Ogden Air Logistics Center

BE AMERICA’S BEST 1

OO-ALCPilot Status Update

UID Off-Site 23 Feb 05

OO-ALC/MG

Page 2: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 2

O G D E N A I R L O G I S T I C S C E N T E R

UID/SNT Overview

Hill AFB Workloads OSD Sponsored Pilot Status Air Force Sponsored

Pathfinder Other Activities Challenges Summary

Page 3: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 3

O G D E N A I R L O G I S T I C S C E N T E R

Hill AFB Workloads Aircraft Airframes – F-16, C-130, A-10 Aircraft Commodities, such as Landing Gear, Wheels,

Brakes, & Hydraulics ICBM Missile Systems Air Munitions Software Space Programs and Satellite Communication Systems Command/Control/Communications Ground Based Sensors Telecommunications Power Equipment & Support Systems (Gas Turbine

Engines) Programs Mature and Proven Aircraft Programs – F-4, T-33, F-5, A-10,

T-38, F-111

Page 4: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 4

O G D E N A I R L O G I S T I C S C E N T E R

OSD SponsoredUID Pilot Status

NCMS/CTMA UID Marking Project Project Intended to Evaluate Application, Survivability, and

Readability of Direct UID Mark in Harsh Environments• CTMA Equipment Delivered July 04 – Too Late for Pilot• Tasking Accomplished Through Outsourcing

All Objectives of Hill Pilot Met• Survivability of Direct UID Mark is a Continuing Issue in Harsh

Environments• Readability of Direct UID Mark on Plated and Painted Items is a

Continuing Issue• Additional Engineering/Testing Required• Deep Laser Etching Probable Solution for High Strength

Steel• Not All Items are Conducive to Data Plates and Labels i.e. Foreign

Object Damage Risk

Page 5: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 5

O G D E N A I R L O G I S T I C S C E N T E R

OSD SponsoredUID Pilot Status (cont)

Continuing Efforts Marking of Tooling, Fixtures and Condemned Items

Providing Marking Opportunities NCMS/CTMA Cart Ownership – Working to Transfer

Ownership to OO-ALC•Upgrades/Enhancement Needs

Other Issues: Readability of 2D Code NCMS/CTMA Prototype Cart Not Equipped for

Production Environment OO-ALC in Communication with NADEP Cherry Point,

and Letterkenny Army Depot

Page 6: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 6

O G D E N A I R L O G I S T I C S C E N T E R

Air Force SponsoredUID Pathfinder

AFMC Providing “New” Part Marking Capability at ALC’s via Core6

• Delivery May/Jun 05• OO-ALC, WR-ALC, OC-ALC, Travis AFB

Proposed Goal/Purpose: Demonstrate Initial Capability for Production Part Marking

• No Deep Laser Etching Capability

Page 7: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 7

O G D E N A I R L O G I S T I C S C E N T E R

Other UID Activities at Hill AFB

OO-ALC Key Personnel Support of OSD UID IPT – Dec 02

UID Conference, Redstone – May 04

Working Group, WPAFB for SNT – June 04

UID Conference, St Louis – Aug 04

Working Group, WPAFB for SNT Plan – Oct 04

AFMC OPR Visit and Brief – Nov 04

Source Selection – Jan 05

Page 8: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 8

O G D E N A I R L O G I S T I C S C E N T E R

Other UID Activities at Hill AFB

OO-ALC IPT Formed – 4 Jan 05 (next chart)

Draft Depot Manufactured Items Implementation Plan Submitted – Dec 04 Part of Overarching AFMC Plan Reworking to Include Legacy Items

Page 9: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 9

O G D E N A I R L O G I S T I C S C E N T E R

OO-ALC UID/SNT IPT Permanent Members

OO-ALC COMMAND SECTIONMGEN

OO-ALC STAFF OFFICES

309th Maintenance Wing508th AircraftSustainment Wing

84th Combat Sustainment Wing 75th Air Base Wing

508 Attack Sustainment

Squadron

508 Mature Aircraft& Training

Sustainment Group

508 Fighter Sustainment

Group

84 Space & C3ISustainment

Group

84 MaterielSustainment

Group

84 MunitionsSustainment

Group

84 CommoditiesSustainment

Group

84 Specialized MgmtSustainment

Squadron

526th ICBMSystems Wing

526 Ground SystemsSustainment

Group

526 Flight SystemsSustainment

Group

526 Acquisition Group

309 AircraftMaintenance

Group

309 Missile Maintenance

Group

309 CommoditiesMaintenance

Group

309 ElectronicsMaintenance

Group

309 SoftwareMaintenance

Group

309 MaintenanceSupportGroup

WING GROUP SQDN EN

PK

Mike FrenaOCR

Darrell NitzOPR/OCR

Jared DunnOCR

Laurie CrawfordOCR

Richard Martin/Al Fabiano

OCR ?Dave Diguangco

OCR

= UID/SNT IPT Members

= UID/SNT Information Flow to Wing & Back Through IPT

UID

/SN

T F

low

to W

ing

UID

/SN

T F

low

to W

ing

UID

/SN

T F

low

to W

ing

UID

/SN

T F

low

to W

ing

IT ?

Page 10: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 10

O G D E N A I R L O G I S T I C S C E N T E R

Other UID Challenges

Significant Engineering Effort Must Precede Standup of Organic Production Capability Affects 1 Jan 05 Objective for Depot Manufactured Items

Gov’t Cost Issues Budgeting for UID Cost per Item Unknown (Organic & Contract) Reduction of Buy Quantities to Fund UID Unacceptable

“No Bids” Contractor Pushback

• Mil Std Guidance & Engineering• Technology• Vendor Cost

Some Vendors Bidding/Winning w/o Plan• Added Contractor Default Risk

Page 11: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 11

O G D E N A I R L O G I S T I C S C E N T E R

Summary

OO-ALC Strongly Support UID/SNT Initiative OO-ALC Pioneer with F16 Falcon Flex Project

Pilot Identified Challenges

Way Ahead Engineer / Contractor Engagement Maturing / Understanding of Relevant UID Governing

Documents is an Issue

Page 12: Ogden Air Logistics Center BE AMERICA’S BEST 1 OO-ALC Pilot Status Update UID Off-Site 23 Feb 05 OO-ALC/MG.

BE AMERICA’S BEST 12

O G D E N A I R L O G I S T I C S C E N T E R

Hill AFB