Name of the Project :
Equipment/Facilities:Location :
Pump No. : Phase : :
Voltage : Size of Wire : Breaker Rating :
Check all gate valves if functioning properly.
Check for pump overheating.
Check the leak at packing seal.
Check the leaks at all gate valves and check valves.
Check the directional flow arrow on the pipes.
Check all screws, holding, mounting nuts and bolts.
Check all electrical controllers and components .
Test and check for noise and vibration.
L1: L12: Cut-In Pressure:
L2: L23: Cut-Out Pressure:
L3: L31:
L1-Ground : L1-L2:
L2-Ground : L2-L3:
L3-Ground : L3-L1:
Recorded by:
Witnessed and Certified by:
Contractor/Supplier
M / E Engineer CMT Head
Senior MEPF-In-Charge QA/BTO Head
Horsepower Rating
Get ampere and voltage reading of the motor.
Test insulation resistance of the motors.
Check the proper tagging of valves.(Normally open / Normally closed.)
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING CHECKLIST
JOCKEY PUMP
Work Description Status Remark/s
-
8/10/2019 Official Testing Checklist
3/31
-
8/10/2019 Official Testing Checklist
4/31
Name of the Project :
Equipment/Facilities :Location :
Geneset No. : Voltage :
Capacity : Frequency:
FullLoad Current : RPM :
Time Time Time
Radiator Water Level Full
Radiator Water Temperature
Fuel Level Full
Engine Oil Level Full or 3/4
Battery Charger Functional
Battery Charge, Vdc 24 - 27 Vdc
Battery Solution Level Full
Frequency Reading 60 Hz
Revolution Per Minute, RPM 1800
Pilot Light Indicator Functional
Ventilation
Voltmeter Reading
L1L2L2L3
L3L1
Ammeter Reading
L1
L2
L3
Recorded by:
Witnessed and Certified by:
Contractor/Supplier
M / E Engineer
Senior MEPF-In-Charge
CMT Head
QA/BTO Head
OFFICIAL TESTING CHECKLIST
MEGAWORLD CORPORATION - Quality Control Management
GENERATOR SET
INDICATORS STANDARDREADINGS
REMARKS
-
8/10/2019 Official Testing Checklist
5/31
Name of the Project :
Equipment/Facilities: VARIABLE REFRIGERANT VOLUME (VRV)Location :
VRV No.: Horsepower Rating : Voltage: Frequency: Phase :
Size of Wire : Breaker Rating: Compressor No.:
High Pressure: Low Pressure : Capacity in TR :
Check the system if has refrigerant leak.
Inspect contacts of starter, relays and ensure that these are clean.
Check for any unusual noise or vibration.
Check for any water leak around the VRV and drain pipes.
Check all panels and ensure that these are properly secured.
L1: L12: Cut-In Pressure:
L2: L23: Cut-Out Pressure:L3: L31:
L1-Ground : L1-L2:
L2-Ground : L2-L3:
L3-Ground : L3-L1:
Recorded by:
Witnessed and Certified by:
Senior MEPF-In-Charge QA/BTO Head
Check lubrication of bearings, bushing of blower motor, fans of VRV and
FCU's
Check pulley al;ignment and conditions of belt and adjust tensions if
necessary.
Get ampere and voltage reading of the motor.
Test insulation resistance of the motors.
Contractor/Supplier
M / E Engineer CMT Head
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING CHECKLIST
Work Description Status Remark/s
-
8/10/2019 Official Testing Checklist
6/31
Name of the Project :
Equipment/Facilities:Location :
Pump No. : Frequency : Phase : Horsepower Rating :
Voltage : Size of Wire : Breaker Rating :
Check alignment of belt.
Check and clean fan blade.
Re-tension belt. (if necessary)
Check motor.
Check electrical control. Tighten terminals.
Check the directional flow arrow on the pipes.
Clean contacts of magnetic contactor.
Check all electrical controllers and components .
Check setscrews of circuit breakers and controls.
L1: L12: Cut-In Pressure:
L2: L23: Cut-Out Pressure:
L3: L31:
L1-Ground : L1-L2:L2-Ground : L2-L3:
L3-Ground : L3-L1:
Recorded by:
Witnessed and Certified by:
Senior MEPF-In-Charge QA/BTO Head
SUMP PUMP
Get ampere and voltage reading of the motor.
Test insulation resistance of the motors.
Contractor/Supplier
M / E Engineer CMT Head
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING CHECKLIST
Work Description Status Remark/s
-
8/10/2019 Official Testing Checklist
7/31
Name of the Project :
Equipment/Facilities:
Location :
Pump No. : Frequency : Phase : Horsepower Rating :
Voltage : Size of Wire : Breaker Rating :
Check motor.
Check electrical control and terminals.
Check the canvas connector.
Check for vibration.
Check bearings.
Check for lose bolts.
Check airduct hangers.
Check the cleanliness of the area.
L1: L12: Cut-In Pressure:
L2: L23: Cut-Out Pressure:
L3: L31:
L1-Ground : L1-L2:
L2-Ground : L2-L3:
L3-Ground : L3-L1:
Recorded by:
Witnessed and Certified by:
Senior MEPF-In-Charge QA/BTO Head
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING CHECKLIST
Work Description Status Remark/s
SUPPLY BLOWER / EXHAUST BLOWER
Get ampere and voltage reading of the motor.
Test insulation resistance of the motors.
Contractor/Supplier
M / E Engineer CMT Head
-
8/10/2019 Official Testing Checklist
8/31
-
8/10/2019 Official Testing Checklist
9/31
-
8/10/2019 Official Testing Checklist
10/31
-
8/10/2019 Official Testing Checklist
11/31
Name of the Project :
Equipment/Facilities:Location :
Specifications :
Type of Equipment :
Brand :
Model Others :
PUMP and MOTOR - General Condition
Temperature
Sound
Control Panel
Pipes and Gate Valves
Return
Main Drain Valve
Skimmer Line
Check the directional flow arrow in the pipes.
Check the tagging of the installed lighting in the pool.
Check the proper tagging of valves.(normally open /normally close)
FILTER TANKFilter Element
Pressure
Result of Water Test
Pump Room Physical Apperance
Recorded by:
Witnessed and Certified by:
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
Work Description Status Remark/s
SWIMMING POOL
Contractor/Supplier
M / E Engineer CMT Head
Senior MEPF-In-Charge QA/BTO Head
-
8/10/2019 Official Testing Checklist
12/31
-
8/10/2019 Official Testing Checklist
13/31
-
8/10/2019 Official Testing Checklist
14/31
-
8/10/2019 Official Testing Checklist
15/31
Name of the Project :
Equipment/Facilities:
Location :
NORMAL AND EMERGENCY CIRCUIT BREAKER
a.) Check the proper labeling of normal, Emergency and commom circuit breaker.
b.) Check the inside components for possible problem in the transferring like dust and foreign objects.
c.) Check if there is a "mechanical interlock" installed between normal and emergency circuit breaker.
d.) All joints of the busbar and twerminal connections are properly tightened.
e.)Insulation on conductors should be examined for overheating or chafing that could progress into an
insulation failure. Damaged conductors should be replaced.
f.) Mechanisms should be manually operated to ensure proper working condition.
PAD MOUNTED TRANSFORMER
a.) Check the rated capacity of the transformer.
b.) Check the temperature readings and load current. Excessive temperature indicates an overload or
perhaps some interference with the normal means of cooling.
c.) Check the pressure and vacuum gauges.
d.) Check the insulators and insulating surfaces of bushing for trackings, cracks, or chipped skirts, and
the gasket bases for leaks.
LOAD BREAK SWITCH
a.) Check the specification of the vacuum circuit breaker.
b.) Check the arm lever for manual operation.
c.) Check the selector switch of the vacuum circuit breaker. Should have a permanent cover to avoidaccidental contact.
SAFETY CONCERNS
a.) Check the entrance /exit incase emergency problems occurred. Should be free from obstruction.
b.) Fire extinguisher should be present in the area.
c.) All live parts should be covered with appropriate enclosures.
d.) It should never assumed that acircuit breaker is in the open position because the handle mechanism
is in the open position. Always double check for safety.
f.) Lighting system in the area should be properly illuminated.
Recorded by:
Witnessed and Certified by:
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
SWITCHGEAR / POWER ROOM
St
Contractor/Supplier
M / E Engineer
Senior MEPF-In-Charge
PARTICULARS
CMT Head
QA/BTO Head
-
8/10/2019 Official Testing Checklist
16/31
-
8/10/2019 Official Testing Checklist
17/31
-
8/10/2019 Official Testing Checklist
18/31
-
8/10/2019 Official Testing Checklist
19/31
Name of the Project :
Equipment/Facilities:
Location :
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Slot Parking Number
Directional Signage
Emergency Light
Elevetor Parking Lobby
Cleanliness of the area
Location :
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Slot Parking Number
Directional Signage
Emergency Light
Elevetor Parking Lobby
Cleanliness of the area
Location :
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Slot Parking Number
Directional Signage
Emergency Light
Elevetor Parking Lobby
Cleanliness of the area
Recorded by:
Witnessed and Certified by:
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
PARKING AREAS
Site Engineer CMT Head QA/BTO Head
Work Description Status Remark/s
Contractor
Work Description Status Remark/s
Work Description Status Remark/s
-
8/10/2019 Official Testing Checklist
20/31
-
8/10/2019 Official Testing Checklist
21/31
Name of the Project :
Equipment/Facilities:
Location :
Flooring / Stair (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Emergency Light
Fire Exit Door with panic device and door closer
Cleanliness of the area
Location :
Flooring / Stair (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Emergency Light
Fire Exit Door with panic device and door closer
Cleanliness of the area
Location :
Flooring / Stair (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Emergency Light
Fire Exit Door with panic device and door closer
Cleanliness of the area
Recorded by:
Witnessed and Certified by:
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
FIRE EXIT
Items For Inspection Status Remark/s
Contractor
Site Engineer CMT Head QA/BTO Head
Items For Inspection Status Remark/s
Items For Inspection Status Remark/s
-
8/10/2019 Official Testing Checklist
22/31
-
8/10/2019 Official Testing Checklist
23/31
Name of the Project :
Equipment/Facilities:
Location :
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Smoke Detector
Ventilation
Tagging for Panel Board
Harnessing of Wire
Cleanliness of the area
Location :
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Smoke Detector
Ventilation
Tagging for Panel Board
Harnessing of Wire
Cleanliness of the area
Location :
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Smoke Detector
Ventilation
Tagging for Panel Board
Harnessing of Wire
Cleanliness of the area
Recorded by:
Witnessed and Certified by:
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
ELECTRICAL & AUXILLARY ROOM
Items For Inspection Status Remark/s
Contractor
Site Engineer CMT Head QA/BTO Head
Items For Inspection Status Remark/s
Items For Inspection Status Remark/s
-
8/10/2019 Official Testing Checklist
24/31
Name of the Project :
Equipment/Facilities:
Location :
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Smoke Detector
Ventilation
Tagging & Arrow for valves and piping
Tagging for Panel Board
Tagging for pumps and motors
Color coding of pipeCleanliness of the area
Cistern Tank
Float valve
Application of tank epoxy
Clealiness of the tank
Access door w/ provision for lock
Location : ROOFDECK
Flooring (Physical Appearance)
Wall (Physical Appearance)Ceiling (physical Appearance)
Illumination or Lighting System
Tagging for control panel
Tagging for pumps and motors
Cleanliness of the area
Over-head Tank
Electrode
Sight glass
Physical appearance of the tank
Cleanliness (inside) of the tank
Manhole w/ provision for lock
Recorded by:
Witnessed and Certified by:
Site Engineer CMT Head QA/BTO Head
Items For Inspection Status Remark/s
Contractor
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
PUMPS' ROOM
Items For Inspection Status Remark/s
-
8/10/2019 Official Testing Checklist
25/31
-
8/10/2019 Official Testing Checklist
26/31
Name of the Project :
BUILDING AMENITIES
Main Lobby
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Smoke Detector
Sprinkler heads
Ventilation / Air conditioning System
Furniture and decorative items
Equipment
Elevator lobbySignage
Cleanliness of the area
Function Room
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Smoke Detector
Sprinkler heads
Ventilation / Air conditioning SystemFurniture and decorative items
Equipment
Signage
Cleanliness of the area
Recorded by:
Witnessed and Certified by:
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
Items For Inspection Status Remark/s
Contractor
Site Arch't./ Engineer CMT Head QA/BTO Head
Items For Inspection Status Remark/s
-
8/10/2019 Official Testing Checklist
27/31
Name of the Project :
HALLWAYS AND ELEVATOR LOBBIES
ItemsFo
r
Inspectio
n
Flooring,W
all
andCeilin
g
LightingSystem
Convenien
ce
Outlet
Smoke
Detector
s
SprinklerHe
ads
Emergency
Lights
Cleanlinessof
thearea
Others
Gnd Flr
2nd Flr
3rd Flr
4th Flr
5th Flr
6th Flr
7th Flr
8th Flr
9th Flr
10th Flr
11th Flr
12th Flr
14th Flr
15th Flr
16th Flr
17th Flr
18th Flr
19th Flr20th Flr
21st Flr
22nd Flr
23rd Flr
24th Flr
25th Flr
26th Flr
27th Flr
28th Flr
29th Flr
30th Flr
Recorded by:
Witnessed and Certified by:
MEGAWORLD CORPORATION - Quality Control Management
REMARKS
QA/BTO HeadCMT HeadSite Arch't./ Engineer
Contractor
OFFICIAL TESTING/INSPECTION CHECKLIST
-
8/10/2019 Official Testing Checklist
28/31
Name of the Project : Contractor :
nstrument Used: Date :
Model : Time :
Test Voltage : Weather :
Panel Name :
Location :
L - L L - L L - L L - N L - N L - N L - G L - G L - G N - G
Recorded by:
Witnessed and Certified by:
QA/Project-in-chargeM/E Engineer
CMMEPF Engineer
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
Description
INSULATION TEST
Circuit
No.
Test
Time
Reading in Mega-Ohms, MWire Size
-
8/10/2019 Official Testing Checklist
29/31
-
8/10/2019 Official Testing Checklist
30/31
Name of the Project : Contractor :
Instrument Used: Date :
Model : Time :Type of Test : Weather :
Location :
Date of Initial Testing: Date of Final Testing:
Remarks:
Recorded by:
Witnessed and Certified by:
Site Arch't./ Engineer CMT Head QA/BTO Head
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
MECHANICAL LEAK TEST / PLUMBING FLOW TEST
Description Of The Item To Be TestedItemFinal Testing
Remarks
Initial Testing
Remarks
-
8/10/2019 Official Testing Checklist
31/31
Name of the Project : Contractor :
Instrument Used: Date :
Model : Time :Type of Test : Initial Testing Final Testing Weather :
Location :
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
Date of Initial Testing: Date of Final Testing:
Remarks:
Recorded by:
Witnessed and Certified by:
Contractor
Site Arch't./ Engineer CMT Head QA/BTO Head
Design
Req't.Initial Rdg. Final Rdg.
Remarks
MEGAWORLD CORPORATION - Quality Control Management
OFFICIAL TESTING/INSPECTION CHECKLIST
PRESSURE/LEAK TEST
Item Description Of The Item To Be Tested
Pressure in PSI