OEE

34
Overall Equipment Overall Equipment Effectiveness Effectiveness & Capacity Training & Capacity Training

description

Description and some studies

Transcript of OEE

Page 1: OEE

Overall Equipment EffectivenessOverall Equipment Effectiveness

& Capacity Training & Capacity Training

Page 2: OEE

O.E.E. definition Items which influence O.E.E. Applying O.E.E. - 3 Case Studies O.E.E. ‘Quiz’ Capacity Calculations S/D Group Current System for O.E.E. and

capacity calculation

Class FormatClass Format

Page 3: OEE

Class PurposeClass Purpose

Become familiar with O.E.E. Understand Automotive Industry’s approach to

capacity

Page 4: OEE

What Is Overall Equipment What Is Overall Equipment Effectiveness?Effectiveness?

Overall equipment effectiveness is a measure of the how well lines or equipment are utilized in relation to their full potential.

Page 5: OEE

What factors influence Overall What factors influence Overall Equipment Effectiveness?Equipment Effectiveness?

Overall equipment effectiveness is the product of 3 individual rates :

Operating rate Performance rate Quality rate

Page 6: OEE

Loading Time Refers to the net available time. Is the total time available for operation minus

necessary downtime ( breaks and paid lunches)

Equipment

Loading Time

6 Big Losses

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 7: OEE

Big Loss #1 Delays of 5-10 minutes or more which result from

associate errors, electrical failure or mechanical breakdown.

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 8: OEE

Big Loss #2 Losses during setup and adjustment resulting from

downtime during changeover.

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

2. Set-up and Adjustment

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 9: OEE

Operating Time Refers to the time during which the

equipment is actually in operation.

Dow

ntim

eLo

sses

OperatingTime

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

2. Set-up and Adjustment

Page 10: OEE

Operating Rate The ratio of the Operating Time to the Loading Time

OEE Formulas

Loading Time - Downtime

Loading Time

Dow

ntim

eLo

sses

OperatingTime

2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 11: OEE

Big Loss #3 Equipment delays of short duration (Short stoppages). Usually less than 5-10 minutes. Other unrecorded downtime.

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading Time

Dow

ntim

eLo

sses

OperatingTime

2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 12: OEE

Big Loss #4 Losses due to the difference between expected cycle

time and actual cycle time.

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading Time

Dow

ntim

eLo

sses

OperatingTime

2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

4. Drop in Cycle Time

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 13: OEE

Net Operating Time Refers to the time the equipment is operating at a

stable or constant speed.

NetOperating

Time

Spe

edLo

sses

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading Time

Dow

ntim

eLo

sses

OperatingTime

2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

4. Drop in Cycle Time

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 14: OEE

Performance Rate Ratio of Net Operating Time to Operating Time. Compares time it should have taken vs. the time it did take to

produce the products.

Ideal Cycle Time x Output

Operating Time

NetOperating

Time

Spe

edLo

sses

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading Time

Dow

ntim

eLo

sses

OperatingTime

2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

4. Drop in Cycle Time

PERFORMANCE RATE

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 15: OEE

Big Loss #5 Losses generated from rejected parts

Ideal Cycle Time x Output

Operating Time

NetOperating

Time

Spe

edLo

sses

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading Time

Dow

ntim

eLo

sses

OperatingTime

2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

4. Drop in Cycle Time

PERFORMANCE RATE

5. In-Process Scrap

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 16: OEE

Big Loss #6 Losses from initial start-up to process stabilization

Ideal Cycle Time x Output

Operating Time

NetOperating

Time

Spe

edLo

sses

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading Time

Dow

ntim

eLo

sses

OperatingTime

2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

4. Drop in Cycle Time

PERFORMANCE RATE

6. Start-up Scrap

5. In-process scrap

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 17: OEE

Qua

lity

loss

es

ValuableOper.Time

Valuable Oper. Time Time during which acceptable product is manufactured

Ideal Cycle Time x Output

Operating Time

NetOperating

Time

Spe

edLo

sses

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading TimeD

own

time

Loss

esOperating

Time2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

4. Drop in Cycle Time

PERFORMANCE RATE

6. Start-up Scrap

5. In-process scrap

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 18: OEE

Qua

lity

loss

es

ValuableOperatingTime

Quality Rate Ratio of the number of good products to total produced

Ideal Cycle Time x Output

Operating Time

NetOperating

Time

Spe

edLo

sses

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading TimeD

own

time

Loss

esOperating

Time2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

4. Drop in Cycle Time

PERFORMANCE RATE

6. Start-up Scrap

5. In-process scrapTotal Produced - Scrap

Total Produced

QUALITY RATE

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 19: OEE

Qua

lity

loss

es

ValuableOperatingTime

O.E.E. = Availability X Performance X Quality

Ideal Cycle Time x Output

Operating Time

NetOperating

Time

Spe

edLo

sses

3. Idling and Minor Losses (Unrecorded Downtime)

OEE Formulas

Loading Time - Downtime

Loading TimeD

own

time

Loss

esOperating

Time2. Setup and Adjustment

Loading Time

6 Big LossesEquipment

1. Frequent Breakdowns (Recorded Downtime)

OPERATING RATE

4. Drop in Cycle Time

PERFORMANCE RATE

6. Start-up Scrap

5. In-process scrapTotal Produced - Scrap

Total Produced

QUALITY RATE

O.E.E. in Relationship to the 6 Big LossesO.E.E. in Relationship to the 6 Big Losses

Page 20: OEE

O.E.E. - GoalsO.E.E. - Goals

O.E.E. = Availability X Performance X Quality

World Class O.E.E.

= 90% X 95% X 99% = 85%

Page 21: OEE

O.E.E. Case Study 1

1 2 3

ITEM SCHEDULE MINUTES TYPEStart 7:00Meeting 7:00 - 7:05 5 Planned DowntimeWork 7:05 - 9:00 115Break 1 9:00 - 9:10 10 Break timeWork 9:10 - 11:00 110Lunch 11:00 - 11:30 30 Unpaid lunchWork 11:30 - 1:30 120Break 2 1:30 - 1:40 10 Break timeWork 1:40 - 3:20 100Clean-up 3:20 - 3:30 10 Planned DowntimeEnd 3:30

TOTAL 510

The assembly line above has dedicated equipment andfixturing for making identical parts. It works one 8 hr shift

each day 5 days per week according to this schedule:

A time study was completed for the lineand the following times were observed

and determined to be standard process times for each station:

OPERATION1 2 3

TIME (sec) 68 sec 70 sec 74 sec

Calculate O.E.E. for this line based on the following actual production data from the previous month:

•TOTAL PROD. FOR MONTH (good + scrap) : 6300 pcs•TOTAL DAYS WORKED: 21 days•TOTAL SCRAP 168 pcs•TOTAL DOWNTIME 819 min

~ Planned = 15 min/day meeting + cleanup = 315~Unplanned=504 min total (breakdowns, etc.)

•Background for Case Study 1: Dedicated Assembly Line Example

Page 22: OEE

O.E.E. Case Study 1•Calculation of O.E.E.

DAILY WORK TIME = 7:00-3:30 MINUS .5 HR LUNCH = 8 HOURS OR 480 MINUTES

PLANNED BREAK = TWO 10 MINUTE BREAKS = 20 MIN

WORKSHEET CALCULATION

PLANNED DOWNTIME = (5 MINUTE MEETING + 10 MINUTE CLEANUP) = 15 MIN

UNPLANNED DOWNTIME = (504 TOTAL MONTH / 21 WORKDAYS )= 24 MIN / DAY AVG

WORKSHEET CALCULATION

WORKSHEET CALCULATION

OUTPUT / DAY (GOOD + SCRAP) = (6300 PCS PRODUCED/21 DAYS) =300 PCS / DAY

AVG DAILY SCRAP = (168 PCS SCRAPPED / 21 DAYS)=8 PCS / DAY

STANDARD / IDEAL CYCLE TIME = 74 SEC

WORKSHEET CALCULATION

WORKSHEET CALCULATION

WORKSHEET CALCULATION

WORKSHEET CALCULATION

CAPACITY O.E.E. CALCULATIONS

ASSEMBLY

A DAILY WORK TIME (MIN.) 480

B PLANNED BREAK TIME (MIN.) 20

C LOADING TIME (MIN.) 460

D PLANNED DOWNTIME (MIN.) 15

E UNPLANNED DOWNTIME (MIN.) 24.00

F TOTAL DOWNTIME (MIN.) 39.00

G ACTUAL OPERATING TIME (MIN.) 421.00

H OUTPUT (DAY) ACTUAL PRODUCTION 300.00

J SCRAP 8.00

K STANDARD/IDEAL CYCLE TIME (SEC.) 74

L OPERATING RATE 91.52%

M PERFORMANCE RATE 87.89%

N QUALITY RATE 97.33%

P CAPACITY OVERALL EQUIP. EFFECTIVNESS 78.29%

A-B

D+E

C-F

G/C

(HxK)/(Gx60)

(H-J)/H

LxMxNx100

Page 23: OEE

0

50

100

150

200

250

300

350

400

450

50039 MIN

DOWNTIME

ACTUALOPER.TIME =

421 MIN

STD.TIME TO

MAKE 300

PIECES74”/PC =

370 MIN

STDTIME TO

MAKE 292

GOODPIECES:

360 MIN

51 MINLOST TIME

OPERATINGRATE

421MIN 460 MIN

91.52%

PERFORMANCERATE

370MIN 421 MIN

87.89%

QUALITYRATE

292 PCS 300 PCS

97.33%

10 MINSCRAPTIME

MINUTES 480’ WORK TIME

20’ BREAKS

AVAIL.OPER.TIME

(LOADTIME)=

460 MIN

OVERALL EQUIPMENT

EFFECTIVENES = X X

= X X

X X

O.E.E. Case Study 1: O.E.E. Graph

78.3%=

Page 24: OEE

0

50

100

150

200

250

300

350

400

450

500 39 MINDOWNTIME

ACTUALOPER.TIME =

421 MIN

STD.TIME TO MAKE

300 PIECES74”/PC =

370 MIN

STDTIME TO MAKE

292 GOOD

PIECES:

360 MIN

51 MINLOST TIME

OPERATINGRATE

421MIN 460 MIN

91.52%

PERFORMANCERATE

370MIN 421 MIN

87.89%

QUALITYRATE

292 PCS 300 PCS

97.33%

10 MINSCRAPTIME

MINUTES 480’ WORK TIME 20’

BREAKS

AVAIL.OPER.TIME

(LOADTIME)=

460 MIN

OVERALL EQUIPMENT

EFFECTIVENES = X X

= X X

AVAIL.OPER.TIME

(LOADTIME)=

460 MIN

STDTIME TO

MAKE 292

GOODPIECES:360 MIN

OR: 360 MIN 460 MIN

= 78.3%

X X

O.E.E. Case Study 1: O.E.E. Graph

78.3%=

Page 25: OEE

ITEM SCHEDULE MINUTES TYPEStart 6:00Meeting 6:00 - 6:05 5 Planned DowntimeRun 6:05 - 8:00 115Break 1 8:00 - 8:10 10 Break timeRun 8:10 - 10:00 110Lunch 10:00 - 10:20 20 Break (Paid lunch)Run 10:20 - 12:30 130Break 2 12:30 - 12:40 10 Break timeRun 12:40 - 1:45 65Clean-up 1:45 - 2:00 15 Planned DowntimeEnd 2:00

TOTAL 480

The paint line above is a single line painting 10 different parts. Paint racks are spaced

3 feet apart. Line speed is 5.5 ft/min. Last month the paint line ran as follows:

* Same schedule format for 2nd and 3rd shift

Production Total ScrapPart Good Scrap Pcs/Rack Racks RacksA 7800 410 10 821 41B 16147 329 4 4119 82C 16593 513 6 2851 86D 17343 723 6 3011 121E 17434 632 6 3011 105F 44120 1224 8 5668 153G 2824 212 4 759 53H 5754 178 4 1483 44I 2473 103 4 644 26J 92266 3844 14 6865 275

222754 8168 29232 986

Calculate O.E.E. for this line based on last month’s productiondata shown below:

Production Data

- For common / shared equipment such as this paint line, a combined standard cycle time for the group of parts must be determined:

StandardCycle Time

= (3ft/rack)/(5.5ft/min) = .545 min/rack = 32.7 sec/rack

- Total days worked = 21 days- Total Downtime = 4767 min Planned = (5’meeting + 15’ cleanup)X3shiftX21days=1260’/month Unplanned = 3507 recorded for the month ( Avg =167’/day)

O.E.E. Case Study 2•Background for Case Study 2: Paint Line Example

Page 26: OEE

O.E.E. Case Study 2•Calculation of O.E.E.

DAILY WORK TIME = 3 SHIFTS X 8 HOURS = 24 HOURS = 1440 MINUTES

PLANNED BREAK = (TWO 10 MIN BREAKS + 20 MIN LUNCH) X 3 SHIFT = 120 MIN

WORKSHEET CALCULATION

PLANNED DOWNTIME = (5 MIN MTG + 15 MIN CLEANUP)=20 MIN X 3 SHIFT=60 MIN

UNPLANNED DOWNTIME = AVG 167 MIN / DAY (FROM PRODUCTION REPORT)

WORKSHEET CALCULATION

WORKSHEET CALCULATION

OUTPUT/DAY (GOOD+SCRAP RACKS)=(29232 RACKS/21DAYS)=1392 RACKS/DAY

AVG DAILY SCRAP RACKS=(8168 RACKS SCRAPPED / 21 DAYS)=47 RACKS / DAY

COMBINED STANDARD C.T.= 32.7 SEC/RACK (CALC. ON BACKGROUND SHEET)

WORKSHEET CALCULATION

WORKSHEET CALCULATION

WORKSHEET CALCULATION

WORKSHEET CALCULATION

CAPACITY O.E.E. CALCULATIONS

PAINT

A DAILY WORK TIME (MIN.) 1440

B PLANNED BREAK TIME (MIN.) 120

C LOADING TIME (MIN.) 1320

D PLANNED DOWNTIME (MIN.) 60

E UNPLANNED DOWNTIME (MIN.) 167.00

F TOTAL DOWNTIME (MIN.) 227.00

G ACTUAL OPERATING TIME (MIN.) 1093.00

H OUTPUT (DAY) ACTUAL PRODUCTION (RACKS) 1392.00

J SCRAP (RACKS) 47.00

K STANDARD/IDEAL CYCLE TIME (SEC / RACK) 32.7

L OPERATING RATE 82.80%

M PERFORMANCE RATE 69.41%

N QUALITY RATE 96.62%

P CAPACITY OVERALL EQUIP. EFFECTIVNESS 55.53%

A-B

D+E

C-F

G/C

(HxK)/(Gx60)

(H-J)/H

LxMxNx100

Page 27: OEE

OVERALL EQUIPMENT EFFECTIVENESS = 82.8% X 69.41% X 96.92% = 55.5 %- OR -

(STD TIME TO PAINT 1345 GOOD RACKS)/(LOADING TIME)=(733 MIN/1320 MIN)=55.5%

0

200

400

600

800

1000

1200

1400

1600

TOTALCOMBINEDDOWNTIME= 227 MIN

120’ BREAKS

1320’LOADING

TIME

334 MINLOST TIME 26 MIN

STD TIMEFOR 47SCRAPRACKS

OPERATINGRATE

1093 MIN 1320 MIN

= 82.8%PERFORMANCE

RATE 759 MIN 1093 MIN

= 69.41%QUALITY

RATE 1345 RACKS 1392 RACKS

= 96.62%

O.E.E. Case Study 2: O.E.E. Graph

STANDARDTIME TO

MAKE 1345 GOOD

RACKS =733 MIN

STANDARDTIME TO

PAINT 1392 RACKS759 MIN

ACTUALOPER.TIME

1093 MIN

Page 28: OEE

O.E.E. Case Study 3•Background for Case Study 3: Shared Equipment Example

• PRODUCTION AREA OF ANALYSIS = (2) 750 TON PLASTIC INJECTION MOLDING PRESSES

• LAST MONTH’S PRODUCTION SCHEDULE = 3 SHIFTS, 7 DAYS PER WEEK (STANDARD WORKWEEK)

• OPERATORS ARE RELIEVED FOR BREAKS / LUNCHES (BREAKTIME = 0)

• TOTAL # OF TOOLS WHICH RUN IN EITHER OF THE PRESSES = (9)

• PRODUCTION DATA FROM LAST MONTH IS SHOWN BELOW:

Mold Standard Month Total Pieces Scrap Total StandardPart Number Cavity Cycle (sec) Good + Scrap Pieces Hours*

1 H315 2 40 8520 303 47.32 H282A 2 40 79154 3211 439.73 B165 1 39 377 39 4.14 F398 2 30 8848 362 36.95 84C 1 40 4755 190 52.86 621A 2 30 9212 322 38.47 F407 1 90 3503 112 87.68 F363 1 40 809 33 9.09 F364 2 35 74116 2668 360.3

189294 7240 1076.1

StandardCycle Time

= (Total Standard Hours / Total Pieces)

= ( 1076.1 hrs X 3600 sec/hr) / 189294 pieces = 20.5 sec/pc

- Total days worked = 30 days- Total Planned Downtime = 6240 minutes / 30 days = avg 208 min/day- Total Unplanned Downtime = 9060 minutes / 30 days = avg 302 min/day- For common / shared equipment such as these molding presses with a family of tools, a combined standard cycle time must be determined:

* TOTAL STD HOURS =

((C/A) X B) / 3600

A B C D E

Page 29: OEE

O.E.E. Case Study 3

•Calculation of O.E.E.

DAILY WORK TIME = 2 presses X 3 shifts X 8 hours X 60 min = 2880 minutes

PLANNED BREAK = 0 (All breaks and lunches are relief method)

WORKSHEET CALCULATION

PLANNED DOWNTIME = 6240 min month total / 30 days = avg 208 min /day

UNPLANNED DOWNTIME = 9060 min month total / 30 days = avg 302 min / day

WORKSHEET CALCULATION

WORKSHEET CALCULATION

OUTPUT/DAY (GOOD+SCRAP)=(189294 pcs / 30 days) = avg 6310 pcs / day

AVG DAILY SCRAP = 7240 pcs / 30 days = avg 241 pcs / day

COMBINED STANDARD C.T.= 20.5 SEC/PC (See calculation on background sheet)

WORKSHEET CALCULATION

WORKSHEET CALCULATION

WORKSHEET CALCULATION

WORKSHEET CALCULATION

CAPACITY O.E.E. CALCULATIONS

MOLDING

A DAILY WORK TIME (MIN.) 2880

B PLANNED BREAK TIME (MIN.) 0

C LOADING TIME (MIN.) 2880

D PLANNED DOWNTIME (MIN.) 208

E UNPLANNED DOWNTIME (MIN.) 302

F TOTAL DOWNTIME (MIN.) 510

G ACTUAL OPERATING TIME (MIN.) 2370

H OUTPUT (DAY) ACTUAL PRODUCTION 6310

J SCRAP 241

K STANDARD/IDEAL CYCLE TIME (SEC) 20.5

L OPERATING RATE 82.29%

M PERFORMANCE RATE 90.97%

N QUALITY RATE 96.18%

P CAPACITY OVERALL EQUIP. EFFECTIVNESS 72.00%

A-B

D+E

C-F

G/C

(HxK)/(Gx60)

(H-J)/H

LxMxNx100

Page 30: OEE

0

500

1000

1500

2000

2500

3000

3500

OVERALL EQUIPMENT EFFECTIVENESS = 82.3% X 91.0% X 96.2% = 72.0 %- OR -

(STD TIME TO MOLD 6069 GOOD PIECES)/(LOADING TIME)=(2074 MIN/2880 MIN)=72.0%

2880’ LOADING TIME (Relief Style Breaks)

214 MINLOST TIME

82 MINSTD TIMEFOR 241SCRAPPARTS

OPERATINGRATE

2370 MIN 2880 MIN

= 82.29%PERFORMANCE

RATE 2156 MIN 2370 MIN

= 90.97%QUALITY

RATE 6069 PCS 6310 PCS

= 96.18%

STANDARDTIME TO

MOLD 6069 GOOD

PIECES2074 MIN

STANDARDTIME TO

MOLD 6310 PIECES

2156 MIN

ACTUALOPER.TIME

2370 MIN

TOTALCOMBINEDDOWNTIME= 510 MIN

O.E.E. Case Study 3: O.E.E. Graph

Page 31: OEE

O.E.E. Class Example 1

A DAILY WORK TIME (MIN)

B PLANNED BREAK TIME (MIN/DAY)

C LOADING TIME (MIN/DAY) (A-B)

D PLANNED DOWNTIME (MIN/DAY)

E UNPLANNED DOWNTIME (MIN/DAY)

F TOTAL DOWNTIME (MIN/DAY) (D+E)

G ACTUAL OPERATING TIME (MIN/DAY) (C-F)

H AVG. OUTPUT/DAY (PCS)

J SCRAP (PCS)

K EXPECTED / IDEAL CYCLE TIME (SEC/PC)

L OPERATING RATE (G/C)

M PERFORMANCE RATE (HxK)/(Gx60)

N QUALITY RATE (H-J)/H

P OVERALL EQUIP. EFFECTIVENESS LxMxNx100

Calculations:

Background:• Process: Weld Cell w/ dedicated fixturing• Shifts: 2 ( 8 hours each )• Lunch: Unpaid - Outside of 8 hours (do not include)• Breaks: 2 per shift ( 10 minutes each )• Cycle Time: 27 seconds per piece

• Last Month Total Output: 34221 pcs• Scrap: 934 out of 34221 were scrapped• Days Worked Last Month: 22• Planned Downtime = 10 min / shift ( 5’mtg + 5’ cleanup)• Unplanned Downtime Total for Last Month: 1232 min

Page 32: OEE

O.E.E. Class Example 1: Answer

A DAILY WORK TIME (MIN)

B PLANNED BREAK TIME (MIN/DAY)

C LOADING TIME (MIN/DAY) (A-B)

D PLANNED DOWNTIME (MIN/DAY)

E UNPLANNED DOWNTIME (MIN/DAY)

F TOTAL DOWNTIME (MIN/DAY) (D+E)

G ACTUAL OPERATING TIME (MIN/DAY) (C-F)

H AVG. OUTPUT/DAY (PCS)

J SCRAP (PCS)

K EXPECTED / IDEAL CYCLE TIME (SEC/PC)

L OPERATING RATE (G/C)

M PERFORMANCE RATE (HxK)/(Gx60)

N QUALITY RATE (H-J)/H

P OVERALL EQUIP. EFFECTIVENESS LxMxNx100

• Process: Weld Cell w/ dedicated fixturing• Shifts: 2 ( 8 hours each )• Lunch: Unpaid - Outside of 8 hours (do not include)• Breaks: 2 per shift ( 10 minutes each )• Cycle Time: 27 seconds per piece

Calculations:

2 sh x 8 hr x 60 min = 960 min960

2 x 10 min ea x 2 shift = 40 min40

920

• Last Month Total Output: 34221 pcs• Scrap: 934 out of 34221 were scrapped• Days Worked Last Month: 22• Planned Downtime = 10 min / shift ( 5’mtg + 5’ cleanup)• Unplanned Downtime Total for Last Month: 1232 min

2 sh x 10 min per shift = 20 min20

1232 month / 22 days = 56 min56

76

844

Background:

34221 pcs / 22 days = 1556 pcs / day1556

934 pcs / 22 days = 43 pcs / day43

27

.92

.83

.97

74%

Page 33: OEE

S/D Approach to Capacity

• Expressed as a Percentage of Available Time• Based on actual performance ( Previous Month O.E.E.)• Basic Capacity Formula:

(Standard Hours Required by Demand)O.E.E.

( )Actual Standard Hours Available to Produce

Page 34: OEE

CAPACITY ANALYSISSUPPLIER: EXAMPLE SUPPLIERLINE/EQUIP. TYPE: COMMON/FLEXIBLE ISSUED BY: FRANCIS

EXCLUSIVE/DEDICATED ISSUE DATE: 10/29/98DESCRIPTION:

0

PROCESS/OPERATION: WELD CELL WELD CELL

MONTH: NOV MONTH: MONTH: JANCYCLE DEMAND HOURS DEMAND HOURS DEMAND HOURS

PART NUMBER PART NAME TIME (PCS.) REQ. (PCS.) REQ. (PCS.) REQ.

12345-xxx-a000 WELDED BRACKET 27 27785 208.4 0.0 41000.0 307.5

OTHER CUSTOMERS:

1. GROSS HRS REQUIRED: SUM OF HOURS REQ'D FOR EACH MONTH. 208 3082. OVERALL EQUIPMENT EFFECTIVENESS (LINE P OF C.I.C. FORM: ATTACH). 74% 74%3. NET HOURS REQUIRED = ( 1 / 2 ) 282 4164. STANDARD MONTHLY HOURS AVAILABLE

(# of mach. or lines x shifts / day x (hrs. shift - breaks) x w orkdays / month)

MONTH MACH/LINE SHIFTS/DAY HRS-BRKS DAYS/MON

NOV 1 X 2 X 7.6 X 19 288.8 X X X

JAN 1 X 2 X 7.6 X 20 3045. ACTUAL CAPACITY = ( 3 / 4 ) X 100 98% 137%6. TARGET CAPACITY 100%7. O.E.E. REQUIRED TO MEET TARGET CAPACITY: 72% 101%