OCTOBER 29, 2014 STUDY SESSION PROPOSED MEASURE AA 5YEAR PROJECT LIST (starting 2015) COMPREHENSIVE (all "Essential", Land Conservation, Public Access/Restoration Projects) SORTED BY PORTFOLIO NUMBER RESTORATION / AGRICULTURE Diverse Public Benefit High Beneficial Impact for Public Use / Recreation High Beneficial Impact for Natural Resources Partnership Opportunity Existing Deadline Within 5 Years Project Underway Quick Implementation (2 years or less) Need for Timely Action (or Loss of Opportunity) Broad Geographic Distribution Immediate Public Safety Concern Existing Legal or Formal Commitment MEASURE AA / VISIONPLAN PORTFOLIO # PROJ # PORTFOLIO TITLE Project Name (Highlighted projects are continuing into or beginning in FY201516.) Total Score Tier 2 and 3 (11 max.) Total Score Tier 1 (3 max.) Brief Project Description Prioritization Criteria Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1) 11 Miramontes Ridge: Gateway to the Coast Public Access, Stream Restoration and Agriculture Enhancement Agricultural Well at Madonna Creek Ranch Design & Implementation Installation of groundwater well at Madonna Creek Ranch to replace agricultural water currently provided through instream impoundment on steelhead fisheries stream. X X X 1 3 12 Miramontes Ridge: Gateway to the Coast Public Access Stream Restoration ACCESS / PATROL Madonna Bridge Replacement Design, Permitting, & Implementation Replace current interior bridge with bridge or culvert crossing. Current bridge is weight limited X 1 0 Access, Stream Restoration and Agriculture Enhancement Implementation and does not allow for emergency vehicle access. 21 Regional: Bayfront Habitat Protection and Public Access Partnerships PUBLIC ACCESS Cooley Landing Interpretative Facilities & Infrastructure Design & Implementation Design and implement interpretative facilities, infrastructure, and signage related to Cooley Landing Park. X X X X X X X 0 10 Page 1 o f 19

Transcript of OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … ·...

Page 1: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

RESTORATION / AGRICULTURE

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

1‐1

Miramontes Ridge: Gateway to the Coast Public Access, Stream Restoration and Agriculture Enhancement

/•   Agricultural Well at Madonna Creek  RanchDesign & Implementation

Installation of groundwater well at Madonna Creek Ranch to replace agricultural water currently provided through in‐stream impoundment on steelhead fisheries stream.

X X X 1 3

1‐2

Miramontes Ridge: Gateway to the Coast Public Access Stream Restoration

ACCESS / PATROL•   Madonna Bridge ReplacementDesign, Permitting, & Implementation

Replace current interior bridge with bridge or culvert crossing.  Current bridge is weight limited  X 1 0

Access, Stream Restoration and Agriculture Enhancement

Implementationand does not allow for emergency vehicle access.

2‐1Regional:Bayfront Habitat Protection and Public Access Partnerships 

PUBLIC ACCESS•   Cooley Landing ‐ Interpretative Facilities & InfrastructureDesign & Implementation              

Design and implement interpretative facilities, infrastructure, and signage related to Cooley Landing Park.

X X X X X X X 0 10

Page 1 o f 19

Page 2: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

PUBLIC ACCESS

2‐2Regional:Bayfront Habitat Protection and Public Access Partnerships 

PUBLIC ACCESS•   Ravenswood Bay TrailDesign, CEQA, Permtting, & Implementation

Complete design, environmental review,  permitting, and implementation of the Bay Trail gap north of Ravenswood OSP.

X X X X X X X 1 8

3‐1

Purisima Creek Redwoods: Purisima‐to‐Sea Trail, Watershed Protection

LAND CONSERVATION•   Lot Line Adjustment / Property Transfer (Guisti ‐ Purisima Uplands) and Protection of Lobitos Creek

Work with property owner to submit lot line adjustment application to San Mateo County.  Prepare preliminary use and management plan for  X X X X X X 1 7

Watershed Protection and Conservation Grazing

Protection of Lobitos Creek Watershed

property transfer to District. Pursue land purchase opportunities in the Lobitos Creek watershed.

3‐2

Purisima Creek Redwoods: Purisima‐to‐Sea Trail, Watershed Protection and Conservation Grazing

RESTORATION•   Site Clean Up and Soil Remediation Post‐Purchase  (Guisti ‐ Purisima uplands) 

Site clean up and soil remediation around existing empty oil tank.

X X X 0 5

Page 2 o f 19

Page 3: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

RESTORATION / AGRICULTURE

3‐3

Purisima Creek Redwoods: Purisima‐to‐Sea Trail, Watershed Protection and Conservation Grazing

RESTORATION / AGRICULTURE•   Grazing PlanAssessment, Scoping, & Implementation•   Water Systems Infrastructure

Improve ranching infrastructure (fences, corrals, stockwater) to provide greater protection of streams and habitat.

X X X 1 3

3‐4

Purisima Creek Redwoods: Purisima‐to‐Sea Trail, Watershed Protection

PUBLIC ACCESS•   Harkins Bridge ReplacementImplementation

Complete construction of new vehicle bridge which connects Purisima Creek Trail to the  X X X X 1 4

Watershed Protection and Conservation Grazing

Harkins Trail to replace failing bridge.

4‐1El Corte de Madera Creek:Bike Trail and Water Quality Projects

LAND CONSERVATION•   Pursue Land Conservation Opportunities Pursue potential land purchase 

opportunites for Bay Area Ridge Trail connection with La Honda Creek Open Space Preserve.

X X X X X 0 6

Page 3 o f 19

Page 4: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

RESTORATION

4‐2El Corte de Madera Creek:Bike Trail and Water Quality Projects

RESTORATION•   Watershed Protection Measures, Final PhaseImplementation

Implement final construction phase of 2004 Watershed Protection Program, including multi‐use trail improvements.

X X X X X X X X 2 9

4‐3El Corte de Madera Creek:Bike Trail and Water Quality 

RESTORATION•   Watershed Protection MeasuresRe‐Assessment & Implementation

Re‐assess watershed conditions and implement Phase 1 meas res (c l ert bridges) to

X X 1 1Projects

Implementation measures (culvert, bridges) to address sedimentation issues.

4‐4El Corte de Madera Creek:Bike Trail and Water Quality Projects

PUBLIC ACCESS•   Oljon TrailPermitting & Implementation Complete Phases III and IV of the 

Oljon Trail, which is part of the overall staging area and trails project.  

X X X X X 0 6

Page 4 o f 19

Page 5: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

LAND CONSERVATION

5‐1

La Honda Creek:Upper Area Recreation, Habitat Restoration and Conservation Grazing Projects 

LAND CONSERVATION•   Pursue Land Conservation Opportunities

Pursue potential land purchase opportunites for Bay Area Ridge Trail connection with El Corte de Madera Creek Open Space Preserve.

X X X X X X 0 7

5‐2

La Honda Creek:Upper Area Recreation, Habitat Restoration and Conservation

RESTORATION•   Grazing InfrastructureAssessment, Scoping, & Implementation• Water Systems Infrastructure

Improve and upgrade ranching infrastructure (fences, corrals, stockwater) to provide greater  X X X X X 2 4

Restoration and Conservation Grazing Projects 

•   Water Systems Infrastructureprotection of streams and habitat.

5‐3

La Honda Creek:Upper Area Recreation, Habitat Restoration and Conservation Grazing Projects 

RESTORATION•   Green House next to Paulin CabinDemolition •   Water Systems Infrastructure

Demolish house on former Paulin Property.  Approved in La Honda Master Plan.

X X 1 2

Page 5 o f 19

Page 6: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

RESTORATION

6‐1

Windy Hill: Trail Improvements, Preservation and Hawthorns Area Historic Partnership

RESTORATION•   Hawthorns Historic ComplexPartner Selection & Site Development

Select tenant and prepare lease, site and implementation plan for Hawthorns Historic Complex.

X X X X X 0 8

7‐1

La Honda Creek:Driscoll Ranch Public Access, Endangered Wildlife Protection

LAND CONSERVATION•   Event Center and Apple Orchard Purchase

Purchase Apple Orchard, Event Center properties and San  X X X X X X X 1 8

Endangered Wildlife Protection and Conservation Grazing

Gregorio riparian easement.  

7‐2

La Honda Creek:Driscoll Ranch Public Access, Endangered Wildlife Protection and Conservation Grazing

RESTORATION•   Fisheries RestorationDesign, Permitting & Implementation

Design, permit and implement priority fisheries restoration projects within San Gregorio Creek watershed on District lands.

X X X X X X X 2 7

Page 6 o f 19

Page 7: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

RESTORATION

7‐3

La Honda Creek:Driscoll Ranch Public Access, Endangered Wildlife Protection and Conservation Grazing

RESTORATION•   Fisheries Enhancement ‐ Apple OrchardScoping, Design, & Implementation

Scope, design, and implement fisheries enhancement project at the Apple Orchard property, which includes a large woody debris fish habitat structure.

X X X X 0 5

7‐4

La Honda Creek:Driscoll Ranch Public Access, Endangered Wildlife Protection

RESTORATION•   Fisheries Enhancement ‐ Event CenterScoping & Design

Scope and design fisheries enhancement project at the E ent Center propert hich

X X X X 0 5Endangered Wildlife Protection and Conservation Grazing

Event Center property, which includes a backwater pool.

7‐5

La Honda Creek:Driscoll Ranch Public Access, Endangered Wildlife Protection and Conservation Grazing

RESTORATION•   Grazing InfrastructureAssessment, Scoping, & Implementation•   Water Systems Infrastructure

Improve and upgrade ranching infrastructure (fences, corrals, stockwater) to provide greater protection of streams and habitat.

X X X X 1 4

Page 7 o f 19

Page 8: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

8

La Honda/Russian Ridge:Preservation of Upper San Gregorio Creek Watershed & Ridge Trail Completion

CURRENTLY NO PROJECTS IN FIRST FIVE YEARS 0 0

9‐1Russian Ridge:Public Recreation, Grazing and 

RESTORATION•   Grazing InfrastructureAssessment, Scoping, & Implementation• Gra ing Lease

Improve and upgrade ranching infrastructure (fences, corrals, stockwater) to provide greater protection of streams and  X X X X X X X 2 8

Wildlife Protection Projects  •   Grazing Lease•   Water Systems Infrastructure

habitat. Release grazing lease RFP and select grazing tenant for Mindego Ranch.

9‐2Russian Ridge:Public Recreation, Grazing and Wildlife Protection Projects  

RESTORATION•  Mindego Public Access and Demo ‐ True Ranch Remediation, Demolition, & RestorationDesign, Permitting & Implementation•   Water Systems Infrastructure

Complete demolition of two structures ("Grandma's House" and  the True House), remediation of an existing corral, and clean up of Giandrea Cabin.

X X X X X 2 5

Page 8 o f 19

Page 9: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

RESTORATIONi i d

9‐3Russian Ridge:Public Recreation, Grazing and Wildlife Protection Projects  

RESTORATION•   Pond Improvements (1‐2 ponds)Design, Permitting, & Implementation

Engineer, permit, and restore aquatic habitats at Mindego Ranch to provide habitat for California red‐legged frog and San Francisco garter snake as well as water supply for livestock operation.

X X X 1 2

9‐4Russian Ridge:Public Recreation, Grazing and 

PUBLIC ACCESS•   Mindego Hill Trail ‐ Open to Public (once grazing infrastructure & True Ranch demo and restoration

Complete and open Mindego Hill Trail to the public once prior commitments to San Mateo County and the Farm Bureau are  X X X X X 0 7

Wildlife Protection Projects  demo and restoration completed)

fulfilled (see True Ranch remediation, demolition, & restoration above).

9‐5Russian Ridge:Public Recreation, Grazing and Wildlife Protection Projects  

PUBLIC ACCESS•   Public Trail Access to Council Circle (once grazing infrastructure & True Ranch demo and restoration completed)Design, Permitting, & Implementation 

Complete public trail access (road and drainage improvements, signage, gates) to the existing POST Council Circle once prior commitments to San Mateo County and the Farm Bureau are fulfilled.

X X X X 1 5

Page 9 o f 19

Page 10: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

PUBLIC ACCESS

10‐1Coal Creek: Reopen Alpine Road for Trail Use

PUBLIC ACCESS•   Alpine Road Trail ‐ Urgent ImprovementsDesign, Permitting, & Implementation

Engineer, permit, and construct urgent road improvements to enhance public access and reduce further erosion and sedimentation downstream.

X X X X X X X X 2 7

10‐2Coal Creek: Reopen Alpine Road for Trail 

LAND CONSERVATION•   Alpine Road & Drainage Improvements ‐ Memorandum of Understanding (MOU) ‐ Coordination with San Mateo

Work with San Mateo County on longer term road and drainage improvements and prepare MOU for management or

X X X X X X 1 5Use

Coordination with San Mateo County

MOU for management or transfer of Alpine Road to District.

11‐1

Rancho San Antonio:Interpretive Improvements, Refurbishing, and Transit Solutions

PUBLIC ACCESS•   New Trails to Connect Quarry Trail to Black Mountain TrailDesign, CEQA, & Implementation

Trail location scouting, design, environmental review, and implementation for two trail connections to Monte Bello from Rancho San Antonio to improve existing trail infrastructure.

X X X X X 2 4

Page 10 o f 19

Page 11: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

12Peninsula/South Bay Cities:Partner to Complete Middle Stevens Creek Trail

CURRENTLY NO PROJECTS IN FIRST FIVE YEARS 0 0

13Cloverdale Ranch: Wildlife Protection, Grazing and  CURRENTLY NO PROJECTS IN FIRST FIVE YEARS 0 0Trail Connections 

14Regional:Trail Connections and Campgrounds

CURRENTLY NO PROJECTS IN FIRST FIVE YEARS 0 0

Page 11 o f 19

Page 12: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

LAND CONSERVATION

15‐1Regional: Redwood Protection and Salmon Fishery Conservation 

LAND CONSERVATION•   Conservation Easement Upper Alpine Ranch Area

Work with partners to purchase conservation easement and support transfer of property as an addition to Pescadero County Park.

X X X X X X X 0 9

15‐2Regional: Redwood Protection and 

LAND CONSERVATION•   Pursue Land Conservation Opportunities with Partner Consultation

Work with private and public open space and park agencies to pursue Redwood and Fishery land conser ation properties

X X X 0 3Salmon Fishery Conservation 

land conservation properties both through fee and easement purchases.

16Long Ridge:Trail, Conservation and Habitat Restoration Projects

CURRENTLY NO PROJECTS IN FIRST FIVE YEARS 0 0

Page 12 o f 19

Page 13: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

 LAND CONSERVATION

17‐1Regional:  Complete Upper Stevens Creek Trail

LAND CONSERVATION•   Upper Stevens Creek Trail ‐ Last Piece ‐ Pursue Land Conservation Opportunities

Pursue land purchase opportunities to connect Stevens Creek County Park to Monte Bello and Saratoga Gap Open Space Preserves.  

X X X X X X X X 1 10

17‐2Regional:  Complete Upper Stevens Creek 

 RESTORATION•   Lobner Demolition & RestorationImplementation• Water Systems Infrastructure

Complete removal of structures and restoration of site along the  X X X X X X 2 6

Trail•   Water Systems Infrastructure 

Canyon trail and Stevens creek.

17‐3Regional:  Complete Upper Stevens Creek Trail

 PUBLIC ACCESS•   Completion of Upper Stevens Creek Trail ‐ Coordination with Partners

Phase 1:  Work with partners to identify trail connector alignment from Stevens Creek County Park to Monte Bello OSP.

X X X X X X 2 4

Page 13 o f 19

Page 14: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

 PUBLIC ACCESS

Replace a deteriorating bridge l d b k

17‐4Regional:  Complete Upper Stevens Creek Trail

PUBLIC ACCESS•   Stevens Creek Nature Trail ‐ Existing Bridge ReplacementScoping, CEQA, Design, & Implementation•   Stevens Creek Nature Trail ‐ New BridgeScoping & CEQA

located between Stevens Creek bridge crossing and the Canyon Trail.  Also scope and conduct environmental review for a new bridge on the Stevens Creek Nature Trail to replace a ford crossing that can be impassable during winter.

X X X 1 3

18South Bay Foothills: Saratoga‐to‐Sea Trail and  CURRENTLY NO PROJECTS IN FIRST FIVE YEARS 0 0Wildlife Corridor

19‐1El Sereno:Dog Trails and Connections

PUBLIC ACCESS•   Dog AccessScoping & Implementation

Pursue a Use and Management Plan update & amendment to potentially include dog use.

X X X 0 4

Page 14 o f 19

Page 15: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

RESTORATION

20‐1South Bay Foothills: Wildlife Passage and Ridge Trail Improvements

RESTORATION•   HWY 17 Wildlife Crossing CulvertScoping, Design, CEQA, & Permitting

Work with partners to develop and engineer wildlife crossing improvements at HWY 17.

X X X X X 0 7

20‐2South Bay Foothills: Wildlife Passage and Ridge 

PUBLIC ACCESS•   HWY 17 Bay Area Ridge Trail CrossingScoping, Design, Permitting & Implementation

In conjunction with the wildlife crossing, explore public access  X X X X X X 0 8

Trail ImprovementsImplementation

across Highway 17.

21‐1Bear Creek Redwoods: Public Recreation  and Interpretive Projects

LAND CONSERVATION•   Moody Gulch ‐ Land Conservation, Gate and Fence Improvements 

Finalize agreements with County and neighboring communities to complete transfer of Moody Gulch property with County reservation of conservation easement.  Install gate and fencing along right‐of‐way.

X X X X X 1 6

Page 15 o f 19

Page 16: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

PUBLIC ACCESS

21‐2Bear Creek Redwoods: Public Recreation  and Interpretive Projects

PUBLIC ACCESS•   Preserve PlanDevelopment & CEQA•   Ponds Assessment

Complete Preserve Plan and environmental review.  Conduct pond inundation study as part of environmental review.

X X X X X X X 0 9

21‐3Bear Creek Redwoods: Public Recreation  and 

PUBLIC ACCESS•   Water Infrastructure Improvements for Existing UsesEvaluation & Implementation

Evaluate long term water needs and implement improvements  X X X 0 5

Interpretive Projects for Bear Creek Stables operation.

21‐4Bear Creek Redwoods: Public Recreation  and Interpretive Projects

PUBLIC ACCESS•   Bear Creek Stables Site Plan (PHASE I)Development

Prepare Bear Creek Stables site plan including general public trail uses and horse riding opportunities.  

X X X X 0 6

Page 16 o f 19

Page 17: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

RESTORATION

22‐1Sierra Azul: Cathedral Oaks Public Access and Conservation Projects

RESTORATION•   Hendrys Creek RestorationDesign & Implementation

Complete environmental review of stream channel restoration.  Permit and implement.

X X X X X 1 6

23‐1Sierra Azul:Mt. Umunhum Public Access 

 LAND CONSERVATION•   Mt Um Road and Trail Property Rights

Pursue land purchase opportunities and negotiations on Mt Umunhum Road (to impro e p blic access and trail

X X X X X X X X X 3 9and Interpretation Projects

improve public access and trail connections to Cathedral Oaks Area of Sierra Azul).

23‐2Sierra Azul:Mt. Umunhum Public Access and Interpretation Projects

PUBLIC ACCESS•   Mt Um TrailImplementation

Complete Mt. Umunhum Trail. X X X X X X X X 2 8

Page 17 o f 19

Page 18: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

RESTORATION

23‐3Sierra Azul:Mt. Umunhum Public Access and Interpretation Projects

RESTORATION•   Radar Tower RepairImplementation

Implement stabilization measures to radar tower in preparation for public access.

X X X X X X X 3 6

23‐4Sierra Azul:Mt. Umunhum Public Access 

PUBLIC ACCESS•   Summit Restoration, Parking, & Landing Zone (PHASE 1)Design, Permitting & Implementation

Complete restoration of summit area, new parking areas, and isitor amenities to allo p blic

X X X X X X X X 2 7and Interpretation Projects

Implementation visitor amenities to allow public access.

23‐5Sierra Azul:Mt. Umunhum Public Access and Interpretation Projects

PUBLIC ACCESS•   Mt. Um Guadalupe Creek Overlook and BridgesPlanning & Design

Engineer, design, and permit destination overlook platform and two trail bridges over Guadalupe Creek as part of the Mt. Umunhum Trail. 

X X X X X X X X 2 8

Page 18 o f 19

Page 19: OCTOBER 29, 2014 PROPOSED MEASURE AA 5 YEAR PROJECT LIST 2015) COMPREHENSIVE BY PORTFOLIO … · PORTFOLIO # ‐ PROJ # PORTFOLIO TITLE Project Name (Highlighted projectsare continuinginto

OCTOBER 29, 2014STUDY SESSION 

PROPOSED MEASURE AA 5‐YEAR PROJECT LIST (starting 2015) ‐ COMPREHENSIVE(all "Essential", Land Conservation, Public Access/Restoration Projects)

SORTED BY PORTFOLIO NUMBER

Diverse Pu

blic Ben

efit

High

 Ben

eficial Impact fo

r Pu

blic Use / Re

creatio

n

High

 Ben

eficial Impact fo

r Natural Resou

rces

Partne

rship Opp

ortunity

Existing De

adline With

in 5 

Years

Project U

nderway

Quick Im

plem

entatio

n (2

 years or less)

Need for T

imely Actio

n (or 

Loss of O

pportunity)

Broad Geo

graphic  

Distrib

ution

Immed

iate Pub

lic Safety 

Concern 

Existing Legal or F

ormal 

Commitm

ent

MEA

SURE

 AA / VISION PLA

PORT

FOLIO # ‐ PR

OJ #

PORTFOLIO TITLE 

Project Name

(Highlighted projects are continuing into or beginning in 

FY2015‐16.)

Total Score ‐ Tier 2 and

 3 

(11 max.)

Total Score ‐ Tier 1  

(3 m

ax.)

Brief Project Description

Prioritization Criteria

Tier 1 (Essential) Tier 2 (value = 2) Tier 3 (value = 1)

PUBLIC ACCESS

23‐6Sierra Azul:Mt. Umunhum Public Access and Interpretation Projects

PUBLIC ACCESS•   Mount Umunhum RoadDesign, Permitting & Implementation

Engineer, permit, and complete improvements and safety upgrades to Mt. Umunhum Road once access issues are resolved.

X X X X X 0 6

24‐1Sierra Azul: Rancho de Guadalupe Family 

LAND CONSERVATION•   Pursue Land Conservation Opportunities

Pursue potential land purchase opport nites at Preser e

X X X 0 4Recreation

opportunites at Preserve.

25‐1

Sierra Azul:Loma Prieta Area Public Access, Regional Trails and Habitat Projects

LAND CONSERVATION•   Pursue Land Conservation Opportunities Pursue land purchase 

opportunities to provide connection to Loma Prieta and Forest Nisene Marks.

X X X 0 4

Total number of projects 51 Total number of "Essential" projects 31