OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji...

18
From To 1 2 3 5 6 7 8 9 10 11 12 13 14 1 Ajmer Arain Distt Dn Ajmer SHW Sarwar Arain Kishangarh road 11/0 to 15/0 M/S Balaji Const 11 @ 0 15/0 4.00 07/23/2012 07/22/2017 2 Ajmer Arain Distt Dn Ajmer PMGSY A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain - Kishangarh road Km. 32/0 o 35/0 M/S Balaji Const 32/0 35/0 3.00 10/13/2013 10/12/2018 4 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain - Kishangarh road Km. 49/0 to 54/0 M/S Balaji Const 49/0 54/0 5.00 10/13/2013 10/12/2018 5 Ajmer Arain Distt Dn Ajmer PMGSY Lamba - Barwas to Janiyon ki Dhani Balaji Construction Jodhpur 0/0 3/0 3.00 2-9-2013. 1-9-2018. 6 Ajmer Arain Distt Dn Ajmer RIDF 19 L/R Barol Chouki to Barol (VR-742) Km 0/0 to 1/800 M/S Ram Swaroop Jat 0 @0 1 @800 1.80 12/03/2013 12/02/2018 Total 19.80 1 Ajmer Bhinai Kekri 13 FC VR - (64) Badali to Ghnaheda 0/0 to 3/0 M/s H.S Mehta 0/0 3 @ 0 3.00 07/28/2012 07/27/2017 2 Ajmer Bhinai Kekri RIDF 18 Nagola to Balapura Km 0/0 to 2/0 M/s Ram Swaroop Jat Kotri 0 @ 0 2 @0 2.00 04/16/2013 04/15/2018 3 Ajmer Bhinai Kekri RIDF 18 Kanai Kalan to Laxmipura Km 0/00 to 1/750 M/s Ram Swaroop Jat Kotri 0 @0 1 @750 1.75 04/16/2013 04/15/2018 4 Ajmer Bhinai Kekri RIDF 18 Chapaneri to Udaipurkhera km 0/0 to 2/500 M/s Ram Swaroop Jat Kotri 0 @0 2 @500 2.50 04/16/2013 04/15/2018 5 Ajmer Bhinai Kekri RIDF 18 Bhinai-Telara to Pratappura Km 0/0 to 1/500 M/s Ram Swaroop Jat Kotri 0 @0 1 @500 1.50 04/16/2013 04/15/2018 Date of DLP Ending Remarks Scheme Division OFFICE OF THE SUPERITENDING ENGINEER P.W.D CIRCLE AJMER 06/14/2017 Block wise Details of DLP Roads in District Name of Agency Total DLP Length Chainage under Actual Date of Completion S.no Name of roads District Name of Block

Transcript of OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji...

Page 1: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From To

1 2 3 5 6 7 8 9 10 11 12 13 14

1 Ajmer Arain Distt Dn Ajmer

SHW Sarwar Arain Kishangarh road 11/0 to 15/0 M/S Balaji Const 11 @ 0 15/0 4.00 07/23/2012 07/22/2017

2 Ajmer Arain Distt Dn Ajmer PMGSY A/R to Dand ki Dhani Km.

0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018

3 Ajmer Arain Distt Dn Ajmer SHW

Sarwar - Arain - Kishangarh road Km. 32/0

o 35/0M/S Balaji Const 32/0 35/0 3.00 10/13/2013 10/12/2018

4 Ajmer Arain Distt Dn Ajmer SHW

Sarwar - Arain - Kishangarh road Km. 49/0

to 54/0M/S Balaji Const 49/0 54/0 5.00 10/13/2013 10/12/2018

5 Ajmer Arain Distt Dn Ajmer PMGSY Lamba - Barwas to Janiyon

ki Dhani Balaji Construction

Jodhpur 0/0 3/0 3.00 2-9-2013. 1-9-2018.

6 Ajmer Arain Distt Dn Ajmer RIDF 19 L/R Barol Chouki to Barol

(VR-742) Km 0/0 to 1/800M/S Ram Swaroop

Jat 0 @0 1 @800 1.80 12/03/2013 12/02/2018

Total 19.80

1 Ajmer Bhinai Kekri13 FC VR -

(64)Badali to Ghnaheda 0/0 to

3/0 M/s H.S Mehta 0/0 3 @ 0 3.00 07/28/2012 07/27/2017

2 Ajmer Bhinai Kekri RIDF 18 Nagola to Balapura Km 0/0 to 2/0

M/s Ram Swaroop Jat Kotri 0 @ 0 2 @0 2.00 04/16/2013 04/15/2018

3 Ajmer Bhinai Kekri RIDF 18 Kanai Kalan to Laxmipura Km 0/00 to 1/750

M/s Ram Swaroop Jat Kotri 0 @0 1 @750 1.75 04/16/2013 04/15/2018

4 Ajmer Bhinai Kekri RIDF 18 Chapaneri to Udaipurkhera km 0/0 to 2/500

M/s Ram Swaroop Jat Kotri 0 @0 2 @500 2.50 04/16/2013 04/15/2018

5 Ajmer Bhinai Kekri RIDF 18 Bhinai-Telara to Pratappura Km 0/0 to 1/500

M/s Ram Swaroop Jat Kotri 0 @0 1 @500 1.50 04/16/2013 04/15/2018

Date of DLP Ending RemarksSchemeDivision

OFFICE OF THE SUPERITENDING ENGINEER P.W.D CIRCLE AJMER06/14/2017

Block wise Details of DLP Roads in District

Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

Page 2: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

6 Ajmer Bhinai Kekri RIDF 18 Nagola Badla road to Sapni Khera Km 0/0 to 2/0

M/s Ram Swaroop Jat Kotri 0 @0 2 @0 2.00 04/16/2013 04/15/2018

7 Ajmer Bhinai Kekri RIDF 19L/R Boobkiya to Bijainagar road (VR-675) Km 2/0 to

3/500

M/s Ram Swaroop Jat Kotri 2 @0 3 @500 1.50 12/03/2013 12/02/2018

8 Ajmer Bhinai Kekri RIDF 19L/R Boobkiya to Bijainagar road (VR-675) Km 0/0 to

2/0

M/s Ram Swaroop Jat Kotri 0 @0 2 @0 2.00 12/03/2013 12/02/2018

9 Ajmer Bhinai Kekri RIDF 19 L/R Re Ghati to Heerapura (VR-716) Km 0/0 to 2/0

M/s Ram Swaroop Jat Kotri 0 @0 2 @0 2.00 12/03/2013 12/02/2018

10 Ajmer Bhinai Kekri RIDF 19 L/R Badla kala Talab (VR-753) Km 0/0 to 4/750

M/s Ram Swaroop Jat Kotri 0 @0 4 @750 4.75 12/03/2013 12/02/2018

11 Ajmer Bhinai Beawar Kekri CRF

Widening & Strengthning of

Bandanwara Bhinai Nagola (MDR-74)

M/s H.S Mehta 0/0 16/00 16.00 06/16/2012 06/17/2017

Total 39.00

1 Ajmer Jawaja Beawar PMGSY Sangarwas to Mata Ka Than

M/S H.S Mehta Ajmer 0/0 3/0 3.00 02/04/2013 12/03/2018

2 Ajmer Jawaja Beawar PMGSY Malanton ki Ber to Saknia Beri

M/S H.S Mehta Ajmer 0/0 3/30 3.30 02/04/2013 12/03/2018

3 Ajmer Jawaja Beawar PMGSY Kotra Kabra road Naka ka Badia

M/S H.S Mehta Ajmer 0/0 3/0 3.00 02/04/2013 12/03/2018

4 Ajmer Jawaja Beawar PMGSY NH-08 to Beej Godam ka Badia

M/S H.S Mehta Ajmer 0/0 3/60 3.60 02/04/2013 12/03/2018

5 Ajmer Jawaja Beawar PMGSY Jassakhera Barakhan road to Adawala

M/S H.S Mehta Ajmer 0/0 3/0 3.00 02/04/2013 12/03/2018

6 Ajmer Jawaja Beawar PMGSY NH-08(Dadola) to Kheriya Khorat

M/S H.S Mehta Ajmer 0/0 2/55 2.55 02/04/2013 12/03/2018

7 Ajmer Jawaja Beawar RIDF XVII ML

Rampura Duda Link road to Rohidakhera

Ramesh Jain Beawar 0/0 1/70 1.70 20.03.2013 19.03.2018

8 Ajmer Jawaja Beawar RIDF XVII ML

Kotra Kabra road km. 11 to Thakarwas

Ramesh Jain Beawar

0/0 1/10 1.10 20.03.2013 19.03.2018

Page 3: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

9 Ajmer Jawaja Beawar RIDF XVII ML

Surdiya to Jetgarh Bamaniya

Ramesh Jain Beawar 0/0 2/30 2.30 20.03.2013 19.03.2018

10 Ajmer Jawaja Beawar RIDF XVII ML

Badia Mota to Kuneja upto Pali border

Ramesh Jain Beawar 0/0 2/90 2.90 20.03.2013 19.03.2018

11 Ajmer Jawaja Beawar RIDF XVIII ML

Thooni Thak to Kalatkhera via Mataji ka Mandir Kishanpura

Ramesh Jain Beawar 0/0 2/20 2.20 03.06.2013 02.06.2018

12 Ajmer Jawaja Beawar RIDF XVIII ML

NH 8 to Indra Colony (Surajpura) Rawatmal

Lassani road

Ramesh Jain Beawar 0/0 1/20 1.20 03.06.2013 02.06.2018

13 Ajmer Jawaja Beawar RIDF XVIII ML

Bhim Banjari road to Barakhera to

Barakhan road

Ramesh Jain Beawar 0/0 1/10 1.10 03.06.2013 02.06.2018

14 Ajmer Jawaja Beawar RIDF XVIII ML

Old NH 8 to NH 14 via Choudhary Colony

(G.P.Noondri mendratan)

Ramesh Jain Beawar 0/0 .1/40 1.40 03.06.2013 02.06.2018

15 Ajmer Jawaja Beawar V.C RIDF XVII

A/R to Rehaman Khera from Gola

Pisangan Road (Km 9) Km 0/0 to 1/200

M/S Savinder Singh Beawar 0/0 0/81 0.81 05/21/2013 05/20/2018

16 Ajmer Jawaja Beawar V.C RIDF XVII

A/R to Roopaheli via Ramgarh Jhoontha

from Beawar Bijainagar Road (Km

7) Km 0/0 to 4/00

M/S Savinder Singh Beawar 0/0 2/71 2.71 05/21/2013 05/20/2018

17 Ajmer Jawaja Beawar V.C RIDF XVII

A/R to Ratanpura Jhoontha from

Pakhariawas road Km 0/0 to 2/500

M/S Savinder Singh Beawar 0/0 1/69 1.69 05/21/2013 05/20/2018

18 Ajmer Jawaja Beawar V.C RIDF XVIII

A/R to Bassi from Golneemri Siliberi

road Km 0/0 to 1/00

M/S Sh Hari Singh Rawat

Beawar0/0 0/680 0.68 02/06/2013 02/05/2018

Page 4: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

19 Ajmer Jawaja Beawar V.C RIDF XVIII

A/R to Jalia II Bas Lala from Bazora Chowraha Jalia

RoopawasRoad (Km 3) Km 0/0 to 1/500

M/S Sh Hari Singh Rawat

Beawar0/0 1/020 1.02 02/06/2013 02/05/2018

20 Ajmer Jawaja Beawar V.C RIDF XVIII

A/R to Jalia II Bas Durga from Rawatmal Chiman Nagar Badia

KM 0/0 to 2/00

M/S Sh Hari Singh Rawat

Beawar0/0 1/35 1.35 02/06/2013 02/05/2018

21 Ajmer Jawaja Beawar V.C RIDF XVIII

A/R to Banewari from NH-14 to Jalia Road (Km 1) Km 0/0 to 1/00

M/S Sh Hari Singh Rawat

Beawar0/0 0/680 0.68 02/06/2013 02/05/2018

22 Ajmer Jawaja Beawar V.C RIDF XVIII

A/R to Daulatpura Balayan from NH 08 (Km 49) Km 0/00 to

1/400

M/S Sh Hari Singh Rawat

Beawar0/0 0/950 0.95 02/06/2013 02/05/2018

23 Ajmer Jawaja Beawar SHW Plan 2012-13

Beawar Nimbijodha via Pisangon

Govindgarh Tahla Bherunda Degana Khatu road (SH-59)

M/s Nakoda Const Co. Ajmer 5/00 6/00 0.50 07/13/2013 07/12/2018

24 Ajmer Jawaja Beawar SHW Plan 2012-13

Beawar Nimbijodha via Pisangon

Govindgarh Ladpura Tahla Bherunda

Degana Khatu road (SH-59)

Sh Ashok Agerwal Beawar 2/0 15/0 5.00 06/18/2013 06/17/2018

25 Ajmer Jawaja Beawar TFC 11-12 Haripur to Beawar via Asind

M/S Savinder Singh Beawar 97/0 103/40

0 6.70 12/12/2012 12/11/2017

26 Ajmer Jawaja Beawar TFC 11-12 Haripur to Beawar via Asind

M/S Savinder Singh Beawar 0/0 2/800 2.80 12/12/2012 12/11/2017

Page 5: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

27 Ajmer Jawaja Beawar TFC 11-12 Barakhan to Dudhaleshwar

M/S Savinder Singh Beawar 10/0 14/00 4.00 12/12/2012 12/11/2017

28 Ajmer Jawaja Beawar TFC 11-12 Barakhan to Totgarh M/S Savinder Singh Beawar 6/0 8/00 2.00 12/12/2012 12/11/2017

29 Ajmer Jawaja Beawar TFC 11-12 Beawar Chang Bilata M/S Savinder Singh Beawar 2/0 4/00 2.00 12/12/2012 12/11/2017

30 Ajmer Jawaja Beawar TFC 11-12 Beawar khass to Sarmaliya

M/S Savinder Singh Beawar 2/00 3/00 1.00 12/12/2012 12/11/2017

31 Ajmer Jawaja Beawar TFC 11-12 Beawar Kotra Kabra M/S Savinder Singh Beawar 16/00 22/500 6.50 12/12/2012 12/11/2017

32 Ajmer Jawaja Beawar TFC 12-13Beawar khass to

Saradhna Mines 0/0 to 2/0

M/S Savinder Singh Beawar 0/0 2/00 2.00 02.07.2013 01.07.2018

33 Ajmer Jawaja Beawar TFC 12-13 NH 8 to Delwara road km.0/0 to 1/0

M/S Savinder Singh Beawar 0/0 1/00 1.00 02.07.2013 01.07.2018

34 Ajmer Jawaja Beawar TFC 12-13 Dewata Lotiyana Badkochra 0/0 to 2/0

M/S Savinder Singh Beawar 0/0 2/00 2.00 02.07.2013 01.07.2018

35 Ajmer Jawaja Beawar TFC 12-13Beawar city road to

Old NH 8 km. 56/0 to 58/0

M/S Savinder Singh Beawar 0/0 2/00 2.00 02.07.2013 01.07.2018

36 Ajmer Jawaja Beawar RRSMP Arnali Palri road to Samapa

M/S Giriraj Const Bijaynagar 0/0 0/73 0.73 04/14/2015 04/13/2020

37 Ajmer Jawaja Beawar RRSMP Makereda road to Rampura Mewatiyan

M/S Giriraj Const Bijaynagar 0/0 2/100 2.10 04/14/2015 04/13/2020

38 Ajmer Jawaja Beawar RRSMP Beawar Bijainagar road to Kaliyawas

M/S Giriraj Const Bijaynagar

0/0 0/700 0.70 04/14/2015 04/13/2020

39 Ajmer Jawaja Beawar RRSMP A/R to Gogela M/S Giriraj Const Bijaynagar 0/0 1/280 1.28 04/14/2015 04/13/2020

40 Ajmer Jawaja Beawar CRF

Widening & Strengthning of

Beawar Goyala Via Masuda Bandanwara (MDR-57) km. 0/0 to

43/0)

M/s SPC Infra Struction Limited

Jaipur0/0 6/00 6.00 12/16/2012 12/15/2017

Page 6: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

41 Ajmer Jawaja Beawar N.P. RIDF-XX

Bamanheda Gafa Raod M/s Savendra Jeet Singh Beawar

0/0 10/750 10.75 17.10.15. 16.10.18

42 Ajmer Jawaja Beawar N.P. RIDF-XX

Bhagwanpura Ranita M/s Savendra Jeet Singh Beawar

0/0 1/450 1.45 17.10.15. 16.10.18

43 Ajmer Jawaja Beawar N.P. RIDF-XX

Barakher - Rawali to Satukhera (VR-670)

M/s Savendra Jeet Singh Beawar

0/0 1/200 1.20 17.10.15. 16.10.18

44 Ajmer Jawaja Beawar N.P. RIDF-XX

NH-8 Bhuriyakhera Bhagwanpura (VR-599)

M/s Savendra Jeet Singh Beawar

0/0 3/0 3.00 17.10.15. 16.10.18

45 Ajmer Jawaja Beawar N.P. RIDF-XX

Tadgarh to Malanto ki Ber (VR-643)

M/s Savendra Jeet Singh Beawar

0/0 1/600 1.60 17.10.15. 16.10.18

46 Ajmer Jawaja Beawar N.P. RIDF-XX

L/R Surajpura Jethgarh Bamaniya

M/s Savendra Jeet Singh Beawar

0/0 3/0 3.00 17.10.15. 16.10.18

47 Ajmer Jawaja Beawar N.P. RIDF-XX

Gohana to Raitakhera (VR-579)

M/s Savendra Jeet Singh Beawar

0/0 2/0 2.00 17.10.15. 16.10.18

48 Ajmer Jawaja Beawar N.P. RIDF-XX

L/R Tadgarh to Khera Looneta

M/s Savendra Jeet Singh Beawar

0/0 2/450 2.45 17.10.15. 16.10.18

49 Jawaja Beawar N.P. RIDF-XX

Bajora Chouraha to Kamor ki Beri (VR-644)

M/s Savendra Jeet Singh Beawar

0/0 3/0 3.00 17.10.15. 16.10.18

50Ajmer

Jawaja Beawar N.P. RIDF-

XXBeawar - Ajagar Baba to Devata Chouraha Kotra Kabra

M/s Balaji Construction Company Ajmer

0/0 10/0 10.00 28.1.16 29.1.19.

51 Ajmer Jawaja Beawar N.P. RIDF-XX

Tadgarh to Malanto ki Beri M/s Laxman Singh Solanki Pali

0/0 1/925 1.92 25-6-15. 25-6-18.

52Ajmer

Jawaja Beawar N.P. RIDF-

XXBhim Banjari Road M/s Laxman Singh

Solanki Pali 5/0 7/0 2.00 25-6-15. 25-6-18.

53 Ajmer Jawaja Beawar N.P. RIDF-XX

Kabra to Char Khamba Kabra Raod

M/s Laxman Singh Solanki Pali

0/0 2/0 2.00 25-6-15. 25-6-18.

54 Ajmer Jawaja Beawar GGP-I Beawar Kabra raod to Seliberi

M/s Laxman Singh Solanki Pali

0/0 0/500 0.50 25-6-15. 25-6-18.

55Ajmer

Jawaja Beawar GGP-I Kotra- Kabra road

Kishanpura Himatpura road M/s Laxman Singh Solanki Pali

0/0 1/0 1.00 25-6-15. 25-6-18.

56Ajmer

Jawaja Beawar GGP-I Kotra - Kabra road to

Durgawas M/s Laxman Singh Solanki Pali

0/0 2/0 2.00 25-6-15. 25-6-18.

Page 7: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

57

Ajmer

Jawaja

Beawar GGP-I NH-8 to Sarvina M/s Laxman Singh Solanki Pali

0/0 2/0 2.00 25-6-15. 25-6-18.

58 Ajmer Jawaja Beawar GGP-I Beawar - Kotra - Kabra road to Jaliya - I

M/s Laxman Singh Solanki Pali

2/0 4/0 2.00 25-6-15. 25-6-18.

59 Ajmer Jawaja Beawar RIDF-XXI Barakhan Tadgarh road Ramesh Jain Beawar 2/0 10/0 8.00 6-8-16. 5-8-19.

60 Ajmer Jawaja Beawar RIDF-XXI Devata - Lotiyana - Badgochra

Ramesh Jain Beawar 7/0 11/0 4.00 6-8-16. 5-8-19.

61 Ajmer Jawaja Beawar RIDF XVIII ML

Balaikhera to Raitakhera

Ramesh Jain Beawar 0/0 2/10 2.10 03.06.2013 02.06.2018

Total 156.52

1 Ajmer Kekri Kekri13 th FC- VR ( 64)

Molkiya to Salari road M/S Choudhary Const.3/0 .6/0 3.00 04/23/2013 04/22/2018

2 Ajmer Kekri Kekri13 th FC- VR ( 64)

Sawar Laxmipura Chitiyaws road km 3/0 to

6/0M/S Choudhary Const

.3/0 .6/0 3.00 04/23/2013 04/22/2018

3 Ajmer Kekri Kekri RIDF 18 Kekri to Manda road Km 0/0 to 1/100

M/s Ramswaroop Jat Kotri 0 @ 0 1 @100 1.10 04/16/2013 04/15/2018

4 Ajmer Kekri Kekri RIDF 18 Devgaon to Dholai road Km 0/3 to 3/0

M/s Ramswaroop Jat Kotri 0 @0 3 @0 3.00 04/16/2013 04/15/2018

5 Ajmer Kekri Kekri RIDF 18 Junia to Ambapura road Km 0/0 to 3/0

M/s Ramswaroop Jat Kotri 0 @0 3 @0 3.00 04/16/2013 04/15/2018

6 Ajmer Kekri Kekri RIDF 18Sawar-Pander road to

Motalav road Km 0 /0 to 1/500

M/s Ramswaroop Jat Kotri 0 @0 1 @50 1.50 04/16/2013 04/15/2018

7 Ajmer Kekri Kekri RIDF 18 Faarkiya to Devpura road Km 0/0 to 1/500

M/s Ramswaroop Jat Kotri 0 @0 1 @500 1.50 04/16/2013 04/15/2018

8 Ajmer Kekri Kekri RIDF 18 Gulgaon to Sankariya road Km 0/0 to 4/0

M/s Ram Swaroop Jat Kotri 0 @0 4 @0 4.00 03/16/2013 03/15/2018

9 Ajmer Kekri Kekri RIDF 19L/R Kushayata Gordha

Peeplaj to Bisundani road km 0/0 to 0/500

M/s Ram Swaroop Jat Kotri 0 @0 0 @50 0.50 12/15/2013 12/14/2018

10 Ajmer Kekri Kekri RIDF 19L/R Kekri Baghera road to Nayagaon Kumawato ka

Km 0/0 to 2/0

M/s Ram Swaroop Jat Kotri 0 @0 2 @0 2.00 12/15/2013 12/14/2018

Page 8: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

11 Ajmer Kekri Kekri RIDF 19 L/R Molkiya to Amli (Juniya) Km 0/0 to 3/0

M/s Ram Swaroop Jat Kotri 0 @0 3 @0 3.00 12/15/2013 12/14/2018

12 Ajmer Kekri Kekri RIDF 19 L/R Manda to Kekri road (VR-727) Km 0/0 to 1/00

M/s Ram Swaroop Jat Kotri 0 @0 1 @0 1.00 12/15/2013 12/14/2018

13 Ajmer Kekri Kekri RIDF 19L/R Mavdakaln to

Mankhand road (VR-723) Km 0/0 to 1/500

M/s Ram Swaroop Jat Kotri 0 @0 1 @500 1.50 12/15/2013 12/14/2018

14 Ajmer Kekri Kekri RIDF 19 L/R Surajpura to Ajmer road

M/s Ram Swaroop Jat Kotri 0 @0 1 @200 1.20 12/03/2013 12/02/2018

15 Ajmer Kekri Kekri RIDF 19L/R Sarwar Bus Stand to Sub Yard 0/800 to 1/300

(VR-731

M/s Ram Swaroop Jat Kotri 0 @800 1 @300 0.50 12/03/2013 12/02/2018

16 Ajmer Kekri Kekri RIDF 19L/R Sarwar Bus Stand to

Sub Yard Km 0/0 to 0/800 (VR-731)

M/s Ram Swaroop Jat Kotri 0 @0 0 @800 0.80 12/03/2013 12/02/2018

17

Ajmer Kekri Kekri RIDF-XVIII Rehabilitation of Upgradation of Beawar - Masuda- Bandanwara Goyla -Shergarh - Birla Syara Juniya Karnoj Baghera (MDR-057)

M/s Balaji Constrution

109/0 124/0 15.00 25-3-13. 24-3-18.

18 Ajmer Kekri Kekri RIDF-XIX L/R Rajpura to Tankawas M/s Ram Swaroop Jat Kotari

0/0 4/0 4.00 15-12-13. 14-12-18.

19 Ajmer Kekri Kekri RIDF-XIX L/R Rajpura to Tankawas M/s Ram Swaroop Jat Kotari

4/0 6/0 2.00 15-12-13. 14-12-18.

Total 51.60

1 Ajmer Masuda Beawar PMGSY X

New Connectivity

Badi to Khera M/S Balaji Const 0/0 0/720 0.72 30.11.2013 29.11.2018

2 Ajmer Masuda Beawar PMGSY X

New Connectivity

Kharwa Kashipura to Guwaria M/S Balaji Const 0/0 0/90 0.90 30.11.2013 29.11.2018

3 Ajmer Masuda Beawar PMGSY X

New Connectivity

Meriya Magri to Doulatpura M/S Balaji Const 0/0 1/30 1.30 30.11.2013 29.11.2018

Page 9: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

4 Ajmer Masuda Beawar PMGSY X

New Connectivity

Kirap to Pokhron ka Badia M/S Balaji Const 0/0 2/00 2.00 30.11.2013 29.11.2018

5 Ajmer Masuda Beawar PMGSY X

New Connectivity

Jamola Mohanpura to Devmagari M/S Balaji Const 0/0 1/00 1.00 30.11.2013 29.11.2018

6 Ajmer Masuda Beawar PMGSY X

New Connectivity

Peeplaj Kanakhera to Kundiya M/S Balaji Const 0/0 1/05 1.05 30.11.2013 29.11.2018

7 Ajmer Masuda Beawar PMGSY X

New Connectivity

MDR-57 km. 28 to Kishanpura M/S Balaji Const 0/0 2/60 2.60 30.11.2013 29.11.2018

8 Ajmer Masuda Beawar PMGSY X

New Connectivity

MDR-57 km. 35 to Naya Goanv M/S Balaji Const 0/0 1/80 1.80 30.11.2013 29.11.2018

9 Ajmer Masuda Beawar PMGSY X

New Connectivity

Jaisinghpura to Laxmipura M/S Balaji Const 0/0 3/63 3.63 30.11.2013 29.11.2018

10 Ajmer Masuda Beawar PMGSY X

New Connectivity

Jhak to Lala Rasa ka Badia M/S Balaji Const 0/0 2/43 2.43 30.11.2013 29.11.2018

11 Ajmer Masuda Beawar PMGSY X

New Connectivity

Banola km. 3 to Randmari M/S Balaji Const 0/0 1/23 1.23 30.11.2013 29.11.2018

12 Ajmer Masuda Beawar PMGSY X

New Connectivity

SH-39 km. 11 to Roda Dada ka Badia M/S Balaji Const 0/0 1/95 1.95 30.11.2013 29.11.2018

Page 10: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

13 Ajmer Masuda Beawar PMGSY X

New Connectivity

Tamatar Mandi Nayagaonv to Nahar

Magri M/S Balaji Const 0/0 1/73 1.73 30.11.2013 29.11.2018

14 Ajmer Masuda Beawar Missing LinkRIDF XVIII Padanga to Devariya M/S Shiv Const

Kirap 0/0 3/00 3.00 04/07/2013 04/06/2018

15 Ajmer Masuda Beawar Missing LinkRIDF XVIII Kirap to Kashipura M/S Shiv Const

Kirap 0/0 5/00 5.00 04/07/2013 04/06/2018

16 Ajmer Masuda Beawar TFC 12-13 A/R Chhachundra km. 0/0 to 2/0

M/S Savinder Singh Beawar 0/0 2/0 2.00 07/02/2013 07/01/2018

17 Ajmer Masuda Beawar TFC 12-13Bhinai Bandanwara road to Karanti km.

3/0 to 4/500

M/S Savinder Singh Beawar 0/0 1/50 1.50 07/02/2013 07/01/2018

18 Ajmer Masuda Beawar TFC 12-13Bhinai Singhawal via Gopalpura km. 6/0 to

8/0

M/S Savinder Singh Beawar 0/0 2/0 2.00 07/02/2013 07/01/2018

19 Ajmer Masuda Beawar TFC 12-13 Moti pura to Kalaheri km. 0/0 to 1/500

M/S Savinder Singh Beawar 0/0 1/50 1.50 07/02/2013 07/01/2018

20 Ajmer Masuda Beawar RRSMP A/R to Lalawas M/s Goriraj Const Bijanagar 0/0 2/15 2.15 04/14/2015 04/13/2020

21 Ajmer Masuda Beawar RRSMP A/R to Devgarh M/s Goriraj Const Bijanagar 0/0 1/80 1.80 04/14/2015 04/13/2020

22 Ajmer Masuda Beawar RRSMP Masuda Kharwa road to Bachpadi

M/s Goriraj Const Bijanagar 0/0 0/60 0.60 04/14/2015 04/13/2020

23 Ajmer Masuda Beawar RRSMP Bandanwara to Bagrai M/s Goriraj Const Bijanagar 0/0 2/60 2.60 04/14/2015 04/13/2020

24 Ajmer Masuda Beawar SHW Plan

Satoor Nagour Via Jahajpur Bijainagar Beawar Merta road (SH-39) km. 19/0 to

23/0

M/S H.S Mehta Ajmer 19/0 23/0 4.00 12/27/2012 12/26/2017

Page 11: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

25 Ajmer Masuda Beawar SHW Plan

Satoor Nagour Via Jahajpur Bijainagar Beawar Merta road

(SH-39) km. 45/300 to 46/700

M/S H.S Mehta Ajmer 45/300 46/700 3.70 12/27/2012 12/26/2017

26 Ajmer Masuda Beawar SHW Plan

Satoor Nagour Via Jahajpur Bijainagar Beawar Merta road

(SH-39) km. 46/700 to 47/800

M/S H.S Mehta Ajmer 46/700 47/800 1.10 12/27/2012 12/26/2017

27 Ajmer Masuda Beawar SHW Plan

Satoor Nagour Via Jahajpur Bijainagar Beawar Merta road (SH-39) km. 48/0 to

49/0

M/S H.S Mehta Ajmer 48/00 49/0 1.00 12/27/2012 12/26/2017

28 Ajmer Masuda Beawar SHW Plan

Satoor Nagour Via Jahajpur Bijainagar Beawar Merta road

(SH-39) km. 45/300 to 49/0

M/S H.S Mehta Ajmer 45/300 49/0 3.70 12/27/2012 12/26/2017

29 Ajmer Masuda Beawar TFC 11-12 Darbar colony to Baral road

M/S H.S Mehta Ajmer 0/0 0/500 0.50 20.11.2012 19.11.2017

30 Ajmer Masuda Beawar TFC 11-12 Masuda Lordi Bijainagar road

M/S H.S Mehta Ajmer 0/0 5/0 5.00 20.11.2012 19.11.2017

31 Ajmer Masuda Beawar TFC 11-12 Masuda Lordi Bijainagar road

M/S H.S Mehta Ajmer 5/0 9/0 4.00 20.11.2012 19.11.2017

32 Ajmer Masuda Beawar RIDF - XX Widening of Vijanagar to Kekri Road

M/s Balaji Const. Cop.

0/0. 5/0. 5.00 24.11.15. 24-11-18.

33 Ajmer Masuda Beawar GGP-I NH-79 to Sathana - Doulathpura

M/s Laxman Singh Solanki Pali

0/0. 1/200 1.200 25-6-15. 25-6-18.

34Ajmer

MasudaBeawar GGP-I NH-79 to Lamba Shergarh M/s Laxman Singh

Solanki Pali 11/300 12/500 1.200 25-6-15. 25-6-18.

35 Ajmer Masuda Beawar GGP-I A/R to Devmali to Kelu road

M/s Laxman Singh Solanki Pali

0/0 1/0 1.000 25-6-15. 25-6-18.

Page 12: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

36 Ajmer Masuda Beawar GGP-I A/R Moyana M/s Laxman Singh Solanki Pali

0/0 0/500 0.500 25-6-15. 25-6-18.

37Ajmer

MasudaBeawar GGP-I Masuda - Bhagsuri M/s Laxman Singh

Solanki Pali 7/0 7/800 0.800 25-6-15. 25-6-18.

38 Ajmer Masuda Beawar GGP-I Begliyawas - Jamola - Mohanpura road

M/s Laxman Singh Solanki Pali

5/0 6/500 1.500 25-6-15. 25-6-18.

39 Ajmer Masuda Beawar GGP-I Jaliya to Kaniya road M/s Laxman Singh Solanki Pali

1/0 2/0 1.00 25-6-15. 25-6-18.

40Ajmer

MasudaBeawar Rural Road Strengthining and

Wedining of Masuda Vijanagar Road (ODR-06)

Giriraj Const. Company Vijay Nagar

0/0 22/0 22.00 15-1-15. 14-1-18.

41 Ajmer Masuda Beawar RIDF- XXI Jiwana to Uttani Ram Swaroop Choudhary

0/0. 4/0 4.000 14-7-16. 13-7-19.

42 Ajmer Masuda Beawar RIDF- XXI Devmali - Kelooe road Ram Swaroop Choudhary

0/0. 6/500 6.50 14-7-16. 13-7-19.

43 Ajmer MasudaBhinai Beawar CRF

Widening & Strengthning of

Beawar Goyala Via Masuda Bandanwara (MDR-57) km. 0/0 to

43/0)

M/s SPC Infra Struction Limited

Jaipur6/0 43/00 37.00 12/16/2012 12/15/2017

Total 149.19

1 Ajmer Pisangan Distt Dn Ajmer 13th FC Pisangan - Picholiya -

Pushkar road Km.0/0 to 5/0 M/S Joraram Const 0/0. 5/0. 5.00 01/13/2014 12/01/2017

2 Ajmer Pisangan Distt Dn Ajmer

RIDF 19 Devra to Leedi road Km. 0/0 to 2/0

M/S Nakada Bhaidav 0/0 2/0 2.00 12/15/2014 12/14/2017

3 Ajmer Pisangan Distt Dn Ajmer RIDF - XX

Rehablition of Non patchble road Pisnagan -Mewariya-Karnos Road km 0/0 to 4/0,7/0 to 9/0

11/0 to 13/0

Balaji dayalpura infra pvt. Lmd. 11/0 13/0 2.00 4-8-2015. 3-8-2018.

4 Ajmer Pisangan Distt Dn Ajmer RIDF - XX

Rehablition of Non patchble road Pisnagan -

Richmaliya Road km 3/0 to 8/0

Balaji dayalpura infra pvt. Lmd. 3/0 8/0 5.00 4-8-2015. 3-8-2018.

Page 13: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

5 Ajmer Pisangan Distt Dn Ajmer RIDF - XX

Rehablition of Non patchble road Jethana -

Gola to Samla Road km 0/0 to 4/0

Balaji dayalpura infra pvt. Lmd. 0/0 4/0 4.00 4-8-2015. 3-8-2018.

6 Ajmer Pisangan Distt Dn Ajmer 13th FC

NH-8 to Makereda - Doodiyana road Km. 8/0 to

14/0M/S Ram Swaroop Jat 8/0 14/0 6.00 01/04/2013 03/31/2018

7 Ajmer Pisangan Distt Dn Ajmer TFC

Nasirabad - Mangaliawas - Pisangan Km. 28/500 to

29/0

M/s Ram Swaroop Jaat 28/500 29/0 0.50 01/04/2013 31/03/2018

8 Ajmer Pisangan Distt Dn Ajmer TFC Nasirabad - Mangaliawas -

Pisangan Km. 31/0 to 33/0M/s Ram Swaroop

Jaat 31/0 33/0 2.00 01/04/2013 31/03/2018

9 Ajmer Pisangan Distt Dn Ajmer TFC

Nasirabad - Mangaliawas - Pisangan Km. 42/500 to

43/0

M/s Ram Swaroop Jaat 42/500 43/0 0.50 01/04/2013 31/03/2018

10 Ajmer Pisangan Distt Dn Ajmer

RIDF -18 Dhuwariya to Shivpura road km. 0/0 to 1/800

M/S RR Jajra 0/0 1/800 1.80 04/26/2013 04/24/2018

11 Ajmer Pisangan Distt Dn Ajmer RIDF-21

Nasirabad - Mangaliawas - Pisangan road Km. 56/0 to

59/500 (MDR-39)M/s Siya Ram Jajra 56/0 59/500 3.50 25-7-2016- 24-7-2019.

12 Ajmer Pisangan Distt Dn Ajmer

RIDF-21 Pisangan - Picholiya road Km. 15/0 to 17/0 (ODR-17)

M/s Siya Ram Jajra 15/0 17/0 2.00 25-7-2016- 24-7-2019.

13 Ajmer Pisangan Distt Dn Ajmer RIDF-21

Doomara - Bhawanta road Km. 13/500 to 15/0 (ODR-

24)M/s Siya Ram Jajra 13/500 15/0 1.50 25-7-2016- 24-7-2019.

14 Ajmer Pisangan Distt Dn Ajmer

PMGSY Pagara - Ramsar (Kholiyo ki Dhani)

M/S RR Jajra 0/0. 3/0 3.00 10/20/2014 10/19/2019

15 Ajmer Pisangan Distt Dn Ajmer

PMGSY Bridchiyawas to Tikabadiya S.R. Jajra 0 1/300 1.30 8-9-2015. 7-9-2020.

16 Ajmer Pisangan Distt Dn Ajmer

PMGSY Jethana Gola to Amartpura S.R. Jajra 0 1/250 1.20 8-9-2015. 7-9-2020.

17 Ajmer Pisangan Distt Dn Ajmer

RIDF 18 Khori to Kawlai Gudda Km. 0/0 to 1/0

M/S Bochaliya Const 0/0 1/0. 1.000 07/11/2012 07/10/2017

18 Ajmer Pisangan Distt Dn Ajmer

13th FC Devnagar - Khori road Km. 1/0 to 2/0

M/S Balaji Const 1/0 2/0 1.000 12/06/2012 12/05/2017

19 Ajmer Pisangan Distt Dn Ajmer 13th FC

Doomara - Bhawata - Pisangan road Km. 2/0 to

6/500M/S Balaji Const 2/0 6/500 4.500 12/07/2012 12/06/2017

Page 14: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

20 Ajmer Pisangan Distt Dn Ajmer 13th FC

Doomara - Bhawata - Pisangan road Km. 10/0 to

13/500M/S Balaji Const 10/0 13/500 3.500 12/07/2012 12/06/2017

21 Ajmer Pisangan Distt Dn Ajmer 13th FC

Doomara - Bhawata - Pisangan road Km. 9/0 to

11/0M/S Balaji Const 9/0 11/0 2.000 12/07/2012 12/06/2017

22 Ajmer Pisangan Distt Dn Ajmer RIDF -18

Sawarda to Ajmer via Narena - Marwa -

Roopangarh - Salemabad Km. 43/0 to 49/0

M/S Balaji Const 43/0 49/0 6.000 12/09/2012 12/08/2017

23 Ajmer Pisangan Distt Dn Ajmer

RIDF -18 Picholiya - Sawaipura road km. 0/0 to 1/0

M/S Nakada Bhaidav 0/0 1/0 1.000 12/15/2014 12/14/2017

24 Ajmer Pisangan Distt Dn Ajmer

RIDF-21 Tilora - Kadel - Bassi Km. 0/0 to 5/5

M/s Rajendra Kumar Const.

0/0 5/500 5.50 5-8-2016. 4-8-2019.

25 Ajmer Pisangan Distt Dn Ajmer

PMGSY A/R to Jhooto ki Dhani M/s H.S. Mehta 0/0 1/400 1.400 12/11/2014 11/11/2019

26 Ajmer Pisangan Distt Dn Ajmer

PMGSY Makhupura Rajgarh Km. 7 to Dedula

S.R. Jajra 0/0 1/600 1.600 8-9-2015. 7-9-2020.

Total 68.80

1 Ajmer Sarwar Kekri SHW Sarwar Arain Kishangarh road 7/0 to 11/0 M/S Balaji Const 7 @ 0 11 @0 4.00 07/23/2012 07/22/2017

2 Ajmer Sarwar Kekri RIDF 18 SH-26 to Banti road Km 0/ to 1/500

M/s Ramswaroop Jat Kotri 0 @ 0 1 @500 1.50 04/16/2013 04/15/2018

3 Ajmer Sarwar Kekri RIDF 18 Kekri to Rajpura road Km 0/0 to 2/600

M/s Ramswaroop Jat Kotri 0 @0 2 @600 2.60 04/16/2013 04/15/2018

4 Ajmer Sarwar Kekri RIDF 18 Jaliya to Kheri road Km 0/0 to 5/0

M/s Ramswaroop Jat Kotri 0 @0 5 @0 5.00 04/16/2013 04/15/2018

5 Ajmer Sarwar Kekri RIDF 18 SH-26 to Dorai road Km 0/0 to 1/500

M/s Ramswaroop Jat Kotri 0 @0 1 @500 1.50 04/16/2013 04/15/2018

6 Ajmer Sarwar Kekri RIDF 18 SH-7 to Indrapura road KM 0/0 to 2/0

M/s Ramswaroop Jat Kotri 0 @0 2 @0 2.00 04/16/2013 04/15/2018

7 Ajmer Sarwar Kekri RIDF 18 Manpura to Hingoniya road Km 0/0 to 2/500

M/s Ram ratan Jajra Ajmer 0 @0 2 @500 2.50 04/16/2013 04/15/2018

8 Ajmer Sarwar Kekri RIDF 18 Bhatolav to Sohanpura road Km 0/0 to 2/0

M/s Ram ratan Jajra Ajmer 0 @0 2 @0 2.00 04/16/2013 04/15/2018

Page 15: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

9 Ajmer Sarwar Kekri RIDF 18 Sarwar to Sompura road Km 0/0 to 1/700

M/s Ram ratan Jajra Ajmer 0 @0 1 @700 1.70 04/16/2013 04/15/2018

10 Ajmer Sarwar Kekri RIDF 18 Fatehgarh to Marogla road Km 0/0 to 4/0

M/s Ram ratan Jajra Ajmer 0 @0 4 @0 4.00 04/16/2013 04/15/2018

11 Ajmer Sarwar Kekri RIDF 18 Hingoniya to Sapunda road Km 0/0 to 4/0

M/s Ram Swaroop Jat Kotri 0 @0 4 @0 4.00 03/16/2013 03/15/2018

50 @0 70 @0 20.00

Sarwar 105 @0 109 @0 4.00

Total 54.80

1 Ajmer Shrinagar Distt Dn Ajmer RIDF 19

Ramsar - Morajhari - Samprada road Km. 3/0 to

10/0M/S Nakada Bhaidav 3/0 10/0 7.00 12/15/2014 12/14/2017

2 Ajmer Shrinagar Distt Dn Ajmer

13th FC Deelwari - Aashapura - Dhal Km. 0/0 to 3/0

M/S Nakada Bhaidav 0/0 3/0 3.00 12/15/2014 12/14/2017

3 Ajmer Shrinagar Distt Dn Ajmer RIDF -18 Manpura to Rampura

Arihan Km. 0/0 to 2/0 M/S RR Jajra 0/0 2/0 2.00 04/26/2013 04/25/2018

4 Ajmer Shrinagar Distt Dn Ajmer RIDF -18 Ramsar- Kanpura to

Tilana Km. 0/0 to 2/0 M/S RR Jajra 0/0 2/0 2.00 04/26/2013 04/24/2018

5 Ajmer Shrinagar Distt Dn Ajmer RIDF-21 Ramsar Kanpura road Km.

0/0 to 4/0 M/s Siya Ram Jajra 0/0 4/0 4.00 25-7-2016- 24-7-2019.

6 Ajmer Shrinagar Distt Dn Ajmer PMGSY MDR-6 Km. 12 to Lidi ka

Badiya M/S Balaji Const 0/0. 2/20. 2.20 20.10.2014 19.10.2019

7 Ajmer Shrinagar Distt Dn Ajmer

PMGSY Ramsar - Kanpura to Rambadi

S.R. Jajra 0/0 2/500 2.50 8-9-2015. 7-9-2020.

8 Ajmer Shrinagar Distt Dn Ajmer PMGSY A/R to Jharniya Bada M/S Balaji Const 0/0. 1/20. 1.200 11/04/2012 11/03/2017

9 Ajmer Shrinagar Distt Dn Ajmer

SM&R Sawarda to Ajmer via Roopangarh Km 3/0 to 7/0

M/S Radhakishan 3/0 7/0 5.000 30.08-2014 29.08.2017

04/07/2015 04/07/2018

Beawar Masuda Bandanwara Goyla

Sherarh road (MDR-57) Km 50/0 to 70/0 105/0 to

109/0

M/s Ram Ratan jajra ajmerCRF Kekri12 Ajmer

Page 16: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

10 Ajmer Shrinagar Distt Dn Ajmer RIDF 17 Babaicha - Rodawas road

Km. 0/0 to 3/0 M/S Bochaliya Const 0/0 3/0. 3.000 07/11/2012 07/10/2017

11 Ajmer Shrinagar Distt Dn Ajmer RIDF 18 Gram Chandiyawas to

Gegal Km. 0/0 to 1/50 M/S Bochaliya Const 0/0 1/50. 1.500 07/11/2012 07/10/2017

12 Ajmer Shrinagar Distt Dn Ajmer RIDF 18 Kayampura to Panchpeer

Dargah Km. 0/0 to 2/0 M/S Bochaliya Const 0/0 2/0. 2.000 07/11/2012 07/10/2017

13 Ajmer Shrinagar Distt Dn Ajmer SM&R

Widening & Strengthining of Sawarda (NH-8) to

Ajmer road via Roopangarh - Salemabad - Kucheel - Babaicha road Km. 3/0 to 7/0, 8/500 to

32/0

M/S Radhakishan 3/0 & 8/500

7/0 & 32/0

27.500 08/30/2014 08/29/2017

14 Ajmer Shrinagar Distt Dn Ajmer

PMGSY A/R to Tidana ki Dhani M/S Balaji Const 0/0. 2/500. 2.500 11/04/2012 11/03/2017

15 Ajmer Shrinagar Distt Dn Ajmer

PMGSY A/R to Danta M/S Balaji Const 0/0. 2/50. 2.500 11/04/2012 11/03/2017

16 Ajmer Shrinagar Distt Dn Ajmer 13th FC

Sawarda NH-8 to Ajmer Via Narena - Roopangarh Km 21/0 to 23/0 (0/0 at

Ajmer)

M/S Balaji Const 21/0 23/0 2.000 12/06/2012 12/05/2017

17 Ajmer Shrinagar Distt Dn Ajmer RIDF -18

Sawarda to Ajmer via Narena - Marwa -

Roopangarh - Salemabad Km. 14/0 to 16/0, 19/0 to

21/0 & 23/0 to 25/500

M/S Balaji Const 14/0, 19/0, 23/0

16/0, 21/0, 25/500

6.500 12/09/2012 12/08/2017

18 Ajmer Shrinagar Distt Dn Ajmer RIDF - XX

Rehablition of Non patchble road Goghra-

Ladpura-Shrinagar Road km 0/0 to 18/0

Balaji dayalpura infra pvt. Lmd. 0/0 18/0 18.00 4-8-2015. 3-8-2018.

19 Ajmer Shrinagar Distt Dn Ajmer

RIDF-21 Kishangarh to Ararka Km 8/0 to 12/0

M/s Rajendra Kumar Const.

8/0 12/0 4.00 5-8-2016. 4-8-2019.

Page 17: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

20 Ajmer Shrinagar Distt Dn Ajmer

PMGSY A/R to Badwali Dhani M/S RR Jajra 0/0. 1/0 1.000 20.10.2014 19.10.2019

21 Ajmer Shrinagar Distt Dn Ajmer

PMGSY Bhoodol to Barda ki Dhani M/s H.S. Mehta 0/0 3/600 3.600 20/11/2014 11/11/2019

Total 103.00

1 Ajmer Silora Distt Dn Ajmer SHW

Sarwar - Arain - Kishangarh - Parbatsar

Km. 570/ to 63/0M/S SR MalaKar 57/0 63/0 6.000 06/19/2012 06/18/2017

2 Ajmer Silora Distt Dn Ajmer

PMGSY A/R to Kadampura ki Dhani

M/S Balaji Const 0/0 0/850 0.850 11/04/2012 11/03/2017

3 Ajmer Silora Distt Dn Ajmer

PMGSY Salemabad to Moondawariya ki Dhani

M/S Balaji Const 0/0 3/0. 3.000 11/04/2012 11/03/2017

4 Ajmer Silora Distt Dn Ajmer SHW

Sarwad - Arain - Kishangarh Km. 63/0 to

68/0 M/S Balaji Const 63/0 68/0 5.000 12/09/2012 12/08/2017

5 Ajmer Silora Distt Dn Ajmer RIDF - XX

Rehablition of Non patchble road Kishangarh-Araka Road km 0/0 to 7/0

Balaji dayalpura infra pvt. Lmd. 0/0 7/0 7.00 4-8-2015. 3-8-2018.

6 Ajmer Silora Distt Dn Ajmer RIDF - XX

Rehablition of Non patchble road Patan-

Tilonia-Harmara Road km 0/0 to 8/0

Balaji dayalpura infra pvt. Lmd. 0/0 8/0 8.00 4-8-2015. 3-8-2018.

7 Ajmer Silora Distt Dn Ajmer SHW

Sarwar - Arain - Kishangarh road Km. 70/0

to 71/0M/S Balaji Const 70/0 71/0 1.000 10/13/2013 10/12/2018

8 Ajmer Silora Distt Dn Ajmer misc

CC Pavment in km. 10/0 to 11/0 (Harmada village

Portion) Patan - Tiloniya - Harmada road .

MR Last 10/0 11/0 1.000 10/20/2013 10/19/2018

9 Ajmer Silora Distt Dn Ajmer

RIDF-21 Salemabad to Nonadpura Km. 0/0 to 1/600

M/s Rajendra Kumar Const.

0/0 1/600 1.60 5-8-2016. 04-08-2019.

10 Ajmer Silora Distt Dn Ajmer

PMGSY Moondoti to Khatiko ki Dhani

M/S RR Jajra 0/0. 0/80. 0.800 20.10.2014 19.10.2019

11 Ajmer Silora Distt Dn Ajmer RIDF-21 Salemabad to Roopangarh

via Singla Km. 0/0 to 10/0 M/s Rajendra Kumar

Const. 0/0 10/0 10.00 5-8-2016. 4-8-2019.

12 Ajmer Silora Distt Dn Ajmer

RIDF 18 Sagarmala to Karkeri - Salemabad road

M/S Bochaliya Const 0/0 1/0 1.000 07/11/2012 07/10/2017

Page 18: OFFICE OF THE SUPERITENDING ENGINEER P.W.D ......A/R to Dand ki Dhani Km. 0/0 to 3/0 M/S Balaji Const 0/0 3/0 3.00 09/02/2013 09/01/2018 3 Ajmer Arain Distt Dn Ajmer SHW Sarwar - Arain

From ToDate of

DLP Ending RemarksSchemeDivision Name of AgencyTotal DLP

Length

Chainage under Actual Date of

Completion S.no Name of roadsDistrict Name of Block

13 Ajmer Silora Distt Dn Ajmer SM&R

Widening & Strengthining of Sawarda (NH-8) to

Ajmer road via Roopangarh - Salemabad - Kucheel - Babaicha road

Km. 32/0 to 63/700

M/S Radhakishan 32/0 63/700 21.700 08/30/2014 08/29/2017

14 Ajmer Silora Distt Dn Ajmer

PMGSY Roopangarh to Jhupo ki Dhani road

M/S Balaji Const 0/0 1/40. 1.400 11/04/2012 11/03/2017

15 Ajmer Silora Distt Dn Ajmer

PMGSY A/R to Chhapri ki Dhani M/S Balaji Const 0/0 1/80. 1.800 11/04/2012 11/03/2017

16 Ajmer Silora Distt Dn Ajmer

PMGSY A/R to Kanadiya ki Dhani M/S Balaji Const 0/0 0/600. 0.600 11/04/2012 11/03/2017

17 Ajmer Silora Distt Dn Ajmer

PMGSY Karkeri to Rebariyon ki Dhani

M/S RR Jajra 0/0 5/20. 5.200 11/04/2012 11/03/2017

18 Ajmer Silora Distt Dn Ajmer

PMGSY Roopangarh - Bhadoon - Samali ki Dhani

M/S Balaji Const 0/0 3/50. 3.500 11/04/2012 11/03/2017

19 Ajmer Silora Distt Dn Ajmer PMGSY

Kishangarh - Salemabad - Karkeri road to Nayako ki

Dhani M/S Balaji Const 0/0. 1/30. 1.300 11/04/2012 11/03/2017

20 Ajmer Silora Distt Dn Ajmer RIDF-21 Salemabad to Rodawas

Km. 3/0 to 5/500M/s Rajendra Kumar

Const. 3/0 5/500 2.50 5-8-2016. 4-8-2019.

Total 83.25G. Total 725.96

(Avinash Sharma)Superintending Engineer

P.W.D. Circle Ajmer