Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan...

67
Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course

Transcript of Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan...

Page 1: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Module 3Devices and Materials

Traffic Control Plan Development Course

Page 2: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

2

TTC Zone Devices

All shall conform to Specs, MN MUTCD, etc.

Placed where they convey message most effectively

Page 3-1

Page 3: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

3

Traffic Signing

Guide Signs– Guidance through work zones– Should not interfere with necessary

regulatory and warning signs– Common: Advance Notice Guide Sign

• Those with date • Those with exact location

Page 4: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

4

Traffic Signing

Regulatory and Warning Signs– MN MUTCD Parts 2 and 6– Also see handout in Section 3.12

Page 5: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

5

Traffic Signing

Supplemental Sign Plates– Separate demountable plates

• Have proper legend• Proper letters size and series• Properly fastened to sign face• Same retroreflective material as sign face• Sheeting oriented same as the sign face

Page 6: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

6

Traffic Signing

Temporary Sign Covering– Care in placement not to

damage permanent sign– Avoid the use of ropes,

wire fasteners or strapping

– Do not apply tape to the sign sheeting surface

– Do not use paper or plastic covers

Page 7: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

7

Traffic Signing

Sign Panel Overlays– Care in placement to preserve sign

inplaceAdditional Information

– MN MUTCD Part 6F (Later)

Page 8: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

8

Business Signing

Handout from approved new language to be added to TEM Chapter 8

Be sure to check for updates

Page 9: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

9

Proposed TEM 8-5

8-5.02.030 Temporary Business Signing in Work Zones– Construction projects have frequently

caused disruption of traffic patterns in business areas

– Temporary business signs are used to improve• driver guidance• create safer operations• reduce the impact on businesses created

by construction activities and detours

Page 10: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

10

Proposed TEM 8-5

8-5.02.031 Location and Installation of Temporary Business Signs– Shall not interfere with permanent or

construction signing– Hierarchy for sign installation

• Regulatory• warning (permanent and construction)• Guide sign

Page 3-4

Page 11: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

11

Proposed TEM 8-5

– Minimize multiple sign structures– Minimum distances

– Not installed on freeways (are exceptions)

– Funding

Page 12: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

12

Proposed TEM 8-5

8-5.02.032 Temporary Business Signing Plan Guidelines– District to study all local business– Estimate the extent and impact– “traffic sensitive” or “regionally

sensitive”– Work with businesses

Page 13: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

13

Proposed TEM 8-5

8-5.02.033 Types of Temporary Business Signs– Design to guide through easy decisions– Trailblazing that is understandable– First encountered should be generic in

business names

Page 14: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

14

Proposed TEM 8-5

– Business Access Signs

Page 3-6

Page 15: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

15

Proposed TEM 8-5

– Business Service Signs

Page 16: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

16

Proposed TEM 8-5

– Business Identification Signs

Page 17: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

17

Proposed TEM 8-5

– Temporary Business Guide Signs

Page 3-10

Page 18: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

18

Business Impact Mitigation

Purpose to:– Involve businesses more in the project

development process– Keep businesses informed regarding

project issues– Help businesses understand a project

and its potential impacts– Mitigate construction impacts to

businesses as feasible (Includes reducing and, if practical, preventing negative impacts to businesses)

Page 19: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

19

Business Impact Mitigation

Threshold Criteria– Substantial business impacts?– If Yes

• Designate a project Business Liaison• Use the Business Impact Mitigation

Checklist• Follow the guidelines in the Guidelines

section

Page 20: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

20

Business Impact Mitigation

Responsibilities of Business Liaison– Consult with affected businesses

before and during construction– Investigate means of mitigating project

impacts to businesses– Provide information to the businesses

before and during construction

Page 21: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

21

Business Impact Mitigation

Guidelines– Use the Business Impact Mitigation

Checklist– Identify Businesses

• Early in Scoping, identify small businesses in the project area (not just within the project termini)

• List potentially-affected businesses and their contact information

Page 22: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

22

Business Impact Mitigation

Guidelines– Contact Business Owners

• Provide information on the project in written format

• Provide contact information for the Business Liaison

• Work with businesses to identify potential concerns, and determine preferred methods for future project communications

Page 23: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

23

Business Impact Mitigation

Guidelines– Identify Potential Impacts

• Determine the resources needed to identify and evaluate potential impacts

• Does the project have unique characteristics?

• businesses in the area have any unique issues?

• Is there a need for specific expertise? • Does the project scale warrant extra

resources?

Page 24: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

24

Business Impact Mitigation

Guidelines– Contact Local Governments

• Consult with city and county governments to identify potential impacts and discuss potential mitigation measures

– Contact MN Dept. of Employment and Economic Development• Assistance in determining a list of

business-development organizations that may offer resources to affected businesses

Page 25: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

25

Pavement Markings in TTC

Definitions– Final Pavement Marking

• The pavement marking that will be installed until the next time the pavement marking is scheduled to be renewed (typically one or more years). Final markings would include full length centerline markings, edgelines and messages

Page 3-17

Page 26: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

26

Pavement Markings in TTC

Definitions– Temporary Pavement Marking

• the pavement marking that will be installed in staged long-term temporary traffic control zones

• The temporary markings will either be removed or covered with another pavement surface prior to the application of the final markings

• The temporary markings would include full length centerline markings, edgelines and messages. All temporary pavement markings shall be in conformance Part 6 and Part 3 of the MN MUTCD

Page 27: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

27

Pavement Markings in TTC

Definitions– Interim Pavement Marking

• any pavement markings that are not the final marking or is temporarily placed for staging purposes

– Temporary Raised Pavement Marker (TRPM)• retroreflective pavement markers applied

to the roadway surface which maintain retroreflective properties during wet weather conditions

• TRPMs are used alone to substitute for pavement marking segments or to provide wet weather capabilities to other pavement markings

Page 28: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

28

Pavement Markings in TTC

Interim Marking Guidelines– Projects greater than 1.25 miles in

length• use the same cycle length as final

pavement markings• minimum of 2 feet in length

– Projects >350 feet, < 1-1/4 miles in length• Match the cycle length on either end• See Figure 6F-8a and 8b of MN MUTCD

Page 29: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

29

Pavement Markings in TTC

Temporary Pavement Marking Guidelines– Give traffic clear path to follow– Typically, markings for staging are

temporary– Of pavement to be overlaid or

reconstructed, temp tap or marking paint, or epoxy can be used

Page 30: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

30

Pavement Markings in TTC

Wet Retro-reflective Properties– Retains retroreflectivity, presence, and color

when wet or submerged in water– Consist of

• Solid temporary pavement marking tape lines supplemented with TRPMs (temporary raised pavement markings) or

• Solid temporary wet retroreflective pavement marking tape lines or

• Solid pavement marking paint or epoxy lines supplemented with TRPMs (temporary raised pavement markings) or

• Solid wet retroreflective pavement marking paint or epoxy lines

Page 3-19

Page 31: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

31

Pavement Markings in TTC

Final Pavement Markings– Refer to TEM Chapter 7

Temporary Raised Pavement Markings– May be used to simulate solid lines– See Standards for TRPMS on APL/QPL

Page 32: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

32

Pavement Markings in TTC

Temp. Pavement Markings Tech Memo– TM 08-10-T-02– Provide an appropriate pavement

marking on all highways, 365 days per year

– An appropriate pavement marking is one that meets or exceeds the standards defined in the MN MUTCD

– During winter weather events, pavement markings should provide presence after pavement is clear of snow and ice

Page 33: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

33

Pavement Markings in TTC

Pavement Marking Removal Scarring– Removed marking can be confusing– Overly aggressive techniques can

leave scars

Page 34: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

34

Pavement Markings in TTC

Spec Book on Pavement Marking Removal

Page 35: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

35

Pavement Markings in TTC

Special Provisions

Page 36: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

36

Channelizing Devices

Classified into 3 types– Type A– Type B– Type C

Page 37: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

37

Channelizing Devices

Quick Reference Chart

Page 38: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Temporary Traffic Barriers

A number of temporary barriers are used for temporary traffic control– www.dot.state.mn.us/products/tempora

rytrafficcontrol/temporarybarriers.html

38

Page 39: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Temporary Traffic Barriers

Proper temporary barrier system selection and design involves the consideration of a number of specific factors– NCHRP Report 350 – Duration and ease of installation,

maintenance, and removal– Exposure and safety risks for workers and

road users– Expected frequency and severity of impacts – Available space for barrier installation and

lateral deflection 39

Page 40: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Temporary Traffic Barriers

MN MUTCD Section 6F.85, five primary functions – To keep motor vehicle traffic from entering

work areas, such as excavations or material storage sites;

– To separate workers, bicyclists, and pedestrians from motor vehicle traffic;

– To separate opposing directions of motor vehicle traffic; and

– To separate motor vehicle traffic, bicyclists, and pedestrians from the work area such as false work for bridges and other exposed objects; and

– To protect drop-offs of greater than 12 inches on longer term projects when a suitable buffer lane cannot be provided

40

Page 41: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Temporary Traffic Barriers

Crashworthiness– Crashworthy

• Characteristic of roadside devices that have been successfully crash tested in accordance with a national standard such as the National Cooperative Highway Research Program Report 350, “Recommended Procedures for the Safety Performance Evaluation of Highway Features

• All temporary traffic control devices shall be crashworthy

• FHWA requires successful crash testing in accordance with the NCHRP Report 350 or AASHTO MASH

41

Page 42: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Temporary Traffic Barriers

Crashworthiness– Key Points of MASH

• All new testing will be done following MASH evaluation techniques

• Hardware accepted under NCHRP Report 350 is appropriate for replacement and new installation

– Retesting is not required

• As of January 1, 2011, all new products must be tested using MASH crash test criteria for use on the National Highway System (NHS)

42

Page 43: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Temporary Traffic Barriers

Anchoring– To control or eliminate lateral

deflection close to pavement edge drop-offs and in other situations where deflection space is limited, barrier sections may be anchored to the pavement

– Bridge Department has a memo, “Interim Guidance for Installation of Temporary Barriers on Bridges and Approach Panels”

43

Page 44: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

44

PPCB

Majority of temporary barriers used in Minnesota are portable precast concrete barriers

MN MUTCD for Info

Page 45: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Moveable Barrier

Source: Barrier Systems Inc.

45

Page 46: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy Portable Non-Concrete

BarrierPPCB is the most widely used

positive protection device in use today

PPCB does have a low initial cost and are readily available

They also are quite heavy and creates issues when required on a bridge project and during transport

Other barrier systems (such as steel) are available

Generally higher upfront cost46

Page 47: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Water Filled Barrier

Water-filled barrier in APLBarriers shall be certified by the

FHWA as meeting or exceeding the requirements of the NCHRP 350

The installer shall install according to the manufacturer's installation instructions

47

Page 48: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Barrier End Treatments

Upstream leading ends that are present shall be appropriately flared or protected with properly installed and maintained crashworthy cushions

48

Page 49: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Barrier End Treatments

Crash cushions – systems that mitigate the effects of errant

vehicles that strike obstacles, either by • smoothly decelerating the vehicle to a stop when

hit head-on• redirecting the errant vehicle

A typical barrier end treatment can be found at, – http

://www.dot.state.mn.us/trafficeng/workzone/doc/PCBendtreatment.pdf

49

Page 50: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy Truck Mounted

AttenuatorsEnergy-absorbing devices attached

to the rear of shadow trailers or trucks

When used, the shadow vehicle with the attenuator is located in advance of the work area, workers, or equipment to reduce the severity of rear-end crashes from errant vehicles

Vehicle is positive protection for the workers and the attenuator is positive protection for the driver

50

Page 51: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

51

Surface Mounted (Centerline) DelineatorsDevices that may be used as center

lane dividers

Page 3-29

Page 52: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

52

Portable Changeable Message Signs (PCMS)

Page 53: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Portable Signal Sytems

Portable Traffic Control Signals are either Trailer Mounted or Pedestal Mounted

Approved products and specifications for portable signal systems can be found on the APL

53

Page 54: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy Automated Flagging Assist

DeviceEnable the operator to be positioned

out of the lane of traffic Capable of displaying a STOP

message followed by a SLOW message without the need for a flagger

Can be remotely operated by a one operator

Single operator may only be used on roadways with unobstructed sight lines, less than 1500 ADT, and less than 1000 feet between the devices 54

Page 55: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

55

Flashing Arrow Boards

Part 6 of MN MUTCDSee APL/QPL

Page 56: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

56

Crash Cushions and AttenuatorsNon-Redirective (Gating)Redirective (Non-Gating)

Page 57: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

57

Ballast

Sandbags are the most common ballast

Should be constructed of a material which will allow the bag to break and disperse

Other ballasting systems may be used on some temporary traffic control devices provided they are crashworthy.

Page 58: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

58

Approved/Qualified Products (APL/QPL)list of approved products

Page 59: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

59

MN MUTCD

6F.1 Types of Devices6F.2 General Characteristics of

Signs6F.3 Sign Placement

Page 60: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

60

MN MUTCD

Page 61: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

61

MN MUTCD

Page 62: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

62

MN MUTCD

6F.4 Sign Maintenance6F.5 Regulatory Sign Authority6F.6 Regulatory Sign Design6F.7 Regulatory Sign ApplicationsRefer to other section in MN MUTCD

Page 63: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

63

MN MUTCD

Type A Channelizing Devices– Figure 6F-7

Page 64: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

64

MN MUTCD

6F.77 Pavement Markings– Figure 6F-8a

Page 65: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

65

MN MUTCD

Page 66: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

66

MN MUTCD

6F.85 Temporary Traffic Barriers

Page 67: Office of Traffic, Safety and Technology Module 3 Devices and Materials Traffic Control Plan Development Course.

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

67

MN MUTCD

6F.86 Crash Cushions6F.87 Rumble Strips6F.88 Screens