windeurope.org
Iván Pineda
Director of Public Affairs
September 2021
OFFSHORE WIND IN ITALY AND EUROPE What are success factors?
![Page 2: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/2.jpg)
Europe’s offshore capacity to grow 5x by 2030
GW
0
20
40
60
80
100
120
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Offshore Wind annual installations based on existing projects and announces auctions, complemented by Government ambitions under the NECPs*
UK Germany Denmark Netherlands France Poland Other
Source: WindEurope
![Page 3: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/3.jpg)
Onshore & offshore wind will be the main sources of electricity generation by 2040
![Page 4: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/4.jpg)
A strategy dedicated to offshore wind
![Page 5: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/5.jpg)
Wind farm development takes time
![Page 6: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/6.jpg)
1. It all starts with planning
Energy
Defense
BE
![Page 7: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/7.jpg)
2. Define who does what for permitting
Up to 2025
Post 2025
Cen
tralised
Mo
del
Decen
tralised
mo
del
Currentuntil2020
Zone identification
Site selection ConstructionSite
investigationPermitting
Grid application & planning Construction
Governmental agencies Private developer TSO(Transmission system operator) Auction
![Page 8: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/8.jpg)
One-stop shop for permitting
and
Modular offshore substations
Source: RVO
NL
![Page 9: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/9.jpg)
3. Provide auction visibilityOffshore wind roadmap in France
Source: French NECP (March 2020)
Bottom-fixed Floating500 MW extension under revision
120 €/MWh
110 €/MWh
FR
![Page 10: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/10.jpg)
4. Offer Contracts for Difference (CfD)Two sided contracts for difference deliver lower costs
€92/MWh
= €50/MWh
=
![Page 11: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/11.jpg)
5. Plan for the grid needed
![Page 12: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/12.jpg)
6. Ports are key in the offshore wind supply chain
More information:windeurope.org/report/ports2030
![Page 13: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/13.jpg)
Starting from zero? Fast-track to succeed
2019 20212020
3.5 GW by 2030Final NECP
5 GW by 2030New government increases target
Government fast tracks projects worth 3.5 GW
Government plans phased plan for offshore wind
Draft Maritime Spatial Plan
Consultation period
Government plans new auction framework
Governmentrevision
MSP approved
Arklow Bank25 MW -2004
Online
IE
![Page 14: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/14.jpg)
The government fast tracked 3.5 GW and has a target of 5 GW by 2030. The Irish government designated Eirgrid as the TSO for offshore wind. The regime will be phased over time.
Institutional framework for offshore wind under development. Possible to start with a developer-built approach but could change.
Offshore Wind Roadmap under development. Possible to start with a developer-built approach but could change.
The 1st phase granted CfDs for 5.9 GW. Grid model is under discussion but there would be an agreement between TSO and project developers.
![Page 15: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/15.jpg)
First Italian offshore wind farm under construction
Source: Van Oord ©
30 MW
900 MW
2021
2030
IT
![Page 16: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/16.jpg)
Conclusions1. It all starts with planning
2. Define who does what for permitting
→One-stop shops
3. Provide auction visibility
4. Offer Contracts for Difference (CfD)
5. Plan for the grid needed
6. Invest in port infrastructure
![Page 17: OFFSHORE WIND IN ITALY AND EUROPE What are success …](https://reader030.fdocuments.us/reader030/viewer/2022012614/619c83975be36c0fa17e6e18/html5/thumbnails/17.jpg)