Perron Group Office Fit-out 4 Plain Street, East Perth Project Summary Perron Group committed to a programme of services and finishes upgrades and building modifications to their head office workspace, all while their business remained fully operational on the existing site. The scope included the installation of a lift into the existing building fabric, replacement and upgrade of the mechanical units, new lighting, lighting controls, fire detection services and external works to the entry façade, hard landscaping to courtyards and painting. A spectacular new frameless curved glass balustrade was also included in the works. All works were completed after hours. Structural building modifications were required to facilitate a new 25 person boardroom, the new external porte- cochere and open plan workspace on Level 1. Project Details Features 100% live site Structural elements Project Profile Client Perron Group Value 3.56M inc GST Size 1,500m 2 Duration 28 weeks Architect Roxby Architects Consultant Lucid Consulting Contract Fixed Lump Sum Significant services components

Transcript of Office Fit-out - OPRA Projects · 2019-07-25 · roect rofile Perron Group Office Fit-out 4 Plain...

Page 1: Office Fit-out - OPRA Projects · 2019-07-25 · roect rofile Perron Group Office Fit-out 4 Plain Street, East Perth Project Summary Perron Group committed to a programme of services

Project Profile

Perron Group Office Fit-out4 Plain Street, East Perth

Project Summary

Perron Group committed to a programme of services and finishes upgrades and building modifications to their head office workspace, all while their business remained fully operational on the existing site.

The scope included the installation of a lift into the existing building fabric, replacement and upgrade of the mechanical units, new lighting, lighting controls, fire detection services and external works to the entry façade, hard landscaping to courtyards and painting. A spectacular new frameless curved glass balustrade was also included in the works. All works were completed after hours.

Structural building modifications were required to facilitate a new 25 person boardroom, the new external porte-cochere and open plan workspace on Level 1.

Project Details Features

100% live siteStructural elements

Project Profile

ClientPerron Group

Value3.56M inc GST

Size 1,500m2

Duration28 weeks

ArchitectRoxby Architects

Consultant Lucid Consulting

Contract Fixed Lump Sum

Significant services components