MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
LLOYD
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit
Important check point
00
Compressor Fixing
BASE OUT
NUT
GROMMET
COMPRESSOR
Manual &
Pneumatic Gun
Torque meter
01
.
Load the assembly base out on the
pallet as shown in picture A.
Then apply oil on Grommet and
place it on compressor mounting
bolt.Place the compressor on the
compressor mounting bolt carefullyand tighten the compressor with M8
hex nut as shown in picture B.
Check compressor & base out for dent , paint Damage & rust. Check Compressor & grommet part code as per the model. Check compressor mounting torque spec. is 100-150Kgf-cm
Check the N2 Pressure of compressor while removing the the
rubber caps.
ALL ODU
MODELS
A
SHAMS VINOD PANT VISHAWARUP
B
03
03
01
WORK MANUAL
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 2/10
MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit
Important check point
00
Discharge Pipe:
Suction pipe :
Capillary :
Manual
01
01
01
.
Tube FIXING
Insert the capillary pipe intocond out (10~12mm)and
suction pipe into the
accumulator port (14~16mm)
Insert one end of dischargetube into compressor port
(14~16mm) and other end
into cond in (10~12mm)
Manual
Check all the tubings for dent, deep scratchesand bending
LLOYD
A B
WORK MANUALALL ODU
MODELSSHAMS VINOD PANT VISHAWARUP
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 3/10
MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit
Important check point
00
Brazing Rod
Manual
As required
.
Brazing
Adjust the flame to neutral
and heat the joint and apply
Filler material from the
Opposite side of heating
Do brazing of the belowmentioned joints: Accumulator - SuctionCompressor - DischargeDischarge - Condenser InletCondenser Out - Capillary inlet
Manual &
Brazing torch
Manual &
Brazing torch
Check for the inclination of the piping.Check for LPG and Oxygen pressure as per specs before
starting brazing
N2 Purging
Suction Valve
LLOYD
WORK MANUALALL ODU
MODELS
A
B
SHAMS VINOD PANT VISHAWARUP
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 4/10
MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit
Important check point
Manual
.
N2 Leak Test
Fix the coupler at the suction
charging joint and the condenser
charging joint.
Plug the output of the hose pipe
to the coupler and switch ON the
DP machine.
Press the start button until thegreen light in DP machine gets
ON. Do soap bubble test during leak
test After the test is done remove the
hose output and send the
machine to next stage.
Manual &
DP test
machine
Manual &
DP test
machine
Total leak testing time 15sec.Couplers should be fixed properly while testing.The pressure of the nitrogen should reach 400 PSI.
Reject the Air Con if the DP machine indicates fail and alarms.
LLOYD
WORK MANUALALL ODU
MODELSSHAMS VINOD PANT VISHAWARUP
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 5/10
MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit
Important check point
01
ManualA
Manual
.
Vacuumization
Connect the female coupler
of vacuum pump with male
Couplers of the set.
Reset the timer and send the set
for vacuuming
Allow vacuum level as per specs
till green light is on.
At the end of vacuum stageremove the couplers from the
connectors and send the
machine for gas charging
All the couplers should be properly fixed
Coupler should be gently removed aftr achieving vacum level
Vacuum level <0.05 mbar and time of vacuum time 6
mins.
Manual
LLOYD
WORK MANUALALL ODU
MODELSSHAMS VINOD PANT VISHAWARUP
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 6/10
MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit
Important check point
Manual A
Brazing tools
.
Switch the machine ON and Set
the program in the Galileo
machine as per the model and
perform the bomb test
Connect the female coupler of the
Galileo machine with the male
coupler at the charging joint and
Start the program by pressing the
start button on the charging gun
Disconnect the gas charging gun
After gas is charged.
remove the coupler..
Manual &Galileo Gas
charging Machine
Perform the bomb test in every 2 hrs.
Evacuation level should be achieved below 40Pa in 20secs
and Leak Test should not exceed 250 Pa in 05 secs
R22 Gas:
Brazing rod:
As per model
As per required
Gas Charging
LLOYD
WORK MANUALALL ODU
MODELSSHAMS VINOD PANT VISHAWARUP
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 7/10
MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit Important check point
00
Manual & VAW
Meter .
Connect the suction & discharge
couplers with the dummy AndOpen the discharge & suction
valve
Put the supply on and check therated volt., Amps. & Watt.
Run the machine as per specs.
After testing close discharge valvethen close suction valve.
Switch off the dummy and send itTo further operation
LQC
Parameters to be maintained as per model spec.
Check ODU thoroughly for any dent or physical damage.
Maintain Temperature of LQC Chamber as per specs.(28-35)Dg.C.
T>=10ÛC,low pressure 4-6 kgf-cm,high pressure 6-8
kgf-cm
Manual
Manual
LLOYD
WORK MANUALALL ODU
MODELSSHAMS VINOD PANT VISHAWARUP
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 8/10
MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit
Important check point
01
A
.
HLD Leak Test
Check service couplers should be
removed before performing theHLD test
Check setting of the HLDmachine (<1.0gm/annum)
Move probe on all U Bends &
brazed joints(0.5sec/joint) Check leakage in service valves
by keeping probe at 20mm
distance from valve as shown inPic-B
There will be an alarm beep fromthe leakage point.
In case of any leakage send M/Cto repair area with defect slip elsesend to the next stage.
Manual
Manual
Manual &
Inficon 5000
Manual
Manual
No Dead cap on service valves. The sensor probe should be moved through the joints at the
specified speed. In case of doubt on sensitivity, calibrate the probe using auto
calibration. Check the accuracy of the HLD with a coupler <1gm/annum
LLOYD
WORK MANUALALL ODU
MODELS
B
SHAMS VINOD PANT VISHAWARUP
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 9/10
MODEL PROCESS NAME DRAFT CHECK APPROVE
REVISION NO
DIAGRAMS/FIGURES
/ / / / / /
Work instructions Specification/Tools
Input part
Part name/ Part Number Qty /unit
Important check point
00
A
.
FQC Testing &Cover Control fixing
Connect the power cord of theSafety analyzer with the odu unit with
As shown in picture A
Start the analyzer for automatic
operation and check all the
readings displayed on theanalyzer board
AC failure is indicated by a
beep sound in that particular
test.
Screw the cover control after safety
Test completed.
1. High Voltage - 1 KV For 2 sec.2. IR Test - More than 1 M Ohm at 500 VDC
3. Ground Test - Less than 0.1 Ohm
4. Leakage Current Test- Less than3. 5 Milli Amp.
LLOYD
01
01
01
WORK MANUALALL ODU
MODELS
Terminal cover:
Screw:
Caution sticker:
SHAMS VINOD PANT VISHAWARUP
8/9/2019 ODU Work Manual(f)
http://slidepdf.com/reader/full/odu-work-manualf 10/10
CRITICAL CHECK POINT
T>=10ÛC