ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000...

37
MIKE DEWINE, OHIO GOVERNOR | JACK MARCHBANKS, PH.D., ODOT DIRECTOR | GERY NOIROT, P.E., DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM SERVING ASHTABULA, MAHONING, PORTAGE, STARK, SUMMIT AND TRUMBULL COUNTIES

Transcript of ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000...

Page 1: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

MIKE DEWINE, OHIO GOVERNOR | JACK MARCHBANKS, PH.D., ODOT DIRECTOR | GERY NOIROT, P.E., DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

SERVING ASHTABULA, MAHONING, PORTAGE, STARK, SUMMIT AND TRUMBULL COUNTIES

Page 2: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

OVERVIEW 2

Page 3: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

OVERVIEW 3

2019 Construction Program

Total Costs: $584.7 million - Construction Costs: $514.6 million

Thank you for your interest in Ohio Department of Transportation - District 4’s 2019 Construction Program. This publication is intended to

provide a general overview of projects that currently are under construction and those scheduled to be awarded or begin construction in 2019

The 2019 Construction Program is divided into six sections, one representing each county in District 4. Award dates, expected

completion dates, project descriptions, project locations, cost and maintenance of traffic are listed. Total costs include preliminary

engineering, right-of-way and construction. County maps have also been included for your reference.

Please keep this book on hand throughout the upcoming construction season. Information regarding construction projects is continually

changing; therefore, if you have any questions or require additional information, please do not hesitate to contact us or visit the District 4 website at

www.transportation.ohio.gov/dist4 for updates. District 4 utilizes Facebook and Twitter! Please like us on our Ohio Department of Transportation

Akron / Canton District 4 page and follow us on Twitter at ODOT_Akron.

District 4 Public Information Office 330-786-2208 Printed: April 2019

Front cover photo: Newly constructed roundabout on SR 164 and SR 626 in Beaver Township.

Page 4: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

OVERVIEW 4

Page 5: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

ASHTABULA COUNTY 5

Ash

tab

ula

Co

un

ty

Co

nstr

uctio

n C

osts

: A

ctiv

e: $

16

.9 m

illion

U

pco

min

g: $

4.2

millio

n

To

tal: $

21

.1 m

illion

Page 6: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

ASHTABULA COUNTY 6

Ashtabula County Active Projects

State Route 11 Wayne, Colebrook, New Lyme, Cherry Valley, Lenox & Dorset Townships

PID: 96733 PROJECT: 18-346

CONSTRUCTION COST: $2.2 million TOTAL COST: $2.2 million

START DATE: July 2018 COMPLETION DATE: July 2019

PROJECT DESCRIPTION: Painting of the following bridges over SR 11: US 6,

US 322, Cream Ridge Rd., Dodgeville, Rd., Sodam Rd., Mill Rd., Windsor Rd.,

Sentinel Rd., Footville-Richmond Rd. and Allen Comp Rd.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 11.

US Route 20 City of Conneaut

PID: 94077 PROJECT: 18-598

CONSTRUCTION COST: $900,000 TOTAL COST: $1 million

START DATE: May 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Resurfacing of US 20 from just east of SR 7 to the

Pennsylvania state line. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on US 20.

US Route 20 City of Ashtabula; Ashtabula Township

PID: 94073 PROJECT: 18-8003

CONSTRUCTION COST: $4.4 million TOTAL COST: $5 million

START DATE: May 2018 COMPLETION DATE: June 2019

PROJECT DESCRIPTION: Total pavement replacement of US 20 between

Seymour Dr. to just west of Park Ave. and the resurfacing of US 20 from the

eastern Ashtabula Corporation limit to Donahoe Dr. Project also includes minor

bridge repairs. Work completed in 2018 included the pavement replacement along

US 20. Work to be completed in 2019 includes the resurfacing of US 20 from the

eastern Ashtabula Corporation limit to Donahue Dr.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on US 20.

US Route 20 & State Route 84 City of Ashtabula; Saybrook, Ashtabula & Kingsville Townships

PID: 100815 PROJECT: 18-556

CONSTRUCTION COST: $1.9 million TOTAL COST: $1.9 million

START DATE: May 2019 COMPLETION DATE: August 2019

PROJECT DESCRIPTION: Resurfacing of US 20 between Brown Rd. and N.

Bend Rd. and on SR 84 between the eastern Ashtabula Corporation limit to SR

193. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 84. A minimum of one lane of traffic will be

maintained in each direction on US 20.

Page 7: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

ASHTABULA COUNTY 7

Ashtabula County Active Projects Continued

US Route 20 & State Routes 84 & 531 City of Geneva; Village of Geneva on the Lake; Harpersfield Township

PID: 96550 PROJECT: 19-075

CONSTRUCTION COST: $1.9 million TOTAL COST: $1.9 million

START DATE: April 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Resurfacing of US 20 from SR 534 to just east of

Ansel St., SR 84 between Chestnut St. and Walnut St., and SR 531 from just east

of SR 534 to just west of Myers Rd. Project also includes minor bridge repairs and

the replacement of the SR 84 bridge between Walter Main Rd. and LeFevre Rd.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on all routes. SR 84 will be closed for 21 days. A detour

will be posted. Access to all residences and businesses will be maintained at all

times throughout construction.

State Routes 45 & 307 Orwell, Jefferson & Lenox Townships

PID: 100935 PROJECT: 18-599

CONSTRUCTION COST: $900,000 TOTAL COST: $900,000

START DATE: May 2019 COMPLETION DATE: August 2019

PROJECT DESCRIPTION: Microsurfacing of SR 45 between the Trumbull

County line to the southern Orwell Corporation limit. and on SR 307 between the

southern Jefferson Corporation limit to Union Rd. Project also includes

microsurfacing of various routes in Trumbull County.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers.

Interstate 90; State Routes 11 & 45 Various Locations

PID: 101797 PROJECT: 18-468

CONSTRUCTION COST: $2.3 million TOTAL COST: $2.4 million

START DATE: April 2019 COMPLETION DATE: Dec. 2019

PROJECT DESCRIPTION: Painting of 12 bridges including: Van Pelt Rd.,

Plymouth Ridge Rd., Wright Rd., and Middle Rd. over I-90, SR 11 over I-90, Nel

Retcher Rd., S. Denmark Rd., Griggs Rd., Morgan Meaney Rd., Seven Hills Rd.

and Plymouth Ridge Rd. over SR 11, SR 11 over SR 167 and SR 45 over Rock

Creek.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction. SR 45 will be closed for 14 days. A detour will be

posted. Access to all residences and businesses will be maintained at all times

throughout construction.

State Routes 193 & 534 Wayne, Williamsfield, Windsor, Hartsgrove & Trumbull Townships

PID: 100793 PROJECT: 18-483

CONSTRUCTION COST: $1.3 million TOTAL COST: $1.3 million

START DATE: May 2019 COMPLETION DATE: August 2019

PROJECT DESCRIPTION: Chip sealing of SR 193 from the Trumbull County

line to US 322 and on SR 534 from the Trumbull County line to just north of

Footville-Richmond Rd. Project also includes chip sealing on various routes in

Trumbull County.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers.

Page 8: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

ASHTABULA COUNTY 8

Ashtabula County Active Projects Continued

US Route 322 Wayne & Williamsfield Townships

PID: 94108 PROJECT: 19-039

CONSTRUCTION COST: $1.1 million TOTAL COST: $1.1 million

START DATE: May 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Resurfacing of US 322 between SR 193 and SR 7.

Project includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on US 322.

Ashtabula County Upcoming Projects

State Routes 7 & 531 City of Conneaut

PID: 98379

ESTIMATED CONSTRUCTION COST: $600,000

ESTIMATED TOTAL COST: $600,000

AWARD DATE: July 2019 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Resurfacing of SR 7 from US 20 to SR 531 and on SR

531 from Parrish Rd. to SR 7. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on all routes.

State Route 45 & US Route 322 Village of Orwell; Austinburg and Windsor Townships

PID: 104661 PROJECT: 19-4011

CONSTRUCTION COST: $900,000 TOTAL COST: $1 million

START DATE: May 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Replacement of the bridge on US 322 just east of SR

534 and on US 322 just east of SR 45 and minor bridge repairs to the SR 45 bridge

just south of Lampson Rd.

MAINTENANCE OF TRAFFIC: US 322 will close at each bridge for 14 days.

SR 45 will close for five days. These closures will NOT occur at the same time.

All detours will be posted. Access to all residences and businesses will be

maintained at all times throughout construction.

Page 9: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

ASHTABULA COUNTY 9

Ashtabula County Upcoming Projects Continued

State Route 46 & 307 Lenox, Harpersfield & Andover Townships

PID: 106705

ESTIMATED CONSTRUCTION COST: $700,000

ESTIMATED TOTAL COST: $1.1 million

AWARD DATE: April 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Replacement of three culverts on SR 307 between

Van Pelt Rd. and LeFevre Rd., the replacement of a culvert on SR 46 just south of

Footville-Richmond Rd. and the replacement of a culvert in Pymatuning Lake

State park.

MAINTENANCE OF TRAFFIC: SR 46 will be closed for seven days. SR 307

will be closed for 21 days. Pymatuning Lake State Park driveway will be

closed for 14 days. All detours will be posted. Access to all residences and

businesses will be maintained at all times throughout construction.

State Route 86 Windsor Township

PID: 94083

ESTIMATED CONSTRUCTION COST: $900,000

ESTIMATED TOTAL COST: $900,000

AWARD DATE: July 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Resurfacing of SR 86 from the Geauga County line to

SR 534.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 86.

Interstate 90 Geneva Township

PID: 103026

ESTIMATED CONSTRUCTION COST: $600,000

ESTIMATED TOTAL COST: $600,000

AWARD DATE: July 2019 COMPLETION DATE: August 2020

PROJECT DESCRIPTION: Installation of tower lighting at the I-90 and State

Route 534 interchange.

MAINTENANCE OF TRAFFIC: Traffic will be maintained on I-90.

State Route 531 Ashtabula Township

PID: 82819

ESTIMATED CONSTRUCTION COST: $600,000

ESTIMATED TOTAL COST: $600,000

AWARD DATE: July 2019 COMPLETION DATE: October 2019

PROJECT DESCRIPTION: Slide repair on SR 531 at Whitman’s Creek.

MAINTENANCE OF TRAFFIC: SR 531 will be closed for 45 days. A detour will

be posted. Access to all residences and businesses will be maintained at all times

throughout construction.

Page 10: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

MAHONING COUNTY 10

Mahoning County Construction Costs:

Active: $22.3 million Upcoming: $19.3 million

Total: $41.6 million

Page 11: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

MAHONING COUNTY 11

Mahoning County Active Projects

State Route 46 Austintown Township

PID: 103720 PROJECT: 19-220

CONSTRUCTION COST: $700,000 TOTAL COST: $1.2 million

START DATE: May 2019 COMPLETION DATE: Nov. 2019

PROJECT DESCRIPTION: Intersection improvements at SR 46 and Mahoning

Ave., including adding an eastbound right turn lane on Mahoning Ave., and adding

northbound through lane on SR 46. Project also includes curb and signal upgrades

and reduction of speed limit on Mahoning Ave. west of SR 46.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction throughout construction.

Interstate 76 & 80 Jackson and Milton Townships

PID: 104985 PROJECT: 19-135

CONSTRUCTION COST: $300,000 TOTAL COST: $300,000

START DATE: May 2019 COMPLETION DATE: Dec. 2019

PROJECT DESCRIPTION: Replacement of signs along I-76 between SR 534 and

I-80 and on I-80 between I-76/Ohio Turnpike to Lipkey Rd.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on I-76 and I-80 during non-peak travel times.

Interstate 680 & State Route 164 Beaver Township

PID: 80192 PROJECT: 17-587

CONSTRUCTION COST: $11.6 million TOTAL COST: $14.7 million

START DATE: March 2018 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Construct new interchange at I-680 and SR 164.

Project also includes addition of a southbound lane on SR 164 between I-680 and

SR 626, the addition of a southbound left turn lane on SR 164 at the SR 626

southbound junction, conversion of the SR 626 north junction to a single lane

roundabout and the widening and replacement of the SR 164 bridge over I-76/Ohio

Turnpike. Work completed in 2018 included the widening of SR 164 northbound,

completion of the roundabout and earthwork and drainage at the new interchange.

Work to be completed in 2019 includes the completion of the widening of the SR

164 bridge over the Ohio Turnpike, the widening of SR 164 southbound,

completion of the roundabout islands, lighting and landscaping and completion of

the pavement of the new ramps at SR 164 and I-680.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on I-680. A minimum of one lane of traffic will be

maintained by flaggers on SR 164 except for a 3-day period where the road

will be detoured. All detours will be posted. Access to all residences and

businesses will be maintained at all times throughout construction.

Page 12: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

MAHONING COUNTY 12

Mahoning County Active Projects Continued

Interstate 680 City of Youngstown

PID: 96637 PROJECT: 18-203

CONSTRUCTION COST: $9.7 million TOTAL COST: $10.8 million

START DATE: June 2018 COMPLETION DATE: July 2021

PROJECT DESCRIPTION: Repairs to 12 bridges along I-680 between SR 711 to

just south of US 224. Project includes replacement of bridge deck on I-680 bridge

over Cherry Hill Rd., just west of Belle Vista Ave., the removal of the I-680 bridge

over an embankment and miscellaneous repairs to ten other bridges. Project also

includes installation of cable median rail between North Meridian Rd. and Belle

Vista Ave. Work completed in 2018 included the removal of the Renner Brewery

bridge, bridge repairs on the I-680 bridges over Price Rd. and Mahoning Ave. and

the replacement of approach slabs and pavement on I-680 over Oak Hill. Work to

be completed in 2019 includes the reconstruction of the I-680 bridge over Cherry

Hill and the I-680 bridge over the railroad.

MAINTENANCE OF TRAFFIC: Two lanes of traffic will be maintained in each

direction of I-680 via a contraflow traffic pattern. The Bella Vista entrance ramp

I-680 northbound will be closed for 45 days. The ramp from SR 711

southbound to I-680 southbound will be closed for nine months. The ramp

from I-680 southbound to South Ave. will be closed for 14 days. All detours

will be posted. Access to all residences and businesses will be maintained at all

times throughout construction.

Page 13: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

MAHONING COUNTY 13

Mahoning County Upcoming Projects

State Route 45 & Interstate 76 Green, Goshen, Ellsworth & Jackson Townships

PID: 94140

ESTIMATED CONSTRUCTION COST: $4.7 million

ESTIMATED TOTAL COST: $4.8 million

AWARD DATE: October 2019 COMPLETION DATE: Sept. 2020

PROJECT DESCRIPTION: Resurfacing of SR 45 from the Columbiana County

line to Mahoning Ave. Project also includes minor bridge repairs. Project also

includes the addition of cable median rail on portions of I-76 and I-80.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 45.

State Route 46 Weathersfield Township

PID: 102103

ESTIMATED CONSTRUCTION COST: $2.5 million

ESTIMATED TOTAL COST: $3.5 million

AWARD DATE: May 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Re-striping SR 46 between Lou Ida Blvd. and Webb

Rd. for two lanes of traffic. Installation of a northbound thru lane on SR 46

between Webb Rd. and County line Rd. Installation of a southbound left turn lane

at County Line Rd.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 46.

US Route 62 & State Route 630 Green, Boardman & Canfield Townships

PID: 98714

ESTIMATED CONSTRUCTION COST: $3.2 million

ESTIMATED TOTAL COST: $3.3 million

AWARD DATE: June 2019 COMPLETION DATE: Nov. 2019

PROJECT DESCRIPTION: Resurfacing of US 62 from the Columbiana County

line to SR 446 and on SR 630 between SR 170 to the Pennsylvania State line.

Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on US 62 and SR 630 at all times.

State Routes 170 & 616 Poland Township; City of Struthers

PID: 98423

ESTIMATED CONSTRUCTION COST: $1.8 million

ESTIMATED TOTAL COST: $1.9 million

AWARD DATE: July 2019 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Resurfacing of SR 170 from the Northern Poland

Corporation limit to Midlothian Blvd. and on SR 616 from US 224 to SR 289 and

from Highland Ave. to Upland Ave. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers.

Page 14: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

MAHONING COUNTY 14

Mahoning County Upcoming Projects Continued

US Route 224 Ellsworth Township

PID: 106706

ESTIMATED CONSTRUCTION COST: $200,000

ESTIMATED TOTAL COST: $400,000

AWARD DATE: May 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Replacement of a culvert on US 224 just west of

Bailey Rd.

MAINTENANCE OF TRAFFIC: US 224 will be closed for five days. A detour

will be posted. Access to all residences and businesses will be maintained at all

times throughout construction.

US Route 224 Boardman & Canfield Townships

PID: 94132

ESTIMATED CONSTRUCTION COST: $6.9 million

ESTIMATED TOTAL COST: $7.1 million

AWARD DATE: Sept. 2019 COMPLETION DATE: Nov. 2020

PROJECT DESCRIPTION: Resurfacing of US 224 between SR 11 and I-680.

Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction of US 224 during non-peak traffic times.

Page 15: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

PORTAGE COUNTY 15

Po

rta

ge C

ou

nty

C

on

str

uctio

n C

osts

A

ctiv

e: $

11

.4 m

illion

U

pco

min

g: $

3.9

millio

n

To

tal: $

15

.3 m

illion

Page 16: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

PORTAGE COUNTY 16

Portage County Active Projects

State Route 14 Edinburg Township

PID: 101977 PROJECT: 18-366

CONSTRUCTION COST: $1.2 million TOTAL COST: $1.6 million

START DATE: July 2018 COMPLETION DATE: June 2019

PROJECT DESCRIPTION: Intersection improvements at SR 14 and Tallmadge

Rd. Project includes addition of left turn lanes, curb and radius improvements on

the northwest and southeast corners of the intersection and a signal replacement.

Work completed in 2018 included the widening of the northern side of SR 14.

Work to be completed in 2019 includes the widening of the southern side of SR 14

and the placement of the final layer of asphalt.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 14.

State Routes 14, 43 & 303 City of Streetsboro

PID: 99879 PROJECT: 18-616

CONSTRUCTION COST: $3.7 million TOTAL COST: $4.9 million

START DATE: May 2019 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Upgrade signals along various intersection on SR 14,

SR 43 and SR 303 in the City of Streetsboro to improve connectability. Project

also includes the addition of a right turn lane on SR 14 westbound at SR 43 and a

southbound turn lane on Market Square at SR 14.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 14, SR 43 and SR 303.

State Routes 44, 82, 88, 282 & 303 City of Ravenna; Villages of Windham & Mantua; Ravenna & Windham

Townships

PID: 103282 PROJECT: 19-224

CONSTRUCTION COST: $3.7 million TOTAL COST: $4.2 million

START DATE: April 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Resurfacing of SR 44 between Mill St. and SR 82, SR

82 from just east of SR 44 to Vaughn Rd., SR 88 from E. Main St. to east of

Cooley Rd., SR 282 from SR 305 to the Geauga County line and on SR 303

between the western Windham Village limit to the Trumbull County line. Project

includes minor bridge repairs and the replacement of the SR 88 bridge just north of

Peck Rd.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on all routes. SR 88 will be closed for 60 days. A detour

will be posted. Access to all residences and businesses will be maintained at all

times throughout construction.

Interstate 480 & State Route 14 City of Streetsboro; Twinsburg Township

PID: 87283 PROJECT: 18-073

CONSTRUCTION COST: $2.8 million TOTAL COST: $2.9 million

START DATE: April 2018 COMPLETION DATE: July 2019

PROJECT DESCRIPTION: Resurfacing of I-480 between the Summit County line

to SR 14 and on SR 14 just south of I-480. Project also includes minor bridge

repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on I-480 and SR 14.

Page 17: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

PORTAGE COUNTY 17

Portage County Upcoming Projects

State Routes 5 & 44 Rootstown & Ravenna Townships

PID: 100957

ESTIMATED CONSTRUCTION COST: $1.8 million

ESTIMATED TOTAL COST: $1.8 million

AWARD DATE: Oct. 2019 COMPLETION DATE: Oct. 2020

PROJECT DESCRIPTION: Resurfacing of SR 5 from I-76 to SR 59 and on SR 44

from SR 14 to the SR 14 entrance ramp and from Enterprise Parkway to Lake

Rockwell Rd.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 5 and SR 44.

State Route 43 City of Streetsboro

PID: 98378

ESTIMATED CONSTRUCTION COST: $500,000

ESTIMATED TOTAL COST: $500,000

AWARD DATE: Sept. 2019 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Resurfacing of SR 43 from Frost Rd. to the northern

Streetsboro Corporation limit.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 5 and SR 43.

State Route 44 Rootstown Township

PID: 102204

ESTIMATED CONSTRUCTION COST: $400,000

ESTIMATED TOTAL COST: $1.3 million

AWARD DATE: May 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Improvements at the SR 44 and Tallmadge Rd.

intersection. Project includes addition of a southbound right turn lane, restriping to

add more vehicle storage, a signal replacement and access management.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 44 and Tallmadge Rd.

Interstate 76 Palmyra Township

PID: 103201

ESTIMATED CONSTRUCTION COST: $700,000

ESTIMATED TOTAL COST: $900,000

AWARD DATE: June 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Slide repair on I-76 westbound just east of

McClintocksburg Rd.

MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be

maintained on I-76 westbound during peak travel times.

Page 18: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

PORTAGE COUNTY 18

Portage County Upcoming Projects Continued

State Route 700 Freedom Township

PID: 101572

ESTIMATED CONSTRUCTION COST: $500,000

ESTIMATED TOTAL COST: $700,000

AWARD DATE: May 2019 COMPLETION DATE: Dec. 2019

PROJECT DESCRIPTION: Culvert replacement on SR 700 just north of I-

80/Ohio Turnpike. Project also includes culvert replacements in Summit County.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 700.

Page 19: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

STARK COUNTY 19

Stark County Construction Costs:

Active: $38.5 million Upcoming: $73.3 million

Total: $111.8 million

Page 20: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

STARK COUNTY 20

Stark County Active Projects

State Routes 44, 153 & 173 City of Louisville; Nimishillen, Marlboro, Lexington & Washington

Townships

PID: 98392 PROJECT: 18-432

CONSTRUCTION COST: $2.9 million TOTAL COST: $3 million

START DATE: September 2018 COMPLETION DATE: July 2019

PROJECT DESCRIPTION: Resurfacing of SR 44 from just north of US 62 to just

north of St. Peter’s Church Rd., SR 153 from SR 44 to just east of Brookfield St.

and on SR 173 from SR 44 to US 62. Project also includes miscellaneous bridge

repairs. Work completed in 2018 included the resurfacing of SR 44 and SR 153.

Work to be completed in 2019 includes the resurfacing of SR 173 and minor

bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 44, SR 153 and SR 173 during construction.

Interstate 77 & US Route 62 City of Canton; Plain Township

PID: 84654 PROJECT: 19-065

CONSTRUCTION COST: $5.2 million TOTAL COST: $5.3 million

START DATE: April 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Resurfacing of US 62 between Harrison Ave. to just

west of Middlebranch Ave. Project also includes minor bridge repairs and noise

wall installation at I-77 exit ramp to SR 687.

MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be

maintained in each direction during peak travel times on US 62. Various ramp

closures ranging from one night to seven days. All detours will be posted.

Access to all residences and businesses will be maintained at all times throughout

construction.

US Route 62 City of Canton; Plain Township

PID: 96346 PROJECT: 18-271

CONSTRUCTION COST: $5.5 million TOTAL COST: $7.9 million

AWARD DATE: April 2018 COMPLETION DATE: August 2020

PROJECT DESCRIPTION: Re-alignment and reconfiguration of the US 62 and

Middlebranch, Harrisburg and 30th St. intersections. Project includes construction

of a roundabout at Harrisburg and 30th St. intersection and minor widening on US

62. Work completed in 2018 included drainage improvements. Work to be

completed in 2019 includes the construction of the roundabout at Harrisburg Ave.

and 30th St. and drainage improvements along Middlebranch Ave.

MAINTENANCE OF TRAFFIC: US 62 will have various lane restrictions.

Middlebranch will be closed for 7 days. 30th St. will be closed for 270 days.

Harrisburg will be closed for 15 days. All detours will be posted. Access to all

residences and businesses will be maintained at all times throughout construction.

US Route 62 City of Alliance; Lexington & Washington Townships

PID: 94127 PROJECT: 19-129

CONSTRUCTION COST: $900,000 TOTAL COST: $900,000

START DATE: May 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Resurfacing of US 62 from SR 173 to Freshley Ave.

and from Federal Ave. to McKinley Ave. Project also includes sidewalk and

bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on US 62.

Page 21: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

STARK COUNTY 21

Stark County Active Projects Continued

Interstate 77 Jackson Township

PID: 93102 PROJECT: 19-026

CONSTRUCTION COST: $4.8 million TOTAL COST: $4.8 million

START DATE: May 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Resurfacing of I-77 from just south of Shuffel St. to

the Summit County line. Project also includes minor bridge repairs and resurfacing

of I-77 in southern Summit County.

MAINTENANCE OF TRAFFIC: Traffic will be maintained on I-77 during peak

traffic times. Various nightly ramp closures. All detours will be posted. Access

to all residences and businesses will be maintained at all times throughout

construction.

Interstate 77 City of Canton; Plain Township

PID: 100290 PROJECT: 18-111

CONSTRUCTION COST: $3.6 million TOTAL COST: $5 million

START DATE: April 2018 COMPLETION DATE: May 2019

PROJECT DESCRIPTION: Widening and resurfacing of northbound and

southbound ramps at I-77 and SR 687/Fulton Rd./US 62 interchange. Project also

includes median wall construction and various other work to ramps at interchange,

the construction of a cul de sac on Blake Ave. NW and resurfacing of SR 687

between Blake Ave. and the I-77 entrance ramp. Work complete in 2018 included

all widening and ramp work. Work to be completed in 2019 includes placement of

the final course of asphalt and final striping.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction at all times on SR 687/Fulton Ave. Night time ramp

closures will occur. All detours will be posted. Access to all residences and

businesses will be maintained at all times throughout construction.

Interstate 77 & State Route 800 Jackson, Lexington & Nimishillen Townships

PID: 106201 PROJECT: 18-596

CONSTRUCTION COST: $900,000 TOTAL COST: $1 million

START DATE: May 2019 COMPLETION DATE: Nov. 2019

PROJECT DESCRIPTION: Lighting system upgrade at the I-77 and SR 800

interchange.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on I-77 during non-peak travel times.

Interstate 77; State Routes 21 & 619 City of Canton; Villages of Navarre & Wilmot; Bethlehem, Jackson,

Lexington, Marlboro, Plain & Sugar Creek townships

PID: 100939 PROJECT: 19-066

CONSTRUCTION COST: $3.9 million TOTAL COST: $3.9 million

START DATE: May 2019 COMPLETION DATE: August. 2019

PROJECT DESCRIPTION: Microsurfacing of I-77 from US 62 to just south of

Shuffel St., SR 21 from the Tuscarawas County line to Canal St., and on SR 619

from just west of Byers Ave. to Atwater Ave.

MAINTENANCE OF TRAFFIC: Traffic will be maintained on all routes. The

ramp from Everhard Rd. to I-77 southbound will be closed for three nights. A

detour will be posted. Access to all residences and businesses will be maintained at

all times throughout construction.

Page 22: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

STARK COUNTY 22

Stark County Active Projects Continued

Interstate 77 & US Route 30 City of Canton; Bethlehem, Canton & Pike Townships

PID: 104986 PROJECT: 19-170

CONSTRUCTION COST: $200,000 TOTAL COST: $200,000

START DATE: May 2019 COMPLETION DATE: August 2019

PROJECT DESCRIPTION: Replacement of signs on I-77 between the Tuscarawas

County line to US 30 and on US 30 between Belden Ave. and Trump Ave.

MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be

maintained in each direction during peak travel times on I-77 and US 30.

State Route 172 City of Massillon & Tuscarawas Township

PID: 107452 PROJECT: 19-025

CONSTRUCTION COST: $700,000 TOTAL COST: $800,000

START DATE: May 2019 COMPLETION DATE: August 2019

PROJECT DESCRIPTION: Replacement of the SR 172 bridge just east of

Deermont Ave.

MAINTENANCE OF TRAFFIC: SR 172 will be closed for 30 days. Access to all

residences and businesses will be maintained at all times throughout construction.

State Route 619 Lake Township

PID: 93172 PROJECT: 17-043

CONSTRUCTION COST: $10 million TOTAL COST: $13.2 million

START DATE: May 2017 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Widening of SR 619 between Kaufman St. and Milan

Ave. and the addition of turn lanes. Project also includes roundabouts at the SR

619 and King Church Ave. intersection and Kaufman Ave. and SR 619

intersection. Project also includes drainage repairs and new signals. Work

completed in 2018 included the completion of the widening between Misty Ave. to

Market Ave. and the completion of the roundabouts at the SR 619/Kaufman Ave.

and SR 619/King Church Ave. intersections. Work to be complete in 2019 includes

the widening of SR 619 between Market Ave. and Milan Ave.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 619. Market Ave. north of SR 619 will be

closed for 14 days. All detours will be posted. Access to all residences and

businesses will be maintained at all times throughout construction.

Page 23: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

STARK COUNTY 23

Stark County Upcoming Projects

State Route 21 Lawrence Township

PID: 103721

ESTIMATED CONSTRUCTION COST: $2.2 million

ESTIMATED TOTAL COST: $2.4 million

AWARD DATE: June 2019 COMPLETION DATE: June. 2020

PROJECT DESCRIPTION: Installation of a restricted crossing U-turn intersection

to remove the median opening at the SR 21 and Butterbridge Rd. intersection.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 21. Butterbridge Rd. will be closed for 120

days. A detour will be posted. Access to all residences and businesses will be

maintained at all times throughout construction.

US Route 30 Village of Minerva

PID: 103718

ESTIMATED CONSTRUCTION COST: $1.1 million

ESTIMATED TOTAL COST: $1.8 million

AWARD DATE: October 2019 COMPLETION DATE: August 2020

PROJECT DESCRIPTION: Improvements at US 30 and Grant Blvd. including

increasing radius and horizontal curve.

MAINTENANCE OF TRAFFIC: US 30 at Grant Blvd. will be closed for 60

days. A detour will be posted. Access to all residences and businesses will be

maintained at all times throughout construction.

State Route 43 Canton, Osnaburg & Sandy Townships

PID: 98386

ESTIMATED CONSTRUCTION COST: $2.7 million

ESTIMATED TOTAL COST: $2.8 million

AWARD DATE: May 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Resurfacing of SR 43 from the Carroll County line to

just north of Sandy Ave. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of lane of traffic will be maintained

by flaggers on SR 43.

State Routes 43, 172 & 619 City of Canton; Lake Township

PID: 98383

ESTIMATED CONSTRUCTION COST: $2.1 million

ESTIMATED TOTAL COST: $2.1 million

AWARD DATE: October 2019 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Resurfacing of SR 43 between 3rd St. and Market St.

and between SR 619 and the Portage County line, SR 172 from SR 43 to 3rd St. and

on SR 619 between the Summit County line and Kaufman Ave. Project also

includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 43, SR 172 and SR 619.

Page 24: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

STARK COUNTY 24

Stark County Upcoming Projects Continued

Interstate 77 & US Route 30 City of Canton

PID: 90973

ESTIMATED CONSTRUCTION COST: $60.2 million

ESTIMATED TOTAL COST: $66.3 million

AWARD DATE: June 2019 COMPLETION DATE: July 2023

PROJECT DESCRIPTION: Resurfacing on I-77 between SR 800 and US

30. Pavement replacement on I-77 at the US 30 interchange. Project also includes

the rehabilitation of the I-77 bridge over Market St., 15th St., and Cleveland Ave.,

the replacement of the I-77 bridge over the West Branch of the Nimishillin

Creek, and the replacement of the US 30 bridge over the West Branch of the

Nimishillin Creek. Project also includes minor bridge repairs on I-77 at US 30

within the project limits.

MAINTENANCE OF TRAFFIC: A minimum of two lanes of I-77 southbound

will be maintained at all times via a contraflow traffic pattern, A minimum of one

lane of I-77 northbound will be maintained via a contraflow traffic pattern on I-77

and a second northbound lane will be maintained utilizing the US 30 and Cherry

Avenue Interchange as a by-pass. Ramp closures will vary in length from one

weekend to two construction seasons. All detours will be posted. Access to all

residences and businesses will be maintained at all times throughout construction.

US Route 250; State Routes 93 & 212 Villages of Brewster, Beach City & Wilmot; Bethlehem &Sugar Creek

Township

PID: 96671

ESTIMATED CONSTRUCTION COST: $3.5 million

ESTIMATED TOTAL COST: $3.6 million

AWARD DATE: May 2019 COMPLETION DATE: Nov. 2019

PROJECT DESCRIPTION: Resurfacing of US 250 from the Wayne County line to

the Tuscarawas County line, SR 212 from US 250 to the Tuscarawas County line

and on SR 93 between the Tuscarawas County line to Lawndell Rd. and between

Navarre Rd. and Harmon Ave. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on US 250, SR 93 & SR 212.

State Route 800 Canton Township

PID: 102673

ESTIMATED CONSTRUCTION COST: $1.5 million

ESTIMATED TOTAL COST: $1.5 million

AWARD DATE: May 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Widening of SR 800 between 34th St. and the

Southgate Shopping Plaza to create a two way left turn lane and new sidewalks.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 800. Various 14-day side street closures. All

detours will be posted. Access to all residences and businesses will be maintained

at all times throughout construction.

Page 25: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

SUMMIT COUNTY 25

Su

mm

it Co

un

ty

Co

nstr

uctio

n C

osts

: A

ctiv

e: $

258.1

millio

n

Up

co

min

g: $

43.2

millio

n

To

tal: $

30

1.3

millio

n

Page 26: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

SUMMIT COUNTY 26

Summit County Active Projects

Various Routes

PID: 101376 PROJECT: 18-602

CONSTRUCTION COST: $1 million TOTAL COST: $1 million

START DATE: April 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Minor bridge repairs to various structures in Summit

County

MAINTENANCE OF TRAFFIC: Various ramp closures including: Portage

Trail to SR 8 southbound (1 night), SR 8 northbound ramp to Portage Trail (1

night), SR 8 southbound to Broad St. (2 nights), I-76 eastbound to Innovation

Way (4 nights) and I-76 eastbound to Brittain Rd. (4 nights). All detours will

be posted. Access to all businesses will be maintained at all times throughout

construction.

Cleveland Massillon Rd. City of Norton

PID: 97638 PROJECT: 18-591

CONSTRUCTION COST: $8 million TOTAL COST: $10.7 million

START DATE: April 2019 COMPLETION DATE: August 2020

PROJECT DESCRIPTION: Widening of Cleveland Massillon Rd. between

Pleasant Drive and Weber St.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on Cleveland Massillon Rd. Cleveland Massillon

Rd. will close for 14 days just north of Shannon Ave. at the railroad tracks.

Various side street closures. All detours will be posted. Access to all businesses

will be maintained at all times throughout construction.

Howe Ave. City of Cuyahoga Falls

PID: 93819 PROJECT: 19-067

CONSTRUCTION COST: $5.9 million TOTAL COST: $6.5 million

START DATE: April 2019 COMPLETION DATE: Sept. 2020

PROJECT DESCRIPTION: Pavement replacement on Howe Ave. between SR 8

and Bucholzer Blvd. Project also includes drainage, curbs, sidewalks, lighting and

new signage.

MAINTENANCE OF TRAFFIC: Ramps at SR 8 and Howe Ave. between SR 8

and Home Avenue will be closed for 35 days. The eastbound direction of Howe

Ave closed through November 2019. Plaza drive entrances may be closed for up to

7 days. All detours will be posted. Access to all businesses will be maintained at all

times throughout construction.

State Route 8 Cities of Stow and Hudson; Villages of Boston Heights and Silver Lake

PID: 76721 PROJECT: 18-382

CONSTRUCTION COST: $58.6 million TOTAL COST: $63.6 million

START DATE: September 2018 COMPLETION DATE: July 2022

PROJECT DESCRIPTION: Pavement replacement on SR 8 between Graham Rd.

to just north of SR 303, including drainage, signing and lighting. Project includes

the re-decking of the SR 8 bridges over Hudson Drive and Mud Brook and

miscellaneous repairs to nine other bridges.

MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be

maintained in each direction on SR 8 during peak hours. Various ramp closures

at Graham Rd., Steels Corners Rd., Seasons Rd. and SR 303 will occur. All

detours will be posted. Access to all businesses will be maintained at all times

throughout construction.

Page 27: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

SUMMIT COUNTY 27

Summit County Active Projects Continued

State Route 59 City of Akron

PID: 91071 PROJECT: 18-500

CONSTRUCTION COST: $900,000 TOTAL COST: $900,000

START DATE: Spring 2019 COMPLETION DATE: June 2019

PROJECT DESCRIPTION: Repairs to SR 59 bridge over I-76. Project includes

expansion joint repairs, bridge deck patching and sealing and painting.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction of SR 59.

Interstate 76/Main/Broadway City of Akron

PID: 77269 PROJECT: 16-219

CONSTRUCTION COST: $84.2 million TOTAL COST: $97.6 million

START DATE: August 2016 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Reconstruction of the Main/Broadway Interchange

along I-76. Project will remove the interchanges at Wolf Ledges Pkwy. and Grant

St. and reconstruct access points and realign Main/Broadway at I-76. Work

completed in 2018 included the completion of new Main St., the reconstruction of

I-76 eastbound and the construction of the new ramp from I-76 westbound to

Broadway St. Work to be completed in 2019 includes the reconstruction of the I-76

westbound pavement and bridges and the reconstruction of the Broadway

Ave./Thornton St. intersection.

MAINTENANCE OF TRAFFIC: The ramp from SR 8 south to I-77

northbound is closed through fall 2019. The I-76 westbound entrance ramp

from Main St. is closed through fall 2019. Broadway Ave./Thornton St.

intersection and ramp from I-76 westbound to Broadway Ave. will close for 14

days. All detours will be posted. Access to all businesses will be maintained at all

times throughout construction.

Interstate 76 (Design Build) Cities of Norton & Barberton

PID: 93501 PROJECT: 16-3003

CONSTRUCTION COST: $80.4 million TOTAL COST: $87.6 million

START DATE: August 2016 COMPLETION DATE: July 2019

PROJECT DESCRIPTION: Widening of I-76 to three lanes in each direction

between SR 21 and Central Ave. Project also includes pavement replacement on I-

76 between the Medina County line and SR 21 and the re-decking of two bridges

on I-76 over SR 261 in Medina County. Work completed in 2018 included the

complete reconstruction of eastbound I-76 from State St. to the Medina County

line, including the eastbound bridge over SR 261 in Medina County and widening

of the Cleveland-Massillon Rd. bridge over I-76. Work to be completed in 2019

includes the competition of the Cleveland Massillon Rd. bridge over I-76 and the

final placement of asphalt along I-76.

MAINTENANCE OF TRAFFIC: Two lanes of traffic will be maintained in each

direction of I-76 during peak travel times. One lane of traffic will be maintained in

each direction of I-76 during non-peak travel times.

Interstate 77 City of Green

PID: 93102 PROJECT: 19-026

CONSTRUCTION COST: $4.8 million TOTAL COST: $4.9 million

START DATE: May 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Resurfacing of I-77 the Stark County line to SR 241.

Project includes minor bridge repairs and the resurfacing of I-77 in northern Stark

County.

MAINTENANCE OF TRAFFIC: Traffic will be maintained on I-77 during peak

traffic times. Various nightly ramp closures. All detours will be posted. Access

to all residences and businesses will be maintained at all times throughout

construction.

Page 28: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

SUMMIT COUNTY 28

Summit County Active Projects Continued

State Route 91; US Route 224 & Canton Rd. Village of Lakemore; Springfield Township

PID: 89113 PROJECT: 19-130

CONSTRUCTION COST: $8.3 million TOTAL COST: $12.2 million

START DATE: May 2019 COMPLETION DATE: Oct. 2020

PROJECT DESCRIPTION: Intersection improvements at US 224, SR 91 and

Canton Rd. Project includes widening of Canton Rd. to create a dual northbound

left turn lane at US 224, widening of US 224 eastbound to create a dedicated right

turn lane, widening portions of SR 91 and Canton Rd. to create two way left turn

lanes, construction of dedicated U-turns on Canton Rd. at Springfield Lake Dr. and

on SR 91 at Linwood Rd. Project also includes access management improvements.

MAINTENANCE OF TRAFFIC: A single lane in each direction will be

maintained on SR 91, Canton Road, and US 224. Left turns will be restricted at

the SR 91, Canton Road, US 224 intersection for the construction through the

intersection. Left turning vehicles will use the newly constructed median U-

turns both north and south of US 224 to complete the left turn

movements. There will be various side street closures. All detours will be

posted. Access to all businesses will be maintained at all times throughout

construction.

State Route 93 City of Akron

PID: 107337 PROJECT: 18-370

CONSTRUCTION COST: $1.9 million TOTAL COST: $2 million

START DATE: July 2018 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Bridge repairs to the SR 93 bridge just north of SR

764/Wilbeth Rd. Project includes expansion joint repairs, substructure repairs and

bridge painting. Work completed in 2018 included bridge substructure repairs,

bridge deck repairs and approach asphalt replacement. Work to be completed in

2019 includes bridge painting, concrete sealing and drainage repairs.

MAINTENANCE OF TRAFFIC: One lane of traffic will be maintained in each

direction on SR 93. The ramp from SR 93 northbound to Maryland Ave. will

be closed for 14 days. A detour will be posted. Access to all businesses will be

maintained at all times throughout construction.

Page 29: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

SUMMIT COUNTY 29

Summit County Active Projects Continued

State Route 91 City of Twinsburg

PID: 92032 PROJECT: 18-8012

CONSTRUCTION COST: $4.1 million TOTAL COST: $4.4 million

START DATE: September 2018 COMPLETION DATE: October 2019

PROJECT DESCRIPTION: Widening of SR 91 between Glenwood Drive and the

Cuyahoga County line. Project also includes new curbs, drainage, sidewalks,

driveway approaches, lighting and a roundabout at the intersection of SR 91 and

Meadowood Dr. Work completed in 2018 included installation of new storm

sewers on Ethan’s Dr. and widening of a portion of the east side of SR 91. Work to

be completed in 2019 includes the completion of the drainage improvements,

widening and partial roundabout construction at Meadowood / Ethan’s on the west

side of SR 91 and the completion of the widening and roundabout on east side of

SR 91.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction of SR 91. Various side street closures at Ethan

Drive and Meadowood Blvd. will range from 15 to 45 days. All detours will be

posted. Access to all businesses will be maintained at all times throughout

construction.

Summit County Upcoming Projects

State Routes 18, 241 & 261 City of Akron

PID: 98475

ESTIMATED CONSTRUCTION COST: $2.4 million

ESTIMATED TOTAL COST: $2.4 million

AWARD DATE: Sept. 2019 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Resurfacing of SR 18 from I-76 to SR 91, SR 241

from SR 764/Triplett Blvd. to Spencer St. and from Goodyear Headquarters to SR

18/E. Market St. and on SR 261 from Romig Rd. to McTaggart Dr. and Edgewood

St. to Cedar St.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 18, 241 and 261.

State Routes 18 & 261 City of Akron

PID: 96562

ESTIMATED CONSTRUCTION COST: $1 million

ESTIMATED TOTAL COST: $1 million

AWARD DATE: April 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Resurfacing of SR 18 from Hawkins Ave. to Portage

Path and on SR 261 from Market St. to Perkins St. and from Olive St. to SR

261/Tallmadge Ave. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 18 and 261.

Page 30: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

SUMMIT COUNTY 30

Summit County Upcoming Projects Continued

Interstate 77 & State Routes 21 & 176 Village of Richfield

PID: 81632

ESTIMATED CONSTRUCTION COST: $5.2 million

ESTIMATED TOTAL COST: $5.3 million

AWARD DATE: October 2019 COMPLETION DATE: Nov. 2020

PROJECT DESCRIPTION: Resurfacing of I-77 from the Everett Rd. to just south

of I-80/Ohio Turnpike, SR 21 just north of I-77 and SR 176 at the I-77 interchange.

Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be

maintained in each direction on I-77 during peak travel times. A minimum of one

lane of traffic will be maintained in each direction on SR 21 and SR 176. The

ramps from I-77 northbound to Wheatley Rd. and from SR 21 southbound to

I-77 southbound will each be closed for three days. All detours will be posted.

Access to all businesses will be maintained at all times throughout construction.

Interstate 77 Cities of Fairlawn & Twinsburg

PID: 101572

ESTIMATED CONSTRUCTION COST: $500,000

ESTIMATED TOTAL COST: $700,000

AWARD DATE: May 2019 COMPLETION DATE: Dec. 2019

PROJECT DESCRIPTION: Culvert replacement on the ramp from I-77 south to

SR 18 east. Project also includes a culvert replacement on SR 700 in Portage

County.

MAINTENANCE OF TRAFFIC: The ramp from I-77 south to SR 18 east will

be closed for five days. SR 91 will be closed for two weekends. All detours will

be posted. Access to all businesses will be maintained at all times throughout

construction.

Interstate 76 Cities of Akron & Barberton

PID: 96670

ESTIMATED CONSTRUCTION COST: $27.8 million

ESTIMATED TOTAL COST: $36.3 million

AWARD DATE: May 2019 COMPLETION DATE: July 2022

PROJECT DESCRIPTION: Widening of I-76 between Central Ave. and the

Kenmore Leg. Project also includes the reconstruction and reconfiguration of the

East Ave./Wooster Rd./State St. interchange. Project includes the removal of the

bridge over Central Ave. and replacement of I-76 bridge over Wooster Rd. Project

also includes resurfacing on SR 619 from I-76 to E. Hiram St. and from Harding

Ave. to E. Park Ave. and other minor bridge repairs on I-76/Kenmore Leg.

MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be

maintained in each direction during peak travel times. Ramp from I-76 eastbound

to Wooster Rd. and from Wooster Road to I-76 eastbound will be

permanently closed, but not until the new on eastbound on ramp from State

Street is open. I-76 westbound ramp to Wooster Rd. will be closed for 260

days. I-76/Kenmore Leg will be closed for 45 days in each direction. All

detours will be posted. Access to all businesses will be maintained at all times

throughout construction.

Page 31: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

SUMMIT COUNTY 31

Summit County Upcoming Projects Continued

State Route 162 Copley Township

PID: 103171

ESTIMATED CONSTRUCTION COST: $1.3 million

ESTIMATED TOTAL COST: $1.7 million

AWARD DATE: May 2019 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Improvements to the intersection of SR 162 and

Cleveland Massillon Rd. Project includes installation of an eastbound left turn lane

on SR 162 and a southbound right turn lane on Copley Rd.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 162 and Cleveland Massillon Rd. SR 162

westbound will be closed for 14 days. A detour will be posted. Access to all

businesses will be maintained at all times throughout construction.

US Route 224 Springfield Township

PID: 98486

ESTIMATED CONSTRUCTION COST: $1.8 million

ESTIMATED TOTAL COST: $1.8 million

AWARD DATE: December 2019 COMPLETION DATE: July 2020

PROJECT DESCRIPTION: Resurfacing of US 224 from Kelly Ave. to the eastern

Akron Corporation limit and from SR 91 to just west of Neal Rd. Project also

includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on US 224.

Interstate 480 City of Twinsburg

PID: 84657

ESTIMATED CONSTRUCTION COST: $3.2 million

ESTIMATED TOTAL COST: $3.5 million

AWARD DATE: October 2019 COMPLETION DATE: August 2020

PROJECT DESCRIPTION: Installation of noise walls along I-480 westbound

between SR 82 and Chamberlain Rd.

MAINTENANCE OF TRAFFIC: Traffic will be maintained on I-480.

The ramp from SR 82 to I-480 westbound will be closed for 45 days. A detour

will be posted. Access to all businesses will be maintained at all times throughout

construction.

Page 32: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

TRUMBULL COUNTY 32

Tru

mb

ull C

ou

nty

C

on

str

uctio

n C

osts

: A

ctiv

e: $

14

.1 m

illion

U

pco

min

g: $

9.4

millio

n

To

tal: $

23

.5 m

illion

Page 33: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

TRUMBULL COUNTY 33

Trumbull County Active Projects

East Market Street City of Warren; Howland Township

PID: 104740 PROJECT: 19-131

CONSTRUCTION COST: $700,000 TOTAL COST: $800,000

START DATE: May 2019 COMPLETION DATE: Nov. 2019

PROJECT DESCRIPTION: Reconfiguring the SR 82 exit ramp and E. Market St.

intersection to allow left turns off the SR 82 eastbound exit to E. Market St. Project

will also reconfigure eastbound Market St. to consist of a left turn lane and a right

signalized by-pass lane. Also includes re-alignment of westbound Warren Sharon

Rd. and the installation of two traffic signals.

MAINTENANCE OF TRAFFIC: Traffic will be maintained on E. Market St. at all

times during construction. Warren Sharon Rd. at E. Market St. will be closed

for 30 days. All detours will be posted. Access to all residences and businesses

will be maintained at all times throughout construction.

State Routes 5, 87 & 88 Bristol, Farmington, Vernon, Johnston, Kinsman & Mesopotamia

Townships

PID: 100954 PROJECT: 19-132

CONSTRUCTION COST: $1.8 million TOTAL COST: $1.8 million

START DATE: May 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Resurfacing of SR 5 from SR 88 to SR 7, SR 87 from

the Geauga County line to just west of SR 534 and on SR 88 from just east of SR

534 to SR 45. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on all routes.

State Routes 7 & 305 Hartford, Vernon & Kinsman Townships

PID: 94118 PROJECT: 19-027

CONSTRUCTION COST: $1.9 million TOTAL COST: $2 million

START DATE: April 2019 COMPLETION DATE: August 2019

PROJECT DESCRIPTION: Resurfacing of SR 7 from Bradley Brownlee Rd. to

SR 5 and on SR 305 from SR 7 to the Pennsylvania State line. Project also includes

minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on all routes. SR 7 just north of SR 88 will be closed for 3

days. Access to all residences and businesses will be maintained at all times

throughout construction.

State Route 11 Fowler & Johnston Townships

PID: 87292 PROJECT: 19-225

CONSTRUCTION COST: $2.6 million TOTAL COST: $2.6 million

AWARD DATE: April 2019 COMPLETION DATE: August 2019

PROJECT DESCRIPTION: Resurfacing of SR 11 from King Graves Rd. to just

south of SR 5. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained in each direction on SR 11.

Page 34: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

TRUMBULL COUNTY 34

Trumbull County Active Projects Continued

State Routes 45 & 88 Village of West Farmington; Farmington & Bloomfield Townships

PID: 100935 PROJECT: 18-592

CONSTRUCTION COST: $900,000 TOTAL COST: $900,000

START DATE: May 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Microsurfacing of SR 45 from Peck Leach Rd. to SR

87 and on SR 88 between the Geauga County line to just east of SR 534. Project

also includes microsurfacing of various routes in Ashtabula County.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers.

State Route 45 City of Warren; Champion & Warrant Townships

PID: 100817 PROJECT: 18-592

CONSTRUCTION COST: $400,000 TOTAL COST: $400,000

START DATE: May 2019 COMPLETION DATE: July 2019

PROJECT DESCRIPTION: Microsurfacing of SR 45 from the northern Warren

Corporation limit to SR 5 and from Champion Ave. to SR 305.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 45.

US Route 62 Liberty & Hubbard Townships

PID: 87291 PROJECT: 19-103

CONSTRUCTION COST: $300,000 TOTAL COST: $300,000

START DATE: April 2019 COMPLETION DATE: July 2019

PROJECT DESCRIPTION: Placement on thin concrete overlay on US 62 from the

Mahoning County line to the southern Hubbard Corporation limit.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on all routes. US 62.

Interstate 80 Liberty & Hubbard Townships

PID: 100959 PROJECT: 18-548

CONSTRUCTION COST: $1.5 million TOTAL COST: $1.5 million

START DATE: April 2019 COMPLETION DATE: July 2019

PROJECT DESCRIPTION: Resurfacing of I-80 from just east of SR 193 to just

west of US 62/SR 7.

MAINTENANCE OF TRAFFIC: A minimum of two lanes of traffic will be

maintained in each direction of I-80 during peak travel times. A minimum of one

lane of traffic will be maintained in each direction of I-80 during non-peak travel

times.

Page 35: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

TRUMBULL COUNTY 35

Trumbull County Active Projects Continued

State Routes 88 & Chestnut Ridge Rd. Johnston, Vernon and Gustavus Townships

PID: 100793 PROJECT: 18-483

CONSTRUCTION COST: $1.3 million TOTAL COST: $1.3 million

START DATE: May 2019 COMPLETION DATE: August 2019

PROJECT DESCRIPTION: Chip sealing of SR 88 from SR 5 to just west of SR 7

and on Chestnut Ridge Rd. from SR 7 to US 62. Project includes chip sealing of

various routes in Ashtabula County.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers.

State Route 304 Cities of Girard & Hubbard; Liberty & Hubbard Townships

PID: 94116 PROJECT: 19-104

CONSTRUCTION COST: $1.4 million TOTAL COST: $1.4 million

START DATE: April 2019 COMPLETION DATE: Oct. 2019

PROJECT DESCRIPTION: Resurfacing of SR 304 from just west of SR 11 to just

west of US 62. Project also includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 304.

State Route 534 Village of Newton Falls; Newton Township

PID: 93485 PROJECT: 18-566

CONSTRUCTION COST: $1.3 million TOTAL COST: $1.5 million

START DATE: April 2019 COMPLETION DATE: October 2019

PROJECT DESCRIPTION: Bridge deck replacement on the SR 534 bridge over

the Mahoning River between River Rd. and Milton Blvd. Project also includes

resurfacing of SR 534 from just south of the SR 534 bridge over the Mahoning

River to the northern Newton Falls Corporation limit.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 534. SR 534 will be closed for 75 days. A detour

will be posted. Access to all residences and businesses will be maintained at all

times throughout construction.

Page 36: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

ODOT DISTRICT 4 2019 CONSTRUCTION PROGRAM

TRUMBULL COUNTY 36

Trumbull County Upcoming Projects

Bedford Road Brookfield Township

PID: 84727

ESTIMATED CONSTRUCTION COST: $2.2 million

ESTIMATED TOTAL COST: $2.8 million

AWARD DATE: May 2019 COMPLETION DATE: Oct. 2020

PROJECT DESCRIPTION: Widening of Bedford Rd. between US 62 and Stewart

Sharon Rd. Project also includes new drainage and signing.

MAINTENANCE OF TRAFFIC: Eastbound direction of Bedford Rd. will be

closed for a period of 180 days. A detour will be posted. Access to all residences

and businesses will be maintained at all times throughout construction.

State Routes 45, 169, 303 & 304 Cities of Warren & Hubbard; Champion, Bazetta, Braceville & Hubbard

Townships

PID: 98509

ESTIMATED CONSTRUCTION COST: $2.3 million

ESTIMATED TOTAL COST: $2.3 million

AWARD DATE: July 2019 COMPLETION DATE: June 2020

PROJECT DESCRIPTION: Resurfacing of SR 45 from SR 5/82 to Champion

Ave., SR 169 from Rhodes Rd. to US 422, SR 303 from the Portage County line to

SR 534 and on SR 304 from SR 7 to the Pennsylvania state line. Project also

includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on all routes.

State Route 46 Champion Township

PID: 106708

ESTIMATED CONSTRUCTION COST: $100,000

ESTIMATED TOTAL COST: $300,000

AWARD DATE: May 2019 COMPLETION DATE: Nov. 2019

PROJECT DESCRIPTION: Replacement of culvert on SR 46 just south of SR

305.

MAINTENANCE OF TRAFFIC: SR 46 will be closed for 21 days. A detour will

be posted. Access to all residences and businesses will be maintained at all times

throughout construction.

State Route 305 City of Cortland; Southington, Champion, Bazetta, Fowler & Hartford

Townships

PID: 96568

ESTIMATED CONSTRUCTION COST: $4.8 million

ESTIMATED TOTAL COST: $5 million

AWARD DATE: May 2019 COMPLETION DATE: Sept. 2019

PROJECT DESCRIPTION: Resurfacing of SR 305 from SR 534 to SR 7. Project

includes minor bridge repairs.

MAINTENANCE OF TRAFFIC: A minimum of one lane of traffic will be

maintained by flaggers on SR 305.

Page 37: ODOT DISTRICT 4 construction book ver 3.pdfPID: 100935 PROJECT: 18-599 CONSTRUCTION COST: $900,000 TOTAL COST: $900,000 START DATE: May 2019 COMPLETION DATE: August 2019 PROJECT DESCRIPTION:

To provide easy conveyance of people

and goods from place to place, we will:

Take care of what we have;

Make our system work better;

Improve safety;

Enhance capacity

A long-term, reliable, professional and

highly productive organization

O U R M I S S I O N

O U R V I S I O N

For more information, contact the ODOT District 4 Public Information Office at (330) 786-2208.

Like us on Facebook: www.facebook.com/ODOTD4

Follow us on Twitter: www.twitter.com/ODOT_Akron

Statewide Traffic Information: www.Ohgo.com

For general information, call (330) 786-2230 or visit District 4’s Web site at: www.transportation.ohio.gov/dist4