 5: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

Assuming WG charter1. To produce and document the use cases that drive the

definition and prioritization of OGSA components, as well as document the rationale for our choices.

2. To identify and outline requirements for, and a prioritization of, OGSA services and components.

3. To identify and outline requirements for, and a prioritization of, hosting environment and protocol bindings that are required for deployment of portable, interoperable OGSA implementations.

4. To identify and outline requirements for, and a prioritization of, models for resources and other important entities.

5. To identify, outline, and prioritize interoperability requirements for the various OGSA components.

6. To define standard OGSA profiles, i.e., sets of OGSA components that meet specific requirements.

7. To define relationships between GGF and other standards bodies activities such as W3C, OASIS, and WSI whose work touches upon OGSA-related issues.

Page 6: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

New Charter: Scope1. document the use cases

• Proposal: Yes, we will do this

2. OGSA services and components• Proposal: Yes, we will do this

3. hosting environment and protocol bindings• We have no text now

4. models for resources and other important entities• Proposal: Yes, but we should refine the text

5. interoperability requirements • We have no text now

6. standard OGSA profiles • We have no text now

7. relationships between GGF and other standards bodies activities

• Proposal: Yes, we will do this

Page 7: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

New Charter: Milestones

• OGSA usecase– Final draft to editor at GGF10 (feasible?)

• OGSA document– Major update at GGF19– Final draft to editor at GGF11– 2nd version for hosting environment,

interoperability, and profile?

• OGSA roadmap– First draft at GGF11 (feasible?)

Page 8: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

New Charter:

• It is expected that the development of detailed specifications for specific services will occur in other WGs (existing or new)

Page 9: OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.

Next step

• Formal re-charter approval process